Planned Construction and Special Events All Planned Construction and Special Events en-us Mon, 15 Dec 2025 03:36:23 -0500 Copyright 511nj.org 1 Meadowbrook State Parkway southbound : roadwork NYSDOT - Region 10: roadwork on Meadowbrook State Parkway southbound at Exit M9E - Merrick Road (Hempstead), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed Mon, 15 Dec 2025 02:59:36 -0500 40.6512702358579 -73.5663530066404 Wantagh State Parkway southbound : drainage improvements NYSDOT - Region 10: drainage improvements on Wantagh State Parkway southbound area of START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 3 lanes closed Mon, 15 Dec 2025 02:50:18 -0500 40.5970778274846 -73.5083290754755 NY 454 eastbound : roadwork NYSDOT - Region 10: roadwork on NY 454 eastbound at Harned Road (Smithtown), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed Mon, 15 Dec 2025 02:42:57 -0500 40.8388351342812 -73.2791857831607 NY 25A eastbound : roadwork NYSDOT - Region 10: roadwork on NY 25A eastbound at Wolver Hollow Road; Brookville Road (Oyster Bay), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed Mon, 15 Dec 2025 02:34:31 -0500 40.829905087945 -73.5714063035896 I-495 both directions : roadwork NYSDOT - Region 10: roadwork on I-495 both directions at Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed Mon, 15 Dec 2025 02:32:06 -0500 40.8047398163337 -73.2807004297288 Loop Parkway northbound : roadwork NYSDOT - Region 10: roadwork on Loop Parkway northbound between START ROUTE Loop Parkway at Lido Boulevard (Hempstead) and Meadowbrook State Parkway (Hempstead), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed Mon, 15 Dec 2025 02:29:47 -0500 40.5921004670347 -73.5870042628198 Sagtikos State Parkway both directions : roadwork NYSDOT - Region 10: roadwork on Sagtikos State Parkway both directions at Exit S1W - Long Island Expressway (Smithtown), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed Mon, 15 Dec 2025 02:28:02 -0500 40.8055865407872 -73.2811230254421 NY 27A both directions : roadwork NYSDOT - Region 10: roadwork on NY 27A both directions between Riverside Avenue (Amityville) and Grand Central Avenue (Amityville), Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 11:59 PM 1 Center lane of 3 lanes closed Mon, 15 Dec 2025 02:25:54 -0500 40.6700055660767 -73.4130094812685 NY 454 eastbound : overnight roadwork NYSDOT - Region 10: overnight roadwork on NY 454 eastbound between Jericho Turnpike; NY 25; START ROUTE NY 454 (Smithtown) and Sun Vet Mall (Islip), Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 10:00 PM thru 05:30 AM 1 Right lane of 2 lanes closed Mon, 15 Dec 2025 02:23:48 -0500 40.8423332057992 -73.2903596173976 NY 135 both directions : overnight roadwork NYSDOT - Region 10: overnight roadwork on NY 135 both directions between Exit 1 - Merrick Road (Hempstead) and Exit 14E - NY 25; Jericho Turnpike (Oyster Bay), Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 10:00 PM thru 05:30 AM 1 Left lane of 3 lanes closed Mon, 15 Dec 2025 02:16:54 -0500 40.6666964768683 -73.4926932740213 Wantagh State Parkway both directions : roadwork NYSDOT - Region 10: roadwork on Wantagh State Parkway both directions between START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead) and Exit W6 - Merrick Road (Hempstead), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed Mon, 15 Dec 2025 02:12:11 -0500 40.596869 -73.5077375 NY 27 eastbound : roadwork NYSDOT - Region 10: roadwork on NY 27 eastbound between Exit 65 - Hamptons Bay Road; NY 24 (Southampton) and Exit 66 - North Shore Highway; CR 39; North Shore Road (Southampton), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed Mon, 15 Dec 2025 02:05:21 -0500 40.8795724137931 -72.5366889655172 I-495 eastbound : roadwork NYSDOT - Region 10: roadwork on Long Island Expressway/I-495 HOV Lane eastbound between Exit 49S - NY 110 (Huntington) and I-495 at Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed Mon, 15 Dec 2025 01:58:55 -0500 40.7825497653277 -73.4338661843418 NY 347 eastbound : roadwork NYSDOT - Region 10: roadwork on NY 347 eastbound area of Nicolls Road; CR 97 (Brookhaven), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed Mon, 15 Dec 2025 01:53:34 -0500 40.8829025 -73.106714 NY 27 westbound : roadwork NYSDOT - Region 10: roadwork on NY 27 westbound area of Exit 52A - North Ocean Avenue (Brookhaven), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed Mon, 15 Dec 2025 01:49:43 -0500 40.7793142334375 -73.0139206716475 NY 27 eastbound : roadwork NYSDOT - Region 10: roadwork on NY 27 eastbound area of Henry Street (Hempstead), Monday December 15th, 2025 thru Tuesday December 16th, 2025, Monday/Tuesday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed Mon, 15 Dec 2025 01:34:14 -0500 40.656471 -73.5807185 NY 112 southbound : roadwork NYSDOT - Region 10: roadwork on NY 112 southbound between Washington Avenue (Brookhaven) and Granny Road; Ramp (Brookhaven), Tuesday December 16th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed Mon, 15 Dec 2025 01:31:24 -0500 40.911984103512 -73.0302333826248 NY 25A eastbound : roadwork NYSDOT - Region 10: roadwork on NY 25A eastbound between Mount Sinai Coram Road (Brookhaven) and Pipe Stave Hollow Road (Brookhaven), Monday December 15th, 2025 thru Tuesday December 16th, 2025, Monday/Tuesday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed Mon, 15 Dec 2025 01:28:46 -0500 40.9370178705322 -73.0137049062744 I-495 westbound : roadwork NYSDOT - Region 10: roadwork on Long Island Expressway/I-495 HOV Lane westbound between Exit 64 --NY 112; Patchogue-Port Jefferson Road (Brookhaven) and Exit 40E - Jericho Turnpike; NY 25 (Jericho), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed Mon, 15 Dec 2025 01:26:28 -0500 40.8238597223888 -72.9967988455975 I-495 both directions : utility work NYSDOT - Region 10: utility work on I-495 both directions between Exit 61 - Patchogue Holbrook Road; CR 19 (Brookhaven), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Center lane of 3 lanes closed Mon, 15 Dec 2025 01:18:31 -0500 40.8150782333142 -73.090101200229 I-495 eastbound : utility work NYSDOT - Region 10: utility work on I-495 eastbound between Exit 62 - Nicolls Road; CR 97 (Brookhaven) and Exit 65 - Horseblock Road; CR 16; West Bound (Brookhaven), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed service road Mon, 15 Dec 2025 01:13:15 -0500 40.8184474174871 -73.0637054950776 NY 110 northbound : utility work NYSDOT - Region 10: overnight roadwork and utility work on NY 110 northbound area of RailRoad Street; Broadway (Huntington), Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 2 lanes closed Mon, 15 Dec 2025 01:10:08 -0500 40.8518000682927 -73.4115978146341 NY 24 westbound : utility work NYSDOT - Region 10: overnight roadwork and utility work on NY 24 westbound between Grand Street (Hempstead) and Elmont Road (Hempstead), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed Mon, 15 Dec 2025 01:07:13 -0500 40.708421727636 -73.6850992376268 I-495 westbound : gas main repairs NYSDOT - Region 10: gas main repairs and overnight roadwork on Long Island Expressway/I-495 HOV Lane westbound area of Exit 37 - Willis Avenue (North Hempstead) ser, Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 08:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed service road Mon, 15 Dec 2025 01:01:24 -0500 40.7849591787166 -73.6490221000488 NY 24 eastbound : utility work NYSDOT - Region 10: utility work on NY 24 eastbound between Plainfield Avenue (Hempstead) and Elmont Avenue (Hempstead), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed Mon, 15 Dec 2025 00:58:50 -0500 40.7082932704535 -73.7108011164682 NY 25 westbound : utility work NYSDOT - Region 10: utility work on NY 25 westbound area of Store Hill Road (Oyster Bay), Monday December 15th, 2025 thru Thursday December 18th, 2025, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM All lanes closed Mon, 15 Dec 2025 00:56:46 -0500 40.784451459854 -73.5535459854015 Meadowbrook State Parkway both directions : bridge rehabilitation NYSDOT - Region 10: bridge rehabilitation on Meadowbrook State Parkway both directions area of Exit M4 - NY 24 West; Hempstead Turnpike (Hempstead), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed Mon, 15 Dec 2025 00:35:48 -0500 40.7365684077201 -73.5888117008444 NY 454 eastbound : drainage improvements NYSDOT - Region 10: drainage improvements on NY 454 eastbound between Johnson Avenue; CR 112 (Islip) and Broadway Avenue (Islip), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed Sun, 14 Dec 2025 23:55:50 -0500 40.7823958596279 -73.0978013329303 George Washington Bridge westbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level westbound ramp from Palisades Interstate Parkway (Fort Lee), Thursday December 18th, 2025 thru Saturday December 20th, 2025, Thursday/Friday, 10:00 PM thru 08:00 AM All lanes closed and detoured Sun, 14 Dec 2025 21:43:53 -0500 40.8536477156118 -73.9621352534809 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Friday December 19th, 2025 thru Sunday December 21st, 2025, Friday/Saturday, 10:00 PM thru 08:00 AM 3 Right lanes of 4 lanes closed Sun, 14 Dec 2025 21:40:19 -0500 40.8531895351604 -73.9607213190285 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM All lanes closed and detoured Sun, 14 Dec 2025 21:38:58 -0500 40.8502476163509 -73.9448567260028 George Washington Bridge eastbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level eastbound ramp from Exit 1A - Henry Hudson Parkway (New York), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:30 AM thru 04:30 PM 1 Right lane of 2 lanes closed Sun, 14 Dec 2025 21:32:51 -0500 40.8497580079168 -73.9435953998401 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:00 AM thru 10:00 PM 1 Right lane of 3 lanes closed Sun, 14 Dec 2025 21:11:19 -0500 40.8532111450052 -73.9610373227568 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed Sun, 14 Dec 2025 21:01:08 -0500 40.8531815067962 -73.9606865294504 George Washington Bridge westbound : construction Port Authority NY/NJ: construction on George Washington Bridge Lower Level westbound Lower Trans Manhattan Expressway (Manhattan) to Exit 1A - Henry Hudson Parkway (New York), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed Sun, 14 Dec 2025 20:58:24 -0500 40.849156080119 -73.9389517262979 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Tuesday December 16th, 2025 thru Thursday December 18th, 2025, Tuesday/Thursday, 08:30 AM thru 02:30 PM 1 Left lane of 3 lanes closed Sun, 14 Dec 2025 20:56:55 -0500 40.8503113931577 -73.9451555414274 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed Sun, 14 Dec 2025 20:55:25 -0500 40.8503102101159 -73.9451494394225 Bayonne Bridge both directions : bridge construction Port Authority NY/NJ: bridge construction on Bayonne Bridge both directions New Jersey Side (Bayonne) to New York Side (Staten Island), Tuesday December 16th, 2025 thru Wednesday December 17th, 2025, Tuesday/Wednesday, 09:00 AM thru 02:00 PM 1 Left lane of 2 lanes closed Sun, 14 Dec 2025 20:46:34 -0500 40.6463826504746 -74.1403732664557 Outerbridge Crossing westbound : bridge construction Port Authority NY/NJ: bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Friday December 19th, 2025 thru Saturday December 20th, 2025, 11:59 PM thru 08:00 AM 1 Right lane of 2 lanes closed Sun, 14 Dec 2025 20:43:37 -0500 40.5252319411204 -74.2397980451137 Lincoln Tunnel eastbound : construction Port Authority NY/NJ: construction on Lincoln Tunnel South Tube eastbound New Jersey Side (Weehawken Twp) to New York Side (Manhattan), Wednesday December 17th, 2025 thru Friday December 19th, 2025, Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed and detoured Sun, 14 Dec 2025 20:35:58 -0500 40.7651938922694 -74.016179608795 Lincoln Tunnel westbound : construction Port Authority NY/NJ: construction on Lincoln Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Weehawken Twp), Monday December 15th, 2025 thru Tuesday December 16th, 2025, 11:00 PM thru 05:00 AM All lanes closed and detoured Sun, 14 Dec 2025 20:34:04 -0500 40.7599776175729 -74.0019141715085 Lincoln Tunnel both directions : construction Port Authority NY/NJ: construction on Lincoln Tunnel Center Tube both directions New York Side (New York) to New Jersey Side (Weehawken Twp), Monday December 15th, 2025 thru Monday December 15th, 2025, 12:00 AM thru 05:00 AM All lanes closed and detoured, Tuesday December 16th, 2025 thru Wednesday December 17th, 2025, 11:00 PM thru 05:00 AM All lanes closed and detoured Sun, 14 Dec 2025 20:25:58 -0500 40.75982330264 -74.0022848428169 Holland Tunnel eastbound : construction Port Authority NY/NJ: construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Tuesday December 16th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed Sun, 14 Dec 2025 20:10:42 -0500 40.7287762123953 -74.03200229586 Holland Tunnel westbound : construction Port Authority NY/NJ: construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Tuesday December 16th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday, 11:30 PM thru 05:30 AM 1 Right lane of 2 lanes closed Sun, 14 Dec 2025 20:09:44 -0500 40.7262030865575 -74.0110316059023 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near West of exit 47A - I-280 (Parsippany-Troy Hills Twp), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 04:00 AM) Sun, 14 Dec 2025 19:24:15 -0500 40.8591041564941 -74.3712768554688 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of exit 47A - I-280 (Parsippany-Troy Hills Twp) and East of Exit 47A - I-280 (Parsippany-Troy Hills Twp), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, at least one lane closed Sun, 14 Dec 2025 19:24:16 -0500 40.8591041564941 -74.3712768554688 NJ 31 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 31 Northbound At North of NJ 173 (Clinton Twp) Monday December 15, 2025 07:00 AM thru Friday December 19, 2025 03:00 PM, 1 right lane of 2 lanes closed Sun, 14 Dec 2025 17:09:02 -0500 40.641529083252 -74.8975601196289 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and North of CR 651/Greentree Rd (Washington Twp), Monday December 15, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sun, 14 Dec 2025 14:21:15 -0500 39.7411499023438 -75.0439682006836 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound between South of Rose Ln (Union Beach) and Atlantic St (Keyport), Sunday December 14, 2025 08:00 PM thru Monday December 15, 2025 05:00 AM, right lane closed Sun, 14 Dec 2025 14:21:15 -0500 40.4385299682617 -74.1516418457031 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound near North of Exit 7 - College Dr (Gloucester Twp), Monday December 15, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sun, 14 Dec 2025 14:21:16 -0500 39.7829360961914 -75.0486145019531 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 585/Main St (Pleasantville) and East of CR 629/West End Av (Atlantic City), Sunday December 14, 2025 08:00 PM thru Monday December 15, 2025 06:00 AM, right lane closed Sun, 14 Dec 2025 14:21:17 -0500 39.3898162841797 -74.5236358642578 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 35 - NJ 124 (Morristown) and North of Exit 40 - CR 511/Parsippany Rd (Parsippany-Troy Hills Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sun, 14 Dec 2025 13:48:15 -0500 40.7820930480957 -74.4724426269531 US 9 northbound : roadwork NJDOT - STMC: Roadwork on US 9 Northbound near CR 656/Smith St (Woodbridge Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right lane closed local lane Sun, 14 Dec 2025 13:48:17 -0500 40.5165328979492 -74.2998657226562 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near North of Exit 30 - North Maple Ave (Harding Twp), Monday December 15, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sun, 14 Dec 2025 13:48:18 -0500 40.7520294189453 -74.5260238647461 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between East of Exit 12 - CR 521/Hope-Blairstown Rd (Frelinghuysen Twp) and West of Exit 25 - US 206 (Mount Olive Twp), Tuesday December 16, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sun, 14 Dec 2025 13:48:19 -0500 40.9246940612793 -74.9321670532227 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 21 - I-78 (Bedminster Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sun, 14 Dec 2025 13:48:24 -0500 40.6402282714844 -74.6452407836914 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound at North of US 9 (Sayreville) Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 05:00 AM, ramp, right partial lane Sun, 14 Dec 2025 13:48:25 -0500 40.496467590332 -74.2968673706055 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 21 - I-78 (Bedminster Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, left lane closed Sun, 14 Dec 2025 13:48:20 -0500 40.6402282714844 -74.6452407836914 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound near West of Exit 49 - NJ 124/Springfield Ave (Springfield Twp), left shoulder express lane Sun, 14 Dec 2025 13:48:21 -0500 40.7133255004883 -74.3070297241211 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near Exit 21 - I-78 (Bedminster Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sun, 14 Dec 2025 13:48:22 -0500 40.64306640625 -74.6458892822266 US 9 northbound : roadwork NJDOT - STMC: Roadwork on US 9 Northbound near CR 656/Smith St (Woodbridge Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, left lane closed local lane Sun, 14 Dec 2025 13:48:23 -0500 40.5165328979492 -74.2998657226562 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near North of Exit 34 - CR 663 (Morris Twp), Monday December 15, 2025 09:00 AM thru 02:00 PM, left lane closed Sun, 14 Dec 2025 13:48:27 -0500 40.7770538330078 -74.476203918457 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between East of Exit 27 - NJ 183/US 206 (Roxbury Twp) and East of Exit 26 - US 46 (Mount Olive Twp), Tuesday December 16, 2025 09:00 AM thru 02:00 PM, left lane closed Sun, 14 Dec 2025 13:48:28 -0500 40.8904991149902 -74.6992340087891 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound between North of Birchwood Dr (Old Bridge Twp) and Cliffwood Av (Aberdeen Twp), Saturday December 20, 2025 08:00 PM thru Sunday December 21, 2025 06:00 AM, right lane closed Sun, 14 Dec 2025 08:06:16 -0500 40.4509124755859 -74.2394714355469 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between North of CR 13A/Sycamore Av (Shrewsbury) and South of CR 13/Shrewsbury Av (Shrewsbury), Monday December 22, 2025 10:00 PM thru Tuesday December 23, 2025 05:00 AM, right lane closed Sun, 14 Dec 2025 08:06:17 -0500 40.325984954834 -74.0617828369141 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between North of CR 13A/Sycamore Av (Shrewsbury) and South of CR 13/Shrewsbury Av (Shrewsbury), Sunday December 21, 2025 10:00 PM thru Monday December 22, 2025 04:00 AM, right lane closed Sun, 14 Dec 2025 08:06:18 -0500 40.325984954834 -74.0617828369141 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between North of CR 13A/Sycamore Av (Shrewsbury) and South of CR 13/Shrewsbury Av (Shrewsbury), Saturday December 20, 2025 10:00 PM thru Sunday December 21, 2025 05:00 AM, right lane closed Sat, 13 Dec 2025 23:45:15 -0500 40.325984954834 -74.0617828369141 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and North of CR 639/Ganttown Rd (Washington Twp), Friday December 19, 2025 08:00 PM thru Saturday December 20, 2025 07:00 AM, left lane closed Sat, 13 Dec 2025 23:45:16 -0500 39.7411499023438 -75.0439682006836 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between CR 3/Broadway (Keyport) and North of CR 4/Holmdel Rd/Main St (Hazlet Twp), Saturday December 20, 2025 08:00 PM thru Sunday December 21, 2025 06:00 AM, right lane closed Sat, 13 Dec 2025 23:45:17 -0500 40.4288558959961 -74.2124328613281 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between North of CR 13A/Sycamore Av (Shrewsbury) and South of CR 13/Shrewsbury Av (Shrewsbury), Friday December 19, 2025 10:00 PM thru Saturday December 20, 2025 05:00 AM, right lane closed Sat, 13 Dec 2025 23:45:18 -0500 40.325984954834 -74.0617828369141 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between South of CR 668/Main St (Dennis Twp) and North of CR 668/Main St (Dennis Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:45:19 -0500 39.1609573364258 -74.7500762939453 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Friday December 19, 2025 08:00 PM thru Saturday December 20, 2025 07:00 AM, left lane closed Sat, 13 Dec 2025 23:45:20 -0500 39.7551803588867 -75.0467071533203 NJ 55 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Southbound between North of Exit 35 - CR 674/Garden Rd (Vineland) and North of Exit 26 - Main Rd (Vineland), Friday December 19, 2025 09:00 PM thru Saturday December 20, 2025 03:00 AM, , moving operation Sat, 13 Dec 2025 23:45:21 -0500 39.5349273681641 -75.0634002685547 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between US 322 (Hamilton Twp) and West of CR 614/Cologne Av (Hamilton Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:45:22 -0500 39.4505004882812 -74.6424865722656 NJ 55 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Northbound between North of Exit 26 - Main Rd (Vineland) and North of Exit 35 - CR 674/Garden Rd (Vineland), Friday December 19, 2025 09:00 PM thru Saturday December 20, 2025 03:00 AM, , moving operation Sat, 13 Dec 2025 23:45:23 -0500 39.4241333007812 -75.0265121459961 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound near West of CR 646/Delilah Rd (Hamilton Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 23:44:08 -0500 39.441162109375 -74.6215286254883 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between South of Exit 4 - Atlantic Ave (Camden) and North of Exit 4 - Atlantic Ave (Camden), Tuesday December 16, 2025 09:00 PM thru Wednesday December 17, 2025 12:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 12:00 AM) Sat, 13 Dec 2025 23:44:04 -0500 39.924934387207 -75.1161575317383 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near South of NJ 70 (Collingswood), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:44:05 -0500 39.9152717590332 -75.0903549194336 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between South of Exit 4 - Atlantic Ave (Camden) and North of Exit 4 - Atlantic Ave (Camden), Tuesday December 16, 2025 12:00 AM thru 05:00 AM, at least one lane closed Sat, 13 Dec 2025 23:44:06 -0500 39.924934387207 -75.1161575317383 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between South of CR 689/Milford Rd (Berlin) and CR 534/Jackson Rd (Berlin), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:44:07 -0500 39.7947807312012 -74.9221343994141 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near South of Exit 7 (Oldmans Twp), Tuesday December 16, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:44:03 -0500 39.7249412536621 -75.4188537597656 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between North of I-76 (Gloucester City) and Exit 3 - Morgan Blvd (Camden), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 23:44:09 -0500 39.8983917236328 -75.1097946166992 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near South of Exit 7 (Oldmans Twp), Tuesday December 16, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:44:10 -0500 39.7249412536621 -75.4188537597656 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near South of Exit 7 (Oldmans Twp), Wednesday December 17, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:44:16 -0500 39.7249412536621 -75.4188537597656 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between US 322 (Hamilton Twp) and West of CR 614/Cologne Av (Hamilton Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:44:17 -0500 39.4505004882812 -74.6424865722656 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between North of CR 13A/Sycamore Av (Shrewsbury) and South of CR 13/Shrewsbury Av (Shrewsbury), Thursday December 18, 2025 10:00 PM thru Friday December 19, 2025 05:00 AM, right lane closed Sat, 13 Dec 2025 23:44:12 -0500 40.325984954834 -74.0617828369141 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between Atlantic City Expressway (Winslow Twp) and CR 721/Central Ave (Winslow Twp), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:44:13 -0500 39.6494216918945 -74.8725738525391 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between South of Exit 4 - Atlantic Ave (Camden) and North of Exit 4 - Atlantic Ave (Camden), Tuesday December 16, 2025 09:00 PM thru Wednesday December 17, 2025 12:00 AM, at least one lane closed Sat, 13 Dec 2025 23:44:14 -0500 39.924934387207 -75.1161575317383 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 4 - NJ 48 (Carneys Point Twp) and South of Exit 18 - CR 667 (East Greenwich Twp), Tuesday December 16, 2025 07:00 AM thru 03:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 23:44:15 -0500 39.7047691345215 -75.4532775878906 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 7 (Oldmans Twp), Friday December 19, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:34 -0500 39.7284774780273 -75.4128952026367 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 585/Main St (Pleasantville) and East of CR 629/West End Av (Atlantic City), Thursday December 18, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:43:55 -0500 39.3898162841797 -74.5236358642578 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound between Exit 3 - Morgan Blvd (Camden) and North of I-76 (Gloucester City), Wednesday December 17, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:49 -0500 39.912036895752 -75.1158294677734 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between West of Atlantic City Expressway (Egg Harbor Twp) and Atlantic City Expressway (Atlantic City), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:50 -0500 39.3817367553711 -74.4979705810547 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between South of CR 609/Stiles Av/Princeton Ave (Maple Shade Twp) and North of NJ 70 (Evesham Twp), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:51 -0500 39.9617347717285 -74.9925689697266 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between South of CR 609/Stiles Av/Princeton Ave (Maple Shade Twp) and North of NJ 70 (Evesham Twp), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:52 -0500 39.9617347717285 -74.9925689697266 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between Atlantic City Expressway (Winslow Twp) and CR 721/Central Ave (Winslow Twp), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:58 -0500 39.6494216918945 -74.8725738525391 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between North of NJ 70 (Evesham Twp) and South of CR 609/Stiles Av/Princeton Ave (Maple Shade Twp), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:44:00 -0500 39.8950691223145 -74.9286956787109 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near South of Exit 7 (Oldmans Twp), Wednesday December 17, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:44:00 -0500 39.7249412536621 -75.4188537597656 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:44:02 -0500 39.4505004882812 -74.6424865722656 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between CR 721/Central Ave (Winslow Twp) and Atlantic City Expressway (Winslow Twp), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:35 -0500 39.6868705749512 -74.8901977539062 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 4 - NJ 48 (Carneys Point Twp) and South of Exit 18 - CR 667 (East Greenwich Twp), Friday December 19, 2025 07:00 AM thru 03:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 23:43:36 -0500 39.7047691345215 -75.4532775878906 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 7 (Oldmans Twp), Monday December 15, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:43:37 -0500 39.7284774780273 -75.4128952026367 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 2 - New Jersey Turnpike/NJ 140 (Carneys Point Twp), Monday December 15, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:38 -0500 39.6796798706055 -75.4841613769531 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound between South of Rose Ln (Union Beach) and Atlantic St (Keyport), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, right lane closed Sat, 13 Dec 2025 23:43:32 -0500 40.4385299682617 -74.1516418457031 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between South of CR 668/Main St (Dennis Twp) and North of CR 668/Main St (Dennis Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:33 -0500 39.1609573364258 -74.7500762939453 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound between Exit 3 - Morgan Blvd (Camden) and North of I-76 (Gloucester City), Tuesday December 16, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:46 -0500 39.912036895752 -75.1158294677734 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Thursday December 18, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:47 -0500 39.4485702514648 -74.673698425293 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between US 322 (Hamilton Twp) and West of CR 614/Cologne Av (Hamilton Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:43:48 -0500 39.4505004882812 -74.6424865722656 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between South of Exit 4 - Atlantic Ave (Camden) and North of Exit 4 - Atlantic Ave (Camden), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 12:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 12:00 AM) Sat, 13 Dec 2025 23:43:42 -0500 39.924934387207 -75.1161575317383 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between South of CR 689/Milford Rd (Berlin) and CR 534/Jackson Rd (Berlin), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:43 -0500 39.7947807312012 -74.9221343994141 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Friday December 19, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:44 -0500 39.4485702514648 -74.673698425293 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Monday December 15, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:45 -0500 39.4485702514648 -74.673698425293 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 2 - New Jersey Turnpike/NJ 140 (Carneys Point Twp), Wednesday December 17, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:39 -0500 39.6796798706055 -75.4841613769531 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 585/Main St (Pleasantville) and East of CR 629/West End Av (Atlantic City), Wednesday December 17, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:43:40 -0500 39.3898162841797 -74.5236358642578 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:43:41 -0500 39.397087097168 -74.5497512817383 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 2 - New Jersey Turnpike/NJ 140 (Carneys Point Twp), Thursday December 18, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:56 -0500 39.6796798706055 -75.4841613769531 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 7 (Oldmans Twp), Monday December 15, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:57 -0500 39.7284774780273 -75.4128952026367 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:43:53 -0500 39.397087097168 -74.5497512817383 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between Bader Field (Atlantic City) and CR 585/Main St (Pleasantville), Tuesday December 16, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:43:54 -0500 39.3584403991699 -74.4605560302734 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:43:54 -0500 39.4505004882812 -74.6424865722656 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 2 - New Jersey Turnpike/NJ 140 (Carneys Point Twp), Friday December 19, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:28 -0500 39.6796798706055 -75.4841613769531 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between West of Atlantic City Expressway (Egg Harbor Twp) and Atlantic City Expressway (Atlantic City), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:24 -0500 39.3817367553711 -74.4979705810547 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between South of Exit 4 - Atlantic Ave (Camden) and North of Exit 4 - Atlantic Ave (Camden), Wednesday December 17, 2025 12:00 AM thru 05:00 AM, at least one lane closed, (2nd lane closed from 12:00 AM to 04:00 AM) Sat, 13 Dec 2025 23:43:25 -0500 39.924934387207 -75.1161575317383 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 7 (Oldmans Twp), Tuesday December 16, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:26 -0500 39.7284774780273 -75.4128952026367 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between North of I-76 (Gloucester City) and Exit 3 - Morgan Blvd (Camden), Monday December 15, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 23:43:27 -0500 39.8983917236328 -75.1097946166992 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near South of Exit 7 (Oldmans Twp), Monday December 15, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:20 -0500 39.7249412536621 -75.4188537597656 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between North of Exit 28 - NJ 168/Black Horse Pike (Haddon Heights) and Exit 27 - I-76 To I-676 (Bellmawr), Friday December 19, 2025 12:00 AM thru 05:00 AM, right lane closed Sat, 13 Dec 2025 23:43:21 -0500 39.872486114502 -75.0750274658203 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound near West of CR 646/Delilah Rd (Hamilton Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 23:43:22 -0500 39.441162109375 -74.6215286254883 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound between Exit 3 - Morgan Blvd (Camden) and North of I-76 (Gloucester City), Monday December 15, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:23 -0500 39.912036895752 -75.1158294677734 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near Exit 1 - US 40/US 130 (Pennsville Twp), Thursday December 18, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:19 -0500 39.679573059082 -75.4921951293945 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between Bader Field (Atlantic City) and CR 585/Main St (Pleasantville), Wednesday December 17, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:43:31 -0500 39.3584403991699 -74.4605560302734 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound near West of CR 646/Delilah Rd (Hamilton Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 23:43:29 -0500 39.441162109375 -74.6215286254883 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between Bader Field (Atlantic City) and CR 585/Main St (Pleasantville), Monday December 15, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:43:30 -0500 39.3584403991699 -74.4605560302734 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between North of I-76 (Gloucester City) and Exit 3 - Morgan Blvd (Camden), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 23:43:17 -0500 39.8983917236328 -75.1097946166992 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound between Exit 3 - Morgan Blvd (Camden) and North of I-76 (Gloucester City), Thursday December 18, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:18 -0500 39.912036895752 -75.1158294677734 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between South of CR 609/Stiles Av/Princeton Ave (Maple Shade Twp) and North of NJ 70 (Evesham Twp), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:14 -0500 39.9617347717285 -74.9925689697266 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near Exit 1 - US 40/US 130 (Pennsville Twp), Wednesday December 17, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:43:14 -0500 39.679573059082 -75.4921951293945 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 2 - New Jersey Turnpike/NJ 140 (Carneys Point Twp), Tuesday December 16, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:15 -0500 39.6796798706055 -75.4841613769531 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 7 (Oldmans Twp), Thursday December 18, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:16 -0500 39.7284774780273 -75.4128952026367 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between South of CR 668/Main St (Dennis Twp) and North of CR 668/Main St (Dennis Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:12 -0500 39.1609573364258 -74.7500762939453 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound near West of CR 646/Delilah Rd (Hamilton Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 23:42:36 -0500 39.441162109375 -74.6215286254883 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound near West of CR 646/Delilah Rd (Hamilton Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 23:42:37 -0500 39.441162109375 -74.6215286254883 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound between South of Rose Ln (Union Beach) and Atlantic St (Keyport), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, right lane closed Sat, 13 Dec 2025 23:42:38 -0500 40.4385299682617 -74.1516418457031 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between South of CR 689/Milford Rd (Berlin) and CR 534/Jackson Rd (Berlin), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:32 -0500 39.7947807312012 -74.9221343994141 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Wednesday December 17, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:33 -0500 39.4485702514648 -74.673698425293 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between CR 534/Jackson Rd (Berlin) and South of CR 689/Milford Rd (Berlin), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:34 -0500 39.7849044799805 -74.9094085693359 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between North of NJ 70 (Evesham Twp) and South of CR 609/Stiles Av/Princeton Ave (Maple Shade Twp), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:35 -0500 39.8950691223145 -74.9286956787109 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between CR 721/Central Ave (Winslow Twp) and Atlantic City Expressway (Winslow Twp), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:59 -0500 39.6868705749512 -74.8901977539062 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between South of Exit 4 - Atlantic Ave (Camden) and North of Exit 4 - Atlantic Ave (Camden), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 12:00 AM, at least one lane closed Sat, 13 Dec 2025 23:42:55 -0500 39.924934387207 -75.1161575317383 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 7 (Oldmans Twp), Wednesday December 17, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:42:55 -0500 39.7284774780273 -75.4128952026367 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between CR 721/Central Ave (Winslow Twp) and Atlantic City Expressway (Winslow Twp), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:57 -0500 39.6868705749512 -74.8901977539062 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between CR 534/Jackson Rd (Berlin) and South of CR 689/Milford Rd (Berlin), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:58 -0500 39.7849044799805 -74.9094085693359 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Tuesday December 16, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:10 -0500 39.4485702514648 -74.673698425293 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between Bader Field (Atlantic City) and CR 585/Main St (Pleasantville), Thursday December 18, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:43:11 -0500 39.3584403991699 -74.4605560302734 NJ 38 eastbound : roadwork NJDOT - TOC South: Roadwork on NJ 38 between West of Cherry Hill Mall (Cherry Hill Twp) and CR 625/Longwood Av (Cherry Hill Twp), Wednesday December 17, 2025 12:00 AM thru 06:00 AM, right lane closed Sat, 13 Dec 2025 23:43:12 -0500 39.9386978149414 -75.0264053344727 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 7 (Oldmans Twp), Tuesday December 16, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:42:39 -0500 39.7284774780273 -75.4128952026367 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:42:40 -0500 39.4505004882812 -74.6424865722656 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 4 - NJ 48 (Carneys Point Twp) and South of Exit 18 - CR 667 (East Greenwich Twp), Thursday December 18, 2025 07:00 AM thru 03:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 23:42:41 -0500 39.7047691345215 -75.4532775878906 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between North of Exit 28 - NJ 168/Black Horse Pike (Haddon Heights) and Exit 27 - I-76 To I-676 (Bellmawr), Thursday December 18, 2025 09:00 PM thru Friday December 19, 2025 12:00 AM, right lane closed Sat, 13 Dec 2025 23:42:42 -0500 39.872486114502 -75.0750274658203 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 585/Main St (Pleasantville) and East of CR 629/West End Av (Atlantic City), Tuesday December 16, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:42:47 -0500 39.3898162841797 -74.5236358642578 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between South of CR 668/Main St (Dennis Twp) and North of CR 668/Main St (Dennis Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:48 -0500 39.1609573364258 -74.7500762939453 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between CR 534/Jackson Rd (Berlin) and South of CR 689/Milford Rd (Berlin), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:43 -0500 39.7849044799805 -74.9094085693359 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:42:44 -0500 39.4505004882812 -74.6424865722656 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between North of I-76 (Gloucester City) and Exit 3 - Morgan Blvd (Camden), Friday December 19, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 23:42:45 -0500 39.8983917236328 -75.1097946166992 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 4 - NJ 48 (Carneys Point Twp) and South of Exit 18 - CR 667 (East Greenwich Twp), Wednesday December 17, 2025 07:00 AM thru 03:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 23:42:46 -0500 39.7047691345215 -75.4532775878906 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between Atlantic City Expressway (Winslow Twp) and CR 721/Central Ave (Winslow Twp), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:50 -0500 39.6494216918945 -74.8725738525391 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near East of CR 695/White Horse Av (Lindenwold), Monday December 15, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:42:52 -0500 39.8130416870117 -74.9864730834961 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound between South of Rose Ln (Union Beach) and Atlantic St (Keyport), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 05:00 AM, right lane closed Sat, 13 Dec 2025 23:42:53 -0500 40.4385299682617 -74.1516418457031 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between US 322 (Hamilton Twp) and West of CR 614/Cologne Av (Hamilton Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:42:54 -0500 39.4505004882812 -74.6424865722656 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between South of CR 668/Main St (Dennis Twp) and North of CR 668/Main St (Dennis Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:49 -0500 39.1609573364258 -74.7500762939453 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:43:06 -0500 39.397087097168 -74.5497512817383 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 4 - NJ 48 (Carneys Point Twp) and South of Exit 18 - CR 667 (East Greenwich Twp), Monday December 15, 2025 07:00 AM thru 03:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 23:43:07 -0500 39.7047691345215 -75.4532775878906 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between North of NJ 70 (Evesham Twp) and South of CR 609/Stiles Av/Princeton Ave (Maple Shade Twp), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:09 -0500 39.8950691223145 -74.9286956787109 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between Bader Field (Atlantic City) and CR 585/Main St (Pleasantville), Friday December 19, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:43:02 -0500 39.3584403991699 -74.4605560302734 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between South of Exit 4 - Atlantic Ave (Camden) and North of Exit 4 - Atlantic Ave (Camden), Tuesday December 16, 2025 12:00 AM thru 05:00 AM, at least one lane closed, (2nd lane closed from 12:00 AM to 04:00 AM) Sat, 13 Dec 2025 23:43:03 -0500 39.924934387207 -75.1161575317383 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 7 (Oldmans Twp), Wednesday December 17, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:43:04 -0500 39.7284774780273 -75.4128952026367 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between Atlantic City Expressway (Winslow Twp) and CR 721/Central Ave (Winslow Twp), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:43:05 -0500 39.6494216918945 -74.8725738525391 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between US 322 (Hamilton Twp) and West of CR 614/Cologne Av (Hamilton Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:43:00 -0500 39.4505004882812 -74.6424865722656 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:43:01 -0500 39.4505004882812 -74.6424865722656 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 585/Main St (Pleasantville) and East of CR 629/West End Av (Atlantic City), Monday December 15, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:43:02 -0500 39.3898162841797 -74.5236358642578 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:42:19 -0500 39.397087097168 -74.5497512817383 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between North of I-76 (Gloucester City) and Exit 3 - Morgan Blvd (Camden), Thursday December 18, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 23:42:25 -0500 39.8983917236328 -75.1097946166992 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between South of CR 689/Milford Rd (Berlin) and CR 534/Jackson Rd (Berlin), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:26 -0500 39.7947807312012 -74.9221343994141 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between South of Exit 4 - Atlantic Ave (Camden) and North of Exit 4 - Atlantic Ave (Camden), Wednesday December 17, 2025 12:00 AM thru 05:00 AM, at least one lane closed Sat, 13 Dec 2025 23:42:27 -0500 39.924934387207 -75.1161575317383 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between CR 721/Central Ave (Winslow Twp) and Atlantic City Expressway (Winslow Twp), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:28 -0500 39.6868705749512 -74.8901977539062 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound between Exit 3 - Morgan Blvd (Camden) and North of I-76 (Gloucester City), Friday December 19, 2025 09:00 AM thru 02:00 PM, left lane closed Sat, 13 Dec 2025 23:42:20 -0500 39.912036895752 -75.1158294677734 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between North of NJ 70 (Evesham Twp) and South of CR 609/Stiles Av/Princeton Ave (Maple Shade Twp), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:22 -0500 39.8950691223145 -74.9286956787109 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near South of Exit 7 (Oldmans Twp), Monday December 15, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:42:23 -0500 39.7249412536621 -75.4188537597656 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 585/Main St (Pleasantville) and East of CR 629/West End Av (Atlantic City), Friday December 19, 2025 09:00 AM thru 02:00 PM, right lane closed Sat, 13 Dec 2025 23:42:24 -0500 39.3898162841797 -74.5236358642578 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between South of CR 609/Stiles Av/Princeton Ave (Maple Shade Twp) and North of NJ 70 (Evesham Twp), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:29 -0500 39.9617347717285 -74.9925689697266 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 23:42:30 -0500 39.397087097168 -74.5497512817383 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between CR 534/Jackson Rd (Berlin) and South of CR 689/Milford Rd (Berlin), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sat, 13 Dec 2025 23:42:31 -0500 39.7849044799805 -74.9094085693359 NJ 31 northbound : construction NJ DOT - STMC: Construction on NJ 31 Northbound between South of I-78/US 22 (Clinton Twp) and CR 626/Beaver St (Clinton Twp) Thursday December 18, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 14:51:43 -0500 40.6350708007812 -74.8853073120117 NJ 31 northbound : construction NJ DOT - STMC: Construction on NJ 31 Northbound between South of I-78/US 22 (Clinton Twp) and CR 626/Beaver St (Clinton Twp) Wednesday December 17, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 14:51:30 -0500 40.6350708007812 -74.8853073120117 NJ 31 northbound : construction NJ DOT - STMC: Construction on NJ 31 Northbound between South of I-78/US 22 (Clinton Twp) and CR 626/Beaver St (Clinton Twp) Friday December 19, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 14:51:57 -0500 40.6350708007812 -74.8853073120117 NJ 31 northbound : construction NJ DOT - STMC: Construction on NJ 31 Northbound between South of I-78/US 22 (Clinton Twp) and CR 626/Beaver St (Clinton Twp) Tuesday December 16, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 14:51:16 -0500 40.6350708007812 -74.8853073120117 NJ 31 southbound : construction NJ DOT - STMC: Construction on NJ 31 Southbound between CR 626/Beaver St (Clinton Twp) and South of I-78/US 22 (Clinton Twp) Monday December 15, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 14:47:13 -0500 40.6418609619141 -74.8994216918945 US 1&9/Tonnelle Avenue northbound : roadwork NJ DOT - STMC: Roadwork on US 1&9/Tonnelle Avenue Northbound between South of 83rd St (North Bergen Twp) and North of 83rd St (North Bergen Twp) Monday December 15, 2025 09:00 AM thru Friday December 19, 2025 03:00 PM, 1 right lane of 3 lanes closed Sat, 13 Dec 2025 14:34:53 -0500 40.8071708679199 -74.0162582397461 NY 146 both directions : utility work NYSDOT TMC - Albany: utility work on NY 146 both directions Jessamine Ln (Guilderland) to Coons Rd (Guilderland) - Alternating lane closures, Tuesday December 16th, 2025, 08:00 AM thru 03:00 PM All lanes open Sat, 13 Dec 2025 09:50:55 -0500 42.7495144881936 -73.9422336886749 NY 377 northbound : utility work NYSDOT TMC - Albany: utility work on NY 377 northbound Wolfert Ave (Albany) to River Hill Ave (Albany) - Shift to center lane, Monday December 15th, 2025, 08:00 AM thru 04:00 PM All lanes open Sat, 13 Dec 2025 09:14:51 -0500 42.6802098792606 -73.742876208431 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near I-287 (Parsippany-Troy Hills Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:52:08 -0500 40.8700332641602 -74.4178314208984 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near West of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:52:10 -0500 40.8770599365234 -74.442756652832 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:52:03 -0500 40.8709487915039 -74.4212875366211 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Wednesday December 17, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:52:04 -0500 40.8854179382324 -74.4628219604492 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Tuesday December 16, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:52:05 -0500 40.8854179382324 -74.4628219604492 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Monday December 15, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:52:07 -0500 40.8705444335938 -74.4194183349609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Thursday December 18, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:57 -0500 40.8854179382324 -74.4628219604492 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Tuesday December 16, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:59 -0500 40.8705444335938 -74.4194183349609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Wednesday December 17, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:52:00 -0500 40.8908996582031 -74.512825012207 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near I-287 (Parsippany-Troy Hills Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:52:01 -0500 40.8700332641602 -74.4178314208984 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:52:11 -0500 40.8899612426758 -74.1311798095703 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Tuesday December 16, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:52:12 -0500 40.8908996582031 -74.512825012207 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:52:13 -0500 40.8709487915039 -74.4212875366211 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Thursday December 18, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:54 -0500 40.8908996582031 -74.512825012207 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between NJ 20 (Paterson) and Whitehall St (Fair Lawn), Friday December 19, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:55 -0500 40.9181671142578 -74.13232421875 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between Little Ferry Circle (Little Ferry) and East of New Jersey Turnpike (Ridgefield Park), Wednesday December 17, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:56 -0500 40.852123260498 -74.0318756103516 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of Garden State Parkway (Clifton), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 06:00 AM, right shoulder closed Sat, 13 Dec 2025 07:51:50 -0500 40.877311706543 -74.1625595092773 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of CR 644/Main St (Rockaway Twp), Monday December 15, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:51 -0500 40.8854179382324 -74.4628219604492 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Friday December 19, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:51:52 -0500 40.8770599365234 -74.442756652832 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of CR 644/Main St (Rockaway Twp), Thursday December 18, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:53 -0500 40.8854179382324 -74.4628219604492 US 1&9 southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Southbound between North of Bergen Blvd (Fort Lee) and North of Ridgefield Circle (Palisades Park), Tuesday December 16, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:46 -0500 40.8545799255371 -73.9842834472656 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:51:47 -0500 40.8776435852051 -74.4445190429688 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of CR 527/Mountain Ave (Bridgewater Twp), Saturday December 20, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:48 -0500 40.5812492370605 -74.5193481445312 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Friday December 19, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:27 -0500 40.8854179382324 -74.4628219604492 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of Garden State Parkway (Clifton), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 06:00 AM, right lane closed Sat, 13 Dec 2025 07:51:23 -0500 40.877311706543 -74.1625595092773 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near I-287 (Parsippany-Troy Hills Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:51:20 -0500 40.8700332641602 -74.4178314208984 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:51:22 -0500 40.8709487915039 -74.4212875366211 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of CR 644/Main St (Rockaway Twp), Tuesday December 16, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:16 -0500 40.8854179382324 -74.4628219604492 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Monday December 15, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:17 -0500 40.8908996582031 -74.512825012207 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near I-287 (Parsippany-Troy Hills Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:51:18 -0500 40.8700332641602 -74.4178314208984 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 644/Main St (Rockaway Twp), Monday December 15, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:19 -0500 40.8908996582031 -74.512825012207 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp) and West of US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Friday December 19, 2025 09:00 AM thru 05:00 PM, left lane closed Sat, 13 Dec 2025 07:51:14 -0500 40.8776435852051 -74.4445190429688 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:33 -0500 40.8931846618652 -74.2573089599609 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between Little Ferry Circle (Little Ferry) and Teterboro Airport (Teterboro), Thursday December 18, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:29 -0500 40.852123260498 -74.0318756103516 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Monday December 15, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:30 -0500 40.8854179382324 -74.4628219604492 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near I-287 (Parsippany-Troy Hills Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:51:31 -0500 40.8700332641602 -74.4178314208984 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near East of Garden State Parkway (Clifton), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 06:00 AM, right lane closed Sat, 13 Dec 2025 07:51:32 -0500 40.8779716491699 -74.1588287353516 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:51:24 -0500 40.8709487915039 -74.4212875366211 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Thursday December 18, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:25 -0500 40.8705444335938 -74.4194183349609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Friday December 19, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:26 -0500 40.8908996582031 -74.512825012207 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Wednesday December 17, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:41 -0500 40.8705444335938 -74.4194183349609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 07:51:43 -0500 40.8709487915039 -74.4212875366211 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 07:51:44 -0500 40.8835868835449 -74.4576416015625 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound near North of Blair Rd (Wantage Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 07:51:45 -0500 41.1732444763184 -74.5882797241211 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound near South of CR 565/Lewisburg Rd (Wantage Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 07:51:37 -0500 41.1983680725098 -74.5952529907227 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of CR 644/Main St (Rockaway Twp), Wednesday December 17, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:38 -0500 40.8854179382324 -74.4628219604492 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of CR 644/Main St (Rockaway Twp), Friday December 19, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:39 -0500 40.8854179382324 -74.4628219604492 US 1&9 southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Southbound between North of Bergen Blvd (Fort Lee) and North of Ridgefield Circle (Palisades Park), Monday December 15, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:40 -0500 40.8545799255371 -73.9842834472656 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Friday December 19, 2025 08:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 07:51:34 -0500 40.8705444335938 -74.4194183349609 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near East of Garden State Parkway (Clifton), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 06:00 AM, right shoulder closed Sat, 13 Dec 2025 07:51:36 -0500 40.8779716491699 -74.1588287353516 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound near Exit 58 - US 1&9/E. Port St (Newark), Friday December 19, 2025 09:00 AM thru Saturday December 20, 2025 09:00 AM, right shoulder closed local lane Sat, 13 Dec 2025 07:45:14 -0500 40.7107543945312 -74.1664428710938 NJ 15 southbound : roadwork NJDOT - STMC: Roadwork on NJ 15 Southbound near US 206/CR 585 (Lafayette Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 07:45:15 -0500 41.1199111938477 -74.7126083374023 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 57 - Skyline Drive (Wanaque) and North of Exit 58 - US 202/Ramapo Valley Rd (Oakland), Tuesday December 16, 2025 09:00 AM thru 05:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:30 -0500 41.0238647460938 -74.2726058959961 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between New York State Line (Mahwah Twp) and South of Exit 66 - NJ 17 (Mahwah Twp), Friday December 19, 2025 12:00 AM thru Saturday December 20, 2025 12:00 AM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:27 -0500 41.1124114990234 -74.162956237793 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between New York State Line (Mahwah Twp) and North of Exit 58 - US 202/Ramapo Valley Rd (Oakland), Thursday December 18, 2025 07:00 AM thru 05:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:28 -0500 41.1124114990234 -74.162956237793 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near Morris Av/Hoes Ln West (Piscataway Twp), Monday December 15, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 06:54:29 -0500 40.5320129394531 -74.4687271118164 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near Morris Av/Hoes Ln West (Piscataway Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 06:54:34 -0500 40.5320129394531 -74.4687271118164 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between New York State Line (Mahwah Twp) and North of Exit 58 - US 202/Ramapo Valley Rd (Oakland), Saturday December 20, 2025 07:00 AM thru 05:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:36 -0500 41.1124114990234 -74.162956237793 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between New York State Line (Mahwah Twp) and North of Exit 58 - US 202/Ramapo Valley Rd (Oakland), Wednesday December 17, 2025 07:00 AM thru 05:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:37 -0500 41.1124114990234 -74.162956237793 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between New York State Line (Mahwah Twp) and South of Exit 66 - NJ 17 (Mahwah Twp), Tuesday December 16, 2025 07:00 AM thru Wednesday December 17, 2025 12:00 AM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:38 -0500 41.1124114990234 -74.162956237793 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 21 - I-78 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday December 19, 2025 08:00 PM thru Saturday December 20, 2025 05:00 AM, left lane closed local lane Sat, 13 Dec 2025 06:54:32 -0500 40.6261596679688 -74.640869140625 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between New York State Line (Mahwah Twp) and South of Exit 66 - NJ 17 (Mahwah Twp), Saturday December 20, 2025 12:00 AM thru 06:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:33 -0500 41.1124114990234 -74.162956237793 NJ 18 southbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Southbound between New Jersey Turnpike (East Brunswick Twp) and Tices Ln (East Brunswick Twp), Monday December 15, 2025 10:00 PM thru Tuesday December 16, 2025 05:00 AM, left lane closed Sat, 13 Dec 2025 06:54:39 -0500 40.4728813171387 -74.4093704223633 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near North of Bishop Pl (New Brunswick), Friday December 19, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 06:54:40 -0500 40.5047302246094 -74.4486923217773 NJ 18 southbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Southbound between Tices Ln (East Brunswick Twp) and CR 606/Milltown Rd (East Brunswick Twp), Monday December 15, 2025 10:00 PM thru Tuesday December 16, 2025 05:00 AM, Sat, 13 Dec 2025 06:54:42 -0500 40.4570083618164 -74.401123046875 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between New York State Line (Mahwah Twp) and North of Exit 58 - US 202/Ramapo Valley Rd (Oakland), Friday December 19, 2025 07:00 AM thru 05:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:43 -0500 41.1124114990234 -74.162956237793 NJ 18 southbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Southbound between CR 535/Cranbury Rd (East Brunswick Twp) and South of Racetrack Rd (East Brunswick Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:44 -0500 40.4391784667969 -74.3931350708008 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near Morris Av/Hoes Ln West (Piscataway Twp), left shoulder Sat, 13 Dec 2025 06:54:16 -0500 40.5320129394531 -74.4687271118164 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near North of Bishop Pl (New Brunswick), Thursday December 18, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 06:54:18 -0500 40.5047302246094 -74.4486923217773 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near Morris Av/Hoes Ln West (Piscataway Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, left lane closed Sat, 13 Dec 2025 06:54:15 -0500 40.5320129394531 -74.4687271118164 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near Morris Av/Hoes Ln West (Piscataway Twp), left shoulder Sat, 13 Dec 2025 06:54:20 -0500 40.5320129394531 -74.4687271118164 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between New York State Line (Mahwah Twp) and South of Exit 66 - NJ 17 (Mahwah Twp), Thursday December 18, 2025 12:00 AM thru Friday December 19, 2025 12:00 AM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:22 -0500 41.1124114990234 -74.162956237793 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near Morris Av/Hoes Ln West (Piscataway Twp), Tuesday December 16, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 06:54:23 -0500 40.5320129394531 -74.4687271118164 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near North of Possumtown Rd (Piscataway Twp), Wednesday December 17, 2025 07:00 AM thru 03:00 PM, right shoulder closed Sat, 13 Dec 2025 06:54:24 -0500 40.5509414672852 -74.4836349487305 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near North of Possumtown Rd (Piscataway Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right lane closed Sat, 13 Dec 2025 06:54:19 -0500 40.5509414672852 -74.4836349487305 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between New York State Line (Mahwah Twp) and South of Exit 66 - NJ 17 (Mahwah Twp), Wednesday December 17, 2025 12:00 AM thru Thursday December 18, 2025 12:00 AM, right shoulder closed, moving operation Sat, 13 Dec 2025 06:54:25 -0500 41.1124114990234 -74.162956237793 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions At North of NJ 23 (Sussex) Wednesday December 17, 2025 07:00 AM thru 02:00 PM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 12 Dec 2025 23:15:31 -0500 41.2088317871094 -74.605827331543 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions At North of NJ 23 (Sussex) Thursday December 18, 2025 07:00 AM thru 02:00 PM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 12 Dec 2025 23:15:43 -0500 41.2088317871094 -74.605827331543 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions At North of NJ 23 (Sussex) Friday December 19, 2025 07:00 AM thru 02:00 PM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 12 Dec 2025 23:15:50 -0500 41.2088317871094 -74.605827331543 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions At North of NJ 23 (Sussex) Monday December 15, 2025 07:00 AM thru 02:00 PM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 12 Dec 2025 23:15:10 -0500 41.2088317871094 -74.605827331543 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions At North of NJ 23 (Sussex) Tuesday December 16, 2025 07:00 AM thru 02:00 PM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 12 Dec 2025 23:15:21 -0500 41.2088317871094 -74.605827331543 NY 33 eastbound : utility work NYSDOT - Region 4: utility work on NY 33 eastbound at 3865 Buffalo Rd (Ogden) Northline Utilities pole replacement for RGE. Replacing pole 141. Crew will be working in the eastbound shoulder/lane of traffic with flaggers, tma and alternating one lane traffic control , Wednesday December 17th, 2025 thru Saturday December 20th, 2025, Wednesday/Thursday/Friday/Saturday, 12:00 PM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently Fri, 12 Dec 2025 19:36:53 -0500 43.1374491044521 -77.7637092610894 NY 386 southbound : utility work NYSDOT - Region 4: utility work on NY 386 southbound at 782 Elmgrove Rd (Gates) Northline crews will be replacing a pole for RGE across from 782 Elmgrove Rd. This pole is 20' or so off the road between the southbound right lane of traffic and the parking lot of Gerber Collision. Crews and trucks will be in the right lane of traffic/ grass. Traffic control with flaggers and TMA , Wednesday December 17th, 2025 thru Saturday December 20th, 2025, Wednesday/Thursday/Friday/Saturday, 12:00 PM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently Fri, 12 Dec 2025 19:38:16 -0500 43.1608721551999 -77.7324 NY 259 northbound : utility work NYSDOT - Region 4: utility work on NY 259 northbound at 2938 S Union St (Ogden) Pole replacement for RGE. Crews will have flaggers and TMA vehicle, alternating one lane operations. Crews will be working in the northbound lane of traffic at this location , Wednesday December 17th, 2025 thru Saturday December 20th, 2025, Wednesday/Thursday/Friday/Saturday, 12:00 PM thru 03:00 PM All lanes closed intermittently Fri, 12 Dec 2025 19:35:17 -0500 43.1354937733416 -77.8066426597844 NY 33 eastbound : utility work NYSDOT - Region 4: utility work on NY 33 eastbound at 2591 Buffalo Rd (Gates) Crew will be replacing a pole for RGE at this location. Flaggers with TMA taking the right eastbound lane of traffic , Wednesday December 17th, 2025 thru Saturday December 20th, 2025, Wednesday/Thursday/Friday/Saturday, 12:00 PM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently Fri, 12 Dec 2025 19:33:16 -0500 43.1445917792802 -77.7224956695169 NY 390 southbound : bridge work NYSDOT - Region 4: bridge work on NY 390 southbound from Trolley Boulevard (Gates) to I-490 (Gates) I-390 SB RT lane closure at I490 EB ramp for bridge steel repair work , Monday December 15th, 2025 thru Wednesday December 17th, 2025, Monday/Tuesday/Wednesday, 09:30 AM thru 03:00 PM 1 Right lane of 3 lanes closed intermittently Fri, 12 Dec 2025 19:16:24 -0500 43.1723112396595 -77.6833529442778 NY 7 eastbound : gas main repairs NYSDOT TMC - Albany: gas main repairs on NY 7 eastbound Roosevelt Ave (Troy) to Brunswick Dr (Troy), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed Fri, 12 Dec 2025 15:18:58 -0500 42.7434746809491 -73.6457910716247 I-495 eastbound : construction NYSDOT - Region 11: construction on I-495 eastbound between 80th Street; I-495 (New York) Subject to change without notice., Friday December 19th, 2025, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed Fri, 12 Dec 2025 14:51:00 -0500 40.728553322043 -73.8819868134411 Bronx River Parkway northbound : bridge rehabilitation Westchester Co. DPW: bridge rehabilitation on Bronx River Parkway northbound between Midland Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) � There will be single lane closures , Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes open Fri, 12 Dec 2025 14:38:46 -0500 40.9340237507018 -73.8362973778776 US 4 both directions : installation of fiber optics NYSDOT TMC - Albany: installation of fiber optics on US 4 both directions Ferry Ln (Stillwater) to NY 32 at Durham Rd (Stillwater) - Alternating lane closures, Monday December 15th, 2025 thru Thursday December 18th, 2025, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 04:00 PM All lanes open Fri, 12 Dec 2025 14:28:03 -0500 42.9417989984534 -73.6487344006187 I-495 westbound : construction NYSDOT - Region 11: construction on I-495 westbound from Exit 22A - Grand Central Parkwy (New York) to Exit 22B - Van Wyck Expwy I-678 / College Point Blvd (New York) Subject to change without notice., Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 11:59 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday December 16th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 06:00 AM 2 Right lanes of 4 lanes closed, Friday December 19th, 2025 thru Saturday December 20th, 2025, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Saturday December 20th, 2025, 01:00 AM thru 06:00 AM 2 Right lanes of 4 lanes closed Fri, 12 Dec 2025 14:22:42 -0500 40.7414942056328 -73.8425515887345 New Jersey Turnpike northbound : deck work NJ Turnpike Auth.: construction and deck work on New Jersey Turnpike Inner Roadway northbound between Inner and Outer Roadway Merge (Mansfield Twp) and North of Interchange 14 - I-78/US 1&9 (Newark), Monday December 15th, 2025 thru Tuesday December 16th, 2025, 08:00 PM thru 05:00 AM All lanes closed Fri, 12 Dec 2025 14:22:46 -0500 40.0797044170661 -74.7484351830285 I-495 eastbound : construction NYSDOT - Region 11: construction on I-495 eastbound from Exit 19 - Woodhaven Boulevard / Queens Boulevard (New York) Subject to change without notice., Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 11:59 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday December 16th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 06:00 AM 2 Right lanes of 4 lanes closed, Friday December 19th, 2025 thru Saturday December 20th, 2025, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Saturday December 20th, 2025, 01:00 AM thru 06:00 AM 2 Right lanes of 4 lanes closed Fri, 12 Dec 2025 14:20:06 -0500 40.7252077352803 -73.8936523334902 New Jersey Turnpike - Western Spur northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike - Western Spur northbound between South of Interchange 15E - US 1&9 (Newark) and North of Interchange 15W - I-280 (Kearny), Monday December 15th, 2025 thru Tuesday December 16th, 2025, 09:00 PM thru 05:00 AM 2 Left lanes of 4 lanes closed Fri, 12 Dec 2025 14:18:24 -0500 40.7260658214202 -74.1318861562573 I-495 both directions : construction NYSDOT - Region 11: construction on I-495 both directions from 48th Street; Ramp (New York) to Exit 19 - Woodhaven Boulevard / Queens Boulevard (New York) Subject to change without notice., Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 11:59 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday December 16th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Friday December 19th, 2025 thru Saturday December 20th, 2025, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday December 20th, 2025, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed Fri, 12 Dec 2025 14:17:14 -0500 40.7273823260127 -73.9071363573559 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 29 - I-287/US 202/US 206 (Bridgewater Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Tuesday December 16, 2025 08:00 AM thru 02:00 PM, right lane closed Fri, 12 Dec 2025 14:12:18 -0500 40.6441383361816 -74.623779296875 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 29 - I-287/US 202/US 206 (Bridgewater Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Monday December 15, 2025 08:00 AM thru 02:00 PM, right lane closed Fri, 12 Dec 2025 14:12:16 -0500 40.6441383361816 -74.623779296875 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 29 - I-287/US 202/US 206 (Bridgewater Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Wednesday December 17, 2025 08:00 AM thru 02:00 PM, right lane closed Fri, 12 Dec 2025 14:12:17 -0500 40.6441383361816 -74.623779296875 E 115TH ST westbound : parade NYC DOT: parade on E 115TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) 2026 Annual Three Kings Day Parade. Closures are at the discretion of the NYPD., Tuesday January 6th, 2026, 11:00 AM thru 01:00 PM All lanes open Fri, 12 Dec 2025 14:09:20 -0500 40.7986834317137 -73.9439280448371 PARK AVE both directions : parade NYC DOT: parade on PARK AVE both directions between E 116TH ST (New York) and E 115TH ST (New York) 2026 Annual Three Kings Day Parade. Closures are at the discretion of the NYPD., Tuesday January 6th, 2026, 11:00 AM thru 01:00 PM All lanes open Fri, 12 Dec 2025 14:08:01 -0500 40.7993259642541 -73.943384797472 E 116TH ST both directions : parade NYC DOT: parade on E 116TH ST both directions between 3RD AVE (New York) and PARK AVE (New York) 2026 Annual Three Kings Day Parade. Closures are at the discretion of the NYPD., Tuesday January 6th, 2026, 11:00 AM thru 01:00 PM All lanes open Fri, 12 Dec 2025 14:06:01 -0500 40.7979752475631 -73.9400706695173 3RD AVE northbound : parade NYC DOT: parade on 3RD AVE northbound between E 106TH ST (New York) and E 116TH ST (New York) 2026 Annual Three Kings Day Parade. Closures are at the discretion of the NYPD., Tuesday January 6th, 2026, 11:00 AM thru 01:00 PM All lanes open Fri, 12 Dec 2025 14:03:18 -0500 40.7916134849963 -73.9446386652232 NJ 27 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 27 Both Directions between Talmadge Rd (Edison Twp) and NJ 35/St. Georges Av (Rahway) Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 04:00 AM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 12 Dec 2025 14:01:35 -0500 40.5254096984863 -74.3882827758789 E 106TH ST both directions : parade NYC DOT: parade on E 106TH ST both directions between PARK AVE (New York) and 3RD AVE (New York) 2026 Annual Three Kings Day Parade. Closures are at the discretion of the NYPD., Tuesday January 6th, 2026, 11:00 AM thru 01:00 PM All lanes open Fri, 12 Dec 2025 14:00:52 -0500 40.7928413429502 -73.9476997602606 NJ 27 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 27 Both Directions between Talmadge Rd (Edison Twp) and NJ 35/St. Georges Av (Rahway) Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 04:00 AM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 12 Dec 2025 14:00:26 -0500 40.5254096984863 -74.3882827758789 NJ 27 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 27 Both Directions between Talmadge Rd (Edison Twp) and NJ 35/St. Georges Av (Rahway) Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 04:00 AM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 12 Dec 2025 14:00:43 -0500 40.5254096984863 -74.3882827758789 NJ 27 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 27 Both Directions between Talmadge Rd (Edison Twp) and NJ 35/St. Georges Av (Rahway) Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 04:00 AM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 12 Dec 2025 14:01:19 -0500 40.5254096984863 -74.3882827758789 NJ 27 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 27 Both Directions between Talmadge Rd (Edison Twp) and NJ 35/St. Georges Av (Rahway) Sunday December 14, 2025 08:00 PM thru Monday December 15, 2025 04:00 AM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 12 Dec 2025 13:59:42 -0500 40.5254096984863 -74.3882827758789 E 106TH ST both directions : parade NYC DOT: parade on E 106TH ST both directions between 5TH AVE (New York) and PARK AVE (New York) 2026 Annual Three Kings Day Parade. Closures are at the discretion of the NYPD., Tuesday January 6th, 2026, 11:00 AM thru 01:00 PM All lanes open Fri, 12 Dec 2025 13:59:07 -0500 40.7942743837006 -73.9510761646847 NY 32 northbound : utility work NYSDOT - Region 8: utility work on NY 32 northbound between Scism Road (Red Hook) and Pleasantvale Road (Red Hook) 2025082248645/32667209 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday December 18th, 2025 thru Friday December 19th, 2025 Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic Fri, 12 Dec 2025 13:16:51 -0500 42.0434679128166 -73.8476446164433 Garden State Parkway northbound : overhead sign repair NJ Turnpike Auth.: overhead sign repair on Garden State Parkway northbound between North of Exit 137 - NJ 28 (Kenilworth) and South of Union Toll Plaza (Hillside Twp), Friday December 19th, 2025 thru Saturday December 20th, 2025, 08:00 PM thru 06:00 AM 1 Right lane of 5 lanes closed, Friday December 19th, 2025 thru Saturday December 20th, 2025, 11:00 PM thru 01:00 AM 1 Center lane of 5 lanes closed, Saturday December 20th, 2025 thru Sunday December 21st, 2025, 09:00 PM thru 06:00 AM 1 Right lane of 5 lanes closed, Sunday December 21st, 2025 thru Sunday December 21st, 2025, 12:00 AM thru 01:00 AM 1 Center lane of 5 lanes closed Fri, 12 Dec 2025 12:59:45 -0500 40.6684910437092 -74.2840376485294 NY 208 both directions : road maintenance operations NYSDOT - Region 8: road maintenance operations on NY 208 both directions between Hollis Lane (Montgomery) and Goodwill Road (Montgomery) 202508106130/32451309 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday December 18th, 2025 thru Friday December 19th, 2025 Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic Fri, 12 Dec 2025 12:59:46 -0500 41.5132234676288 -74.2074230143486 NY 5 both directions : utility work NYSDOT - Region 4: utility work on NY 5 both directions between Genesee-Livingston County Line (Le Roy) and Route 36 Junction Caledonia (Caledonia) Alternating lane closures with flaggers as needed, Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes Fri, 12 Dec 2025 12:54:42 -0500 42.9784888191419 -77.9094224213856 Garden State Parkway northbound : line striping NJ Turnpike Auth.: line striping on Garden State Parkway northbound Exit ramp Exit 142-A - I-78 East (Hillside Twp), Friday December 19th, 2025 thru Saturday December 20th, 2025, 10:00 PM thru 06:00 AM All lanes closed Fri, 12 Dec 2025 12:54:27 -0500 40.7024439416753 -74.2470721166495 Garden State Parkway southbound : crack sealing NJ Turnpike Auth.: crack sealing on Garden State Parkway Local Lanes southbound between North of Exit 109 - CR 520 (Middletown Twp) and North of Exit 105 - NJ 36 (Tinton Falls), Wednesday December 17th, 2025 thru Thursday December 18th, 2025, 11:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed Fri, 12 Dec 2025 12:51:54 -0500 40.3435326567611 -74.1093590542358 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway southbound between South of Raritan Toll Plaza (Sayreville), Wednesday December 17th, 2025 thru Thursday December 18th, 2025, 10:00 PM thru 06:00 AM 8 Left lanes of 9 lanes closed Fri, 12 Dec 2025 12:48:33 -0500 40.4869170514968 -74.3033585897007 Garden State Parkway northbound : line striping NJ Turnpike Auth.: line striping on Garden State Parkway northbound between Exit 138 - CR 509 (Kenilworth) and Union Toll Plaza (Hillside Twp), Wednesday December 17th, 2025 thru Friday December 19th, 2025, Wednesday/Thursday, 08:00 PM thru 06:00 AM 1 Left lane of 5 lanes closed, Wednesday December 17th, 2025 thru Friday December 19th, 2025, Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed Fri, 12 Dec 2025 12:22:15 -0500 40.6791865943964 -74.2781340216811 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of CR 679/Station Rd (Bridgewater Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 12:12:16 -0500 40.5969848632812 -74.6754150390625 Garden State Parkway northbound : line striping NJ Turnpike Auth.: line striping on Garden State Parkway northbound between South of Union Toll Plaza (Hillside Twp), Wednesday December 17th, 2025 thru Friday December 19th, 2025, Wednesday/Thursday, 08:00 PM thru 06:00 AM 6 Center lanes of 13 lanes closed, Friday December 19th, 2025 thru Saturday December 20th, 2025, 08:00 PM thru 06:00 AM 6 Left lanes of 13 lanes closed Fri, 12 Dec 2025 12:56:12 -0500 40.7031131436766 -74.2465460810766 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of CR 679/Station Rd (Branchburg Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 12:09:18 -0500 40.5974807739258 -74.6772003173828 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of CR 679/Station Rd (Branchburg Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, left lane closed Fri, 12 Dec 2025 12:09:19 -0500 40.5974807739258 -74.6772003173828 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of CR 679/Station Rd (Branchburg Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, left lane closed Fri, 12 Dec 2025 12:09:15 -0500 40.5974807739258 -74.6772003173828 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of CR 679/Station Rd (Branchburg Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 12:09:17 -0500 40.5974807739258 -74.6772003173828 NY 14A southbound : installation of fiber optics NYSDOT - Region 6: installation of fiber optics on NY 14A southbound Highland Drive (Starkey) 1 Lane, 2 Way, Flagger Control, Wednesday December 17th, 2025 thru Tuesday December 23rd, 2025, Sunday thru Saturday, 08:00 AM thru 03:00 PM All lanes open Fri, 12 Dec 2025 12:04:03 -0500 42.5262790471858 -76.980945535336 Garden State Parkway southbound : steel repairs NJ Turnpike Auth.: steel repairs on Garden State Parkway southbound between South of Exit 156 - US 46 (Clifton) and South of Exit 154 - US 46 (Clifton), Thursday December 18th, 2025 thru Friday December 19th, 2025, Thursday/Friday, 12:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed Fri, 12 Dec 2025 12:03:23 -0500 40.8879958120585 -74.1453781986545 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway northbound between South of Exit 137 - NJ 28 (Cranford Twp) and South of Exit 140 - US 22/NJ 82 (Union Twp), Tuesday December 16th, 2025 thru Wednesday December 17th, 2025, 10:30 PM thru 05:00 AM 2 Right lanes of 5 lanes closed Fri, 12 Dec 2025 12:01:26 -0500 40.6530331005674 -74.2871576916882 US 1 northbound : roadwork NJDOT - STMC: Roadwork on US 1 Northbound near North of College Rd (Plainsboro Twp), Thursday December 18, 2025 09:00 PM thru Friday December 19, 2025 05:00 AM, right shoulder closed Fri, 12 Dec 2025 12:00:16 -0500 40.3603477478027 -74.6029281616211 Garden State Parkway northbound : attenuator repairs NJ Turnpike Auth.: attenuator repairs on Garden State Parkway northbound Exit ramp Exit 142C - Maplewood (Hillside Twp), Tuesday December 16th, 2025, 09:00 PM thru 10:00 PM All lanes closed Fri, 12 Dec 2025 11:56:14 -0500 40.7085653278036 -74.2449209387462 US 9 northbound : repaving NYSDOT TMC - Albany: repaving on US 9 northbound Farm to Market Rd (Clifton Park) to English Rd (Malta), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed Fri, 12 Dec 2025 11:50:14 -0500 42.888025369024 -73.7729003059274 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway southbound Entrance ramp Exit 154 - US 46 (Clifton), Tuesday December 16th, 2025 thru Thursday December 18th, 2025, Tuesday/Wednesday, 10:00 PM thru 05:00 AM All lanes closed Fri, 12 Dec 2025 11:49:36 -0500 40.8767360655352 -74.1676531147706 NJ 208 northbound : roadwork NJDOT - STMC: Roadwork on NJ 208 Northbound at North of Morlot Av (Fair Lawn) Tuesday December 16, 2025 04:00 AM thru 05:00 AM, ramp Fri, 12 Dec 2025 11:45:17 -0500 40.9323348999023 -74.1134185791016 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of Passaic Ave (Clifton), Monday December 15, 2025 09:00 AM thru 03:00 PM, left lane closed Fri, 12 Dec 2025 11:45:16 -0500 40.833324432373 -74.1461791992188 Garden State Parkway southbound : guard rail repairs NJ Turnpike Auth.: guard rail repairs on Garden State Parkway southbound Entrance ramp Exit 157 - US 46 (Elmwood Park), Wednesday December 17th, 2025, 01:00 AM thru 03:00 AM All lanes closed Fri, 12 Dec 2025 11:43:37 -0500 40.8933534151774 -74.1205137220925 NY 119 westbound : road rehabilitation NYSDOT - Region 8: road rehabilitation on NY 119 westbound between Old White Plains Road (Tarrytown) and Sleepy Hollow Road (Tarrytown) 202408110361/32476909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure Fri, 12 Dec 2025 11:45:43 -0500 41.0633596472551 -73.8447068811808 Garden State Parkway northbound : crack sealing NJ Turnpike Auth.: crack sealing on Garden State Parkway northbound between South of Exit 38 - Atlantic City Expressway (Egg Harbor Twp) and South of Frank Sinatra Service Area (Galloway Twp), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed Fri, 12 Dec 2025 11:29:53 -0500 39.4092996816247 -74.5554427346977 NJ 120/Paterson Plank Road northbound : roadwork NJDOT - STMC: Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of CR 503 (East Rutherford), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:31 -0500 40.8186531066895 -74.0677261352539 NJ 120/Paterson Plank Road northbound : roadwork NJDOT - STMC: Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of CR 503 (East Rutherford), Monday December 15, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:25 -0500 40.8186531066895 -74.0677261352539 NJ 120/Paterson Plank Road northbound : roadwork NJDOT - STMC: Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of CR 503 (East Rutherford), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:27 -0500 40.8186531066895 -74.0677261352539 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 21 - I-78 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 05:00 AM, left lane closed local lane Fri, 12 Dec 2025 11:27:28 -0500 40.6261596679688 -74.640869140625 NJ 120/Paterson Plank Road northbound : roadwork NJDOT - STMC: Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of CR 503 (East Rutherford), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:29 -0500 40.8186531066895 -74.0677261352539 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near East of Exit 63 - NJ 17 North (Lodi), Monday December 15, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:20 -0500 40.8881034851074 -74.0707778930664 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound at NJ 3 (Rutherford) Thursday December 18, 2025 09:00 PM thru Friday December 19, 2025 06:00 AM, ramp Fri, 12 Dec 2025 11:27:21 -0500 40.8093223571777 -74.1011047363281 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of Grove St (Clifton), Friday December 19, 2025 09:00 AM thru 03:00 PM, deceleration lane closed Fri, 12 Dec 2025 11:27:22 -0500 40.864933013916 -74.1819686889648 NJ 120/Paterson Plank Road southbound : roadwork NJDOT - STMC: Roadwork on NJ 120/Paterson Plank Road Southbound near In the vicinity of CR 503 (East Rutherford), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:24 -0500 40.8198547363281 -74.0686416625977 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 21 - I-78 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 05:00 AM, left lane closed local lane Fri, 12 Dec 2025 11:27:19 -0500 40.6261596679688 -74.640869140625 NJ 120/Paterson Plank Road southbound : roadwork NJDOT - STMC: Roadwork on NJ 120/Paterson Plank Road Southbound near In the vicinity of CR 503 (East Rutherford), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:39 -0500 40.8198547363281 -74.0686416625977 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 21 - I-78 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, left lane closed local lane Fri, 12 Dec 2025 11:27:41 -0500 40.6261596679688 -74.640869140625 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near East of Exit 63 - NJ 17 North (Lodi), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:42 -0500 40.8881034851074 -74.0707778930664 Garden State Parkway southbound : line striping NJ Turnpike Auth.: line striping on Garden State Parkway southbound Entrance ramp Exit 125 - NJ 35 (Sayreville), Monday December 15th, 2025 thru Tuesday December 16th, 2025, 10:30 PM thru 05:00 AM All lanes closed Fri, 12 Dec 2025 11:28:25 -0500 40.4924657887488 -74.3033539972453 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near East of Exit 63 - NJ 17 North (Lodi), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:35 -0500 40.8881034851074 -74.0707778930664 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 21 - I-78 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, left lane closed local lane Fri, 12 Dec 2025 11:27:36 -0500 40.6261596679688 -74.640869140625 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound at NJ 3 (Rutherford) Wednesday December 17, 2025 09:00 PM thru Thursday December 18, 2025 06:00 AM, ramp Fri, 12 Dec 2025 11:27:37 -0500 40.8093223571777 -74.1011047363281 NJ 120/Paterson Plank Road northbound : roadwork NJDOT - STMC: Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of CR 503 (East Rutherford), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:38 -0500 40.8186531066895 -74.0677261352539 NJ 120/Paterson Plank Road southbound : roadwork NJDOT - STMC: Roadwork on NJ 120/Paterson Plank Road Southbound near In the vicinity of CR 503 (East Rutherford), Monday December 15, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:32 -0500 40.8198547363281 -74.0686416625977 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near East of Exit 63 - NJ 17 North (Lodi), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:33 -0500 40.8881034851074 -74.0707778930664 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near East of Exit 63 - NJ 17 North (Lodi), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:15 -0500 40.8881034851074 -74.0707778930664 NJ 120/Paterson Plank Road southbound : roadwork NJDOT - STMC: Roadwork on NJ 120/Paterson Plank Road Southbound near In the vicinity of CR 503 (East Rutherford), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:16 -0500 40.8198547363281 -74.0686416625977 NJ 120/Paterson Plank Road southbound : roadwork NJDOT - STMC: Roadwork on NJ 120/Paterson Plank Road Southbound near In the vicinity of CR 503 (East Rutherford), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 11:27:18 -0500 40.8198547363281 -74.0686416625977 Garden State Parkway northbound : steel repairs NJ Turnpike Auth.: steel repairs on Garden State Parkway northbound between South of Exit 155B - Passaic (Clifton), Monday December 15th, 2025 thru Thursday December 18th, 2025, Monday/Tuesday/Wednesday, 10:00 PM thru 05:00 AM All lanes closed Fri, 12 Dec 2025 11:23:33 -0500 40.8782513534031 -74.1659511385565 NY 252 both directions : utility work NYSDOT - Region 4: utility work on NY 252 both directions between I-390 (Henrietta) and Edgewood Ave. (Henrietta) Alternating lane closures with flaggers as needed, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes Fri, 12 Dec 2025 10:59:24 -0500 43.0871562574038 -77.6011193052852 Garden State Parkway northbound : steel repairs NJ Turnpike Auth.: steel repairs on Garden State Parkway northbound between North of Exit 153A - NJ 3 (Clifton) and North of Exit 155B - Passaic (Clifton), Monday December 15th, 2025 thru Wednesday December 17th, 2025, Monday/Tuesday, 10:00 PM thru 06:00 AM 2 Left lanes of 3 lanes closed Fri, 12 Dec 2025 10:57:09 -0500 40.860507711865 -74.1733258153915 New Jersey Turnpike - Western Spur southbound : installation of sign structure NJ Turnpike Auth.: barrier repairs and installation of sign structure and milling on New Jersey Turnpike - Western Spur southbound between South of Northern Mixing Bowl (Ridgefield) and South of Interchange 15E - US 1&9 (Newark), Friday December 19th, 2025 thru Saturday December 20th, 2025, 09:00 PM thru 06:00 AM All lanes closed Fri, 12 Dec 2025 10:53:18 -0500 40.8378812305077 -74.0199821539956 New Jersey Turnpike northbound : barrier repairs NJ Turnpike Auth.: barrier repairs and guard rail repairs and street sweeping on New Jersey Turnpike Outer Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and Interchange 14 - I-78/US 1&9 (Newark), Thursday December 18th, 2025 thru Friday December 19th, 2025, 08:00 PM thru 05:00 AM All lanes closed Fri, 12 Dec 2025 10:51:58 -0500 40.0786925805957 -74.7497259310311 I-81 southbound : roadwork NYSDOT - Region 3: roadwork on I-81 southbound between Exit 106 (Old Exit 32) - NY 49; Central Square (Hastings) and Onondaga - Oswego County Line (West Monroe), Monday December 15th, 2025 thru Tuesday December 16th, 2025, Monday/Tuesday, 08:00 AM thru 04:00 PM 1 Right lane of 3 lanes closed Fri, 12 Dec 2025 10:50:21 -0500 43.2830124573895 -76.125788637073 I-81 northbound : roadwork NYSDOT - Region 3: roadwork on I-81 northbound between Onondaga - Oswego County Line (West Monroe) and Exit 106 (Old Exit 32) - NY 49; Central Square (Hastings), Monday December 15th, 2025 thru Tuesday December 16th, 2025, Monday/Tuesday, 08:00 AM thru 04:00 PM 1 Left lane of 3 lanes closed Fri, 12 Dec 2025 10:43:04 -0500 43.2351220625378 -76.12958047966 NY 33 westbound : roadwork NITTEC: roadwork on NY 33 westbound Fillmore Avenue (Buffalo), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed Fri, 12 Dec 2025 10:43:07 -0500 42.9279299256355 -78.8367466728897 New Jersey Turnpike - Western Spur northbound : barrier repairs NJ Turnpike Auth.: barrier repairs and traffic shift on New Jersey Turnpike - Western Spur northbound between Southern Mixing Bowl (Newark) and North of Interchange 15W - I-280 (Kearny), Wednesday December 17th, 2025 thru Saturday December 20th, 2025, Wednesday/Thursday/Friday, 09:00 PM thru 04:00 AM All lanes closed Fri, 12 Dec 2025 10:40:15 -0500 40.7136246569829 -74.1405310515837 New Jersey Turnpike/I-95 northbound : guard rail repairs NJ Turnpike Auth.: construction and guard rail repairs on New Jersey Turnpike/I-95 Local Lanes northbound between Exit 70B - Teaneck (Teaneck Twp) and South of Exit 72 (NB) - US 9W/US 1&9/US 46 (Englewood), Tuesday December 16th, 2025 thru Wednesday December 17th, 2025, 09:00 PM thru 04:00 AM All lanes closed Fri, 12 Dec 2025 10:38:41 -0500 40.8651037216344 -74.0084868964752 NJ 122 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 122 Northbound At Dalton St (Pohatcong Twp) Wednesday December 17, 2025 07:00 AM thru 03:30 PM, right shoulder closed Fri, 12 Dec 2025 10:37:41 -0500 40.6766510009766 -75.164680480957 New Jersey Turnpike - Western Spur southbound : installation of sign structure NJ Turnpike Auth.: installation of sign structure on New Jersey Turnpike - Western Spur southbound between South of Northern Mixing Bowl (Ridgefield) and North of Interchange 18W - I-80/US 46/George Washington Bridge (Carlstadt), Monday December 15th, 2025 thru Tuesday December 16th, 2025, 10:00 PM thru 04:00 AM All lanes closed Fri, 12 Dec 2025 10:37:23 -0500 40.8378812305077 -74.0199821539956 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of Grove St (Clifton), Thursday December 18, 2025 09:00 AM thru 03:00 PM, deceleration lane closed Fri, 12 Dec 2025 10:34:22 -0500 40.864933013916 -74.1819686889648 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of Grove St (Clifton), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, deceleration lane closed Fri, 12 Dec 2025 10:34:24 -0500 40.864933013916 -74.1819686889648 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound at East of NJ 17 (Rutherford) Monday December 15, 2025 09:00 AM thru 02:00 PM, ramp, right partial lane Fri, 12 Dec 2025 10:34:20 -0500 40.8105773925781 -74.0997924804688 NJ 495 westbound : roadwork NJDOT - STMC: Roadwork on NJ 495 Westbound near East of US 1&9 (North Bergen Twp), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 10:34:21 -0500 40.7750701904297 -74.0385513305664 Bronx River Parkway both directions : construction NYSDOT - Region 11: construction on Bronx River Parkway both directions between Cross Bronx Expressway; East 177th Street (New York) and Exit 7E - US 1; Boston Road (New York) Subject to change without notice., Friday December 19th, 2025, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound, Saturday December 20th, 2025 thru Sunday December 21st, 2025, Saturday/ Sunday, 12:00 AM thru 11:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound Fri, 12 Dec 2025 10:34:06 -0500 40.8370837340027 -73.8734332689251 New Jersey Turnpike southbound : line striping NJ Turnpike Auth.: construction and line striping and milling on New Jersey Turnpike Outer Roadway southbound between North of Interchange 14 - I-78/US 1&9 (Newark) and South of Molly Pitcher Service Area (Cranbury Twp), Monday December 15th, 2025 thru Thursday December 18th, 2025, Monday/Tuesday/Wednesday, 09:00 PM thru 05:00 AM All lanes closed Fri, 12 Dec 2025 10:33:29 -0500 40.7125224726015 -74.1442700730626 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of CR 509/Broad St (Clifton), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Fri, 12 Dec 2025 10:31:36 -0500 40.8553276062012 -74.1781692504883 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of CR 509/Broad St (Clifton), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 06:00 AM, at least one lane closed Fri, 12 Dec 2025 10:31:38 -0500 40.8553276062012 -74.1781692504883 US 9 southbound : roadwork NJDOT - STMC: Roadwork on US 9 Southbound between South of CR 616/New Brunswick Ave (Woodbridge Twp) and South of Edison Bridge (Sayreville), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 10:31:33 -0500 40.5236625671387 -74.2994689941406 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of CR 509/Broad St (Clifton), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, deceleration lane closed Fri, 12 Dec 2025 10:31:34 -0500 40.8553276062012 -74.1781692504883 US 1&9 Truck Route southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Southbound near NJ 440 (Jersey City), Wednesday December 17, 2025 10:00 AM thru 02:00 PM, right lane closed Fri, 12 Dec 2025 10:31:35 -0500 40.724536895752 -74.0902557373047 US 1&9 Truck Route southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Southbound near NJ 440 (Jersey City), Tuesday December 16, 2025 10:00 AM thru 02:00 PM, right lane closed Fri, 12 Dec 2025 10:31:40 -0500 40.724536895752 -74.0902557373047 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of CR 509/Broad St (Clifton), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Fri, 12 Dec 2025 10:31:41 -0500 40.8553276062012 -74.1781692504883 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of Grove St (Clifton), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 06:00 AM, at least one lane closed Fri, 12 Dec 2025 10:31:42 -0500 40.864933013916 -74.1819686889648 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of Grove St (Clifton), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Fri, 12 Dec 2025 10:31:43 -0500 40.864933013916 -74.1819686889648 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of Grove St (Clifton), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 06:00 AM, at least one lane closed Fri, 12 Dec 2025 10:31:39 -0500 40.864933013916 -74.1819686889648 US 9 northbound : roadwork NJDOT - STMC: Roadwork on US 9 Northbound between South of Edison Bridge (Sayreville) and NJ 440 (Woodbridge Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 10:31:45 -0500 40.5050086975098 -74.3005752563477 US 9 southbound : roadwork NJDOT - STMC: Roadwork on US 9 Southbound between South of CR 616/New Brunswick Ave (Woodbridge Twp) and South of Edison Bridge (Sayreville), Monday December 15, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 10:31:46 -0500 40.5236625671387 -74.2994689941406 NJ 495 westbound : roadwork NJDOT - STMC: Roadwork on NJ 495 Westbound near East of US 1&9 (North Bergen Twp), Monday December 15, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 10:31:47 -0500 40.7750701904297 -74.0385513305664 US 1&9 Truck Route southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Southbound near NJ 440 (Jersey City), Thursday December 18, 2025 10:00 AM thru 02:00 PM, right lane closed Fri, 12 Dec 2025 10:31:24 -0500 40.724536895752 -74.0902557373047 NJ 495 westbound : roadwork NJDOT - STMC: Roadwork on NJ 495 Westbound near East of US 1&9 (North Bergen Twp), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 10:31:25 -0500 40.7750701904297 -74.0385513305664 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of Grove St (Clifton), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Fri, 12 Dec 2025 10:31:26 -0500 40.864933013916 -74.1819686889648 New Jersey Turnpike northbound : deck work NJ Turnpike Auth.: deck work and street sweeping on New Jersey Turnpike Inner Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and North of Interchange 12 - Carteret-Rahway (Linden), Monday December 15th, 2025 thru Tuesday December 16th, 2025, 08:00 PM thru 05:00 AM All lanes closed Fri, 12 Dec 2025 10:31:13 -0500 40.0787047875987 -74.749715486836 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of CR 509/Broad St (Clifton), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, deceleration lane closed Fri, 12 Dec 2025 10:31:20 -0500 40.8553276062012 -74.1781692504883 US 9 northbound : roadwork NJDOT - STMC: Roadwork on US 9 Northbound between South of Edison Bridge (Sayreville) and NJ 440 (Woodbridge Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 10:31:21 -0500 40.5050086975098 -74.3005752563477 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of CR 509/Broad St (Clifton), Monday December 15, 2025 09:00 AM thru 03:00 PM, deceleration lane closed Fri, 12 Dec 2025 10:31:22 -0500 40.8553276062012 -74.1781692504883 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near East of CR 509/Broad St (Clifton), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 06:00 AM, at least one lane closed Fri, 12 Dec 2025 10:31:27 -0500 40.8553276062012 -74.1781692504883 US 9 northbound : roadwork NJDOT - STMC: Roadwork on US 9 Northbound between South of Edison Bridge (Sayreville) and NJ 440 (Woodbridge Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 10:31:28 -0500 40.5050086975098 -74.3005752563477 US 1&9 Truck Route southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Southbound near NJ 440 (Jersey City), Friday December 19, 2025 10:00 AM thru 02:00 PM, right lane closed Fri, 12 Dec 2025 10:31:29 -0500 40.724536895752 -74.0902557373047 NJ 495 westbound : roadwork NJDOT - STMC: Roadwork on NJ 495 Westbound near East of US 1&9 (North Bergen Twp), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 10:31:31 -0500 40.7750701904297 -74.0385513305664 NJ 495 westbound : roadwork NJDOT - STMC: Roadwork on NJ 495 Westbound near East of US 1&9 (North Bergen Twp), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 10:31:32 -0500 40.7750701904297 -74.0385513305664 NJ 94 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 94 Northbound between North of Mount Pleasant Rd (Knowlton Twp) and North of CR 521/Stillwater Rd (Blairstown Twp) Tuesday December 16, 2025 09:00 AM thru 03:00 PM, All lanes open Fri, 12 Dec 2025 10:30:32 -0500 40.9567794799805 -75.0595397949219 NJ 94 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 94 Northbound between North of Mount Pleasant Rd (Knowlton Twp) and North of CR 521/Stillwater Rd (Blairstown Twp) Wednesday December 17, 2025 09:00 AM thru 03:00 PM, All lanes open Fri, 12 Dec 2025 10:30:47 -0500 40.9567794799805 -75.0595397949219 NJ 94 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 94 Northbound between North of Mount Pleasant Rd (Knowlton Twp) and North of CR 521/Stillwater Rd (Blairstown Twp) Monday December 15, 2025 09:00 AM thru 03:00 PM, All lanes open Fri, 12 Dec 2025 10:30:12 -0500 40.9567794799805 -75.0595397949219 New Jersey Turnpike northbound : milling NJ Turnpike Auth.: milling on New Jersey Turnpike Outer Roadway northbound Entrance ramp Interchange 12 - Carteret-Rahway (Carteret), Thursday December 18th, 2025 thru Friday December 19th, 2025, 08:00 PM thru 05:00 AM All lanes closed Fri, 12 Dec 2025 10:29:52 -0500 40.5947193831536 -74.2325871952006 New Jersey Turnpike - Pennsylvania Ext. westbound : deck work NJ Turnpike Auth.: deck work on New Jersey Turnpike - Pennsylvania Ext. westbound between West of New Jersey Turnpike South (Mansfield Twp), Wednesday December 17th, 2025 thru Thursday December 18th, 2025, 09:00 PM thru 03:00 AM 2 Left lanes of 3 lanes closed Fri, 12 Dec 2025 10:26:34 -0500 40.0968336591346 -74.7376753957423 New Jersey Turnpike/I-95 southbound : guard rail repairs NJ Turnpike Auth.: guard rail repairs on New Jersey Turnpike/I-95 Local Lanes southbound between North of Exit 71 (NB) - NJ 4/Broad Ave (Englewood) and North of Exit 69 - I-80 (Teaneck Twp), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed Fri, 12 Dec 2025 10:25:10 -0500 40.8716490200322 -73.9793603086082 New Jersey Turnpike/I-95 northbound : guard rail repairs NJ Turnpike Auth.: guard rail repairs on New Jersey Turnpike/I-95 Express Lanes northbound between Exit 70B - Teaneck (Teaneck Twp) and Exit 72 (NB) - US 9W/US 1&9/US 46 (Leonia), Monday December 15th, 2025 thru Tuesday December 16th, 2025, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Wednesday December 17th, 2025 thru Friday December 19th, 2025, Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed Fri, 12 Dec 2025 10:23:55 -0500 40.8652615731042 -74.0085420493914 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Thursday December 18, 2025 07:00 AM thru 05:00 PM, right shoulder closed Fri, 12 Dec 2025 09:58:29 -0500 40.513240814209 -74.6323852539062 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Tuesday December 16, 2025 07:00 AM thru 05:00 PM, right shoulder closed Fri, 12 Dec 2025 09:58:28 -0500 40.513240814209 -74.6323852539062 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 09:58:30 -0500 40.834114074707 -74.3345031738281 US 1&9 northbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Northbound near South of Elizabeth Ave (Elizabeth), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, right lane closed Fri, 12 Dec 2025 09:58:32 -0500 40.6585273742676 -74.2093887329102 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Wednesday December 17, 2025 07:00 AM thru 03:00 PM, right shoulder closed Fri, 12 Dec 2025 09:58:34 -0500 40.5338592529297 -74.6204376220703 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Monday December 15, 2025 07:00 AM thru 03:00 PM, right shoulder closed Fri, 12 Dec 2025 09:58:33 -0500 40.5338592529297 -74.6204376220703 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Friday December 19, 2025 07:00 AM thru 05:00 PM, right shoulder closed Fri, 12 Dec 2025 09:58:36 -0500 40.513240814209 -74.6323852539062 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Thursday December 18, 2025 07:00 AM thru 03:00 PM, right shoulder closed Fri, 12 Dec 2025 09:58:24 -0500 40.5338592529297 -74.6204376220703 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Monday December 15, 2025 07:00 AM thru 05:00 PM, right shoulder closed Fri, 12 Dec 2025 09:58:25 -0500 40.513240814209 -74.6323852539062 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Tuesday December 16, 2025 07:00 AM thru 03:00 PM, right shoulder closed Fri, 12 Dec 2025 09:58:26 -0500 40.5338592529297 -74.6204376220703 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Friday December 19, 2025 07:00 AM thru 03:00 PM, right shoulder closed Fri, 12 Dec 2025 09:58:20 -0500 40.5338592529297 -74.6204376220703 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Wednesday December 17, 2025 07:00 AM thru 05:00 PM, right shoulder closed Fri, 12 Dec 2025 09:58:22 -0500 40.513240814209 -74.6323852539062 US 1&9 southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Southbound near Grand St (Elizabeth), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, right lane closed Fri, 12 Dec 2025 09:58:21 -0500 40.6648483276367 -74.2054061889648 NJ 94 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 94 Northbound At South of CR 517/Mcafee Rd (Vernon Twp) Monday December 15, 2025 09:00 AM thru 03:30 PM, left shoulder closed Fri, 12 Dec 2025 09:44:04 -0500 41.1729316711426 -74.5497283935547 NY 30 northbound : bridge inspection NYSDOT - Region 2: bridge inspection on NY 30 northbound between NY 5S (Amsterdam) and West Main Street; NY 5 (Amsterdam) Motorists will encounter a full northbound ramp closure with a detour in place, Monday December 15th, 2025, 08:00 AM thru 12:00 PM, Fri, 12 Dec 2025 09:01:24 -0500 42.9354463587793 -74.1924408645852 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of CR 575/Pomona Rd (Galloway Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 08:34:21 -0500 39.469799041748 -74.5625839233398 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between South of CR 689/Milford Rd (Berlin) and North of CR 537/Main St (Maple Shade Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:34:22 -0500 39.7947807312012 -74.9221343994141 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between NJ 109 (Lower Twp) and South of Great Egg Harbor Bay (Upper Twp), left shoulder, moving operation Fri, 12 Dec 2025 08:34:23 -0500 38.9662971496582 -74.9151611328125 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near South of Lalor St (Trenton), Friday December 19, 2025 10:00 AM thru 02:00 PM, left lane closed Fri, 12 Dec 2025 08:34:20 -0500 40.195987701416 -74.7574615478516 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between North of CR 537/Main St (Maple Shade Twp) and South of CR 689/Milford Rd (Berlin), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:34:28 -0500 39.9599838256836 -74.9896240234375 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between South of I-295 (Mount Laurel Twp) and South of NJ 38 (Maple Shade Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 08:34:29 -0500 39.9325561523438 -74.9624710083008 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound between North of CR 644/Dolphin Av (Northfield) and Chapman Blvd (Somers Point), left shoulder, moving operation Fri, 12 Dec 2025 08:34:31 -0500 39.3823547363281 -74.5441589355469 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between NJ 109 (Lower Twp) and South of Great Egg Harbor Bay (Upper Twp), left shoulder, moving operation Fri, 12 Dec 2025 08:34:24 -0500 38.9662971496582 -74.9151611328125 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between South of I-295 (Bellmawr) and US 322/CR 536 Spur (Monroe Twp), Wednesday December 17, 2025 09:00 AM thru 01:00 PM, , moving operation Fri, 12 Dec 2025 08:34:25 -0500 39.8649711608887 -75.1009826660156 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between US 322/CR 536 Spur (Monroe Twp) and South of I-295 (Bellmawr), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:34:26 -0500 39.6893310546875 -74.9929809570312 NJ 38 eastbound : roadwork NJDOT - TOC South: Roadwork on NJ 38 near CR 625/Longwood Av (Cherry Hill Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:34:27 -0500 39.936351776123 -75.0451354980469 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between South of I-295 (Mount Laurel Twp) and South of NJ 38 (Maple Shade Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 08:28:42 -0500 39.9325561523438 -74.9624710083008 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound between North of CR 644/Dolphin Av (Northfield) and Chapman Blvd (Somers Point), left shoulder, moving operation Fri, 12 Dec 2025 08:28:24 -0500 39.3823547363281 -74.5441589355469 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 06:00 AM, left lane closed Fri, 12 Dec 2025 08:28:25 -0500 39.7551803588867 -75.0467071533203 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 06:00 AM, left lane closed Fri, 12 Dec 2025 08:28:26 -0500 39.7551803588867 -75.0467071533203 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and North of CR 639/Ganttown Rd (Washington Twp), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 05:00 AM, left lane closed Fri, 12 Dec 2025 08:28:27 -0500 39.7411499023438 -75.0439682006836 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between North of CR 537/Main St (Maple Shade Twp) and South of CR 689/Milford Rd (Berlin), Friday December 19, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:28:19 -0500 39.9599838256836 -74.9896240234375 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Friday December 19, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 08:28:21 -0500 39.7623252868652 -75.0479965209961 NJ 55 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Northbound between North of Exit 26 - Main Rd (Vineland) and North of Exit 35 - CR 674/Garden Rd (Vineland), Thursday December 18, 2025 09:00 PM thru Friday December 19, 2025 03:00 AM, , moving operation Fri, 12 Dec 2025 08:28:21 -0500 39.4241333007812 -75.0265121459961 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound near South of CR 635/Broadway (Point Pleasant Beach), Friday December 19, 2025 08:00 AM thru 04:00 PM, right lane closed Fri, 12 Dec 2025 08:28:23 -0500 40.0958023071289 -74.0492553710938 NJ 55 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Southbound between North of Exit 35 - CR 674/Garden Rd (Vineland) and North of Exit 26 - Main Rd (Vineland), Wednesday December 17, 2025 09:00 PM thru Thursday December 18, 2025 03:00 AM, , moving operation Fri, 12 Dec 2025 08:28:28 -0500 39.5349273681641 -75.0634002685547 NJ 55 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Northbound between North of Exit 26 - Main Rd (Vineland) and North of Exit 35 - CR 674/Garden Rd (Vineland), Wednesday December 17, 2025 09:00 PM thru Thursday December 18, 2025 03:00 AM, , moving operation Fri, 12 Dec 2025 08:28:29 -0500 39.4241333007812 -75.0265121459961 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near CR 671/Kresson Rd (Voorhees Twp), Thursday December 18, 2025 10:00 PM thru Friday December 19, 2025 06:00 AM, right lane closed, moving operation Fri, 12 Dec 2025 08:28:36 -0500 39.854118347168 -74.9216613769531 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound near South of Raceway Mall Dr (Freehold Twp), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 05:00 AM, right shoulder closed Fri, 12 Dec 2025 08:28:37 -0500 40.2547416687012 -74.2895431518555 NJ 38 eastbound : roadwork NJDOT - TOC South: Roadwork on NJ 38 near CR 625/Longwood Av (Cherry Hill Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:28:38 -0500 39.936351776123 -75.0451354980469 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between US 322/CR 536 Spur (Monroe Twp) and South of I-295 (Bellmawr), Friday December 19, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:28:39 -0500 39.6893310546875 -74.9929809570312 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between NJ 109 (Lower Twp) and South of Great Egg Harbor Bay (Upper Twp), left shoulder, moving operation Fri, 12 Dec 2025 08:28:32 -0500 38.9662971496582 -74.9151611328125 NJ 38 eastbound : roadwork NJDOT - TOC South: Roadwork on NJ 38 near CR 625/Longwood Av (Cherry Hill Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:28:33 -0500 39.936351776123 -75.0451354980469 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between US 322/CR 536 Spur (Monroe Twp) and South of I-295 (Bellmawr), Thursday December 18, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:28:34 -0500 39.6893310546875 -74.9929809570312 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near South of CR 689/Cross Keys Berlin Rd (Monroe Twp), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 05:00 AM, right lane closed Fri, 12 Dec 2025 08:28:35 -0500 39.7158546447754 -75.0191955566406 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound near South of CR 635/Broadway (Point Pleasant Beach), Thursday December 18, 2025 08:00 AM thru 04:00 PM, right lane closed Fri, 12 Dec 2025 08:28:30 -0500 40.0958023071289 -74.0492553710938 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between South of CR 689/Milford Rd (Berlin) and North of CR 537/Main St (Maple Shade Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:28:31 -0500 39.7947807312012 -74.9221343994141 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of CR 575/Pomona Rd (Galloway Twp), Friday December 19, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 08:28:43 -0500 39.469799041748 -74.5625839233398 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of CR 575/Pomona Rd (Galloway Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 08:28:44 -0500 39.469799041748 -74.5625839233398 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between CR 601/Avalon Blvd (Middle Twp) and CR 550/Woodbine Ocean View Rd (Dennis Twp), Friday December 19, 2025 07:00 AM thru 07:00 PM, right shoulder closed Fri, 12 Dec 2025 08:28:45 -0500 39.1293258666992 -74.7806854248047 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and North of CR 639/Ganttown Rd (Washington Twp), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 05:00 AM, left lane closed Fri, 12 Dec 2025 08:28:40 -0500 39.7411499023438 -75.0439682006836 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and North of CR 651/Greentree Rd (Washington Twp), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 08:28:41 -0500 39.7411499023438 -75.0439682006836 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound between North of CR 644/Dolphin Av (Northfield) and Chapman Blvd (Somers Point), left shoulder, moving operation Fri, 12 Dec 2025 08:25:29 -0500 39.3823547363281 -74.5441589355469 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 08:25:30 -0500 39.7623252868652 -75.0479965209961 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near South of CR 689/Cross Keys Berlin Rd (Monroe Twp), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, right lane closed Fri, 12 Dec 2025 08:25:31 -0500 39.7158546447754 -75.0191955566406 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and North of CR 639/Ganttown Rd (Washington Twp), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, left lane closed Fri, 12 Dec 2025 08:25:33 -0500 39.7411499023438 -75.0439682006836 NJ 55 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Northbound between North of Exit 26 - Main Rd (Vineland) and North of Exit 35 - CR 674/Garden Rd (Vineland), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 03:00 AM, , moving operation Fri, 12 Dec 2025 08:25:33 -0500 39.4241333007812 -75.0265121459961 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound near South of CR 635/Broadway (Point Pleasant Beach), Monday December 15, 2025 08:00 AM thru 04:00 PM, right lane closed Fri, 12 Dec 2025 08:25:35 -0500 40.0958023071289 -74.0492553710938 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of CR 575/Pomona Rd (Galloway Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 08:25:39 -0500 39.469799041748 -74.5625839233398 NJ 38 eastbound : roadwork NJDOT - TOC South: Roadwork on NJ 38 near CR 625/Longwood Av (Cherry Hill Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:25:40 -0500 39.936351776123 -75.0451354980469 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 06:00 AM, left lane closed Fri, 12 Dec 2025 08:25:41 -0500 39.7551803588867 -75.0467071533203 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Monday December 15, 2025 07:00 AM thru 04:00 PM, right shoulder closed Sun, 14 Dec 2025 14:21:16 -0500 39.7623252868652 -75.0479965209961 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between South of I-295 (Bellmawr) and US 322/CR 536 Spur (Monroe Twp), Tuesday December 16, 2025 09:00 AM thru 01:00 PM, , moving operation Fri, 12 Dec 2025 08:25:36 -0500 39.8649711608887 -75.1009826660156 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near South of CR 689/Cross Keys Berlin Rd (Monroe Twp), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, right lane closed Fri, 12 Dec 2025 08:25:37 -0500 39.7158546447754 -75.0191955566406 NJ 90 eastbound : roadwork NJDOT - TOC South: Roadwork on NJ 90 Eastbound near West of CR 644/Haddonfield Rd (Pennsauken Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed Fri, 12 Dec 2025 08:25:43 -0500 39.9751319885254 -75.0269088745117 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and North of CR 639/Ganttown Rd (Washington Twp), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, left lane closed Fri, 12 Dec 2025 08:25:44 -0500 39.7411499023438 -75.0439682006836 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and North of CR 651/Greentree Rd (Washington Twp), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Fri, 12 Dec 2025 08:25:45 -0500 39.7411499023438 -75.0439682006836 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between South of I-295 (Bellmawr) and US 322/CR 536 Spur (Monroe Twp), Monday December 15, 2025 09:00 AM thru 01:00 PM, , moving operation Fri, 12 Dec 2025 08:25:19 -0500 39.8649711608887 -75.1009826660156 NJ 90 westbound : roadwork NJDOT - TOC South: Roadwork on NJ 90 Westbound near East of CR 644/Haddonfield Rd (Pennsauken Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed Fri, 12 Dec 2025 08:25:24 -0500 39.9760818481445 -75.0173187255859 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between US 322/CR 536 Spur (Monroe Twp) and South of I-295 (Bellmawr), Monday December 15, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:25:20 -0500 39.6893310546875 -74.9929809570312 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 06:00 AM, left lane closed Fri, 12 Dec 2025 08:25:23 -0500 39.7551803588867 -75.0467071533203 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between South of I-295 (Mount Laurel Twp) and South of NJ 38 (Maple Shade Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Fri, 12 Dec 2025 08:25:27 -0500 39.9325561523438 -74.9624710083008 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between NJ 109 (Lower Twp) and South of Great Egg Harbor Bay (Upper Twp), left shoulder, moving operation Fri, 12 Dec 2025 08:25:28 -0500 38.9662971496582 -74.9151611328125 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound between North of CR 537/Main St (Maple Shade Twp) and South of CR 689/Milford Rd (Berlin), Monday December 15, 2025 09:00 AM thru 03:00 PM, , moving operation Fri, 12 Dec 2025 08:25:26 -0500 39.9599838256836 -74.9896240234375 NY 26 both directions : bridge inspection NYSDOT - Region 2: bridge inspection on NY 26 both directions over Martin Street (Rome) Motorists will encounter lane closures in both directions, Thursday December 18th, 2025, 08:00 AM thru 03:00 PM, Fri, 12 Dec 2025 08:24:14 -0500 43.1994018554688 -75.4531021118164 NY 12 southbound : bridge inspection NYSDOT - Region 2: bridge inspection on NY 12 southbound ramp to Burrstone Road (Utica) Motorists will encounter a full ramp closure with a detour in place. The detour wil be French Road to Burrstone Road., Tuesday December 16th, 2025, 09:00 AM thru 02:00 PM, Fri, 12 Dec 2025 08:19:05 -0500 43.0923004150391 -75.263298034668 NY 29 both directions : drainage improvements NYSDOT - Region 2: drainage improvements on NY 29 both directions between N Main Street (Dolgeville) and Brockettt Hill Road (Dolgeville) Motorists will encounter lane closures in both directions with flaggers in place, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 05:00 PM, Fri, 12 Dec 2025 07:58:00 -0500 43.1066657582898 -74.7682760767509 NY 29 both directions : drainage improvements NYSDOT - Region 2: drainage improvements on NY 29 both directions between Horn Street (Dolgeville) and N Main Street (Dolgeville) Motorists will encounter lane closures in both directions, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 05:00 PM, Fri, 12 Dec 2025 07:31:06 -0500 43.106128111627 -74.7712924588516 NY 167 both directions : drainage improvements NYSDOT - Region 2: drainage improvements on NY 167 both directions between Winton Lane (Dolgeville) and W State Street (Dolgeville) Motorists will encounter lane closures in both directions with flaggers in place, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 05:00 PM, Fri, 12 Dec 2025 07:37:15 -0500 43.102531642631 -74.7702626433325 NY 12 southbound : guard rail repairs NYSDOT - Region 2: guard rail repairs on NY 12 southbound ramp to Route 840 West (New Hartford) Motorists will encounter a shoulder closure on the ramp, Friday December 19th, 2025, 07:00 AM thru 05:00 PM, Fri, 12 Dec 2025 07:02:01 -0500 43.0812493864149 -75.291365368731 NY 5 both directions : utility work NYSDOT - Region 2: utility work on NY 5 both directions between Snells Bush Road (Little Falls) and Route 67 Junction (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 06:00 AM thru 06:00 PM, Fri, 12 Dec 2025 06:58:01 -0500 43.0050988476538 -74.7227233897488 NY 5S both directions : utility work NYSDOT - Region 2: utility work on NY 5S both directions between Town of Danube; Town of Minden Line (Danube) and CR 70; Fordsbush Road (Minden) Motorists will encounter lane closures in both directions with flaggers in place, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 06:00 AM thru 06:00 PM, Fri, 12 Dec 2025 06:47:48 -0500 42.988899230957 -74.7416000366211 NY 12 both directions : bridge inspection NYSDOT - Region 2: bridge inspection on NY 12 both directions between Oriskany Street West; Ramp (Utica) and I-90 (Utica) Motoristst will encounter lane closures in both directions, Wednesday December 17th, 2025, 09:00 AM thru 03:00 PM, Fri, 12 Dec 2025 06:46:30 -0500 43.1121329474509 -75.2362475502985 NY 331 both directions : sign work NYSDOT - Region 2: sign work on NY 331 both directions between Kennedy Road; Crum Creek Road; START ROUTE NY 331 (St Johnsville) and END ROUTE; NY 29; Oppenheim (Oppenheim) Motorists will encounter lane or shoulder closures in both directions with flaggers in place, Monday December 1st, 2025 thru Saturday December 20th, 2025 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 04:00 PM, Fri, 12 Dec 2025 06:42:31 -0500 43.0325012207031 -74.716796875 NY 208 southbound : utility work NYSDOT - Region 8: utility work on NY 208 southbound between Museum Village Road (Blooming Grove) and Old Mountain Road (Blooming Grove) 2024MO1858264/32619409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025, 09:00 AM thru 03:30 PM, alternating traffic Fri, 12 Dec 2025 07:01:27 -0500 41.3512422706618 -74.1930759489836 NY 211 eastbound : utility work NYSDOT - Region 8: utility work on NY 211 eastbound between Dunn Road; NY 416 (Montgomery) and Chandler Lane (Mount Hope) 2024MO1858264/32524209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 16th, 2025, 09:00 AM thru 03:30 PM, alternating traffic Fri, 12 Dec 2025 06:58:55 -0500 41.4732681604456 -74.5304659275184 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near Exit 43 - I-287 (Parsippany-Troy Hills Twp), Tuesday December 16, 2025 09:00 AM thru 12:00 PM, right shoulder closed Fri, 12 Dec 2025 02:28:19 -0500 40.8646697998047 -74.4203186035156 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near Exit 43 - I-287 (Parsippany-Troy Hills Twp), left shoulder Fri, 12 Dec 2025 02:28:20 -0500 40.8646697998047 -74.4203186035156 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near East of Exit 43 - I-287 (Parsippany-Troy Hills Twp), Tuesday December 16, 2025 11:00 AM thru 03:00 PM, right shoulder closed local lane Fri, 12 Dec 2025 02:28:21 -0500 40.863151550293 -74.4106063842773 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near North of Exit 41 - I-80 (Parsippany-Troy Hills Twp), Monday December 15, 2025 09:00 AM thru 11:00 AM, right lane closed Fri, 12 Dec 2025 02:28:22 -0500 40.8642234802246 -74.4172210693359 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of CR 527/Mountain Ave (Bridgewater Twp), Thursday December 18, 2025 07:00 AM thru 03:00 PM, right shoulder closed Thu, 11 Dec 2025 22:34:20 -0500 40.5812492370605 -74.5193481445312 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of CR 527/Mountain Ave (Bridgewater Twp), Wednesday December 17, 2025 07:00 AM thru 03:00 PM, right shoulder closed Thu, 11 Dec 2025 22:34:22 -0500 40.5812492370605 -74.5193481445312 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of CR 527/Mountain Ave (Bridgewater Twp), Tuesday December 16, 2025 07:00 AM thru 03:00 PM, right shoulder closed Thu, 11 Dec 2025 22:34:19 -0500 40.5812492370605 -74.5193481445312 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of CR 527/Mountain Ave (Bridgewater Twp), Friday December 19, 2025 07:00 AM thru 03:00 PM, right shoulder closed Thu, 11 Dec 2025 22:34:23 -0500 40.5812492370605 -74.5193481445312 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of CR 527/Mountain Ave (Bridgewater Twp), Monday December 15, 2025 07:00 AM thru 03:00 PM, right shoulder closed Thu, 11 Dec 2025 22:34:24 -0500 40.5812492370605 -74.5193481445312 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound near North of NJ 3 (Rutherford), Tuesday December 16, 2025 10:00 PM thru Wednesday December 17, 2025 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Thu, 11 Dec 2025 22:31:34 -0500 40.8120765686035 -74.1019439697266 NJ 15 northbound : roadwork NJDOT - STMC: Roadwork on NJ 15 Northbound near South of CR 623/Lafayette Franklin Rd (Lafayette Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Thu, 11 Dec 2025 22:31:35 -0500 41.0889015197754 -74.6771392822266 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and CR 618/Kinnelon Rd/Keil Rd (Butler), Friday December 19, 2025 08:00 AM thru 05:00 PM, right lane closed Thu, 11 Dec 2025 22:31:36 -0500 40.9595413208008 -74.282600402832 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between East of Exit 47A - I-280 (Montville Twp) and Exit 47B - US 46 (Parsippany-Troy Hills Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Thu, 11 Dec 2025 22:31:37 -0500 40.866870880127 -74.3314895629883 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound near Exit 58 - US 1&9/E. Port St (Newark), Thursday December 18, 2025 09:00 AM thru Friday December 19, 2025 06:00 AM, right shoulder closed local lane Thu, 11 Dec 2025 22:31:31 -0500 40.7107543945312 -74.1664428710938 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound near North of NJ 3 (Rutherford), Wednesday December 17, 2025 10:00 PM thru Thursday December 18, 2025 06:00 AM, at least one lane closed Thu, 11 Dec 2025 22:31:38 -0500 40.8120765686035 -74.1019439697266 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between East of Exit 61 - CR 507/River Rd (Elmwood Park) and West of Exit 62 - Garden State Parkway (Elmwood Park), Wednesday December 17, 2025 09:00 PM thru Thursday December 18, 2025 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Thu, 11 Dec 2025 22:31:39 -0500 40.901309967041 -74.1254501342773 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between East of Exit 61 - CR 507/River Rd (Elmwood Park) and West of Exit 62 - Garden State Parkway (Elmwood Park), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Thu, 11 Dec 2025 22:31:41 -0500 40.901309967041 -74.1254501342773 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between East of Exit 61 - CR 507/River Rd (Elmwood Park) and West of Exit 62 - Garden State Parkway (Elmwood Park), Thursday December 18, 2025 09:00 PM thru Friday December 19, 2025 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Thu, 11 Dec 2025 22:31:42 -0500 40.901309967041 -74.1254501342773 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound near North of CR 631/Franklin Av (Franklin Twp), Monday December 15, 2025 11:00 AM thru 03:00 PM, right shoulder closed, moving operation Thu, 11 Dec 2025 22:31:43 -0500 41.1136894226074 -74.5808486938477 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between East of Exit 61 - CR 507/River Rd (Elmwood Park) and West of Exit 62 - Garden State Parkway (Elmwood Park), Thursday December 18, 2025 09:00 PM thru Friday December 19, 2025 05:00 AM, at least one lane closed Thu, 11 Dec 2025 22:31:44 -0500 40.901309967041 -74.1254501342773 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound near North of NJ 3 (Rutherford), Thursday December 18, 2025 10:00 PM thru Friday December 19, 2025 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Thu, 11 Dec 2025 22:31:26 -0500 40.8120765686035 -74.1019439697266 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound near North of NJ 3 (Rutherford), Thursday December 18, 2025 10:00 PM thru Friday December 19, 2025 06:00 AM, at least one lane closed Thu, 11 Dec 2025 22:31:23 -0500 40.8120765686035 -74.1019439697266 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between East of Exit 61 - CR 507/River Rd (Elmwood Park) and West of Exit 62 - Garden State Parkway (Elmwood Park), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 05:00 AM, at least one lane closed Thu, 11 Dec 2025 22:31:24 -0500 40.901309967041 -74.1254501342773 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound near North of NJ 3 (Rutherford), Wednesday December 17, 2025 10:00 PM thru Thursday December 18, 2025 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Thu, 11 Dec 2025 22:31:25 -0500 40.8120765686035 -74.1019439697266 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between West of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Friday December 19, 2025 08:00 AM thru 05:00 PM, right shoulder closed Thu, 11 Dec 2025 22:31:19 -0500 40.866641998291 -73.9739074707031 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound near North of NJ 3 (Rutherford), Tuesday December 16, 2025 10:00 PM thru Wednesday December 17, 2025 06:00 AM, at least one lane closed Thu, 11 Dec 2025 22:31:21 -0500 40.8120765686035 -74.1019439697266 I-390 northbound : roadwork NYSDOT - Region 4: roadwork on I-390 northbound area of Sonyea Road; NY 36 (Groveland), Wednesday December 17th, 2025 thru Thursday December 18th, 2025, Wednesday/Thursday, 09:00 AM thru 04:00 PM right shoulder closed Thu, 11 Dec 2025 19:56:15 -0500 42.6874833075216 -77.800079774122 NY 15A southbound : utility work NYSDOT - Region 4: utility work on NY 15A southbound at METRO PARK (Brighton), Monday December 8th, 2025 thru Wednesday December 17th, 2025, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed Thu, 11 Dec 2025 19:27:39 -0500 43.0983300820461 -77.6135061525884 NY 31F westbound : utility work NYSDOT - Region 4: utility work on NY 31F westbound between 357 NY 31F (East Rochester) and Turk Hill Road; CR 50 (Perinton) alternating lane/shoulder closures, Wednesday December 10th, 2025 thru Friday December 19th, 2025, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes Thu, 11 Dec 2025 19:12:48 -0500 43.1043158089324 -77.486927172558 NY 286 eastbound : utility work NYSDOT - Region 4: utility work on NY 286 eastbound between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 NY 286 (Penfield) alternating lane/shoulder closures, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes Thu, 11 Dec 2025 19:08:39 -0500 43.1600091457399 -77.4314822623313 NY 250 southbound : utility work NYSDOT - Region 4: utility work on NY 250 southbound between Penfield Road; NY 441 (Penfield) and New Wickham Dr (Perinton) alternating lane/shoulder closures, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes Thu, 11 Dec 2025 19:04:50 -0500 43.1306445944795 -77.4413 NY 441 eastbound : utility work NYSDOT - Region 4: utility work on NY 441 eastbound between Willow Pond Way (Penfield) and NY 250 (Penfield) alternating lane/shoulder closures, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes Thu, 11 Dec 2025 19:01:06 -0500 43.1309164716686 -77.4508000367325 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions After NJ 45 (Salem) Monday December 15, 2025 09:00 AM thru 01:00 PM, 1 left lane of 2 lanes closed eastbound; 1 left lane of 2 lanes closed westbound Thu, 11 Dec 2025 16:32:17 -0500 39.5720329284668 -75.4676513671875 NJ 147 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 147 Eastbound At W Anglesea Dr (North Wildwood) Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right shoulder closed Thu, 11 Dec 2025 16:28:18 -0500 39.0184669494629 -74.7989501953125 NJ 47 northbound : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Northbound Before CR 603/Bayshore Rd (Middle Twp) Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right shoulder closed Thu, 11 Dec 2025 16:25:35 -0500 39.0456466674805 -74.9009323120117 Horace Harding Expressway westbound : construction NYSDOT - Region 11: construction on Horace Harding Expressway westbound between Reeves Avenue (New York) and Main Street (New York) Subject to change without notice., Monday December 15th, 2025 thru Tuesday December 16th, 2025, Monday/Tuesday, 09:00 AM thru 02:00 PM 1 Left lane of 2 lanes closed Thu, 11 Dec 2025 16:16:15 -0500 40.7392772174605 -73.8154264848079 ASTORIA BLVD S eastbound : construction NYSDOT - Region 11: construction on ASTORIA BLVD S eastbound between ASTORIA BLVD (New York) and ASTORIA BLVD at 77TH ST (New York) Subject to change without notice., Monday December 15th, 2025, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed Thu, 11 Dec 2025 16:14:52 -0500 40.7658987136555 -73.893255864314 ASTORIA BLVD N westbound : construction NYSDOT - Region 11: construction on ASTORIA BLVD N westbound between 75TH ST (New York) and 73RD ST (New York) Subject to change without notice., Friday December 19th, 2025, 09:00 AM thru 02:00 PM 1 Left lane of 2 lanes closed Thu, 11 Dec 2025 16:12:38 -0500 40.76678 -73.8941663119684 NJ 70 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 70 Eastbound between I-295 (Cherry Hill Twp) and CR 673/Springdale Rd (Cherry Hill Twp) Friday December 19, 2025 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 11 Dec 2025 16:15:12 -0500 39.9089660644531 -74.9840469360352 Astoria Boulevard North westbound : construction NYSDOT - Region 11: construction on Astoria Boulevard North westbound ramp from Brooklyn Queens Expressway West (New York) Subject to change without notice. Partial ramp closure., Friday December 19th, 2025, 10:00 AM thru 02:00 PM left shoulder closed Thu, 11 Dec 2025 16:10:31 -0500 40.7682827579328 -73.9046033708068 NJ 70 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 70 Eastbound between I-295 (Cherry Hill Twp) and CR 673/Springdale Rd (Cherry Hill Twp) Thursday December 18, 2025 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 11 Dec 2025 16:15:08 -0500 39.9089660644531 -74.9840469360352 NJ 70 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 70 Eastbound between I-295 (Cherry Hill Twp) and CR 673/Springdale Rd (Cherry Hill Twp) Monday December 15, 2025 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 11 Dec 2025 16:14:50 -0500 39.9089660644531 -74.9840469360352 NJ 70 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 70 Eastbound between I-295 (Cherry Hill Twp) and CR 673/Springdale Rd (Cherry Hill Twp) Tuesday December 16, 2025 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 11 Dec 2025 16:15:00 -0500 39.9089660644531 -74.9840469360352 NJ 70 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 70 Eastbound between I-295 (Cherry Hill Twp) and CR 673/Springdale Rd (Cherry Hill Twp) Wednesday December 17, 2025 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 11 Dec 2025 16:15:04 -0500 39.9089660644531 -74.9840469360352 NJ 70 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Eastbound between NJ 38 (Pennsauken Twp) and CR 644/Grove St/Haddonfield Rd (Cherry Hill Twp) Friday December 19, 2025 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 11 Dec 2025 16:06:11 -0500 39.9343376159668 -75.0728378295898 I-278-TRUCK westbound : construction NYSDOT - Region 11: construction on I-278-TRUCK westbound between 36TH ST (New York) and 35TH ST (New York) Subject to change without notice., Thursday December 18th, 2025, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed Thu, 11 Dec 2025 16:06:33 -0500 40.7698813208821 -73.913500047958 NJ 70 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Eastbound between NJ 38 (Pennsauken Twp) and CR 644/Grove St/Haddonfield Rd (Cherry Hill Twp) Tuesday December 16, 2025 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 11 Dec 2025 16:05:52 -0500 39.9343376159668 -75.0728378295898 NJ 70 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Eastbound between NJ 38 (Pennsauken Twp) and CR 644/Grove St/Haddonfield Rd (Cherry Hill Twp) Wednesday December 17, 2025 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 11 Dec 2025 16:05:58 -0500 39.9343376159668 -75.0728378295898 NJ 70 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Eastbound between NJ 38 (Pennsauken Twp) and CR 644/Grove St/Haddonfield Rd (Cherry Hill Twp) Thursday December 18, 2025 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 11 Dec 2025 16:06:05 -0500 39.9343376159668 -75.0728378295898 NJ 70 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Eastbound between NJ 38 (Pennsauken Twp) and CR 644/Grove St/Haddonfield Rd (Cherry Hill Twp) Monday December 15, 2025 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 11 Dec 2025 16:05:44 -0500 39.9343376159668 -75.0728378295898 I-278-TRUCK westbound : construction NYSDOT - Region 11: construction on I-278-TRUCK westbound between STEINWAY ST (New York) and 37TH ST (New York) Subject to change without notice., Wednesday December 17th, 2025, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed Thu, 11 Dec 2025 16:05:19 -0500 40.7694561751819 -73.9104155276904 ASTORIA BLVD N westbound : construction NYSDOT - Region 11: construction on ASTORIA BLVD N westbound between HAZEN ST (New York) and 47TH ST (New York) Subject to change without notice., Wednesday December 17th, 2025, 09:00 AM thru 02:00 PM 1 Left lane of 2 lanes closed Thu, 11 Dec 2025 15:59:56 -0500 40.7675791184838 -73.900569776727 I-278-TRUCK westbound : construction NYSDOT - Region 11: construction on I-278-TRUCK westbound between 43RD ST (New York) and 41ST ST (New York) Subject to change without notice., Tuesday December 16th, 2025, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed Thu, 11 Dec 2025 15:58:21 -0500 40.7688825575153 -73.9068912855544 Grand Central Parkway westbound : construction NYSDOT - Region 11: construction on Grand Central Parkway westbound ramp from 77th Street (New York) Subject to change without notice., Friday December 19th, 2025, 09:00 AM thru 02:00 PM right shoulder closed Thu, 11 Dec 2025 15:56:23 -0500 40.7665721274593 -73.8919912506411 Grand Central Parkway westbound : construction NYSDOT - Region 11: construction on Grand Central Parkway westbound between 82nd Street (New York) Subject to change without notice., Monday December 15th, 2025, 09:00 AM thru 02:00 PM right shoulder closed Thu, 11 Dec 2025 15:54:38 -0500 40.7663069101963 -73.8919049975097 I-278 westbound : construction NYSDOT - Region 11: construction on I-278 westbound between Columbia Heights (New York) and Joralemon Street; Ramp (New York) Subject to change without notice., Wednesday December 17th, 2025 thru Wednesday December 17th, 2025, 12:00 AM thru 05:00 AM 1 Left lane of 3 lanes closed Thu, 11 Dec 2025 15:46:50 -0500 40.7004547193644 -73.9956425340395 Belt System - Shore Parkway both directions : construction NYSDOT - Region 11: construction on Belt System - Shore Parkway both directions between Exit - Gowanus Expressway (New York) and Exit 1 - 68th Street; Owl's Head Park (New York) Subject to change without notice., Friday December 19th, 2025, 10:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed westbound; 1 Left lane of 2 lanes closed eastbound Thu, 11 Dec 2025 15:45:09 -0500 40.6412359802813 -74.0214475981896 Belt System - Shore Parkway both directions : construction NYSDOT - Region 11: construction on Belt System - Shore Parkway both directions between 63rd Street; 3rd Avenue (New York) and 2nd Avenue (New York) Subject to change without notice., Tuesday December 16th, 2025 thru Wednesday December 17th, 2025, Tuesday/Wednesday, 12:00 AM thru 05:00 AM 1 Right lane of 2 lanes closed westbound; 1 Left lane of 2 lanes closed eastbound Thu, 11 Dec 2025 15:42:46 -0500 40.6404891827524 -74.0226379866512 I-678 both directions : street sweeping NYSDOT - Region 11: street sweeping on I-678 both directions from Union Turnpike (New York) to Whitestone Expressway; Ramp (New York) Subject to change without notice., Friday December 19th, 2025, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed Thu, 11 Dec 2025 15:37:36 -0500 40.7154559235644 -73.8253772823763 I-678 both directions : street sweeping NYSDOT - Region 11: street sweeping on I-678 both directions from Whitestone Expressway; Ramp (New York) to Exit 17 - Whitestone Expressway; 3rd Avenue (New York) Subject to change without notice., Thursday December 18th, 2025, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed Thu, 11 Dec 2025 15:35:25 -0500 40.7639990262361 -73.8395019657218 Sports Illustrated Stadium : soccer game New York Red Bulls: soccer game on Sports Illustrated Stadium at (Harrison) New York Vs. D.C. United, Wednesday April 22nd, 2026, 07:30 PM thru 10:30 PM Thu, 11 Dec 2025 15:22:26 -0500 40.7366914609768 -74.1502866405472 Grand Central Parkway westbound : construction NYSDOT - Region 11: construction on Grand Central Parkway westbound between Exit 11 - Jewel Avenue; Ramp (New York) and Exit 10 - I-495 Long Island Expressway (New York) Subject to change without notice., Thursday December 18th, 2025 thru Thursday December 18th, 2025, 12:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday December 19th, 2025 thru Friday December 19th, 2025, 12:00 AM thru 05:00 AM 2 Left lanes of 4 lanes closed Thu, 11 Dec 2025 15:22:25 -0500 40.7314871655683 -73.8421382326833 I-495 westbound : construction NYSDOT - Region 11: construction on I-495 westbound between 48th Street; Ramp (New York) Subject to change without notice., Wednesday December 17th, 2025 thru Wednesday December 17th, 2025, 12:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed Thu, 11 Dec 2025 15:20:15 -0500 40.7299898689335 -73.9118161642449 Sports Illustrated Stadium : soccer game New York Red Bulls: soccer game on Sports Illustrated Stadium at (Harrison) New York Vs. Cincinnati, Saturday April 4th, 2026, 07:30 PM thru 10:30 PM Thu, 11 Dec 2025 15:20:12 -0500 40.7366914609768 -74.1502866405472 NY 440 northbound : construction NYSDOT - Region 11: construction on NY 440 northbound between Arden Avenue; Ramp (Staten Island) and Veterans Road West; Victory Boulevard (Staten Island) Subject to change without notice., Tuesday December 16th, 2025 thru Tuesday December 16th, 2025, 12:00 AM thru 05:00 AM 1 Left lane of 2 lanes closed Thu, 11 Dec 2025 15:18:20 -0500 40.5660505859102 -74.1935968494529 Sports Illustrated Stadium : soccer game New York Red Bulls: soccer game on Sports Illustrated Stadium at (Harrison) New York Vs. Montr�al, Sunday March 8th, 2026, 04:30 PM thru 07:30 PM Thu, 11 Dec 2025 15:17:49 -0500 40.7366914609768 -74.1502866405472 Grand Central Parkway eastbound : construction NYSDOT - Region 11: construction on Grand Central Parkway eastbound between Exit 11 - Jewel Avenue; Ramp (New York) and Exit 12 - Route 25 Queens Boulevard (New York) Subject to change without notice., Tuesday December 16th, 2025 thru Tuesday December 16th, 2025, 12:00 AM thru 05:00 AM 2 Left lanes of 4 lanes closed Thu, 11 Dec 2025 15:16:29 -0500 40.7302301670675 -73.8410612843663 Sports Illustrated Stadium : soccer game New York Red Bulls: soccer game on Sports Illustrated Stadium at (Harrison) New York Vs. New England, Saturday February 28th, 2026, 02:30 PM thru 05:30 PM Thu, 11 Dec 2025 15:15:28 -0500 40.7366914609768 -74.1502866405472 Korean Veterans Memorial Parkway eastbound : construction NYSDOT - Region 11: construction on Korean Veterans Memorial Parkway eastbound ramp to Page Avenue (Exit 1) (New York) Subject to change without notice., Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed Thu, 11 Dec 2025 15:12:51 -0500 40.5253642657724 -74.2329755946341 Sports Illustrated Stadium : sports event TRANSCOM, Jersey City: sports event on Sports Illustrated Stadium at (Harrison) HSBC SVNS New York, Saturday March 14th, 2026 thru Sunday March 15th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM Thu, 11 Dec 2025 15:07:34 -0500 40.7366914609768 -74.1502866405472 I-278 eastbound : construction NYSDOT - Region 11: construction on I-278 eastbound between 86th Street (New York) and Fort Hamilton Parkway Extension (New York) Subject to change without notice., Friday December 19th, 2025, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed Thu, 11 Dec 2025 15:07:22 -0500 40.6197126878842 -74.0231817695546 VAN WYCK EXPY southbound : construction NYSDOT - Region 11: construction on VAN WYCK EXPY southbound from LIBERTY AVE (New York) to 109TH AVE (New York) Subject to change without notice., Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road Thu, 11 Dec 2025 15:03:35 -0500 40.6917791890792 -73.8109377837206 I-678 northbound : construction NYSDOT - Region 11: construction on I-678 northbound ramp from Archer Avenue (New York) Subject to change without notice., Continuous Monday December 15th, 2025 07:00 AM thru Saturday February 28th, 2026 11:59 PM All lanes closed Thu, 11 Dec 2025 14:55:33 -0500 40.6990191589913 -73.8144592991594 Franklin D. Roosevelt Drive southbound : construction NYSDOT - Region 11: construction on Franklin D. Roosevelt Drive southbound from I-495 Long Island Expressway (New York) to Exit 8 - Franklin D. Roosevelt Drive (New York) Subject to change without notice., Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed Thu, 11 Dec 2025 14:43:41 -0500 40.7480420371573 -73.9681616357022 I-495 eastbound : construction NYSDOT - Region 11: construction on I-495 Lower Level eastbound from Exit 18 - I-278/Brooklyn Queens Expressway (New York) to I-495 at 48th Street; Ramp (New York) Subject to change without notice., Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed lower level Thu, 11 Dec 2025 14:40:02 -0500 40.7341932247668 -73.9222860855552 I-495 westbound : construction NYSDOT - Region 11: construction on I-495 westbound from Exit 25 - Utopia Parkway / 188th Street (New York) Subject to change without notice., Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed Thu, 11 Dec 2025 14:36:54 -0500 40.7392284117982 -73.7929847283909 I-95 northbound : construction NYSDOT - Region 11: construction on I-95 northbound from Saint Nicholas Avenue (Manhattan) to Harlem River Drive (New York) Subject to change without notice., Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed Thu, 11 Dec 2025 14:34:29 -0500 40.8474913890231 -73.9349288891957 I-278 westbound : construction NYSDOT - Region 11: construction on I-278 westbound from Leonard Street (New York) to Union Avenue (New York) Subject to change without notice., Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 10:30 PM thru 12:01 AM 1 Right lane of 4 lanes closed, Tuesday December 16th, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed Thu, 11 Dec 2025 14:31:13 -0500 40.7176933606123 -73.9483161476092 I-95 southbound : construction NYSDOT - Region 11: construction on I-95 southbound from Sedgwick Avenue (New York) to Audubon Avenue (Manhattan) Subject to change without notice., Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 11:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed Thu, 11 Dec 2025 14:28:43 -0500 40.8449827290715 -73.9259936453575 I-95 northbound : construction NYSDOT - Region 11: construction on I-95 northbound from 3rd Avenue; Exit 3 (New York) to East 176th Street (New York) Subject to change without notice., Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday December 16th, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Tuesday December 16th, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 05:00 AM thru 06:00 AM 1 Right lane of 3 lanes closed Thu, 11 Dec 2025 14:25:33 -0500 40.8439352453707 -73.8974245856512 I-95 southbound : construction NYSDOT - Region 11: construction on I-95 southbound from West Farms Road (New York) to Grand Concourse (New York) Subject to change without notice., Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 11:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday December 16th, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Tuesday December 16th, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 05:00 AM thru 06:00 AM 1 Right lane of 4 lanes closed Thu, 11 Dec 2025 14:23:11 -0500 40.838154710691 -73.8818102100615 I-95 northbound : construction NYSDOT - Region 11: construction on I-95 northbound from Prospect Avenue (New York) to Crotona Parkway (New York) Subject to change without notice., Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday December 16th, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Tuesday December 16th, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 05:00 AM thru 06:00 AM 1 Right lane of 3 lanes closed Thu, 11 Dec 2025 14:20:39 -0500 40.8426867293803 -73.8903630616919 New Jersey Turnpike southbound : barrier repairs NJ Turnpike Auth.: barrier repairs and milling on New Jersey Turnpike Outer Roadway southbound Entrance ramp Interchange 13 - I-278/Goethals Bridge (Linden) to Interchange 13 - I-278/Goethals Bridge (Linden), Monday December 15th,2025 thru Thursday December 18th,2025, Monday/Tuesday/Wednesday, 09:00 PM thru 05:00 AM All lanes closed southbound, Sat, 13 Dec 2025 05:00:02 -0500 40.6383584029442 -74.2087357985279 New Jersey Turnpike southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Outer Roadway southbound Entrance ramp Interchange 10 - NJ 440/I-287 (Edison Twp) to Interchange 10 - NJ 440/I-287 (Edison Twp), Monday December 15th,2025 thru Tuesday December 16th,2025, Monday, 08:00 PM thru 05:00 AM All lanes closed southbound, Sat, 13 Dec 2025 05:00:05 -0500 40.5279491339971 -74.3420458736086 NY 9A both directions : utility work NYSDOT - Region 8: utility work on NY 9A both directions between Lyndsey Avenue (Cortlandt) and White Street (Cortlandt) 2025082886900/32666309 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday December 17th, 2025 thru Thursday December 18th, 2025 Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic Thu, 11 Dec 2025 13:29:23 -0500 41.2588214732418 -73.934809434028 NY 36 both directions : utility work NYSDOT - Region 4: utility work on NY 36 both directions between Telephone Road; US 20 (York) and Genesee Street; NY 63 (York) Alternating lane closures with flaggers as needed, Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes Thu, 11 Dec 2025 13:09:18 -0500 42.8966092995575 -77.8806459318777 NY 100 northbound : utility work NYSDOT - Region 8: utility work on NY 100 northbound between Primrose Street - NY 139 (Somers) and Plum Brook Road (Somers) 2025082502725/32620909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday December 17th, 2025, 09:30 AM thru 03:00 PM, alternating traffic Thu, 11 Dec 2025 13:18:04 -0500 41.2833147533595 -73.7083628139523 NY 117 northbound : utility work NYSDOT - Region 8: utility work on NY 117 northbound between Rebecca Avenue (Mount Pleasant) and Bedford Road - NY 141 (Mount Pleasant) 2025082502725/32666209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday December 17th, 2025, 09:30 AM thru 03:00 PM, alternating traffic Thu, 11 Dec 2025 12:57:15 -0500 41.136156989434 -73.7891143576361 NY 299 eastbound : water main work NYSDOT - Region 8: water main work on NY 299 eastbound between Joalyn Road (New Paltz) and Cherry Hill Road (New Paltz) 202508114055/32666009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Wednesday December 17th, 2025 Monday/ Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, lane shift Thu, 11 Dec 2025 10:37:55 -0500 41.7435665674008 -74.0720075063775 NY 35/US 202 both directions : utility work NYSDOT - Region 8: utility work on NY 35/US 202 both directions between Hamblyn Street (Yorktown) and Elizabeth Road (Yorktown) 2025082502725/32665909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 16th, 2025, 09:30 AM thru 03:00 PM, alternating traffic Thu, 11 Dec 2025 10:26:20 -0500 41.2781699093885 -73.7854505378757 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near South of Woodschurch Rd (Raritan Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right lane closed Thu, 11 Dec 2025 10:07:22 -0500 40.5486221313477 -74.8552398681641 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near South of Woodschurch Rd (Raritan Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right lane closed Thu, 11 Dec 2025 10:07:21 -0500 40.5486221313477 -74.8552398681641 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near South of Woodschurch Rd (Raritan Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Thu, 11 Dec 2025 10:07:20 -0500 40.5486221313477 -74.8552398681641 NY 80 both directions : tree trimming NYSDOT - Region 3: tree trimming on NY 80 both directions between Kingsley Rd (Onondaga) and US 20 (Onondaga) ; Alternating one-way traffic with flaggers, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open Thu, 11 Dec 2025 08:57:45 -0500 42.8841651147922 -76.2198247122547 US 202 eastbound : utility work NYSDOT - Region 8: utility work on US 202 eastbound between Somerset Drive (Somers) and Scott Drive (Somers) 2025082502725/32665509 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 16th, 2025, 09:30 AM thru 03:00 PM, alternating traffic Thu, 11 Dec 2025 08:47:01 -0500 41.3269874526621 -73.6950185520455 NY 104 westbound : utility work NYSDOT - Region 4: utility work on NY 104 westbound between West Ridge Road; Maplewood Drive (Rochester) and Carlisle St. (Rochester), Monday December 15th, 2025 thru Monday December 22nd, 2025, Sunday thru Saturday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed Thu, 11 Dec 2025 08:41:13 -0500 43.19658543215 -77.6316743073527 I-287 northbound : roadwork NJ DOT - STMC: Roadwork on I-287 Northbound Ramp To Exit 4 - Durham Rd (South Plainfield) Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 05:00 AM, 1 right lane of 4 lanes closed Thu, 11 Dec 2025 07:56:58 -0500 40.5530891418457 -74.4135055541992 I-287 northbound : roadwork NJ DOT - STMC: Roadwork on I-287 Northbound Ramp To Exit 4 - Durham Rd (South Plainfield) Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 05:00 AM, 1 right lane of 4 lanes closed Thu, 11 Dec 2025 07:57:04 -0500 40.5530891418457 -74.4135055541992 I-287 northbound : roadwork NJ DOT - STMC: Roadwork on I-287 Northbound Ramp To Exit 4 - Durham Rd (South Plainfield) Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, 1 right lane of 4 lanes closed Thu, 11 Dec 2025 07:56:53 -0500 40.5530891418457 -74.4135055541992 I-287 northbound : roadwork NJ DOT - STMC: Roadwork on I-287 Northbound Ramp To Exit 4 - Durham Rd (South Plainfield) Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, 1 right lane of 4 lanes closed Thu, 11 Dec 2025 07:56:49 -0500 40.5530891418457 -74.4135055541992 NY 301 both directions : tree trimming NYSDOT - Region 8: tree trimming on NY 301 both directions between Fishkill Avenue (Cold Spring) and US 9 (Philipstown) 2024081748389/32665209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 03:30 PM, alternating traffic Thu, 11 Dec 2025 07:56:56 -0500 41.4205455919062 -73.9538735875892 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound near Exit 58 - US 1&9/E. Port St (Newark), Monday December 15, 2025 09:00 AM thru Tuesday December 16, 2025 06:00 AM, right shoulder closed local lane Thu, 11 Dec 2025 07:37:21 -0500 40.7107543945312 -74.1664428710938 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound near Exit 58 - US 1&9/E. Port St (Newark), Wednesday December 17, 2025 09:00 AM thru Thursday December 18, 2025 06:00 AM, right shoulder closed local lane Thu, 11 Dec 2025 07:37:19 -0500 40.7107543945312 -74.1664428710938 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound near Exit 58 - US 1&9/E. Port St (Newark), Tuesday December 16, 2025 09:00 AM thru Wednesday December 17, 2025 06:00 AM, right shoulder closed local lane Thu, 11 Dec 2025 07:37:22 -0500 40.7107543945312 -74.1664428710938 NY 199 westbound : utility work NYSDOT - Region 8: utility work on NY 199 westbound between Meadow Drive (Red Hook) and Huckleberry Lane (Red Hook) 2025082254618/32665009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic Thu, 11 Dec 2025 06:53:42 -0500 41.9993999121717 -73.8995013465094 US 322 eastbound : roadwork NJDOT - TOC South: Roadwork on US 322 Eastbound near West of CR 655/Fries Mill Rd (Monroe Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Thu, 11 Dec 2025 04:13:30 -0500 39.6958961486816 -75.0585098266602 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between CR 601/Avalon Blvd (Middle Twp) and CR 550/Woodbine Ocean View Rd (Dennis Twp), Thursday December 18, 2025 07:00 AM thru 07:00 PM, right shoulder closed Thu, 11 Dec 2025 04:13:37 -0500 39.1293258666992 -74.7806854248047 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound near South of Raceway Mall Dr (Freehold Twp), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, right shoulder closed Thu, 11 Dec 2025 04:13:28 -0500 40.2547416687012 -74.2895431518555 US 322 eastbound : roadwork NJDOT - TOC South: Roadwork on US 322 Eastbound near West of CR 655/Fries Mill Rd (Monroe Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Thu, 11 Dec 2025 04:13:31 -0500 39.6958961486816 -75.0585098266602 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near CR 671/Kresson Rd (Voorhees Twp), Wednesday December 17, 2025 10:00 PM thru Thursday December 18, 2025 06:00 AM, right lane closed, moving operation Thu, 11 Dec 2025 04:13:29 -0500 39.854118347168 -74.9216613769531 US 322 eastbound : roadwork NJDOT - TOC South: Roadwork on US 322 Eastbound near West of CR 655/Fries Mill Rd (Monroe Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Thu, 11 Dec 2025 04:13:38 -0500 39.6958961486816 -75.0585098266602 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound near South of Raceway Mall Dr (Freehold Twp), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 05:00 AM, right shoulder closed Thu, 11 Dec 2025 04:13:24 -0500 40.2547416687012 -74.2895431518555 NJ 29 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Wednesday December 17, 2025 09:00 AM thru 02:00 PM, right lane closed Thu, 11 Dec 2025 04:13:25 -0500 40.2001991271973 -74.7585601806641 NJ 29 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Thursday December 18, 2025 09:00 AM thru 02:00 PM, right lane closed Thu, 11 Dec 2025 04:13:26 -0500 40.2001991271973 -74.7585601806641 NY 378 westbound : bridge inspection NYSDOT TMC - Albany: bridge inspection on NY 378 westbound Menands Bridge; Albany-Rensselaer County Line over the Hudson River (Troy) (Bin 1062850) , Monday December 15th, 2025 thru Friday December 19th, 2025, 09:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed Wed, 10 Dec 2025 21:02:06 -0500 42.7011635044635 -73.7013665129045 BROADWAY(Erie Boulevard) eastbound : bridge inspection NYSDOT TMC - Albany: bridge inspection on BROADWAY(Erie Boulevard) eastbound under I-890 (Schenectady) BIN(1049921 + 1049922), Friday December 19th, 2025, 09:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Friday December 19th, 2025, 11:00 AM thru 12:00 PM 1 Left lane of 3 lanes closed, Friday December 19th, 2025, 01:00 PM thru 02:00 PM 1 Right lane of 3 lanes closed Wed, 10 Dec 2025 20:51:01 -0500 42.8050115145069 -73.9482128060922 US 9 : bridge inspection NYSDOT TMC - Albany: bridge inspection on US 9 Westbound ramp to I-787 (Albany) BIN (1092940), Wednesday December 17th, 2025, 09:00 AM thru 03:30 PM All lanes closed Wed, 10 Dec 2025 20:45:17 -0500 42.6443248194492 -73.7494362048623 I-787 northbound : bridge inspection NYSDOT TMC - Albany: bridge inspection on I-787 northbound Under Troy Watervliet Bridge (Watervliet) BIN (1004279), Tuesday December 16th, 2025, 09:30 AM thru 11:00 AM 2 Right lanes of 4 lanes closed, Tuesday December 16th, 2025 thru Tuesday December 16th, 2025, 12:30 PM thru 02:00 PM 2 Left lanes of 4 lanes closed Wed, 10 Dec 2025 20:42:13 -0500 42.7294588180564 -73.6991764727775 US 9 : bridge inspection NYSDOT TMC - Albany: bridge inspection on US 9 Westbound ramp to I-787 (Albany) BIN (1092940), Monday December 15th, 2025, 09:00 AM thru 11:00 AM 1 Right lane of 2 lanes closed, Monday December 15th, 2025, 11:30 AM thru 12:00 PM 1 Left lane of 2 lanes closed, Monday December 15th, 2025 thru Monday December 15th, 2025, 12:30 PM thru 02:00 PM 1 Right lane of 2 lanes closed Wed, 10 Dec 2025 20:42:33 -0500 42.644401915371 -73.74944 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and CR 618/Kinnelon Rd/Keil Rd (Butler), Thursday December 18, 2025 08:00 AM thru 05:00 PM, right lane closed Wed, 10 Dec 2025 20:10:23 -0500 40.9595413208008 -74.282600402832 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near West of CR 639/North Bridge St (Bridgewater Twp), Thursday December 18, 2025 07:00 AM thru 04:00 PM, right shoulder closed Wed, 10 Dec 2025 20:10:22 -0500 40.580982208252 -74.6090087890625 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between West of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Thursday December 18, 2025 08:00 AM thru 05:00 PM, right shoulder closed Wed, 10 Dec 2025 20:10:20 -0500 40.866641998291 -73.9739074707031 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between CR 618/Kinnelon Rd/Keil Rd (Butler) and North of Alexander Av (Pequannock Twp), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right lane closed Wed, 10 Dec 2025 20:10:19 -0500 41.0032196044922 -74.3572463989258 NJ 63 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 63 Northbound At South of CR 50/Edgewater Rd (Fairview) Monday December 15, 2025 09:00 AM thru 03:00 PM, All lanes open Wed, 10 Dec 2025 18:53:35 -0500 40.8227043151855 -73.9985885620117 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between West of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Tuesday December 16, 2025 08:00 AM thru 05:00 PM, right shoulder closed Wed, 10 Dec 2025 16:37:24 -0500 40.866641998291 -73.9739074707031 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between West of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Monday December 15, 2025 08:00 AM thru 05:00 PM, right shoulder closed Wed, 10 Dec 2025 16:37:25 -0500 40.866641998291 -73.9739074707031 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between West of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Wednesday December 17, 2025 08:00 AM thru 05:00 PM, right shoulder closed Wed, 10 Dec 2025 16:37:26 -0500 40.866641998291 -73.9739074707031 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between CR 618/Kinnelon Rd/Keil Rd (Butler) and North of Alexander Av (Pequannock Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right lane closed Wed, 10 Dec 2025 16:37:28 -0500 41.0032196044922 -74.3572463989258 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and CR 618/Kinnelon Rd/Keil Rd (Butler), Wednesday December 17, 2025 08:00 AM thru 05:00 PM, right lane closed Wed, 10 Dec 2025 16:37:27 -0500 40.9595413208008 -74.282600402832 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and CR 618/Kinnelon Rd/Keil Rd (Butler), Tuesday December 16, 2025 08:00 AM thru 05:00 PM, right lane closed Wed, 10 Dec 2025 16:37:31 -0500 40.9595413208008 -74.282600402832 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between CR 618/Kinnelon Rd/Keil Rd (Butler) and North of Alexander Av (Pequannock Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right lane closed Wed, 10 Dec 2025 16:37:21 -0500 41.0032196044922 -74.3572463989258 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and CR 618/Kinnelon Rd/Keil Rd (Butler), Monday December 15, 2025 08:00 AM thru 05:00 PM, right lane closed Wed, 10 Dec 2025 16:37:20 -0500 40.9595413208008 -74.282600402832 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between CR 618/Kinnelon Rd/Keil Rd (Butler) and North of Alexander Av (Pequannock Twp), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right lane closed Wed, 10 Dec 2025 16:37:23 -0500 41.0032196044922 -74.3572463989258 Taconic State Parkway northbound : road maintenance operations NYSDOT - Region 8: road maintenance operations on Taconic State Parkway northbound between Exit 20 - US 6 (Yorktown) and Exit 41 - Beekman Road - CR 9 (East Fishkill) Res 8-3 RW/32664909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 16th, 2025 thru Friday December 19th, 2025 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 02:30 PM, various lane closures Wed, 10 Dec 2025 16:19:26 -0500 41.3334292118016 -73.8175945379423 Taconic State Parkway southbound : road maintenance operations NYSDOT - Region 8: road maintenance operations on Taconic State Parkway southbound between Exit 41 - Beekman Road - CR 9 (East Fishkill) and Exit 20 - US 6 (Yorktown) Res 8-3 RW/32664809 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 16th, 2025 thru Friday December 19th, 2025 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 02:30 PM, various lane closures Wed, 10 Dec 2025 16:18:06 -0500 41.5781968611805 -73.7792523797005 I-84 eastbound : safety improvements CT DOT-Newington-HWY-Oper Ctr: safety improvements on I-84 eastbound between Exit 63 - CT 30/CT 83 (Manchester) and Exit 64 - CT 30/CT 83 (Vernon), Tuesday December 16th, 2025 thru Wednesday December 17th, 2025, 07:00 PM thru 02:00 AM All lanes closed Wed, 10 Dec 2025 16:12:59 -0500 41.8113894540165 -72.5205207921238 CT 8 northbound : roadwork CT DOT-Newington-HWY-Oper Ctr: roadwork on CT 8 northbound between Exit 31 - I-84 East (Waterbury), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed Wed, 10 Dec 2025 16:09:20 -0500 41.5503091981717 -73.0492143948199 I-95 northbound : bridge work CT DOT-Bridgeport-Oper: bridge work and substructure repairs on I-95 northbound between Exit 83 - US 1/CT 32 (New London) and Exit 85 - CT 184/US 1N (Groton) There will be various lane closures on I-95 northbound from Exit 83 to 85, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Wed, 10 Dec 2025 16:05:37 -0500 41.3687435966813 -72.1160711202366 CT 2 eastbound : safety improvements CT DOT-Newington-HWY-Oper Ctr: safety improvements on CT 2 eastbound Exit ramp Exit 18 - CT 16/Middletown Road (Colchester), Monday December 15th, 2025 thru Tuesday December 16th, 2025, 07:00 PM thru 05:00 AM All lanes closed Wed, 10 Dec 2025 15:52:34 -0500 41.5697091185022 -72.337774796488 I-395 southbound : safety improvements CT DOT-Newington-HWY-Oper Ctr: safety improvements on I-395 southbound Exit ramp Exit 14 - West Town Street (Norwich), Monday December 15th, 2025 thru Tuesday December 16th, 2025, 07:00 PM thru 05:00 AM All lanes closed Wed, 10 Dec 2025 15:45:35 -0500 41.5567754942589 -72.1044307969293 I-278 eastbound : construction NYSDOT - Region 11: construction on I-278 eastbound from Kent Avenue (New York) to South 5th Street (New York) Subject to change without notice., Tuesday December 16th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 06:00 AM 1 Right lane and shoulder of 3 lanes closed Wed, 10 Dec 2025 15:40:05 -0500 40.698228762704 -73.9622693495057 I-278 eastbound : construction NYSDOT - Region 11: construction on I-278 eastbound from Waverly Avenue (New York) to Bedford Avenue (New York) Subject to change without notice., Tuesday December 16th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 06:00 AM 1 Left lane and shoulder of 3 lanes closed Wed, 10 Dec 2025 15:37:43 -0500 40.6958107343003 -73.9682437322499 I-278 eastbound : construction NYSDOT - Region 11: construction on I-278 eastbound from Rapelye Street (New York) to Congress Street (New York) Subject to change without notice., Tuesday December 16th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 06:00 AM 1 Right lane and shoulder of 2 lanes closed Wed, 10 Dec 2025 15:34:54 -0500 40.6806790242739 -74.0029899157978 NY 33 eastbound : utility work NYSDOT - Region 4: utility work on NY 33 eastbound from 3940 SR-33 (Ogden) to Whittier Rd (Ogden) We will be placing/splicing aerial/underground fiber. Right/left lane/shoulder closure needed. Work beyond shoulder. Temp road closure for aerial crossings , Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed intermittently Wed, 10 Dec 2025 14:37:27 -0500 43.1366657625496 -77.7714624783921 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between East of Exit 3 - NJ 173/US 22 (Greenwich Twp) and East of Exit 4 - CR 637/Stewartsville-Bloomsbury Rd (Greenwich Twp), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Wed, 10 Dec 2025 14:28:32 -0500 40.6718788146973 -75.1218109130859 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between East of Exit 4 - CR 637/Stewartsville-Bloomsbury Rd (Greenwich Twp) and Exit 6 - CR 632 (Greenwich Twp), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Wed, 10 Dec 2025 14:28:30 -0500 40.6698799133301 -75.1014862060547 NY 33 both directions : utility work NYSDOT - Region 4: utility work on NY 33 both directions west of Whittier (Ogden) Alternating lane closures with flaggers as needed, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes Wed, 10 Dec 2025 14:03:03 -0500 43.1369428891925 -77.7695306627959 NY 98 both directions : utility work NYSDOT - Region 4: utility work on NY 98 both directions south of Buffalo St. (Alexander) Alternating lane closures with flaggers as needed, Thursday December 18th, 2025 thru Friday December 19th, 2025, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes Wed, 10 Dec 2025 13:58:08 -0500 42.9010357544411 -78.2574236882939 NY 100B eastbound : road rehabilitation NYSDOT - Region 8: road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic Wed, 10 Dec 2025 13:30:17 -0500 41.0402728369938 -73.8024033716725 I-84 eastbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on I-84 eastbound between Exit 65 - NY 312 (Southeast) and Exit 68 - I-684 - White Plains (Southeast) D265281/B1052800/32617709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure Wed, 10 Dec 2025 13:21:17 -0500 41.4247318109869 -73.6268713958395 Saw Mill River Parkway both directions : guard rail repairs NYSDOT - Region 8: guard rail repairs on Saw Mill River Parkway both directions between Bronx-Westchester County Line (Yonkers) and Exit 9 - Executive Boulevard (Yonkers) D265183/NIGHT/32664709 -This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closures Wed, 10 Dec 2025 13:04:56 -0500 40.9115341908565 -73.8845877309619 Saw Mill River Parkway northbound : guard rail repairs NYSDOT - Region 8: guard rail repairs on Saw Mill River Parkway northbound between Exit 21E - NY 119 (Greenburgh) and Exit 23 - Old Saw Mill Road (Greenburgh) D265183/NIGHT/32664409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closures Wed, 10 Dec 2025 13:06:36 -0500 41.0537109462914 -73.8220562526871 NJ 152 southbound : roadwork NJ DOT - TOC South: Roadwork on NJ 152 Southbound At CR 635/Bay Ave (Somers Point) Monday December 15, 2025 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed Wed, 10 Dec 2025 11:42:08 -0500 39.3180389404297 -74.5880279541016 Saw Mill River Parkway northbound : guard rail repairs NYSDOT - Region 8: guard rail repairs on Saw Mill River Parkway northbound ramp to Exit 7 - Tuckahoe Road (Yonkers) D265183/NIGHT/32664409 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 10:00 AM thru 05:00 AM, ramp closed and detoured Fri, 12 Dec 2025 09:47:00 -0500 40.9544982777746 -73.8714483146406 Saw Mill River Parkway northbound : guard rail repairs NYSDOT - Region 8: guard rail repairs on Saw Mill River Parkway northbound ramp from Exit 21E - NY 119 (Greenburgh) D265183/NIGHT/32664309 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 10:00 AM thru 05:00 AM, ramp closed and detoured Wed, 10 Dec 2025 13:08:43 -0500 41.0603815005969 -73.8222522081142 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound At South of CR 623/North Broad St (Elizabeth) Friday December 19, 2025 08:00 PM thru Saturday December 20, 2025 05:00 AM, right shoulder closed Wed, 10 Dec 2025 10:55:55 -0500 40.6708297729492 -74.2152709960938 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound At South of CR 623/North Broad St (Elizabeth) Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 05:00 AM, right shoulder closed Wed, 10 Dec 2025 10:55:47 -0500 40.6708297729492 -74.2152709960938 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound At South of CR 623/North Broad St (Elizabeth) Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 05:00 AM, right shoulder closed Wed, 10 Dec 2025 10:55:41 -0500 40.6708297729492 -74.2152709960938 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound At South of CR 623/North Broad St (Elizabeth) Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, right shoulder closed Wed, 10 Dec 2025 10:55:18 -0500 40.6708297729492 -74.2152709960938 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound At South of CR 623/North Broad St (Elizabeth) Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, right shoulder closed Wed, 10 Dec 2025 10:55:11 -0500 40.6708297729492 -74.2152709960938 Taconic State Parkway southbound : sign work NYSDOT - Region 8: sign work on Taconic State Parkway southbound between Exit 72 - Jackson Corners Road (Gallatin) and Exit 54 - Route 44 (Pleasant Valley) D265509/32664209 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 12th, 2025 thru Monday December 15th, 2025 Sunday/ Monday/ Friday/ Saturday, 10:00 AM thru 04:00 PM, shoulder closure Wed, 10 Dec 2025 10:52:59 -0500 42.0153406345201 -73.7368330980727 Taconic State Parkway southbound : sign work NYSDOT - Region 8: sign work on Taconic State Parkway southbound ramp to Exit 54 - Route 44 (Pleasant Valley) D265509/32664109 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 12th, 2025 thru Monday December 15th, 2025 Sunday/ Monday/ Friday/ Saturday, 10:00 AM thru 04:00 PM, shoulder closure Wed, 10 Dec 2025 10:49:06 -0500 41.7770732869958 -73.7697008417535 Taconic State Parkway northbound : sign work NYSDOT - Region 8: sign work on Taconic State Parkway northbound between Exit 45 - Noxon Rd (La Grange) and Exit 47B - NY 55 (La Grange) D265509/32664009 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 12th, 2025 thru Monday December 15th, 2025 Sunday/ Monday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, shoulder closure Wed, 10 Dec 2025 10:41:59 -0500 41.6437860060757 -73.787750109987 Taconic State Parkway northbound : sign work NYSDOT - Region 8: sign work on Taconic State Parkway northbound ramp to Exit 47B - NY 55 Westbound (La Grange) D265509/32663909 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 12th, 2025 thru Monday December 15th, 2025 Sunday/ Monday/ Friday/ Saturday, 09:00 AM thru 03:00 PM, shoulder closure Wed, 10 Dec 2025 10:37:05 -0500 41.671838 -73.788182 US 44 westbound : sign work NYSDOT - Region 8: sign work on US 44 westbound between North Avenue (Pleasant Valley) and West Road (Pleasant Valley) D265509/32663709 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 12th, 2025 thru Monday December 15th, 2025 Sunday/ Monday/ Friday/ Saturday, 09:30 AM thru 03:30 PM, shoulder closure Wed, 10 Dec 2025 10:22:55 -0500 41.7441648361936 -73.8252013788595 NY 115 northbound : sign work NYSDOT - Region 8: sign work on NY 115 northbound between Red Hawk Lane (Hyde Park) D265509/32663609 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 12th, 2025 thru Monday December 15th, 2025 Sunday/ Monday/ Friday/ Saturday, 09:00 AM thru 04:00 PM, alternating traffic Wed, 10 Dec 2025 10:14:07 -0500 41.7461474139975 -73.8663627421637 NY 9G northbound : sign work NYSDOT - Region 8: sign work on NY 9G northbound between Prince Road (Hyde Park) and St Andrews Road (Hyde Park) D265509/32663409 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 12th, 2025 thru Monday December 15th, 2025 Sunday/ Monday/ Friday/ Saturday, 09:00 AM thru 04:00 PM, alternating traffic Wed, 10 Dec 2025 10:07:04 -0500 41.7542387161666 -73.9085337091927 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near South of Lalor St (Trenton), Tuesday December 16, 2025 10:00 AM thru 02:00 PM, right lane closed Wed, 10 Dec 2025 09:07:22 -0500 40.195987701416 -74.7574615478516 NJ 29 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Monday December 15, 2025 09:00 AM thru 02:00 PM, left lane closed Wed, 10 Dec 2025 09:07:21 -0500 40.2001991271973 -74.7585601806641 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near West of CR 639/North Bridge St (Bridgewater Twp), Monday December 15, 2025 07:00 AM thru 04:00 PM, right shoulder closed Wed, 10 Dec 2025 09:04:26 -0500 40.580982208252 -74.6090087890625 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near West of CR 639/North Bridge St (Bridgewater Twp), Tuesday December 16, 2025 07:00 AM thru 04:00 PM, right shoulder closed Wed, 10 Dec 2025 09:04:25 -0500 40.580982208252 -74.6090087890625 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near West of CR 639/North Bridge St (Bridgewater Twp), Wednesday December 17, 2025 07:00 AM thru 04:00 PM, right shoulder closed Wed, 10 Dec 2025 09:04:20 -0500 40.580982208252 -74.6090087890625 US 44/NY 55 westbound : sign work NYSDOT - Region 8: sign work on US 44/NY 55 westbound between Winnikee Avenue (Poughkeepsie) and N Clinton Street (Poughkeepsie) D265509/32663309 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 12th, 2025 thru Monday December 15th, 2025 Sunday/ Monday/ Friday/ Saturday, 09:00 AM thru 04:00 PM, shoulder closure Wed, 10 Dec 2025 09:13:02 -0500 41.7022866159573 -73.9174663580182 US 9W both directions : longterm construction NYSDOT - Region 8: longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 07:00 PM thru 05:00 AM, alternating traffic, Monday December 22nd, 2025 thru Wednesday December 24th, 2025 Monday/ Tuesday, 07:00 PM thru 05:00 AM, alternating traffic, Monday December 29th, 2025 thru Wednesday December 31st, 2025 Monday/ Tuesday, 07:00 PM thru 05:00 AM, alternating traffic Sat, 13 Dec 2025 05:00:34 -0500 41.1552342330224 -73.9279789838665 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near CR 671/Kresson Rd (Voorhees Twp), Tuesday December 16, 2025 10:00 PM thru Wednesday December 17, 2025 06:00 AM, right lane closed, moving operation Wed, 10 Dec 2025 08:43:35 -0500 39.854118347168 -74.9216613769531 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between Exit 10A - NJ 168/Black Horse Pike (Gloucester Twp) and North of Exit 8 - CR 534/Clementon Blackwood Rd (Gloucester Twp), Tuesday December 16, 2025 10:00 PM thru Wednesday December 17, 2025 03:00 AM, Wed, 10 Dec 2025 08:43:38 -0500 39.8166313171387 -75.0681228637695 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near CR 671/Kresson Rd (Voorhees Twp), Monday December 15, 2025 10:00 PM thru Tuesday December 16, 2025 06:00 AM, right lane closed, moving operation Wed, 10 Dec 2025 08:43:23 -0500 39.854118347168 -74.9216613769531 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between North of Exit 8 - CR 534/Clementon Blackwood Rd (Gloucester Twp) and Exit 10A - NJ 168/Black Horse Pike (Gloucester Twp), Tuesday December 16, 2025 10:00 PM thru Wednesday December 17, 2025 03:00 AM, Wed, 10 Dec 2025 08:43:34 -0500 39.8044700622559 -75.0565414428711 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between CR 601/Avalon Blvd (Middle Twp) and CR 550/Woodbine Ocean View Rd (Dennis Twp), Wednesday December 17, 2025 07:00 AM thru 07:00 PM, right shoulder closed Wed, 10 Dec 2025 08:43:26 -0500 39.1293258666992 -74.7806854248047 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between CR 601/Avalon Blvd (Middle Twp) and CR 550/Woodbine Ocean View Rd (Dennis Twp), Tuesday December 16, 2025 07:00 AM thru 07:00 PM, right shoulder closed Wed, 10 Dec 2025 08:43:22 -0500 39.1293258666992 -74.7806854248047 I-690 westbound : roadwork NYSDOT - Region 3: roadwork on I-690 westbound between Exit 12A - ROUTE 297; Solvay-Fairgrounds (Geddes) ; Alternating lane closures, Wednesday December 17th, 2025 thru Thursday December 18th, 2025, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open Wed, 10 Dec 2025 08:23:48 -0500 43.0765851993009 -76.2141731323332 US 9 southbound : utility work NYSDOT - Region 8: utility work on US 9 southbound between Kittredge Place (Poughkeepsie) and Laurel Street (Poughkeepsie) 2025083285514/DAY/32663209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Sunday December 21st, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM, shoulder closure Fri, 12 Dec 2025 15:00:50 -0500 41.7148278768589 -73.9358254180176 US 9 southbound : utility work NYSDOT - Region 8: utility work on US 9 southbound between Kittredge Place (Poughkeepsie) and Laurel Street (Poughkeepsie) 2025083285514/NIGHT/32663109 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 12th, 2025 thru Monday December 22nd, 2025, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures Wed, 10 Dec 2025 13:46:04 -0500 41.7147178456845 -73.9359083640135 Taconic State Parkway southbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on Taconic State Parkway southbound between I-90 - Berkshire Section Thruway (Chatham) and Exit 102 - NY 295 (Chatham) D265281/B5502601/32663009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 02:00 PM, various lane closures Wed, 10 Dec 2025 07:30:48 -0500 42.3908705629028 -73.557771661514 Taconic State Parkway northbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on Taconic State Parkway northbound between Exit 102 - NY 295 (Chatham) and I-90 - Berkshire Section Thruway (Chatham) D265281/B5502601/32227809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 02:00 PM, various lane closures Wed, 10 Dec 2025 07:13:12 -0500 42.3908709013637 -73.5575173357707 NY 9D both directions : utility work NYSDOT - Region 8: utility work on NY 9D both directions between Moffat Road (Philipstown) and Peekskill Road (Philipstown) 2025082502725/32602809 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 16th, 2025 thru Wednesday December 17th, 2025 Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic Wed, 10 Dec 2025 06:54:20 -0500 41.4182498394571 -73.9425504909118 I-690 westbound : roadwork NYSDOT - Region 3: roadwork on I-690 westbound between Exit 9 - State Fair Boulevard; Van Vleck Road; CR 80 (Geddes) and Exit 8 - John Glenn Boulevard (Geddes) ; Alternating lane closures, Tuesday December 16th, 2025 thru Thursday December 18th, 2025, Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open Wed, 10 Dec 2025 06:22:12 -0500 43.1062845119904 -76.2480425069693 I-690 eastbound : roadwork NYSDOT - Region 3: roadwork on I-690 eastbound between Exit 8 - John Glenn Boulevard (Geddes) and Exit 9 - State Fair Boulevard; Van Vleck Road; CR 80 (Geddes) ; Alternating lane closures, Wednesday December 17th, 2025 thru Thursday December 18th, 2025, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open Wed, 10 Dec 2025 06:18:32 -0500 43.1123070127217 -76.2662479888775 I-690 westbound : overhead sign repair NYSDOT - Region 3: overhead sign repair on I-690 westbound between Exit 2 (Geddes) and Exit 1 (Van Buren), Wednesday December 17th, 2025 thru Thursday December 18th, 2025, Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed Wed, 10 Dec 2025 06:02:22 -0500 43.1117270507487 -76.2649141014973 I-86 both directions : roadwork NYSDOT - Region 6: roadwork on I-86 both directions Airport Road (Hornellsville) to Exit 34S - NY 36 South; Ramp (Hornellsville) alternating lane closures, Monday December 15th, 2025 thru Tuesday December 16th, 2025, Monday/Tuesday, 08:00 AM thru 03:00 PM All lanes open Wed, 10 Dec 2025 06:32:05 -0500 42.3755334325991 -77.6713862300887 I-90 eastbound : bridge work NYSDOT TMC - Albany: bridge work on I-90 eastbound over North Pearl Street (Albany), Sunday December 7th, 2025 thru Tuesday December 16th, 2025, Sunday thru Saturday, 08:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed Tue, 09 Dec 2025 21:21:52 -0500 42.6700217356626 -73.7414929725312 I-690 eastbound : overhead sign repair NYSDOT - Region 3: overhead sign repair on I-690 eastbound at Exit 9 - NY 298; Bear Street (Syracuse), Wednesday December 17th, 2025 thru Thursday December 18th, 2025, Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed Tue, 09 Dec 2025 20:57:58 -0500 43.0574468742608 -76.1805838051381 I-690 eastbound : overhead sign repair NYSDOT - Region 3: overhead sign repair on I-690 eastbound ramp to Exit 10 - NY 695 (Geddes), Wednesday December 17th, 2025 thru Thursday December 18th, 2025, Wednesday/Thursday, 09:00 AM thru 03:00 PM right shoulder closed Tue, 09 Dec 2025 20:55:45 -0500 43.0834285879442 -76.2275369174239 I-690 eastbound : overhead sign repair NYSDOT - Region 3: overhead sign repair on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 8 - John Glenn Boulevard (Geddes) ; Alternating lane closures, Wednesday December 17th, 2025 thru Thursday December 18th, 2025, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open Tue, 09 Dec 2025 20:37:27 -0500 43.1116966523689 -76.2855989025991 I-690 eastbound : overhead sign repair NYSDOT - Region 3: overhead sign repair on I-690 eastbound between Exit 10 - NY 695 (Geddes) and Exit 11 - ROUTE 297; Solvay-Fairgrounds (Geddes) ; Alternating lane closures, Monday December 15th, 2025 thru Tuesday December 16th, 2025, Monday/Tuesday, 09:00 AM thru 03:00 PM All lanes open Tue, 09 Dec 2025 20:34:33 -0500 43.0853669707226 -76.2293419110037 NJ 49 westbound : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Westbound At East of CR 555/Third St (Millville) Thursday December 18, 2025 01:00 AM thru 05:00 AM, 1 right lane of 2 lanes closed Tue, 09 Dec 2025 18:58:37 -0500 39.3952713012695 -75.0314407348633 I-81 southbound : culvert repairs NYSDOT - Region 3: culvert repairs on I-81 southbound between Exit 50 - US11; NY 41; McGraw (Cortlandville) and Exit 39 - US 11; NY 221; Marathon (Marathon), Continuous Thursday December 11th, 2025 07:00 AM thru Monday December 22nd, 2025 03:30 PM left shoulder closed, Thursday December 11th, 2025 thru Monday December 15th, 2025, Monday/Thursday, 07:00 AM thru 03:30 PM 1 Left lane of 3 lanes closed Wed, 10 Dec 2025 11:46:03 -0500 42.5868234338891 -76.1279653973439 NY 277 both directions : roadwork NITTEC: roadwork on NY 277 both directions at George Urban Boulevard (Cheektowaga), Tuesday December 16th, 2025 thru Thursday December 18th, 2025, Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed Tue, 09 Dec 2025 18:04:06 -0500 42.9187241152437 -78.7541626337445 NY 277 both directions : roadwork NITTEC: roadwork on NY 277 both directions at William Street (Cheektowaga), Tuesday December 16th, 2025 thru Thursday December 18th, 2025, Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed Tue, 09 Dec 2025 18:02:33 -0500 42.8854057111142 -78.75459 NY 277 both directions : roadwork NITTEC: roadwork on NY 277 both directions at Galleria Dr (Cheektowaga), Tuesday December 16th, 2025 thru Thursday December 18th, 2025, Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed Tue, 09 Dec 2025 18:01:32 -0500 42.9160002359115 -78.7542 NJ 208 southbound : roadwork NJDOT - STMC: Roadwork on NJ 208 Southbound near Goffle Rd (Hawthorne), Continuous Wednesday December 10, 2025 09:00 AM thru Friday December 19, 2025 03:00 PM, right shoulder closed Tue, 09 Dec 2025 14:19:24 -0500 40.9677085876465 -74.154411315918 NY 352 eastbound : roadwork NYSDOT - Region 6: roadwork on NY 352 eastbound Town of Big Flats; Town of Elmira Line (Elmira) 2 Lanes reduced to 1 Lane Flagger controled, Monday December 15th, 2025, 09:00 AM thru 04:00 PM All lanes open Tue, 09 Dec 2025 14:19:37 -0500 42.0912950924356 -76.8735304537796 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 62 - Garden State Parkway (Elmwood Park) and East of Exit 61 - CR 507/River Rd (Elmwood Park), Wednesday December 17, 2025 09:00 AM thru 03:00 PM, right shoulder closed Tue, 09 Dec 2025 14:19:27 -0500 40.9041900634766 -74.1109771728516 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of CR 613/River Av/Main St (Readington Twp), Friday December 19, 2025 08:00 PM thru Saturday December 20, 2025 06:00 AM, right lane closed Tue, 09 Dec 2025 14:19:28 -0500 40.5244941711426 -74.8041381835938 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 62 - Garden State Parkway (Elmwood Park) and East of Exit 61 - CR 507/River Rd (Elmwood Park), Thursday December 18, 2025 09:00 AM thru 03:00 PM, right shoulder closed Tue, 09 Dec 2025 14:19:30 -0500 40.9041900634766 -74.1109771728516 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of CR 613/River Av/Main St (Readington Twp), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 06:00 AM, right lane closed Tue, 09 Dec 2025 14:19:20 -0500 40.5244941711426 -74.8041381835938 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 62 - Garden State Parkway (Elmwood Park) and East of Exit 61 - CR 507/River Rd (Elmwood Park), Friday December 19, 2025 09:00 AM thru 03:00 PM, right shoulder closed Tue, 09 Dec 2025 14:19:22 -0500 40.9041900634766 -74.1109771728516 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 62 - Garden State Parkway (Elmwood Park) and East of Exit 61 - CR 507/River Rd (Elmwood Park), Tuesday December 16, 2025 09:00 AM thru 03:00 PM, right shoulder closed Tue, 09 Dec 2025 14:17:01 -0500 40.9041900634766 -74.1109771728516 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of CR 613/River Av/Main St (Readington Twp), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 06:00 AM, right lane closed Tue, 09 Dec 2025 14:17:02 -0500 40.5244941711426 -74.8041381835938 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 62 - Garden State Parkway (Elmwood Park) and East of Exit 61 - CR 507/River Rd (Elmwood Park), Monday December 15, 2025 09:00 AM thru 03:00 PM, right shoulder closed Tue, 09 Dec 2025 14:16:33 -0500 40.9041900634766 -74.1109771728516 NY 7 both directions : roadwork NYSDOT TMC - Albany: roadwork on NY 7 both directions at 25th St (Troy), Monday December 15th, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed Tue, 09 Dec 2025 14:16:57 -0500 42.7375880605692 -73.6651444845536 VAN DUZER ST eastbound : construction NYSDOT - Region 11: construction on VAN DUZER ST eastbound between TARGEE ST (New York) and COURT ST (New York) for utility pole replacement., Continuous Tuesday December 9th, 2025 12:00 AM thru Saturday December 20th, 2025 11:59 PM All lanes closed Tue, 09 Dec 2025 14:11:08 -0500 40.627310551935 -74.08305889613 ROCKAWAY FWY westbound : construction NYSDOT - Region 11: construction on ROCKAWAY FWY westbound between BEACH 101ST ST (New York) and BEACH 108TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday December 9th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed Tue, 09 Dec 2025 14:08:48 -0500 40.5846918195532 -73.8225511180739 ROCKAWAY FWY eastbound : construction NYSDOT - Region 11: construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday December 9th, 2025 thru Monday March 9th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed Tue, 09 Dec 2025 14:06:35 -0500 40.5962076077215 -73.7669561389972 PARK AVE southbound : construction NYSDOT - Region 11: construction on PARK AVE southbound between E 180TH ST (New York) and E 179TH ST (New York) for stage 4 girder removal-contract# HBX180., Continuous Friday December 12th, 2025 09:00 PM thru Monday December 15th, 2025 05:00 AM All lanes closed, Continuous Friday December 19th, 2025 09:00 PM thru Monday December 22nd, 2025 05:00 AM All lanes closed, Continuous Friday December 26th, 2025 09:00 PM thru Monday December 29th, 2025 05:00 AM All lanes closed, Continuous Friday January 2nd, 2026 09:00 PM thru Monday January 5th, 2026 05:00 AM All lanes closed, Continuous Friday January 9th, 2026 09:00 PM thru Monday January 12th, 2026 05:00 AM All lanes closed Tue, 09 Dec 2025 14:01:50 -0500 40.8519116046113 -73.8971232249625 PARK AVE northbound : construction NYSDOT - Region 11: construction on PARK AVE northbound between E 178TH ST (New York) and E 179TH ST (New York) for stage 4 girder removal-contract# HBX180., Continuous Friday December 12th, 2025 09:00 PM thru Monday December 15th, 2025 05:00 AM All lanes closed, Continuous Friday December 19th, 2025 09:00 PM thru Monday December 22nd, 2025 05:00 AM All lanes closed, Continuous Friday December 26th, 2025 09:00 PM thru Monday December 29th, 2025 05:00 AM All lanes closed, Continuous Friday January 2nd, 2026 09:00 PM thru Monday January 5th, 2026 05:00 AM All lanes closed, Continuous Friday January 9th, 2026 09:00 PM thru Monday January 12th, 2026 05:00 AM All lanes closed Tue, 09 Dec 2025 13:58:37 -0500 40.8487035410326 -73.8985023640793 E 180TH ST both directions : construction NYSDOT - Region 11: construction on E 180TH ST both directions between WASHINGTON AVE (New York) and PARK AVE (New York) for stage 4 girder removal-contract# HBX180., Continuous Friday December 12th, 2025 09:00 PM thru Monday December 15th, 2025 05:00 AM All lanes closed, Continuous Friday December 19th, 2025 09:00 PM thru Monday December 22nd, 2025 05:00 AM All lanes closed, Continuous Friday December 26th, 2025 09:00 PM thru Monday December 29th, 2025 05:00 AM All lanes closed, Continuous Friday January 2nd, 2026 09:00 PM thru Monday January 5th, 2026 05:00 AM All lanes closed, Continuous Friday January 9th, 2026 09:00 PM thru Monday January 12th, 2026 05:00 AM All lanes closed Tue, 09 Dec 2025 13:55:30 -0500 40.8514966210235 -73.8956025583716 RIVERSIDE DR northbound : construction NYSDOT - Region 11: construction on RIVERSIDE DR northbound between W 152ND ST (New York) and W 153RD ST (New York) for NYCDOT contract HBM1165 Rehab. Riverside Drive Viaduct over West 158th Street., Continuous Tuesday December 9th, 2025 12:00 AM thru Wednesday December 31st, 2025 11:59 PM All lanes closed Tue, 09 Dec 2025 13:48:44 -0500 40.8317338353136 -73.9495519226898 THOMPSON ST southbound : construction NYSDOT - Region 11: construction on THOMPSON ST southbound between GRAND ST (New York) and 6TH AVE (New York) for sewer relocation work and drilling., Continuous Tuesday December 9th, 2025 12:00 AM thru Sunday March 8th, 2026 11:59 PM All lanes closed Tue, 09 Dec 2025 13:45:25 -0500 40.7226693584467 -74.0044730613591 BROOME ST westbound : construction NYSDOT - Region 11: construction on BROOME ST westbound between CHRYSTIE ST (New York) and BOWERY (New York) for special operations-pour concrete and rebar deliveries., Tuesday December 9th, 2025 thru Friday January 9th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed Tue, 09 Dec 2025 13:43:23 -0500 40.7190988269715 -73.9934594995468 E 74TH ST eastbound : construction NYSDOT - Region 11: construction on E 74TH ST eastbound between 5TH AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Saturday December 13th, 2025 thru Saturday December 27th, 2025, 08:00 AM thru 06:00 PM All lanes closed, Sunday December 14th, 2025 thru Sunday December 28th, 2025, 09:00 AM thru 06:00 PM All lanes closed Tue, 09 Dec 2025 13:40:46 -0500 40.7737260380303 -73.9659754866381 Hutchinson River Parkway [Westchester] southbound : road maintenance operations NYSDOT - Region 8: road maintenance operations on Hutchinson River Parkway [Westchester] southbound ramp to Exit 5 - Wolfs Lane - East Sandford Boulevard (Pelham) Res 8-9 RW/32662909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Wednesday December 17th, 2025 Monday/ Tuesday, 11:00 PM thru 05:00 AM, shoulder closure Tue, 09 Dec 2025 13:28:57 -0500 40.9019938014404 -73.8158366785435 ROCKAWAY FWY eastbound : construction NYSDOT - Region 11: construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 100TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday December 9th, 2025 thru Saturday February 28th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed Tue, 09 Dec 2025 13:06:46 -0500 40.5847427300844 -73.8223827980113 ROCKAWAY FWY eastbound : construction NYSDOT - Region 11: construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday December 9th, 2025 thru Monday March 9th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed Tue, 09 Dec 2025 13:04:42 -0500 40.5878354570812 -73.8143222015132 ROCKAWAY FWY eastbound : construction NYSDOT - Region 11: construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday December 9th, 2025 thru Monday March 9th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed Tue, 09 Dec 2025 13:01:48 -0500 40.5922704555606 -73.785716225995 ROCKAWAY FWY eastbound : construction NYSDOT - Region 11: construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday December 9th, 2025 thru Monday March 9th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed Tue, 09 Dec 2025 12:59:05 -0500 40.5922334724271 -73.7840659215545 Hutchinson River Parkway [Westchester] both directions : drainage improvements NYSDOT - Region 8: drainage improvements and survey work on Hutchinson River Parkway [Westchester] both directions between Exit 4 - Boston Post Road - US 1 (Pelham) and Exit 13 - Mamaroneck Avenue (White Plains) D265463/NIGHT/32455309 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday December 14th, 2025 thru Friday December 19th, 2025 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures Tue, 09 Dec 2025 13:02:22 -0500 40.8913342382476 -73.8157279735634 54th Avenue westbound : construction NYSDOT - Region 11: construction on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for new 5 story school building-all crane operations., Tuesday December 9th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed Tue, 09 Dec 2025 12:55:36 -0500 40.7408097175474 -73.9593863617749 38TH AVE eastbound : crane operations NYSDOT - Region 11: crane operations on 38TH AVE eastbound between MAIN ST (New York) and 138TH ST (New York), Tuesday December 9th, 2025 thru Friday January 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 09 Dec 2025 12:52:23 -0500 40.7608455139791 -73.8306870314967 35TH ST northbound : crane operations NYSDOT - Region 11: crane operations on 35TH ST northbound between 47TH AVE (New York) and RT-25 (New York), Saturday December 13th, 2025 thru Saturday December 20th, 2025, 08:00 AM thru 06:00 PM All lanes closed, Sunday December 14th, 2025 thru Sunday December 21st, 2025, 09:00 AM thru 06:00 PM All lanes closed Tue, 09 Dec 2025 12:50:00 -0500 40.7424910892867 -73.9302219607917 INDIA ST both directions : construction NYSDOT - Region 11: construction on INDIA ST both directions between WEST ST (New York) for large concrete pours., Tuesday December 9th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed Tue, 09 Dec 2025 12:45:47 -0500 40.7318309823267 -73.9596913162115 JAVA ST both directions : construction NYSDOT - Region 11: construction on JAVA ST both directions between WEST ST (New York) for large concrete pours., Tuesday December 9th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed Tue, 09 Dec 2025 12:44:20 -0500 40.7309606795353 -73.9612823127575 LIVONIA AVE both directions : construction NYSDOT - Region 11: construction on LIVONIA AVE both directions between JUNIUS ST (New York) and POWELL ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Tuesday December 9th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed Tue, 09 Dec 2025 12:42:45 -0500 40.6636654770255 -73.9014661837957 JUNIUS ST southbound : construction NYSDOT - Region 11: construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Tuesday December 9th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed Tue, 09 Dec 2025 12:38:57 -0500 40.6651560703197 -73.901813502018 GEORGIA AVE northbound : construction NYSDOT - Region 11: construction on GEORGIA AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for trenching to install conduit for service to 186., Tuesday December 9th, 2025 thru Saturday January 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 09 Dec 2025 12:37:01 -0500 40.6729467900792 -73.8980966975198 NEW JERSEY AVE southbound : construction NYSDOT - Region 11: construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Tuesday December 9th, 2025 thru Saturday February 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 09 Dec 2025 12:34:53 -0500 40.6773183919771 -73.8962093885579 ROCKWELL PL southbound : construction NYSDOT - Region 11: construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for new 43 story building., Tuesday December 9th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 11:00 PM thru 05:00 AM All lanes closed Tue, 09 Dec 2025 12:30:51 -0500 40.6881346915691 -73.9792749513004 VERMONT ST northbound : construction NYSDOT - Region 11: construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Tuesday December 9th, 2025 thru Saturday February 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 09 Dec 2025 12:28:46 -0500 40.6760385508564 -73.8949471377141 AMBOY ST southbound : construction NYSDOT - Region 11: construction on AMBOY ST southbound between LIVONIA AVE (New York) and RIVERDALE AVE (New York) 9am to 3pm without letter from school for boom, knuckle boom and concrete pup to work on new building., Tuesday December 9th, 2025 thru Wednesday February 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 09 Dec 2025 12:26:29 -0500 40.6619364679696 -73.9126591169924 FORREST ST northbound : construction NYSDOT - Region 11: construction on FORREST ST northbound between CENTRAL AVE (New York) and FLUSHING AVE (New York) for crane and knuckle boom to hoist steel., Tuesday December 9th, 2025 thru Friday December 19th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 09 Dec 2025 12:23:29 -0500 40.7025381326366 -73.9327201898824 16TH ST eastbound : construction NYSDOT - Region 11: construction on 16TH ST eastbound between 11TH AVE (New York) and PROSPECT PARK SW (New York) for boom truck, concrete pump., Tuesday December 9th, 2025 thru Sunday December 21st, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 09 Dec 2025 12:19:32 -0500 40.6580619696177 -73.9755595056617 12TH ST eastbound : construction NYSDOT - Region 11: construction on 12TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for hoisting and pumping operations., Tuesday December 9th, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 09 Dec 2025 12:17:33 -0500 40.6684606547837 -73.990068126005 PUTNAM AVE W both directions : construction NYSDOT - Region 11: construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Tuesday December 9th, 2025 thru Thursday January 1st, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed Tue, 09 Dec 2025 12:13:48 -0500 40.8853164898393 -73.8982227249302 VILLA AVE both directions : construction NYSDOT - Region 11: construction on VILLA AVE both directions between BEDFORD PARK BLVD (New York) and E 204TH ST (New York) for bumping, booming operations., Tuesday December 9th, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 07:00 PM thru 10:00 AM All lanes closed, Friday December 12th, 2025 thru Friday December 26th, 2025, 10:00 AM thru 03:00 PM All lanes closed Tue, 09 Dec 2025 12:10:06 -0500 40.8728920472483 -73.8886057835895 VYSE AVE northbound : construction NYSDOT - Region 11: construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for concrete pump and booming operations., Tuesday December 9th, 2025 thru Monday January 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed Tue, 09 Dec 2025 12:06:51 -0500 40.8301557374834 -73.8898642895803 FREEMAN ST eastbound : construction NYSDOT - Region 11: construction on FREEMAN ST eastbound between HOE AVE (New York) and VYSE AVE (New York) for concrete pump and booming operations., Tuesday December 9th, 2025 thru Monday January 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 09 Dec 2025 12:04:29 -0500 40.8301293793467 -73.8908298983133 MORRIS AVE northbound : construction NYSDOT - Region 11: construction on MORRIS AVE northbound between E KINGSBRIDGE RD (New York) and E 196TH ST (New York) for boom truck delivery., Tuesday December 9th, 2025 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed Tue, 09 Dec 2025 12:02:29 -0500 40.8671269011974 -73.8962383960325 MONROE AVE southbound : crane operations NYSDOT - Region 11: crane operations on MONROE AVE southbound between E 175TH ST (New York) and CROSS BRONX EXPY N (New York), Saturday December 13th, 2025 thru Saturday January 3rd, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday December 14th, 2025 thru Sunday January 4th, 2026, 09:00 AM thru 06:00 PM All lanes closed Tue, 09 Dec 2025 11:59:31 -0500 40.8466748120251 -73.90648 ELTON AVE southbound : crane operations NYSDOT - Region 11: crane operations on ELTON AVE southbound between E 158TH ST (New York) and E 157TH ST (New York) 9am to 4pm Monday to Friday when school is not in session ., Tuesday December 9th, 2025 thru Tuesday January 6th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed Tue, 09 Dec 2025 11:55:11 -0500 40.8217888045296 -73.9132309289144 ELTON AVE southbound : crane operations NYSDOT - Region 11: crane operations on ELTON AVE southbound between E 153RD ST (New York) and 3RD AVE (New York) 9am to 4pm Monday to Friday when school is not in session., Tuesday December 9th, 2025 thru Tuesday January 6th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed Tue, 09 Dec 2025 11:53:07 -0500 40.8184116279654 -73.9148759103558 W 262ND ST westbound : construction NYSDOT - Region 11: construction on W 262ND ST westbound between RT-9A (New York) and HUXLEY AVE (New York) for use of concrete pumps, boom trucks and knuckle booms., Tuesday December 9th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes closed Tue, 09 Dec 2025 11:49:34 -0500 40.910208909387 -73.8967069126442 E 194TH ST both directions : construction NYSDOT - Region 11: construction on E 194TH ST both directions between DECATUR AVE (New York) and MARION AVE (New York) for booming and pumping, Tuesday December 9th, 2025 thru Monday February 2nd, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes closed Tue, 09 Dec 2025 11:43:26 -0500 40.8635193788414 -73.8902494157399 French Road and Champlin Avenue; Whitesboro Street northbound : water main work NYSDOT - Region 2: water main work on French Road and Champlin Avenue; Whitesboro Street northbound between Utica College Driveway; St. Lukes Hospital Driveway (Utica) and Campbell Ave (Yorkville) Motorists will encounter a NB lane closure, Wednesday December 10th, 2025 thru Tuesday December 16th, 2025, Sunday thru Saturday, 12:00 AM thru 06:00 PM, Fri, 12 Dec 2025 06:39:58 -0500 43.0976 -75.2745 NY 5 westbound : utility work NYSDOT - Region 4: utility work on NY 5 westbound west of Route 98 Junction (Batavia), Tuesday December 16th, 2025, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed Tue, 09 Dec 2025 11:03:14 -0500 43.0016747460137 -78.195613616363 NY 33A both directions : utility work NYSDOT - Region 4: utility work on NY 33A both directions east of Chili Center Coldwater Road; NY 386; Paul Road; NY 252A (Chili) Alternating lane closures with flaggers as needed, Monday December 15th, 2025 thru Wednesday December 17th, 2025, Monday/Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes Tue, 09 Dec 2025 10:41:58 -0500 43.1110199820558 -77.7381600358884 NY 31 both directions : bridge inspection NYSDOT - Region 3: bridge inspection on NY 31 both directions between Brewerton Road; US 11 (Cicero) and Lakeshore Rd (Cicero) ; Alternating lane closures, Thursday December 18th, 2025 thru Friday December 19th, 2025, Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open Tue, 09 Dec 2025 10:45:51 -0500 43.1754824290587 -76.1190120970312 US 11 both directions : bridge replacement NYSDOT - Region 3: bridge replacement on US 11 both directions between Bennett St (Cicero) and River Rd (Hastings) Detour posted - Alternating one-way traffic with temporary signals , Continuous Tuesday December 23rd, 2025 09:00 AM thru Thursday December 31st, 2026 03:30 PM All lanes closed Tue, 09 Dec 2025 09:51:18 -0500 43.2394049623248 -76.1406132115946 US 20A both directions : utility work NYSDOT - Region 4: utility work on US 20A both directions between York Road; NY 36 (Leicester) and Dunkley Rd (Leicester) Alternating lane closures with flaggers as needed, Thursday December 11th, 2025 thru Friday December 19th, 2025, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes Thu, 11 Dec 2025 18:51:35 -0500 42.7722695138035 -77.8968703021494 US 20 both directions : installation of traffic management systems NYSDOT - Region 3: installation of traffic management systems on US 20 both directions at Amber Rd (Marcellus) ; Alternating lane closures, Tuesday December 9th, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open Tue, 09 Dec 2025 08:17:26 -0500 42.9276288627513 -76.2738617285225 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound near North of Exit 7 - College Dr (Gloucester Twp), Tuesday December 16, 2025 07:00 AM thru 03:00 PM, right shoulder closed Tue, 09 Dec 2025 08:10:20 -0500 39.7829360961914 -75.0486145019531 NY 19 both directions : utility work NYSDOT - Region 4: utility work on NY 19 both directions between Dillon Rd. (Covington) and Wyoming Rd. (Pavilion) Alternating lane closures with flaggers as needed, Wednesday December 10th, 2025 thru Friday December 19th, 2025, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes Thu, 11 Dec 2025 13:13:17 -0500 42.8703225336173 -78.0248751593741 US 9W northbound : gas main repairs NYSDOT - Region 8: gas main repairs on US 9W northbound between Major Andre Drive (Stony Point) and Filors Lane (Stony Point) 2025082416256/32662009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday December 11th, 2025 thru Monday December 22nd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, lane shift Tue, 09 Dec 2025 06:28:35 -0500 41.2168721748207 -73.9864240001966 NJ 94 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 94 Northbound between South of CR 521/Stillwater Rd (Blairstown Twp) and South of CR 661/Ramsey Rd (Frelinghuysen Twp) Monday December 15, 2025 09:00 AM thru Friday December 19, 2025 03:00 PM, 1 right lane of 2 lanes closed Mon, 08 Dec 2025 18:57:52 -0500 40.9805107116699 -74.9548034667969 American Dream Mall : special event Meadowlands Complex: special event on American Dream Mall at (East Rutherford) Angry Birds Holiday Birdie Bash, Sunday December 21st, 2025 thru Sunday December 21st, 2025, 12:00 PM thru 04:00 PM Mon, 08 Dec 2025 16:51:26 -0500 40.8103304020617 -74.0684148072978 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall at (East Rutherford) Max McNown Live at American Dream, Monday December 15th, 2025, 06:00 PM thru 07:00 PM Mon, 08 Dec 2025 16:46:02 -0500 40.8103304020617 -74.0684148072978 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall at (East Rutherford) American Dream Christmas Season Piano Concert, Saturday December 6th, 2025 thru Saturday December 27th, 2025, 02:00 PM thru 04:00 PM Mon, 08 Dec 2025 16:40:55 -0500 40.8103304020617 -74.0684148072978 Saw Mill River Parkway southbound : road maintenance operations NYSDOT - Region 8: road maintenance operations on Saw Mill River Parkway southbound between Exit 34 - NY 133 (Mount Kisco) and Exit 33 - Roaring Brook Road (New Castle) Res 8-9 RW/NIGHT/32661909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Tuesday December 16th, 2025, 10:00 PM thru 05:00 AM, right lane closure Thu, 11 Dec 2025 07:07:04 -0500 41.2065227297786 -73.7353605540665 E 158TH ST eastbound : construction NYSDOT - Region 11: construction on E 158TH ST eastbound between MELROSE AVE (New York) and ELTON AVE (New York) for booming and pumping operations., Monday December 8th, 2025 thru Tuesday January 6th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Mon, 08 Dec 2025 16:20:18 -0500 40.8222694548645 -73.9147483906717 HENRY ST both directions : crane operations NYSDOT - Region 11: construction and crane operations on HENRY ST both directions between CATHERINE ST (New York) and MARKET ST (New York) for boom and pump operations related to new building construction., Saturday December 13th, 2025 thru Saturday December 20th, 2025, 08:00 AM thru 06:00 PM All lanes closed, Sunday December 14th, 2025 thru Sunday December 21st, 2025, 09:00 AM thru 06:00 PM All lanes closed, Sunday December 7th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed Mon, 08 Dec 2025 16:12:24 -0500 40.7128078302867 -73.9970338668464 RECTOR ST eastbound : construction NYSDOT - Region 11: construction on RECTOR ST eastbound between TRINITY PL (New York) and BROADWAY (New York) for DDC reconstruction project utility installation., Monday December 8th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 07:59 PM All lanes closed Mon, 08 Dec 2025 15:59:52 -0500 40.707750623637 -74.0129163348073 NJ 93 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 93 Northbound At North of US 1&9 (Ridgefield) Wednesday December 17, 2025 06:00 PM thru Thursday December 18, 2025 06:00 AM, All lanes closed and detoured Mon, 08 Dec 2025 15:56:15 -0500 40.8354225158691 -74.0086441040039 PARK AVE southbound : construction NYSDOT - Region 11: construction on PARK AVE southbound between E 129TH ST (New York) and E 128TH ST (New York) to erect the gantries for the Park Avenue Viaduct-Southbound., Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed Mon, 08 Dec 2025 15:51:08 -0500 40.8075949954575 -73.9373401620469 PARK AVE northbound : construction NYSDOT - Region 11: construction on PARK AVE northbound between E 128TH ST (New York) and E 129TH ST (New York) to erect the gantries for the Park Avenue Viaduct-Northbound., Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes closed Mon, 08 Dec 2025 15:49:31 -0500 40.8069519462515 -73.9374866741656 PARK AVE southbound : construction NYSDOT - Region 11: construction on PARK AVE southbound between E 128TH ST (New York) to erect the gantries for the Park Avenue Viaduct-Southbound., Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes closed Mon, 08 Dec 2025 15:48:09 -0500 40.8071156374861 -73.9376901694546 E 206TH ST both directions : construction NYSDOT - Region 11: construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Monday December 8th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed Mon, 08 Dec 2025 15:46:06 -0500 40.8757575176302 -73.8834876586722 W 167TH ST westbound : construction NYSDOT - Region 11: construction on W 167TH ST westbound between AUDUBON AVE (New York) and ST NICHOLAS AVE (New York) for use of mobile crane, concrete pump and knuckle boom., Saturday December 13th, 2025 thru Saturday December 27th, 2025, 08:00 AM thru 06:00 PM All lanes closed, Sunday December 7th, 2025 thru Sunday December 28th, 2025, 09:00 AM thru 06:00 PM All lanes closed Mon, 08 Dec 2025 15:42:08 -0500 40.8399259642884 -73.9388751785779 W 140TH ST eastbound : crane operations NYSDOT - Region 11: crane operations on W 140TH ST eastbound between 7TH AVE (New York) and LENOX AVE (New York), Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed Mon, 08 Dec 2025 15:30:51 -0500 40.8183794304677 -73.9411570771563 E 89TH ST westbound : construction NYSDOT - Region 11: construction on E 89TH ST westbound between E END AVE (New York) and YORK AVE (New York) for knuckle boom for lifting/hoisting-replacement HVAC units from and to roof top., Saturday December 13th, 2025 thru Saturday December 20th, 2025, 08:00 AM thru 06:00 PM All lanes closed, Sunday December 7th, 2025 thru Sunday December 21st, 2025, 09:00 AM thru 06:00 PM All lanes closed Mon, 08 Dec 2025 15:29:25 -0500 40.7769165995964 -73.9434706152035 E 89TH ST westbound : construction NYSDOT - Region 11: construction on E 89TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York) for knuckle boom for lifting/hoisting-replacement HVAC units from and to roof top., Saturday December 13th, 2025 thru Saturday December 20th, 2025, 08:00 AM thru 06:00 PM All lanes closed, Sunday December 7th, 2025 thru Sunday December 21st, 2025, 09:00 AM thru 06:00 PM All lanes closed Mon, 08 Dec 2025 15:23:22 -0500 40.7798710559335 -73.9504855403067 E 77TH ST westbound : construction NYSDOT - Region 11: construction on E 77TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for knuckle boom operations to lift/hoist materials., Saturday December 13th, 2025 thru Saturday December 20th, 2025, 08:00 AM thru 06:00 PM All lanes closed, Sunday December 7th, 2025 thru Sunday December 21st, 2025, 09:00 AM thru 06:00 PM All lanes closed Mon, 08 Dec 2025 15:20:50 -0500 40.7750266637954 -73.9631528503748 W 20TH ST eastbound : crane operations NYSDOT - Region 11: crane operations on W 20TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday December 7th, 2025 thru Sunday January 11th, 2026, Saturday/ Sunday, 06:00 AM thru 05:00 PM All lanes closed Tue, 09 Dec 2025 13:35:39 -0500 40.7421771392956 -73.9968844558271 W 11TH ST westbound : crane operations NYSDOT - Region 11: crane operations on W 11TH ST westbound between GREENWICH ST (New York) and WASHINGTON ST (New York), Monday December 8th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed, Saturday December 13th, 2025 thru Saturday December 27th, 2025, 08:00 AM thru 04:00 PM All lanes closed Mon, 08 Dec 2025 15:10:43 -0500 40.7357123421538 -74.0068453453431 I-690 eastbound : roadwork NYSDOT - Region 3: roadwork on I-690 eastbound ramp to Exit 9 - NY 298; Bear Street (Syracuse), Continuous Tuesday December 9th, 2025 07:00 AM thru Friday December 19th, 2025 03:00 PM left shoulder closed Mon, 08 Dec 2025 13:59:20 -0500 43.0572104672422 -76.1801541432199 NY 9A southbound : road maintenance operations NYSDOT - Region 8: road maintenance operations on NY 9A southbound between Bedford Road - NY 117 (Mount Pleasant) and Saw Mill River Parkway (Yonkers) Not currently scheduled Sat, 13 Dec 2025 14:01:16 -0500 41.121019783919 -73.8091418649152 I-95 northbound : bridge rehabilitation CT DOT-Bridgeport-Oper: bridge rehabilitation on I-95 northbound between Exit 83 - US 1/CT 32 (New London) and Exit 84 - CT 32 (New London) There will be temporary nighttime closures of I-95 at the Exit 83 ramp, Monday December 15th, 2025 thru Wednesday January 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open Mon, 08 Dec 2025 11:28:05 -0500 41.3672148000026 -72.1116332843827 NJ 10 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 10 near In the vicinity of Mount Pleasant Tpke (Denville Twp), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:40 -0500 40.8722953796387 -74.5228118896484 NJ 10 westbound : roadwork NJDOT - STMC: Roadwork on NJ 10 near CR 670 (Randolph Twp), Wednesday December 17, 2025 09:00 PM thru Thursday December 18, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:37 -0500 40.8625183105469 -74.5701217651367 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound between South of Shell Bay Ave (Middle Twp) and North of Indian Trail Rd/NJ 147 (Middle Twp), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 06:00 AM, right shoulder closed Mon, 08 Dec 2025 10:31:52 -0500 39.0658760070801 -74.8327255249023 NJ 10 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 10 near In the vicinity of Mount Pleasant Tpke (Denville Twp), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:34 -0500 40.8722953796387 -74.5228118896484 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound near North of I-280 (Newark), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:47 -0500 40.7487335205078 -74.1676559448242 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Friday December 19, 2025 11:00 PM thru Saturday December 20, 2025 05:00 AM, right turn lane Mon, 08 Dec 2025 10:31:39 -0500 40.750171661377 -74.1677703857422 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Thursday December 18, 2025 11:00 PM thru Friday December 19, 2025 05:00 AM, right turn lane Mon, 08 Dec 2025 10:31:35 -0500 40.750171661377 -74.1677703857422 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound near North of I-280 (Newark), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:51 -0500 40.7487335205078 -74.1676559448242 NJ 10 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 10 near In the vicinity of Mount Pleasant Tpke (Denville Twp), Friday December 19, 2025 08:00 PM thru Saturday December 20, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:48 -0500 40.8722953796387 -74.5228118896484 NJ 10 westbound : roadwork NJDOT - STMC: Roadwork on NJ 10 near CR 670 (Randolph Twp), Thursday December 18, 2025 09:00 PM thru Friday December 19, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:43 -0500 40.8625183105469 -74.5701217651367 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Main St (Roxbury Twp) and East of NJ 183/Netcong Circle (Roxbury Twp), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:44 -0500 40.8855934143066 -74.6589813232422 US 1&9 southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Southbound near North of I-78 (Newark), Monday December 15, 2025 10:00 PM thru Tuesday December 16, 2025 04:00 AM, acceleration lane closed local lane Mon, 08 Dec 2025 10:31:45 -0500 40.7082443237305 -74.1692276000977 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound between South of Shell Bay Ave (Middle Twp) and North of Indian Trail Rd/NJ 147 (Middle Twp), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 06:00 AM, right shoulder closed Mon, 08 Dec 2025 10:31:42 -0500 39.0658760070801 -74.8327255249023 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound near North of Limekiln Rd (Hamburg), Thursday December 18, 2025 09:00 PM thru Friday December 19, 2025 06:00 AM, right shoulder closed Mon, 08 Dec 2025 10:31:31 -0500 41.1410713195801 -74.5721435546875 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Wednesday December 17, 2025 11:00 PM thru Thursday December 18, 2025 05:00 AM, right turn lane Mon, 08 Dec 2025 10:31:30 -0500 40.750171661377 -74.1677703857422 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound near North of I-280 (Newark), Saturday December 20, 2025 08:00 PM thru Sunday December 21, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:36 -0500 40.7487335205078 -74.1676559448242 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of CR 577/Springfield Ave (Springfield Twp), Tuesday December 16, 2025 09:00 PM thru Wednesday December 17, 2025 05:00 AM, right shoulder closed Mon, 08 Dec 2025 10:31:25 -0500 40.6858825683594 -74.3199157714844 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound near North of I-280 (Newark), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:41 -0500 40.7487335205078 -74.1676559448242 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Main St (Roxbury Twp) and East of NJ 183/Netcong Circle (Roxbury Twp), Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:23 -0500 40.8855934143066 -74.6589813232422 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Monday December 15, 2025 11:00 PM thru Tuesday December 16, 2025 05:00 AM, right turn lane Mon, 08 Dec 2025 10:31:27 -0500 40.750171661377 -74.1677703857422 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound near North of I-280 (Newark), Friday December 19, 2025 08:00 PM thru Saturday December 20, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:32 -0500 40.7487335205078 -74.1676559448242 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of CR 577/Springfield Ave (Springfield Twp), left shoulder Mon, 08 Dec 2025 10:31:19 -0500 40.6858825683594 -74.3199157714844 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound near North of Limekiln Rd (Hamburg), Friday December 19, 2025 09:00 PM thru Saturday December 20, 2025 06:00 AM, right shoulder closed Mon, 08 Dec 2025 10:31:28 -0500 41.1410713195801 -74.5721435546875 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound between South of Shell Bay Ave (Middle Twp) and North of Indian Trail Rd/NJ 147 (Middle Twp), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 06:00 AM, right shoulder closed Mon, 08 Dec 2025 10:31:33 -0500 39.0658760070801 -74.8327255249023 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound near North of Limekiln Rd (Hamburg), Tuesday December 16, 2025 09:00 PM thru Wednesday December 17, 2025 06:00 AM, right shoulder closed Mon, 08 Dec 2025 10:31:20 -0500 41.1410713195801 -74.5721435546875 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound near North of Limekiln Rd (Hamburg), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 06:00 AM, right shoulder closed Mon, 08 Dec 2025 10:31:29 -0500 41.1410713195801 -74.5721435546875 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound near North of Limekiln Rd (Hamburg), Wednesday December 17, 2025 09:00 PM thru Thursday December 18, 2025 06:00 AM, right shoulder closed Mon, 08 Dec 2025 10:31:23 -0500 41.1410713195801 -74.5721435546875 NJ 10 westbound : roadwork NJDOT - STMC: Roadwork on NJ 10 near CR 670 (Randolph Twp), Friday December 19, 2025 09:00 PM thru Saturday December 20, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:26 -0500 40.8625183105469 -74.5701217651367 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound near North of I-280 (Newark), Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 05:00 AM, right lane closed Mon, 08 Dec 2025 10:31:22 -0500 40.7487335205078 -74.1676559448242 NY 982B - Westchester Avenue westbound : drainage improvements NYSDOT - Region 8: drainage improvements on NY 982B - Westchester Avenue westbound at Abendroth Avenue (Port Chester) 202508114073/32547309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure Mon, 08 Dec 2025 07:12:47 -0500 41.0001325230315 -73.662908257537 NY 59 eastbound : drainage improvements NYSDOT - Region 8: drainage improvements on NY 59 eastbound between 4th Street (Suffern) and Wayne Avenue (Suffern) D265409/32660909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Monday December 22nd, 2025 thru Tuesday December 23rd, 2025 Monday/ Tuesday, 09:00 AM thru 03:30 PM, alternating traffic Fri, 12 Dec 2025 15:30:50 -0500 41.1255711982259 -74.1615386902529 8TH AVE northbound : New Years eve NYC DOT: New Years eve on 8TH AVE northbound between W 34TH ST (New York) and COLUMBUS CIR (New York) Times Square New Year's Eve 2026. Closures are at the discretion of the NYPD., Wednesday December 31st, 2025, 06:00 PM thru 11:59 PM All lanes open Sat, 06 Dec 2025 20:53:06 -0500 40.7522286144576 -73.9934313149743 6TH AVE northbound : New Years eve NYC DOT: New Years eve on 6TH AVE northbound between W 34TH ST (New York) and W 59TH ST (New York) Times Square New Year's Eve 2026. Closures are at the discretion of the NYPD., Wednesday December 31st, 2025, 06:00 PM thru 11:59 PM All lanes open Sat, 06 Dec 2025 20:51:25 -0500 40.7498386184507 -73.9877546411268 CENTRAL PARK S both directions : New Years eve NYC DOT: New Years eve on CENTRAL PARK S both directions between COLUMBUS CIR (New York) and E 59TH ST at 2ND AVE (New York) Times Square New Year's Eve 2026. Closures are at the discretion of the NYPD., Wednesday December 31st, 2025, 06:00 PM thru 11:59 PM All lanes open Sat, 06 Dec 2025 20:49:46 -0500 40.7678616648199 -73.9813384465699 E 34TH ST both directions : New Years eve NYC DOT: New Years eve on E 34TH ST both directions between FDR DR (New York) and W 34TH ST at 12TH AVE (New York) Times Square New Year's Eve 2026. Closures are at the discretion of the NYPD., Wednesday December 31st, 2025, 06:00 PM thru 11:59 PM All lanes open Sat, 06 Dec 2025 20:45:31 -0500 40.7433997273609 -73.972580602482 MADISON AVE northbound : special event NYC DOT: special event on MADISON AVE northbound between E 50TH ST (New York) and E 51ST ST (New York) St. Patrick's Cathedral Midnight Mass. Closures are at the discretion of the NYPD., Thursday December 25th, 2025, 07:00 AM thru 05:30 PM All lanes open Sat, 06 Dec 2025 20:26:12 -0500 40.7578937920619 -73.9755747900491 E 51ST ST westbound : special event NYC DOT: special event on E 51ST ST westbound between MADISON AVE (New York) and 5TH AVE (New York) St. Patrick's Cathedral Midnight Mass. Closures are at the discretion of the NYPD., Thursday December 25th, 2025, 07:00 AM thru 05:30 PM All lanes open Sat, 06 Dec 2025 20:24:43 -0500 40.7585078414487 -73.9751729516357 E 50TH ST eastbound : special event NYC DOT: special event on E 50TH ST eastbound between 5TH AVE (New York) and MADISON AVE (New York) St. Patrick's Cathedral Midnight Mass. Closures are at the discretion of the NYPD., Thursday December 25th, 2025, 07:00 AM thru 05:30 PM All lanes open Sat, 06 Dec 2025 20:23:06 -0500 40.7585221540053 -73.9771580094243 5TH AVE southbound : special event NYC DOT: special event on 5TH AVE southbound between E 51ST ST (New York) and E 50TH ST (New York) St. Patrick's Cathedral Midnight Mass. Closures are at the discretion of the NYPD., Thursday December 25th, 2025, 07:00 AM thru 05:30 PM All lanes open Sat, 06 Dec 2025 20:18:47 -0500 40.7591342607723 -73.9767687194383 New Jersey Turnpike southbound : line striping NJ Turnpike Auth.: line striping and barrier repairs on New Jersey Turnpike Outer Roadway southbound between North of Interchange 14 - I-78/US 1&9 (Newark) and Interchange 6 - Pennsylvania Turnpike (Mansfield Twp), Monday December 15th,2025 thru Tuesday December 16th,2025, Monday, 09:00 PM thru 05:00 AM All lanes closed southbound, Sat, 13 Dec 2025 06:00:02 -0500 40.7125224726015 -74.1442700730626 NJ 49 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Eastbound between CR 551/South Hook Rd (Pennsville Twp) and East of CR 632/Lighthouse Rd (Pennsville Twp) Monday December 15, 2025 09:00 AM thru 01:00 PM, 1 right lane of 2 lanes closed Fri, 05 Dec 2025 23:07:08 -0500 39.6142807006836 -75.5026168823242 I-690 eastbound : bridge work NYSDOT - Region 3: bridge work and steel repairs on I-690 eastbound between I-81 NB ramp (Syracuse) and Exit 14 - Teall Avenue (Syracuse), Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed Fri, 05 Dec 2025 18:59:19 -0500 43.0514808532099 -76.1393418072837 US 62 southbound : bridge work NITTEC: bridge work on US 62 southbound Niagara Falls Boulevard (Niagara Falls) to I-190 Niagara Expressway (Niagara Falls), Continuous Friday December 5th, 2025 12:00 AM thru Saturday February 28th, 2026 11:59 PM 1 Left lane of 3 lanes closed Fri, 05 Dec 2025 16:03:57 -0500 43.0897552345368 -78.9914328144414 NY 5 both directions : utility work NITTEC: utility work on NY 5 both directions Blue Water Dr (Portland) to Pratt Rd (Portland), Saturday December 20th, 2025, 07:00 AM thru 07:00 PM right shoulder closed Fri, 05 Dec 2025 12:48:29 -0500 42.3625578087333 -79.5398417146423 NY 39 both directions : bridge work NYSDOT - Region 4: bridge work on NY 39 both directions north of Littleville Rd (Avon) Alternating lane closures with flaggers as needed, Continuous Friday December 5th, 2025 12:00 AM thru Wednesday December 31st, 2025 05:00 PM right shoulder closed westbound, Monday December 15th, 2025, 07:30 AM thru 05:00 PM All lanes Thu, 11 Dec 2025 08:57:25 -0500 42.8977578580981 -77.7638164280657 CT 9 southbound : construction CT DOT-Newington-HWY-Oper Ctr: construction on CT 9 southbound between Exit 14 - Dekoven Drive (Middletown) and Exit 13 - CT 17 (Middletown) Appropriate detour signs will be posted throughout the detour route. Variable message signs may be used to alert motorists to traffic conditions in the area. Motorists should be aware that modifications to this schedule may become necessary due to weather delays or other unforeseen conditions. During this detour, the segment of Route 9 southbound between Exit 23B (DeKoven Drive) and the Route 17 northbound on-ramp to Route 9 southbound will be closed to all traffic., Continuous Friday December 12th, 2025 12:00 AM thru Tuesday December 16th, 2025 11:59 PM All lanes open Fri, 05 Dec 2025 12:10:57 -0500 41.5601165219359 -72.645772799254 NY 12F both directions : bridge demolition NYSDOT - Region 7: bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) Motorists may experience minor disruptions near the Bridge St. intersection due to equipment and/or material movements, Friday December 5th, 2025 thru Saturday January 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open Fri, 05 Dec 2025 11:36:54 -0500 43.9994230767768 -75.9830930786789 I-84 westbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 20th, 2025 thru Saturday December 20th, 2025 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure Fri, 05 Dec 2025 08:20:43 -0500 41.5141233742272 -74.0479547488194 I-84 westbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure Sat, 13 Dec 2025 14:01:08 -0500 41.5141162855098 -74.048028099154 I-84 westbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on I-84 westbound between Exit 37 - Route 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures Sat, 13 Dec 2025 14:01:06 -0500 41.5137131756588 -74.0495624937813 I-84 eastbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on I-84 eastbound between Exit 36A - Thruway I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures Sat, 13 Dec 2025 14:01:04 -0500 41.5134976429375 -74.0494636092673 I-84 eastbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 20th, 2025 thru Saturday December 20th, 2025 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure Fri, 05 Dec 2025 08:18:28 -0500 41.5146955033416 -74.0751818042876 I-84 eastbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure Sat, 13 Dec 2025 14:01:10 -0500 41.5132134648282 -74.0518651985036 I-84 both directions : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday November 20th, 2025 thru Saturday December 20th, 2025 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures Fri, 05 Dec 2025 08:10:17 -0500 41.5134993415627 -74.0494889965474 NY 30 both directions : construction NYSDOT - Region 2: construction on NY 30 both directions between Maple Lodge Road (Indian Lake) and Salmon River Road (Indian Lake) Motorists will encounter lane closures in both directions, Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 05:00 PM, Fri, 12 Dec 2025 07:03:22 -0500 43.8930186314818 -74.4178137978046 NY 45 both directions : traffic signal repairs NYSDOT - Region 8: traffic signal repairs on NY 45 both directions between East-West Church Street (Ramapo) and East Eckerson Road - CR 74 - West Eckerson Road (Spring Valley) D265198/32653709 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled Fri, 12 Dec 2025 16:00:52 -0500 41.1136234749267 -74.0445371471909 NY 208 northbound : utility work NYSDOT - Region 8: utility work on NY 208 northbound between Mann Lane (Hamptonburgh) and Briarbrook Lane (Hamptonburgh) 2024MO1858264/32660209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday December 17th, 2025, 09:00 AM thru 03:30 PM, alternating traffic Fri, 12 Dec 2025 06:54:08 -0500 41.4406011926261 -74.2031666865082 US 209 northbound : utility work NYSDOT - Region 8: utility work on US 209 northbound between Taxi Drive (Deerpark) and Hanger Drive (Deerpark) 2024MO1858264/32660109 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday December 18th, 2025, 09:00 AM thru 03:30 PM, alternating traffic Fri, 12 Dec 2025 06:52:16 -0500 41.4056698796806 -74.6427514187025 NY 441 both directions : utility work NYSDOT - Region 4: utility work on NY 441 both directions between Willow Pond Way (Penfield) and Dublin Rd (Penfield) Alternating lane closures with flaggers as needed, Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes Thu, 11 Dec 2025 13:05:00 -0500 43.1309179155106 -77.4508491273587 NY 9G southbound : road maintenance operations NYSDOT - Region 8: road maintenance operations on NY 9G southbound between Peach Tree Court (Red Hook) and Kidd Lane (Red Hook) 2025082639219/32660009 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday December 10th, 2025 thru Wednesday December 17th, 2025, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic Thu, 04 Dec 2025 13:40:14 -0500 42.063315100225 -73.8971511385825 NY 250 both directions : utility work NYSDOT - Region 4: utility work on NY 250 both directions between Sweets Corners Rd (Penfield) and Penfield Road; NY 441 (Penfield) Alternating lane closures with flaggers as needed, Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes Thu, 11 Dec 2025 13:02:58 -0500 43.1527760893931 -77.4337582748855 NY 52 eastbound : utility work NYSDOT - Region 8: utility work on NY 52 eastbound between Cragsmoor Road (Wawarsing) and Roxanne Lane (Wawarsing) 2025082530626/32659709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic Fri, 12 Dec 2025 15:30:49 -0500 41.6592896397322 -74.3965874595906 Palisades Interstate Parkway southbound : installation of traffic management systems NYSDOT - Region 8: installation of traffic management systems on Palisades Interstate Parkway southbound between Exit 10 - N. Middletown Road - CR 33 (Clarkstown) and Exit 7 - Town Line Road - CR 42 (Clarkstown) Not currently scheduled Fri, 12 Dec 2025 14:00:24 -0500 41.1221816839341 -74.008836680744 NY 59 both directions : installation of traffic management systems NYSDOT - Region 8: installation of traffic management systems on NY 59 both directions between Augusta Avenue (Ramapo) D264942/32659509 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled Fri, 12 Dec 2025 15:00:48 -0500 41.1090685652699 -74.080736305859 NY 59 both directions : installation of traffic management systems NYSDOT - Region 8: installation of traffic management systems on NY 59 both directions between Middletown Road (Clarkstown) and NY 303 (Clarkstown) D264942/32281509 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled Fri, 12 Dec 2025 15:00:41 -0500 41.0968380915964 -74.0114901593296 I-278 both directions : construction NYSDOT - Region 11: construction on I-278 both directions between Joralemon Street; Ramp (New York) and Exit 28B - Brooklyn Bridge (New York) Subject to change without notice., Monday December 15th,2025 thru Friday December 19th,2025, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed eastbound, 1 Left lane of 3 lanes closed westbound Fri, 12 Dec 2025 05:00:12 -0500 40.6938888049651 -73.999057597721 NJ 35 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 35 Both Directions between CR 514/Main St (Woodbridge Twp) and North of CR 604/Green St (Woodbridge Twp) Friday December 19, 2025 08:00 PM thru Saturday December 20, 2025 05:00 AM, 1 left lane of 2 lanes closed northbound; 1 left lane of 2 lanes closed southbound Tue, 09 Dec 2025 21:40:40 -0500 40.553108215332 -74.2822875976562 NJ 35 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 35 Both Directions between CR 514/Main St (Woodbridge Twp) and North of CR 604/Green St (Woodbridge Twp) Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 05:00 AM, 1 left lane of 2 lanes closed northbound; 1 left lane of 2 lanes closed southbound Tue, 09 Dec 2025 21:40:18 -0500 40.553108215332 -74.2822875976562 NJ 35 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 35 Both Directions between CR 514/Main St (Woodbridge Twp) and North of CR 604/Green St (Woodbridge Twp) Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, 1 left lane of 2 lanes closed northbound; 1 left lane of 2 lanes closed southbound Tue, 09 Dec 2025 21:41:17 -0500 40.553108215332 -74.2822875976562 NJ 35 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 35 Both Directions between CR 514/Main St (Woodbridge Twp) and North of CR 604/Green St (Woodbridge Twp) Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 05:00 AM, 1 left lane of 2 lanes closed northbound; 1 left lane of 2 lanes closed southbound Tue, 09 Dec 2025 21:39:39 -0500 40.553108215332 -74.2822875976562 NJ 35 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 35 Both Directions between CR 514/Main St (Woodbridge Twp) and North of CR 604/Green St (Woodbridge Twp) Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, 1 left lane of 4 lanes closed northbound; 1 left lane of 4 lanes closed southbound Thu, 04 Dec 2025 11:56:00 -0500 40.553108215332 -74.2822875976562 NJ 35 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 35 Both Directions between CR 514/Main St (Woodbridge Twp) and North of CR 604/Green St (Woodbridge Twp) Sunday December 14, 2025 08:00 PM thru Monday December 15, 2025 05:00 AM, 1 left lane of 2 lanes closed northbound; 1 left lane of 2 lanes closed southbound Tue, 09 Dec 2025 21:41:35 -0500 40.553108215332 -74.2822875976562 I-678 northbound : construction NYSDOT - Region 11: construction on I-678 northbound from Hillside Avenue (New York) Subject to change without notice., Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 01:00 PM 1 Right lane of 4 lanes closed Thu, 11 Dec 2025 15:00:19 -0500 40.7025224271236 -73.8163225922056 I-495 westbound : construction NYSDOT - Region 11: construction on I-495 westbound between Exit 31 - Cross Island Parkway (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Tuesday December 9th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 1 Right lane of 4 lanes closed, Friday December 19th, 2025 thru Saturday December 20th, 2025, 11:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed Thu, 11 Dec 2025 14:46:56 -0500 40.7535493293241 -73.744707954886 I-84 eastbound : guard rail repairs CT DOT-Newington-HWY-Oper Ctr: guard rail repairs on I-84 eastbound between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday December 15th, 2025 thru Wednesday December 24th, 2025, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed, Monday December 29th, 2025 thru Wednesday December 31st, 2025, Monday/Tuesday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed, Monday January 5th, 2026 thru Friday January 30th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed Thu, 04 Dec 2025 10:36:00 -0500 41.6686659074733 -72.8235830960854 TOWN LINE RD both directions : construction CT DOT-Newington-HWY-Oper Ctr: construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open Thu, 04 Dec 2025 10:31:45 -0500 41.6497127490642 -72.8818944527624 NY 17K both directions : utility work NYSDOT - Region 8: utility work on NY 17K both directions between Corporate Blvd (Newburgh) and Fletcher Drive (Newburgh) 2024081748389/32636409 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday December 11th, 2025 thru Thursday December 18th, 2025, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure Thu, 04 Dec 2025 12:17:29 -0500 41.5083853019057 -74.0879158878357 US 9 both directions : paving operations NYSDOT - Region 8: paving operations on US 9 both directions between US 6/202 (Cortlandt) and Roa Hook Road (Cortlandt) D265217/32376509 - Motorists are advised to plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures Fri, 12 Dec 2025 15:30:48 -0500 41.299722683306 -73.9344328315945 US 6/202 both directions : paving operations NYSDOT - Region 8: paving operations on US 6/202 both directions between Roa Hook Road (Cortlandt) and Bear Mountain Pkwy (Cortlandt) D265217/32375809 - Motorists are advised to plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures Fri, 12 Dec 2025 15:30:47 -0500 41.2989606851244 -73.9446121234347 US 1 both directions : utility work NYSDOT - Region 8: utility work on US 1 both directions between S Regent Street (Port Chester) and Willow Street (Port Chester) 202508748351/DAY/32615609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Saturday December 20th, 2025, 09:30 AM thru 02:00 PM, various lane closures, Monday December 22nd, 2025, 09:30 AM thru 03:30 PM, various lane closures Sat, 13 Dec 2025 14:01:03 -0500 40.9952398525126 -73.6729489915045 US 1 both directions : gas main repairs NYSDOT - Region 8: gas main repairs on US 1 both directions between S Regent Street (Port Chester) and Willow Street (Port Chester) 202508748351/NIGHT/32412209 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 12th, 2025 thru Tuesday December 23rd, 2025 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures Fri, 12 Dec 2025 07:11:41 -0500 40.9952542885946 -73.6728953490044 NY 7 westbound : repaving NYSDOT TMC - Albany: repaving on NY 7 westbound between Mill Rd (Colonie) and Old Niskayuna Rd (Colonie), Monday December 15th,2025 thru Friday December 19th,2025, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound, Sat, 13 Dec 2025 17:00:00 -0500 42.7639714205274 -73.8028160812715 Saw Mill River Parkway southbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on Saw Mill River Parkway southbound at Exit 39 - NY 117 (Bedford) D265281/B1037210/32577709 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled Fri, 12 Dec 2025 14:00:21 -0500 41.2378978402675 -73.7011535499475 Horace Harding Expressway westbound : construction NYSDOT - Region 11: construction on Horace Harding Expressway westbound between Springfield Blvd (New York) and Clearview Expressway (New York) Subject to change without notice., Tuesday December 9th, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 1 Left lane of 2 lanes closed service road Fri, 12 Dec 2025 10:36:21 -0500 40.7495254176757 -73.7571069874895 50TH ST southbound : construction NYSDOT - Region 11: construction on 50TH ST southbound between 43RD AVE (New York) and ROOSEVELT AVE (New York) for new building construction., Wednesday December 3rd, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Wed, 03 Dec 2025 15:39:04 -0500 40.7444454731668 -73.9146352901013 24TH ST southbound : crane operations NYSDOT - Region 11: crane operations on 24TH ST southbound between 41ST AVE (New York) and QUEENS PLZ N (New York), Wednesday December 3rd, 2025 thru Wednesday December 24th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Wed, 03 Dec 2025 15:37:40 -0500 40.7526010803604 -73.9399140465867 ELDERT LN both directions : construction NYSDOT - Region 11: construction on ELDERT LN both directions between DUMONT AVE (New York) and BLAKE AVE (New York) to lift mechanical equipment and materials., Saturday December 6th, 2025 thru Saturday December 27th, 2025, 08:00 AM thru 06:00 PM All lanes closed, Sunday December 7th, 2025 thru Sunday December 28th, 2025, 09:00 AM thru 06:00 PM All lanes closed Wed, 03 Dec 2025 15:33:42 -0500 40.6708832255039 -73.8631744975678 FLEET PL northbound : construction NYSDOT - Region 11: construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Wednesday December 3rd, 2025 thru Thursday February 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Wed, 03 Dec 2025 15:30:58 -0500 40.6920659155153 -73.9817770877336 CHRISTOPHER AVE northbound : construction NYSDOT - Region 11: construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday December 5th, 2025 thru Friday December 26th, 2025, 09:00 AM thru 04:00 PM All lanes closed, Saturday December 6th, 2025 thru Saturday December 27th, 2025, 07:00 AM thru 06:00 PM All lanes closed Wed, 03 Dec 2025 15:26:42 -0500 40.6717172649053 -73.9063710160542 CYRUS PL westbound : construction NYSDOT - Region 11: construction on CYRUS PL westbound between 3RD AVE (New York) and PARK AVE (New York) for boom truck and concrete pump operation., Wednesday December 3rd, 2025 thru Friday December 26th, 2025, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed Wed, 03 Dec 2025 15:20:32 -0500 40.8584135828568 -73.8912038570204 RYER AVE southbound : crane operations NYSDOT - Region 11: crane operations on RYER AVE southbound between E 180TH ST (New York) and E BURNSIDE AVE (New York), Wednesday December 3rd, 2025 thru Wednesday December 24th, 2025, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed, Saturday December 6th, 2025 thru Sunday December 21st, 2025, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed Wed, 03 Dec 2025 15:19:00 -0500 40.8528239005057 -73.9009295557485 BEDFORD ST northbound : construction NYSDOT - Region 11: construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel and new building materials., Wednesday December 3rd, 2025 thru Friday December 26th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Wed, 03 Dec 2025 15:14:48 -0500 40.7318709811769 -74.0051321981375 JANE ST westbound : construction NYSDOT - Region 11: construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Friday December 5th, 2025 thru Friday December 19th, 2025, 06:00 AM thru 10:00 AM All lanes closed, Saturday December 6th, 2025 thru Saturday December 20th, 2025, 08:00 AM thru 04:00 PM All lanes closed Wed, 03 Dec 2025 15:12:50 -0500 40.7381407423703 -74.0082750673926 WALL ST eastbound : construction NYSDOT - Region 11: construction on WALL ST eastbound between WILLIAM ST (New York) and HANOVER ST (New York) to utilize the gantry rigging system to deliver material., Wednesday December 3rd, 2025 thru Wednesday January 21st, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed Tue, 09 Dec 2025 13:36:38 -0500 40.7063695806453 -74.0094813687883 PERRY ST eastbound : construction NYSDOT - Region 11: construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Wednesday December 3rd, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed Wed, 03 Dec 2025 15:08:21 -0500 40.7347985709819 -74.0083800031266 BROOME ST westbound : construction NYSDOT - Region 11: construction on BROOME ST westbound between CHRYSTIE ST (New York) and BOWERY (New York) for use of concrete pump for new building foundation and superstructure., Wednesday December 3rd, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed Wed, 03 Dec 2025 15:06:35 -0500 40.7190999870145 -73.9934635035663 E 82ND ST eastbound : construction NYSDOT - Region 11: construction and crane operations on E 82ND ST eastbound between LEXINGTON AVE (New York) and 3RD AVE (New York) for concrete pump and mobile crane operation., Saturday December 6th, 2025 thru Saturday December 27th, 2025, 08:00 AM thru 06:00 PM All lanes closed, Sunday December 7th, 2025 thru Sunday December 28th, 2025, 09:00 AM thru 06:00 PM All lanes closed Wed, 03 Dec 2025 15:04:59 -0500 40.7768677250484 -73.9573690448916 W 46TH ST eastbound : construction NYSDOT - Region 11: construction on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York) for mobile crane and concrete pump., Wednesday December 3rd, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 12:30 AM thru 07:00 AM All lanes closed Wed, 03 Dec 2025 15:02:47 -0500 40.7597418009667 -73.9878078445571 W 45TH ST westbound : construction NYSDOT - Region 11: construction on W 45TH ST westbound between 7TH AVE (New York) and 8TH AVE (New York) for mobile crane and concrete pump., Wednesday December 3rd, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 12:30 AM thru 07:00 AM All lanes closed Wed, 03 Dec 2025 15:00:47 -0500 40.7580058727502 -73.9856565073255 W 43RD ST westbound : construction NYSDOT - Region 11: construction on W 43RD ST westbound between 5TH AVE (New York) and 6TH AVE (New York), Wednesday December 3rd, 2025 thru Friday December 19th, 2025, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed Wed, 03 Dec 2025 14:58:35 -0500 40.7542019759764 -73.9805217722877 I-278 southbound : bridge painting NYSDOT - Region 11: bridge painting and construction on Gowanus Expressway/I-278 HOV Lane southbound at Bay Ridge Parkway; Ramp (New York) Subject to change without notice., Continuous Saturday December 13th, 2025 12:01 AM thru Monday December 15th, 2025 05:00 AM 1 Left lane of 3 lanes closed, Continuous Friday December 19th, 2025 10:00 PM thru Monday December 22nd, 2025 05:00 AM 1 Left lane of 3 lanes closed Tue, 09 Dec 2025 16:10:51 -0500 40.6268992715588 -74.0182937516145 I-278 both directions : bridge painting NYSDOT - Region 11: bridge painting and construction on I-278 both directions at Bay Ridge Parkway; Ramp (New York) Subject to change without notice., Tuesday December 9th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 06:00 AM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound Tue, 09 Dec 2025 16:09:23 -0500 40.6267360861717 -74.0181831279335 US 9 both directions : survey work NYSDOT - Region 8: survey work on US 9 both directions at Rockefeller Lane (Rhinebeck) D265165/32658609 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled Fri, 12 Dec 2025 15:00:47 -0500 41.9228940710955 -73.911982171164 NJ 168 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 168 Both Directions At North of CR 534/Church St (Gloucester Twp) Thursday December 18, 2025 08:00 PM thru Friday December 19, 2025 06:00 AM, 2 right lanes of 3 lanes closed northbound; 2 right lanes of 3 lanes closed southbound Wed, 03 Dec 2025 12:27:52 -0500 39.80419921875 -75.0679092407227 NJ 168 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 168 Both Directions At North of CR 534/Church St (Gloucester Twp) Wednesday December 17, 2025 08:00 PM thru Thursday December 18, 2025 06:00 AM, 2 right lanes of 3 lanes closed northbound; 2 right lanes of 3 lanes closed southbound Wed, 03 Dec 2025 12:27:35 -0500 39.80419921875 -75.0679092407227 NJ 168 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 168 Both Directions At North of CR 534/Church St (Gloucester Twp) Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 06:00 AM, 2 right lanes of 3 lanes closed northbound; 2 right lanes of 3 lanes closed southbound Wed, 03 Dec 2025 12:27:27 -0500 39.80419921875 -75.0679092407227 NJ 168 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 168 Both Directions At North of CR 534/Church St (Gloucester Twp) Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 06:00 AM, 2 right lanes of 3 lanes closed northbound; 2 right lanes of 3 lanes closed southbound Wed, 03 Dec 2025 12:27:18 -0500 39.80419921875 -75.0679092407227 The Beacon Theatre : show Madison Square Garden: show on The Beacon Theatre at (Manhattan) Jerry Seinfeld, Friday December 19th, 2025, 07:00 PM thru 09:00 PM, Friday December 19th, 2025, 09:30 PM thru 11:30 PM, Saturday December 20th, 2025, 05:00 PM thru 07:00 PM, Saturday December 20th, 2025, 08:00 PM thru 10:00 PM, Friday January 9th, 2026, 07:00 PM thru 09:00 PM, Saturday January 10th, 2026, 05:00 PM thru 07:00 PM, Saturday January 10th, 2026, 08:00 PM thru 10:00 PM Wed, 03 Dec 2025 11:44:21 -0500 40.7804495284105 -73.9813837409019 Madison Square Garden : concert Madison Square Garden: concert on Madison Square Garden at (New York) Andrea Bocelli In Concert, Wednesday December 17th, 2025 thru Thursday December 18th, 2025, Wednesday/Thursday, 08:00 PM thru 11:00 PM Wed, 03 Dec 2025 11:37:04 -0500 40.7500204681535 -73.9921903610229 Madison Square Garden : hockey game NY Rangers: hockey game on Madison Square Garden at (New York) New York Rangers vs. Vancouver Canucks, Tuesday December 16th, 2025, 07:00 PM thru 10:00 PM Wed, 03 Dec 2025 11:34:40 -0500 40.7500204681535 -73.9921903610229 The Beacon Theatre : concert Madison Square Garden: concert on The Beacon Theatre at (Manhattan) Earth, Wind & Fire, Monday December 15th, 2025 thru Tuesday December 16th, 2025, Monday/Tuesday, 08:00 PM thru 11:00 PM Wed, 03 Dec 2025 11:31:48 -0500 40.7804495284105 -73.9813837409019 Madison Square Garden : hockey game NY Rangers: hockey game on Madison Square Garden at (New York) New York Rangers vs. Anaheim Ducks, Monday December 15th, 2025, 07:00 PM thru 10:00 PM Wed, 03 Dec 2025 11:28:42 -0500 40.7500204681535 -73.9921903610229 NY 302 both directions : utility work NYSDOT - Region 8: utility work on NY 302 both directions between Burlingham Road (Crawford) and Roberson Avenue (Crawford) 2025082284806/32658209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025, 09:30 AM thru 03:00 PM, alternating traffic Wed, 03 Dec 2025 09:45:35 -0500 41.5478601984904 -74.3600131722686 NY 204 both directions : road rehabilitation NYSDOT - Region 4: road rehabilitation on NY 204 both directions between Deep Rock Rd (Gates) and Buell Road; Airport Road (Gates) Road Closed, follow posted detour, Free Taxi service for pedestrian detour, info at detour location, Continuous Monday July 14th, 2025 07:00 AM thru Thursday January 15th, 2026 05:00 PM All lanes closed and detoured Wed, 03 Dec 2025 09:36:11 -0500 43.1306812536769 -77.6793410477718 NY 303 northbound : survey work NYSDOT - Region 8: survey work on NY 303 northbound between Brichwood Lane (Clarkstown) and NY 59 (Clarkstown) D265165/32657909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Wednesday December 17th, 2025 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, right lane closure Wed, 03 Dec 2025 12:17:53 -0500 41.0836921507469 -73.9478668541033 I-95 both directions : rock blasting CT DOT-Bridgeport-Oper: rock blasting on I-95 both directions between Exit 72 - (East Lyme) and Exit 75 - US 1 (East Lyme) I-95 southbound and northbound will be closed, up to twice a day between the hours of 9:00 a.m. and 1:30 p.m. for 5-10 minutes for each blast.Motorists are encouraged to remain on the highway as the closures are anticipated to be short in duration, however, motorists can seek alternate routes. Please note that the start of these closures can change at any time based on weather or resources., Wednesday December 17th, 2025 thru Friday December 19th, 2025, Wednesday/Thursday/Friday, 09:00 AM thru 01:30 PM All lanes open Tue, 02 Dec 2025 10:59:12 -0500 41.3230356690919 -72.2572857182891 US 20 eastbound : installation of sign structure NYSDOT - Region 3: installation of sign structure on US 20 eastbound between Balsley Rd (Seneca Falls) and Ovid Street; NY 414 (Seneca Falls), Monday December 22nd, 2025, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed Tue, 02 Dec 2025 10:54:13 -0500 42.9056634144824 -76.8261965855176 NY 120 both directions : gas main work NYSDOT - Region 8: gas main work on NY 120 both directions between Gateway Lane - NY 120A (North Castle) and Cooney Hill Road (North Castle) 202408111677/32657509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, shoulder closures, Tuesday December 30th, 2025, 09:00 AM thru 04:00 PM, shoulder closures Tue, 02 Dec 2025 10:51:41 -0500 41.0922393652882 -73.7230636854217 Bronx River Parkway southbound : bridge rehabilitation Westchester Co. DPW: bridge rehabilitation on Bronx River Parkway southbound between Palmer Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) There will be single lane closures, Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open Fri, 12 Dec 2025 14:35:47 -0500 40.9413 -73.83907 NY 132 southbound : utility work NYSDOT - Region 8: utility work on NY 132 southbound between Buckhorn Street (Yorktown) and Union Road (Yorktown) 2025083085269/32657209 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday December 5th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic Tue, 02 Dec 2025 07:03:07 -0500 41.329682204921 -73.822691286624 N CROUSE AVE both directions : bridge demolition NYSDOT - Region 3: bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed Mon, 01 Dec 2025 18:16:53 -0500 43.0521363477448 -76.1364019509911 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee) Not currently Scheduled Wed, 03 Dec 2025 05:00:05 -0500 40.850261505958 -73.94491823712 NY 28 westbound : utility work NYSDOT - Region 8: utility work on NY 28 westbound between Sawkill Road (Ulster) and Modica Lane (Ulster) , Monday December 15th, 2025 thru Tuesday December 16th, 2025, 09:00 PM thru 03:30 PM, right lane closure Fri, 12 Dec 2025 15:30:49 -0500 41.9425555973632 -74.025865148666 I-81 northbound : bridge work NYSDOT - Region 3: bridge work on I-81 northbound between Exit 54 (Old Exit 12) - US 11; NY 41; NY 281; Cortland/Homer (Cortlandville) and Exit 62 (Old Exit 13) - NY 281; Preble (Preble), Continuous Monday December 8th, 2025 09:00 AM thru Wednesday December 17th, 2025 03:30 PM left shoulder closed Tue, 09 Dec 2025 18:26:34 -0500 42.617293000723 -76.1805773998554 NY 34 both directions : bridge replacement NYSDOT - Region 3: bridge replacement on NY 34 both directions between Trombley Rd (Brutus) and Emerson Rd (Cato), Continuous Monday December 1st, 2025 07:00 AM thru Sunday November 1st, 2026 06:59 PM All lanes closed Mon, 01 Dec 2025 10:40:51 -0500 43.0647078625052 -76.5591497036743 NY 9G northbound : utility work NYSDOT - Region 8: utility work on NY 9G northbound between Pitcher Road (Rhinebeck) and West Market Street; NY 199 (Red Hook) 2025082185299/32656809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Thursday December 18th, 2025 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:30 PM, alternating traffic Thu, 11 Dec 2025 15:30:32 -0500 41.9691805498749 -73.9034235344759 CR-636 northbound : bridge construction NJ DOT - TOC North: bridge construction on CR-636 northbound between 56A (Woodland Park) and CR-636 (Woodland Park) Southbound traffic operate in the Northbound lane. Northbound traffic is detoured., Continuous Monday December 1st, 2025 12:00 AM thru Monday June 1st, 2026 11:59 PM All lanes closed Mon, 01 Dec 2025 09:28:11 -0500 40.9029870144273 -74.1925535114569 Saw Mill River Parkway northbound : sign work NYSDOT - Region 8: sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure, Monday December 29th, 2025, 10:00 AM thru 02:00 PM, right lane closure, Tuesday December 30th, 2025, 09:30 AM thru 02:00 PM, right lane closure Mon, 01 Dec 2025 08:39:30 -0500 41.2455464580906 -73.6853727316637 Saw Mill River Parkway southbound : sign work NYSDOT - Region 8: sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures, Monday December 29th, 2025 thru Tuesday December 30th, 2025 Monday/ Tuesday, 10:00 AM thru 02:00 PM, various lane closures Mon, 01 Dec 2025 08:28:48 -0500 41.2497256678991 -73.6774259290998 I-684 northbound : sign work NYSDOT - Region 8: sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure, Monday December 29th, 2025, 10:00 AM thru 03:00 PM, left lane closure, Tuesday December 30th, 2025, 09:00 AM thru 03:00 PM, left lane closure Mon, 01 Dec 2025 15:00:52 -0500 41.2531556866921 -73.675993161799 I-684 southbound : sign work NYSDOT - Region 8: sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure, Monday December 29th, 2025 thru Tuesday December 30th, 2025 Monday/ Tuesday, 10:00 AM thru 07:00 PM, Mon, 01 Dec 2025 08:12:37 -0500 41.3455066907721 -73.6524706311358 I-684 northbound : sign work NYSDOT - Region 8: sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Monday December 29th, 2025 thru Tuesday December 30th, 2025 Monday/ Tuesday, 10:00 AM thru 04:00 PM, right lane closure Mon, 01 Dec 2025 08:00:28 -0500 41.0194917148853 -73.715177684976 I-684 southbound : sign work NYSDOT - Region 8: sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure, Monday December 29th, 2025 thru Tuesday December 30th, 2025 Monday/ Tuesday, 10:00 AM thru 04:00 PM, right lane closure Mon, 01 Dec 2025 07:50:38 -0500 41.0312162001066 -73.723813849963 Madison Square Garden : play/show Madison Square Garden: play/show on Madison Square Garden at (New York) 'Twas the Night Before... by Cirque du Soleil, Wednesday December 17th,2025 thru Thursday December 18th,2025, Wednesday/Thursday, 07:00 PM thru 10:00 PM , Friday December 19th,2025 08:00 PM thru 11:00 PM , Saturday December 20th,2025 01:00 PM thru 04:00 PM , Saturday December 20th,2025 04:00 PM thru 07:00 PM , Saturday December 20th,2025 07:00 PM thru 10:00 PM , Sunday December 21st,2025 12:00 PM thru 03:00 PM , Sunday December 21st,2025 03:00 PM thru 06:00 PM , Sunday December 21st,2025 06:30 PM thru 09:30 PM , Tuesday December 23rd,2025 04:00 PM thru 07:00 PM , Tuesday December 23rd,2025 07:00 PM thru 10:00 PM , Wednesday December 24th,2025 12:00 PM thru 03:00 PM , Wednesday December 24th,2025 03:00 PM thru 06:00 PM , Friday December 26th,2025 01:00 PM thru 04:00 PM , Friday December 26th,2025 04:00 PM thru 07:00 PM , Saturday December 27th,2025 01:00 PM thru 04:00 PM , Saturday December 27th,2025 04:00 PM thru 07:00 PM , Saturday December 27th,2025 07:00 PM thru 10:00 PM , Sunday December 28th,2025 12:00 PM thru 03:00 PM , Sunday December 28th,2025 03:00 PM thru 06:00 PM Sun, 14 Dec 2025 21:30:10 -0500 40.7500204681535 -73.9921903610229 I-84 both directions : guard rail repairs NYSDOT - Region 8: guard rail repairs on I-84 both directions between Exit 46 - US 9 (Fishkill) and Exit 58 - Ludingtonville Road (Kent) D265499/NIGHT/32628609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Wednesday December 24th, 2025, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures Fri, 28 Nov 2025 14:07:34 -0500 41.5243895003917 -73.8851248752382 I-84 westbound : guard rail repairs NYSDOT - Region 8: guard rail repairs on I-84 westbound between Exit 50 - Lime Kiln Road - To NY 52 (East Fishkill) and Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) D265499/NIGHT/32611609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Wednesday December 24th, 2025, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures Fri, 28 Nov 2025 14:06:22 -0500 41.5250803420867 -73.8679294322523 NY 167 both directions : sign work NYSDOT - Region 2: sign work on NY 167 both directions between CR 18; Jordanville Road; Village of Jordanville (Warren) and NY168; Paines Hollow (Little Falls) Motorists will encounter lane and shoulder closures in both directions with flaggers in place, Monday December 1st, 2025 thru Saturday December 20th, 2025 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 05:00 PM, Fri, 12 Dec 2025 06:40:45 -0500 42.9149 -74.9512 NY 5S both directions : guard rail repairs NYSDOT - Region 2: guard rail repairs on NY 5S both directions between Central Avenue; NY 51; Ramp (German Flatts) and Warren Street; Start NY 28 Overlap (Mohawk) Motorists may encounter lane closures in both directions with flaggers in place, Monday December 1st, 2025 thru Saturday December 20th, 2025 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 05:00 PM, Fri, 12 Dec 2025 06:41:39 -0500 43.0132674463605 -75.012885204039 NY 26 both directions : culvert repairs NYSDOT - Region 2: culvert repairs on NY 26 both directions between Skinner Road (Augusta) and Berry Farm Road (Augusta) Motorists will encounter a shoulder closure, Monday December 1st, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 06:00 AM thru 06:00 PM, Fri, 05 Dec 2025 07:27:36 -0500 43.0223639370515 -75.5016392349335 NY 30 both directions : guard rail repairs NYSDOT - Region 2: guard rail repairs on NY 30 both directions between Hamilton County; Franklin County Line (Tupper Lake) and NY 28N; Long Lake (Long Lake) Motorists will encounter lane closures in both dierctions with flaggers in place, Monday December 1st, 2025 thru Saturday December 20th, 2025 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 04:00 PM, Fri, 12 Dec 2025 06:43:12 -0500 44.0996017456055 -74.5289993286133 Westchester Ave - NY 120A both directions : gas main repairs NYSDOT - Region 8: gas main repairs on Westchester Ave - NY 120A both directions between Division Street (Rye Brook) and Hawthorne Avenue (Rye Brook) 2025083094416/32655709 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday December 30th, 2025, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:01:04 -0500 41.0057635977487 -73.6813451775306 TEALL AVE northbound : noise wall construction NYSDOT - Region 3: noise wall construction on TEALL AVE northbound between I-690 EB off/on-ramp (Syracuse) and I-690 WB on/off-ramp (Syracuse), Continuous Monday December 1st, 2025 09:00 AM thru Wednesday December 24th, 2025 06:00 AM 1 Left lane of 2 lanes closed Wed, 26 Nov 2025 21:23:33 -0500 43.0531919495223 -76.121896618949 I-690 westbound : noise wall construction NYSDOT - Region 3: noise wall construction on I-690 westbound ramp from Teall Avenue (Syracuse), Continuous Monday December 1st, 2025 09:00 AM thru Wednesday December 24th, 2025 06:00 AM 1 Right lane of 2 lanes closed Wed, 26 Nov 2025 21:06:05 -0500 43.0537288568135 -76.1220406561596 Radio City Music Hall : Christmas spectacular Madison Square Garden: Christmas spectacular on Radio City Music Hall at (Manhattan) Christmas Spectacular Starring The Radio City Rockettes, Monday December 15th,2025 10:00 AM thru 01:00 PM , Monday December 15th,2025 01:00 PM thru 04:00 PM , Monday December 15th,2025 04:00 PM thru 07:00 PM , Monday December 15th,2025 07:00 PM thru 10:00 PM , Monday December 15th,2025 thru Tuesday December 16th,2025, Monday, 10:00 PM thru 01:00 AM , Tuesday December 16th,2025 11:00 AM thru 02:00 PM , Tuesday December 16th,2025 02:00 PM thru 05:00 PM , Tuesday December 16th,2025 05:00 PM thru 08:00 PM , Tuesday December 16th,2025 08:00 PM thru 11:00 PM , Wednesday December 17th,2025 11:00 AM thru 02:00 PM , Wednesday December 17th,2025 02:00 PM thru 05:00 PM , Wednesday December 17th,2025 05:00 PM thru 08:00 PM , Wednesday December 17th,2025 08:00 PM thru 11:00 PM , Thursday December 18th,2025 11:00 AM thru 02:00 PM , Thursday December 18th,2025 02:00 PM thru 05:00 PM , Thursday December 18th,2025 05:00 PM thru 08:00 PM , Thursday December 18th,2025 08:00 PM thru 11:00 PM , Friday December 19th,2025 10:00 AM thru 01:00 PM , Friday December 19th,2025 01:00 PM thru 04:00 PM , Friday December 19th,2025 04:00 PM thru 07:00 PM , Friday December 19th,2025 07:00 PM thru 10:00 PM , Friday December 19th,2025 thru Saturday December 20th,2025, Friday, 10:00 PM thru 01:00 AM , Saturday December 20th,2025 10:00 AM thru 01:00 PM , Saturday December 20th,2025 01:00 PM thru 04:00 PM , Saturday December 20th,2025 04:00 PM thru 07:00 PM , Saturday December 20th,2025 07:00 PM thru 10:00 PM , Saturday December 20th,2025 thru Sunday December 21st,2025, Saturday, 10:00 PM thru 01:00 AM , Sunday December 21st,2025 10:00 AM thru 01:00 PM , Sunday December 21st,2025 01:00 PM thru 04:00 PM , Sunday December 21st,2025 04:00 PM thru 07:00 PM , Sunday December 21st,2025 07:00 PM thru 10:00 PM , Sunday December 21st,2025 thru Monday December 22nd,2025, Sunday, 10:00 PM thru 01:00 AM , Monday December 22nd,2025 10:00 AM thru 01:00 PM , Monday December 22nd,2025 01:00 PM thru 04:00 PM , Monday December 22nd,2025 04:00 PM thru 07:00 PM , Monday December 22nd,2025 07:00 PM thru 10:00 PM , Monday December 22nd,2025 thru Tuesday December 23rd,2025, Monday, 10:00 PM thru 01:00 AM , Tuesday December 23rd,2025 11:00 AM thru 02:00 PM , Tuesday December 23rd,2025 02:00 PM thru 05:00 PM , Tuesday December 23rd,2025 05:00 PM thru 08:00 PM , Tuesday December 23rd,2025 08:00 PM thru 11:00 PM , Wednesday December 24th,2025 11:00 AM thru 02:00 PM , Wednesday December 24th,2025 02:00 PM thru 05:00 PM , Wednesday December 24th,2025 05:00 PM thru 08:00 PM , Wednesday December 24th,2025 08:00 PM thru 11:00 PM , Thursday December 25th,2025 11:00 AM thru 02:00 PM , Thursday December 25th,2025 02:00 PM thru 05:00 PM , Thursday December 25th,2025 05:00 PM thru 08:00 PM , Thursday December 25th,2025 08:00 PM thru 11:00 PM , Friday December 26th,2025 10:00 AM thru 01:00 PM , Friday December 26th,2025 01:00 PM thru 04:00 PM , Friday December 26th,2025 04:00 PM thru 07:00 PM , Friday December 26th,2025 07:00 PM thru 10:00 PM , Friday December 26th,2025 thru Saturday December 27th,2025, Friday, 10:00 PM thru 01:00 AM , Saturday December 27th,2025 10:00 AM thru 01:00 PM , Saturday December 27th,2025 01:00 PM thru 04:00 PM , Saturday December 27th,2025 04:00 PM thru 07:00 PM , Saturday December 27th,2025 07:00 PM thru 10:00 PM , Saturday December 27th,2025 thru Sunday December 28th,2025, Saturday, 10:00 PM thru 01:00 AM , Sunday December 28th,2025 10:00 AM thru 01:00 PM , Sunday December 28th,2025 01:00 PM thru 04:00 PM , Sunday December 28th,2025 04:00 PM thru 07:00 PM , Sunday December 28th,2025 07:00 PM thru 10:00 PM , Sunday December 28th,2025 thru Monday December 29th,2025, Sunday, 10:00 PM thru 01:00 AM , Monday December 29th,2025 10:00 AM thru 01:00 PM , Monday December 29th,2025 01:00 PM thru 04:00 PM , Monday December 29th,2025 04:00 PM thru 07:00 PM , Monday December 29th,2025 07:00 PM thru 10:00 PM , Monday December 29th,2025 thru Tuesday December 30th,2025, Monday, 10:00 PM thru 01:00 AM , Tuesday December 30th,2025 11:00 AM thru 02:00 PM , Tuesday December 30th,2025 02:00 PM thru 05:00 PM , Tuesday December 30th,2025 05:00 PM thru 08:00 PM , Tuesday December 30th,2025 08:00 PM thru 11:00 PM , Wednesday December 31st,2025 11:00 AM thru 02:00 PM , Wednesday December 31st,2025 02:00 PM thru 05:00 PM , Thursday January 1st,2026 02:00 PM thru 05:00 PM , Thursday January 1st,2026 05:00 PM thru 08:00 PM , Thursday January 1st,2026 08:00 PM thru 11:00 PM , Friday January 2nd,2026 11:00 AM thru 02:00 PM , Friday January 2nd,2026 02:00 PM thru 05:00 PM , Friday January 2nd,2026 05:00 PM thru 08:00 PM , Friday January 2nd,2026 08:00 PM thru 11:00 PM , Saturday January 3rd,2026 11:00 AM thru 02:00 PM , Saturday January 3rd,2026 02:00 PM thru 05:00 PM , Saturday January 3rd,2026 05:00 PM thru 08:00 PM , Saturday January 3rd,2026 08:00 PM thru 11:00 PM , Sunday January 4th,2026 11:00 AM thru 02:00 PM , Sunday January 4th,2026 02:00 PM thru 05:00 PM , Sunday January 4th,2026 05:00 PM thru 08:00 PM , Monday January 5th,2026 03:00 PM thru 06:00 PM , Monday January 5th,2026 07:00 PM thru 10:00 PM Mon, 15 Dec 2025 00:00:10 -0500 40.7599027332108 -73.9803932910537 Horace Harding Expressway eastbound : construction NYSDOT - Region 11: construction on Horace Harding Expressway eastbound ramp to Grand Central Parkway (New York) Subject to change without notice., Tuesday December 2nd, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 01:00 AM thru 06:00 AM All lanes closed Mon, 08 Dec 2025 14:41:30 -0500 40.7386440875297 -73.8467345251781 VAN WYCK EXPY southbound : construction NYSDOT - Region 11: construction on VAN WYCK EXPY southbound from ATLANTIC AVE (New York) to 133RD AVE (New York) Subject to change without notice., Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road Thu, 11 Dec 2025 15:01:47 -0500 40.6969475474049 -73.8138072223607 I-678 northbound : construction NYSDOT - Region 11: construction on I-678 northbound from Foch Boulevard; Ramp (New York) to Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 01:00 PM 1 Left lane of 4 lanes closed Thu, 11 Dec 2025 14:59:24 -0500 40.6778237958805 -73.8032188701874 I-678 southbound : construction NYSDOT - Region 11: construction on I-678 southbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 01:00 PM 1 Right lane of 3 lanes closed Thu, 11 Dec 2025 14:58:04 -0500 40.6971031339261 -73.8136815669631 I-678 southbound : construction NYSDOT - Region 11: construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday December 1st,2025 thru Friday December 19th,2025, Monday thru Friday, 09:00 AM thru 01:00 PM 1 Right lane of 3 lanes closed southbound, Sat, 13 Dec 2025 08:00:01 -0500 40.7127401257539 -73.8239337735497 NY 878 eastbound : construction NYSDOT - Region 11: construction on NY 878 eastbound from 134th Street (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Monday December 1st,2025 thru Friday December 19th,2025, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 12:00 AM 1 Right lane of 4 lanes closed eastbound, , Tuesday December 2nd,2025 thru Friday December 19th,2025, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, , Friday December 19th,2025 thru Saturday December 20th,2025, Friday, 10:00 PM thru 12:01 AM 1 Left lane of 4 lanes closed eastbound, , Saturday December 20th,2025 12:01 AM thru 07:00 AM 2 Left lanes of 4 lanes closed eastbound, Sat, 13 Dec 2025 07:00:00 -0500 40.6649627539923 -73.8059650335559 I-495 eastbound : construction NYSDOT - Region 11: construction on I-495 eastbound ramp to Exit 22A - Grand Central Parkwy (New York) Subject to change without notice., Tuesday December 2nd, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 01:00 AM thru 06:00 AM All lanes closed Mon, 08 Dec 2025 14:42:11 -0500 40.7387396037202 -73.8473664820057 Grand Central Parkway eastbound : construction NYSDOT - Region 11: construction on Grand Central Parkway eastbound from Exit 10 - I-495 Long Island Expressway (New York) to 62nd Drive (New York) Subject to change without notice., Tuesday December 2nd, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 05:00 AM 1 Right lane of 2 lanes closed service road Mon, 08 Dec 2025 14:44:14 -0500 40.7410510810429 -73.8460594249471 Grand Central Parkway both directions : construction NYSDOT - Region 11: construction on Grand Central Parkway both directions from Exit 10 - I-495 Long Island Expressway (New York) to Exit 11 - Jewel Avenue; Ramp (New York) Subject to change without notice., Tuesday December 2nd, 2025 thru Saturday December 20th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 05:00 AM 1 Left lane of 5 lanes closed Mon, 08 Dec 2025 14:43:17 -0500 40.7438114787906 -73.8469139066058 Grand Central Parkway both directions : construction NYSDOT - Region 11: construction on Grand Central Parkway both directions between Union Turnpike (New York) and Commonwealth Boulevard (New York) Subject to change without notice., Monday December 1st,2025 thru Friday December 19th,2025, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound, westbound, Monday December 1st,2025 thru Friday December 19th,2025, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed eastbound, westbound Sat, 13 Dec 2025 05:00:05 -0500 40.7367798482965 -73.7414575888289 NY 9A both directions : construction NYSDOT - Region 11: construction on NY 9A both directions between West 57th Street; 12th Avenue (New York) and Joseph P Ward Street; START ROUTE NY 9A; West Street; Ramp (New York) Subject to change without notice., Friday December 19th,2025 thru Saturday December 20th,2025, Friday, 11:00 PM thru 05:00 AM 1 Right lane of 5 lanes closed southbound, northbound, Tuesday December 16th,2025 thru Friday December 19th,2025, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 1 Right lane of 5 lanes closed southbound, northbound Sat, 13 Dec 2025 06:00:01 -0500 40.7728851198226 -73.993538660133 NY 5 eastbound : utility work NYSDOT - Region 4: utility work on NY 5 eastbound between Route 19 Leroy (Le Roy) and Genesee-Livingston County Line (Le Roy) alternating lane closures, Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed intermittently Fri, 12 Dec 2025 12:24:56 -0500 42.9776838673868 -77.9920541154141 US 20 both directions : installation of traffic management systems NYSDOT - Region 3: installation of traffic management systems on US 20 both directions at Oran-Delphi Road (Pompey) ; Alternating lane closures, Wednesday December 3rd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open Wed, 26 Nov 2025 13:13:28 -0500 42.9125229354876 -75.916469738549 NY 264 both directions : roadwork NYSDOT - Region 3: roadwork on NY 264 both directions at Main Street; CR 5; Culvert Street (Schroeppel) ; Alternating lane closures, Tuesday December 2nd, 2025 thru Tuesday December 16th, 2025, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open Wed, 26 Nov 2025 13:09:35 -0500 43.2309783463791 -76.3000974379045 NY-96 both directions : installation of traffic management systems NYSDOT - Region 3: installation of traffic management systems on NY-96 both directions at Whiskey Hill Rd (Waterloo) ; Alternating lane closures, Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open Wed, 26 Nov 2025 13:07:15 -0500 42.9244294670013 -76.9022092611183 I-81 southbound : roadwork NYSDOT - Region 3: roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating left and right lane closures, Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Wed, 26 Nov 2025 12:56:02 -0500 43.0822986475447 -76.1726794786493 I-81 northbound : bridge work NYSDOT - Region 3: bridge work on I-81 northbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Wed, 26 Nov 2025 12:53:47 -0500 43.0393895983965 -76.1421504754156 NY 246 northbound : utility work NYSDOT - Region 4: utility work on NY 246 northbound Sands Rd (Perry) to US 20A (Perry) Right/left lane/shoulder closure needed., Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed Thu, 11 Dec 2025 13:11:04 -0500 42.7333971838278 -78.00559 Barclays Center : boxing Barclays Center: boxing on Barclays Center at (Brooklyn) Subriel Matias vs. Dalton Smith, Saturday January 10th, 2026, 07:00 PM thru 10:00 PM Wed, 26 Nov 2025 12:05:25 -0500 40.6833580495388 -73.9765931134918 Barclays Center : basketball game Brooklyn Nets: basketball game on Barclays Center at (Brooklyn) Brooklyn Nets vs. LA Clippers, Friday January 9th, 2026, 07:30 PM thru 10:30 PM Wed, 26 Nov 2025 12:02:35 -0500 40.6833580495388 -73.9765931134918 NY 9D both directions : tree trimming NYSDOT - Region 8: tree trimming on NY 9D both directions between Hudson View Drive (Fishkill) and Old State Road (Wappinger) 2024081748389/32655209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Monday December 22nd, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic Mon, 01 Dec 2025 15:00:56 -0500 41.5225393484334 -73.9730963097671 Barclays Center : basketball game Brooklyn Nets: basketball game on Barclays Center at (Brooklyn) Brooklyn Nets vs. Orlando Magic, Wednesday January 7th, 2026, 07:30 PM thru 10:30 PM Wed, 26 Nov 2025 11:34:03 -0500 40.6833580495388 -73.9765931134918 Barclays Center : wrestling Barclays Center: wrestling on Barclays Center at (Brooklyn) WWE Monday Night RAW, Monday January 5th, 2026, 07:30 PM thru 11:00 PM Wed, 26 Nov 2025 11:31:50 -0500 40.6833580495388 -73.9765931134918 Barclays Center : basketball game Brooklyn Nets: basketball game on Barclays Center at (Brooklyn) Brooklyn Nets vs. Denver Nuggets, Sunday January 4th, 2026, 07:30 PM thru 10:30 PM Wed, 26 Nov 2025 11:27:32 -0500 40.6833580495388 -73.9765931134918 Barclays Center : basketball game Brooklyn Nets: basketball game on Barclays Center at (Brooklyn) Brooklyn Nets vs. Houston Rockets, Thursday January 1st, 2026, 06:00 PM thru 09:00 PM Wed, 26 Nov 2025 11:23:55 -0500 40.6833580495388 -73.9765931134918 Barclays Center : basketball game Brooklyn Nets: basketball game on Barclays Center at (Brooklyn) Brooklyn Nets vs. Golden State Warriors, Monday December 29th, 2025, 07:30 PM thru 10:30 PM Wed, 26 Nov 2025 11:03:33 -0500 40.6833580495388 -73.9765931134918 Barclays Center : concert Barclays Center: concert on Barclays Center at (Brooklyn) Rod Wave The Redemption Experience Tour, Tuesday December 23rd, 2025, 08:00 PM thru 11:00 PM Wed, 26 Nov 2025 10:45:34 -0500 40.6833580495388 -73.9765931134918 Barclays Center : concert Barclays Center: concert on Barclays Center at (Brooklyn) Jonas Brothers Jonas20: Greetings From Your Hometown Tour, Monday December 22nd, 2025, 07:30 PM thru 10:30 PM Wed, 26 Nov 2025 10:43:08 -0500 40.6833580495388 -73.9765931134918 NY 55 both directions : utility work NYSDOT - Region 8: utility work on NY 55 both directions between Main Street (Wawarsing) and Plank Road (Wawarsing) 2025082234837/32655109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic Mon, 08 Dec 2025 11:58:24 -0500 41.7385296391573 -74.375133416367 NJ 10 westbound : roadwork NJDOT - STMC: Roadwork on NJ 10 near CR 670 (Randolph Twp), Monday December 15, 2025 09:00 PM thru Tuesday December 16, 2025 05:00 AM, right lane closed Wed, 26 Nov 2025 08:08:36 -0500 40.8625183105469 -74.5701217651367 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Main St (Roxbury Twp) and East of NJ 183/Netcong Circle (Roxbury Twp), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, right lane closed Wed, 26 Nov 2025 08:08:37 -0500 40.8855934143066 -74.6589813232422 NJ 10 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 10 near In the vicinity of Mount Pleasant Tpke (Denville Twp), Monday December 15, 2025 08:00 PM thru Tuesday December 16, 2025 05:00 AM, right lane closed Wed, 26 Nov 2025 08:08:22 -0500 40.8722953796387 -74.5228118896484 NJ 10 westbound : roadwork NJDOT - STMC: Roadwork on NJ 10 near CR 670 (Randolph Twp), Tuesday December 16, 2025 09:00 PM thru Wednesday December 17, 2025 05:00 AM, right lane closed Wed, 26 Nov 2025 08:08:32 -0500 40.8625183105469 -74.5701217651367 NJ 10 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 10 near In the vicinity of Mount Pleasant Tpke (Denville Twp), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, right lane closed Wed, 26 Nov 2025 08:08:29 -0500 40.8722953796387 -74.5228118896484 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Main St (Roxbury Twp) and East of NJ 183/Netcong Circle (Roxbury Twp), Tuesday December 16, 2025 08:00 PM thru Wednesday December 17, 2025 05:00 AM, right lane closed Wed, 26 Nov 2025 08:08:26 -0500 40.8855934143066 -74.6589813232422 I-81 southbound : roadwork NYSDOT - Region 3: roadwork on I-81 southbound ramp to Exit 21 - Spencer Street; Catawba Street (Syracuse) ; New Exit Ramp opening at Clinton St , Continuous Tuesday December 23rd, 2025 07:00 AM thru Tuesday June 30th, 2026 11:59 PM All lanes closed Mon, 08 Dec 2025 10:17:13 -0500 43.0626808114849 -76.1586938863579 Barclays Center : basketball game Brooklyn Nets: basketball game on Barclays Center at (Brooklyn) Brooklyn Nets vs. Toronto Raptors, Sunday December 21st, 2025, 06:00 PM thru 09:00 PM Tue, 25 Nov 2025 16:16:22 -0500 40.6833580495388 -73.9765931134918 Barclays Center : basketball game Barclays Center: basketball game on Barclays Center at (Brooklyn) Shark Beauty Women's Champions Classict, Saturday December 20th, 2025, 11:00 AM thru 05:00 PM Tue, 25 Nov 2025 16:13:27 -0500 40.6833580495388 -73.9765931134918 Barclays Center : basketball game Brooklyn Nets: basketball game on Barclays Center at (Brooklyn) Brooklyn Nets vs. Miami Heat, Thursday December 18th, 2025, 07:30 PM thru 10:30 PM Tue, 25 Nov 2025 16:09:23 -0500 40.6833580495388 -73.9765931134918 Barclays Center : concert Barclays Center: concert on Barclays Center at (Brooklyn) Lorde Ultrasound, Tuesday December 16th, 2025 thru Wednesday December 17th, 2025, Tuesday/Wednesday, 07:00 PM thru 10:00 PM Tue, 25 Nov 2025 16:06:16 -0500 40.6833580495388 -73.9765931134918 UBS Arena : concert TRANSCOM, Jersey City: concert on UBS Arena at (Hempstead) Rascal Flatts: Life Is A Highway Tour, Thursday January 29th, 2026, 07:00 PM thru 10:00 PM Tue, 25 Nov 2025 15:51:49 -0500 40.711673 -73.726249 UBS Arena : skating event TRANSCOM, Jersey City: skating event on UBS Arena at (Hempstead) Disney On Ice presents Mickey�s Search Party, Thursday January 15th, 2026 thru Saturday January 17th, 2026, Thursday/Friday/Saturday, 07:00 PM thru 10:00 PM, Saturday January 17th, 2026, 11:00 AM thru 02:00 PM, Saturday January 17th, 2026, 03:00 PM thru 06:00 PM, Sunday January 18th, 2026 thru Monday January 19th, 2026, Sunday/Monday, 12:00 PM thru 03:00 PM, Sunday January 18th, 2026, 04:00 PM thru 07:00 PM Tue, 25 Nov 2025 15:50:18 -0500 40.711673 -73.726249 UBS Arena : concert TRANSCOM, Jersey City: concert on UBS Arena at (Hempstead) Jonas Brothers: JONAS20 Greetings From Your Hometown, Sunday December 21st, 2025, 07:30 PM thru 10:30 PM Tue, 25 Nov 2025 15:45:21 -0500 40.711673 -73.726249 UBS Arena : concert TRANSCOM, Jersey City: concert on UBS Arena at (Hempstead) Trans-Siberian Orchestra � The Ghosts Of Christmas Eve, Thursday December 18th, 2025, 07:30 PM thru 10:30 PM Tue, 25 Nov 2025 15:43:48 -0500 40.711673 -73.726249 Prudential Center - ROCK : concert Prudential Center: concert on Prudential Center - ROCK at (Newark) Rascal Flatts - Life Is A Highway Tour w/ special guests Chris Lane & Lauren Alaina, Friday January 30th, 2026, 07:00 PM thru 10:00 PM Tue, 25 Nov 2025 15:28:58 -0500 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : special event Prudential Center: special event on Prudential Center - ROCK at (Newark) Monster Jam Freestyle Mania, Friday January 23rd, 2026, 07:00 PM thru 10:00 PM, Saturday January 24th, 2026 thru Saturday January 24th, 2026, 12:00 PM thru 03:00 PM, Saturday January 24th, 2026, 06:00 PM thru 09:00 PM, Sunday January 25th, 2026, 01:00 PM thru 04:00 PM Tue, 25 Nov 2025 15:27:14 -0500 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Coretta Scott King Classic TCU vs. Ohio State + Vanderbilt vs. Michigan, Monday January 19th, 2026 thru Monday January 19th, 2026, 12:00 PM thru 06:00 PM Tue, 25 Nov 2025 15:24:09 -0500 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game Prudential Center: hockey game on Prudential Center - ROCK at (Newark) NY Sirens vs. Ottawa, Tuesday January 20th, 2026, 07:00 PM thru 10:00 PM Tue, 25 Nov 2025 15:21:20 -0500 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game Prudential Center: hockey game on Prudential Center - ROCK at (Newark) NY Sirens vs. Minnesota, Friday January 16th, 2026, 07:00 PM thru 10:00 PM Tue, 25 Nov 2025 15:19:48 -0500 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game Prudential Center: hockey game on Prudential Center - ROCK at (Newark) NY Sirens vs. Montreal, Friday January 2nd, 2026, 01:00 PM thru 04:00 PM Tue, 25 Nov 2025 15:18:22 -0500 40.7335901472838 -74.1711848974228 Grand Central Parkway both directions : construction NYSDOT - Region 11: construction on Grand Central Parkway both directions between Union Turnpike (New York) and Roosevelt Avenue (New York) Subject to change without notice., Tuesday December 9th, 2025 thru Friday December 19th, 2025, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 1 Right lane of 3 lanes closed westbound; 1 Left lane of 3 lanes closed eastbound, Friday December 19th, 2025 thru Saturday December 20th, 2025, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed westbound; 1 Left lane of 3 lanes closed eastbound Thu, 11 Dec 2025 14:45:54 -0500 40.7366622323849 -73.7418377676151 Sprain Brook State Pkwy southbound : road rehabilitation NYSDOT - Region 8: road rehabilitation on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Pkwy (Eastchester) D265557/32653609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday December 4th, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closed to traffic Thu, 04 Dec 2025 10:40:10 -0500 40.9459923893224 -73.8494768880327 I-95 both directions : expansion joint repairs CT DOT-Bridgeport-Oper: expansion joint repairs on I-95 both directions between Exit 89 - Mystic Street/Allyn Street (Mystic) and Exit 90 - CT 27 (Stonington) There will be a single lane closure, Monday December 1st, 2025 thru Tuesday December 23rd, 2025, Monday/Tuesday/Wednesday/Thursday, 06:00 AM thru 04:00 PM All lanes open Mon, 24 Nov 2025 14:30:00 -0500 41.3719044027304 -71.9817524232082 Merritt Parkway/CT 15 both directions : bridge work CT DOT-Bridgeport-Oper: bridge work on Merritt Parkway/CT 15 both directions between Exit 51 - CT 108/Nichols Avenue (Trumbull) and Exit 46 - CT 59/Easton Turnpike (Fairfield) There will be lanes closures, Sunday November 16th, 2025 thru Friday December 19th, 2025, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open Mon, 24 Nov 2025 14:19:23 -0500 41.2380200623701 -73.1633334719335 CT 9 both directions : bridge work CT DOT-Newington-HWY-Oper Ctr: bridge work on CT 9 both directions between Exit 23 - Christian Lane (Berlin) Motorists can expect Route 9 north and southbound lane closures, Monday December 1st, 2025 thru Friday December 19th, 2025, Monday/Tuesday/Wednesday/Thursday, 07:30 PM thru 05:30 AM All lanes open Mon, 24 Nov 2025 14:07:52 -0500 41.6326340455095 -72.7518425942204 Yankee Stadium : football game NY Yankees: football game on Yankee Stadium at (New York) 2025 Bad Boy Mowers Pinstripe Bowl, Saturday December 27th, 2025 thru Saturday December 27th, 2025, 12:00 PM thru 03:00 PM Mon, 24 Nov 2025 10:55:43 -0500 40.8276748657227 -73.9261245727539 CR-636 northbound : construction NJ DOT - TOC North: construction on CR-636 northbound between JACKSON AVE (Woodland Park) and CR-636 (Woodland Park), Continuous Monday November 24th, 2025 10:49 AM thru Monday June 1st, 2026 03:00 PM All lanes closed Mon, 24 Nov 2025 10:51:01 -0500 40.9025862339041 -74.1922361851741 I-80 eastbound : construction NJ DOT - TOC North: construction on I-80 eastbound Exit ramp Exit 56 - Squirrelwood Rd (Woodland Park) Exit 56B ramp., Continuous Monday November 24th, 2025 10:48 AM thru Monday June 1st, 2026 03:00 PM All lanes closed Mon, 01 Dec 2025 09:21:01 -0500 40.9040469423991 -74.1932906673503 Pier 17 : concert TRANSCOM, Jersey City: concert on Pier 17 at (New York) Turnpike Troubadours Wild America Tour / With Special Guest Lucero, Friday June 5th, 2026, 07:00 PM thru 10:00 PM Mon, 24 Nov 2025 10:13:21 -0500 40.7060155761017 -74.0019401907921 Pier 17 : concert TRANSCOM, Jersey City: concert on Pier 17 at (New York) MIKA SPINNING OUT TOUR NORTH AMERICA, Saturday May 2nd, 2026, 07:00 PM thru 10:00 PM Mon, 24 Nov 2025 10:10:30 -0500 40.7060155761017 -74.0019401907921 NY 17A westbound : water main work NYSDOT - Region 8: water main work on NY 17A westbound between Pinecrest (Warwick) and Van Duzer Place (Warwick) 2024081985953/32652409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday December 17th, 2025 thru Friday December 19th, 2025 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday December 22nd, 2025 thru Tuesday December 23rd, 2025 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic Thu, 11 Dec 2025 16:00:36 -0500 41.2640811285114 -74.3559641377752 NY 120 both directions : gas main repairs NYSDOT - Region 8: gas main repairs on NY 120 both directions between Pheasant Drive (Harrison) and Bowman Avenue (Harrison) 2025082987532/32652209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternate lanes, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday December 30th, 2025, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:01:02 -0500 40.999073467248 -73.69300090301 US 9W both directions : utility work NYSDOT - Region 8: utility work on US 9W both directions between NY 32 (Saugerties) and Garden Circle (Saugerties) 2024081975849/32652109 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 16th, 2025 thru Saturday December 20th, 2025 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic Sat, 13 Dec 2025 15:01:06 -0500 42.0504989624023 -73.9572982788086 NY 32 both directions : utility work NYSDOT - Region 8: utility work on NY 32 both directions between Glasco Turnpike (Saugerties) and US 9W (Saugerties) 2024081975849/3261509 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 16th, 2025 thru Saturday December 20th, 2025 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic Sat, 13 Dec 2025 15:01:05 -0500 42.0436249148168 -73.9536177699232 I-684 both directions : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265186/B1077550/32651809 - This work is weather permitting. Plan travel accordingly; delays may exist, Continuous Monday December 8th, 2025 12:00 AM thru Thursday November 26th, 2026 11:59 AM right shoulder closure Mon, 24 Nov 2025 06:39:21 -0500 41.3032078231156 -73.6745859893158 Broadway both directions : race NYSDOT TMC - Albany: race on Broadway both directions between Lake Ave (Saratoga Springs) and Grove Street (Saratoga Springs), Thursday January 1st, 2026, 11:00 AM thru 12:00 PM All lanes open Fri, 21 Nov 2025 22:58:09 -0500 43.0834327503048 -73.7846828998781 NY 21 both directions : utility work NYSDOT - Region 4: utility work on NY 21 both directions between Torrance Rd (South Bristol) and Bopple Hill Rd (South Bristol) Alternating lane closures with flaggers as needed, Monday November 24th, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes Thu, 11 Dec 2025 18:49:54 -0500 42.707790068726 -77.3775399770913 CANAL ST both directions : longterm construction NYSDOT - Region 3: longterm construction on CANAL ST both directions at N CROUSE AVE (Syracuse) Permanent closure (no outlet to N. Crouse Ave.; to facilitate new on-ramp from N. Crouse Ave. to I-690 EB), Continuous Tuesday November 25th, 2025 07:00 AM thru Wednesday December 31st, 2025 11:59 PM All lanes closed Thu, 20 Nov 2025 20:50:54 -0500 43.0511772877604 -76.1362801487608 I-690 eastbound : longterm construction NYSDOT - Region 3: longterm construction on I-690 eastbound ramp from McBride Street (Syracuse) Permanent ramp closure (there will be a new on-ramp from N. Crouse Ave. to I-690 EB), Continuous Tuesday November 25th, 2025 12:00 PM thru Wednesday December 31st, 2025 11:59 PM All lanes closed Thu, 20 Nov 2025 20:29:16 -0500 43.0511183073246 -76.1436701560526 I-684 southbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure Fri, 12 Dec 2025 18:00:15 -0500 41.303209415105 -73.6748464218608 I-684 northbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on I-684 northbound between Exit 6A - NY 22 - NY 138 (Lewisboro) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32650809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure Fri, 12 Dec 2025 15:00:45 -0500 41.3032156533813 -73.6745794155338 BEVINS RD both directions : bridge rehabilitation NYSDOT - Region 7: bridge rehabilitation and deck work on BEVINS RD both directions FRENCH CREEK RD (Clayton) Bevins Road Bridge over French Creek is closed to all traffic until further notice, Continuous Wednesday November 19th, 2025 04:48 PM thru Monday November 30th, 2026 05:00 PM All lanes closed Wed, 19 Nov 2025 16:53:47 -0500 44.188614536652 -76.1348379877102 Port Street eastbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Port Street eastbound approaching Doremus Avenue (Newark) Not currently Scheduled Sun, 07 Dec 2025 16:00:01 -0500 40.7001374482999 -74.1382653674892 US 9W both directions : longterm construction NYSDOT - Region 8: longterm construction on US 9W both directions between NY 304 (Haverstraw) and Short Clove Road (Haverstraw) 202308107656/32310409 - ROAD CLOSED NIGHTLY - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday December 8th, 2025 thru Wednesday December 24th, 2025, Monday thru Friday, 07:00 PM thru 05:00 AM, all lanes closed and detoured, Monday December 29th, 2025 thru Wednesday December 31st, 2025 Monday/ Tuesday, 07:00 PM thru 05:00 AM, all lanes closed and detoured Wed, 10 Dec 2025 08:47:16 -0500 41.1747744572603 -73.9442700733267 SACKETT ST eastbound : construction NYSDOT - Region 11: construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for trenching to install conduit for major service., Tuesday November 18th, 2025 thru Monday January 12th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed Tue, 18 Nov 2025 15:34:00 -0500 40.6796958991951 -73.9868497479878 CHRISTOPHER AVE northbound : crane operations NYSDOT - Region 11: crane operations on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) to facilitate crane operation, and boom/pumping operations., Tuesday November 18th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday November 22nd, 2025 thru Saturday December 27th, 2025, 07:00 AM thru 06:00 PM All lanes closed Tue, 18 Nov 2025 15:31:37 -0500 40.6618233832858 -73.9038465085348 N 10TH ST westbound : construction NYSDOT - Region 11: construction on N 10TH ST westbound between DRIGGS AVE (New York) and BEDFORD AVE (New York) for material delivery and boom truck operations., Tuesday November 18th, 2025 thru Tuesday February 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Wed, 26 Nov 2025 15:49:48 -0500 40.7187145219565 -73.9547186220815 E 4TH ST southbound : construction NYSDOT - Region 11: construction on E 4TH ST southbound between AVENUE F (New York) and 18TH AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Tuesday November 18th, 2025 thru Thursday December 18th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 18 Nov 2025 15:17:09 -0500 40.6334081567998 -73.9745682999351 NY 9A southbound : construction NYSDOT - Region 11: construction on NY 9A southbound between West 232nd Street (New York) and Kappock Street (New York) for new business/major install electric equipment, backhoe, dump truck., Tuesday November 18th, 2025 thru Thursday December 25th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 18 Nov 2025 15:14:40 -0500 40.8835984315477 -73.9155476123949 W 130TH ST eastbound : construction NYSDOT - Region 11: construction on W 130TH ST eastbound between 7TH AVE (New York) and LENOX AVE (New York) for major gas installation., Saturday November 22nd, 2025 thru Saturday December 27th, 2025, 08:00 AM thru 06:00 PM All lanes closed, Sunday November 23rd, 2025 thru Sunday December 28th, 2025, 09:00 AM thru 06:00 PM All lanes closed Tue, 18 Nov 2025 13:59:58 -0500 40.8120505754307 -73.9458219058962 E 48TH ST eastbound : construction NYSDOT - Region 11: construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for GCT train shed project., Tuesday November 18th, 2025 thru Friday January 9th, 2026, Sunday thru Saturday, 12:01 AM thru 06:00 AM All lanes closed Tue, 18 Nov 2025 13:42:53 -0500 40.7565699747803 -73.9764273073627 Van Wyck Exprewssway southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Van Wyck Exprewssway southbound ramp from Terminal 4 - Departures (New York) Not currently Scheduled Thu, 11 Dec 2025 04:00:02 -0500 40.644740819659 -73.791218524374 JFK Expressway southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on JFK Expressway southbound ramp to Terminal 8 � Arrivals (New York) Not currently Scheduled Fri, 12 Dec 2025 14:00:00 -0500 40.6481069065586 -73.786458668988 George Washington Bridge eastbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on George Washington Bridge Upper Level eastbound ramp to Exit 1A - Henry Hudson Parkway (New York) Not currently Scheduled Sun, 23 Nov 2025 10:00:00 -0500 40.845751906792 -73.9446664548009 NY 304 southbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday November 17th, 2025 12:00 AM thru Saturday January 17th, 2026 12:00 AM right lane closure Thu, 11 Dec 2025 08:55:12 -0500 41.1022529085572 -73.9975370056921 NY 304 northbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on NY 304 northbound between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/32646509 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday November 17th, 2025 12:00 AM thru Saturday January 17th, 2026 12:00 AM left lane closed to traffic Thu, 11 Dec 2025 08:55:54 -0500 41.1022131869693 -73.9974208532324 Taconic State Parkway northbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Saturday December 20th, 2025 thru Wednesday December 24th, 2025 Sunday/ Monday/ Tuesday/ Saturday, 07:00 PM thru 05:00 AM, various lane closures, Monday December 29th, 2025 thru Wednesday December 31st, 2025 Monday/ Tuesday, 07:00 PM thru 05:00 AM, various lane closures, Monday January 5th, 2026 thru Monday January 19th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures Thu, 11 Dec 2025 10:55:48 -0500 41.2276486379407 -73.807240737208 Taconic State Parkway northbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Thursday December 18th, 2025, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Saturday December 20th, 2025 thru Sunday December 21st, 2025, Saturday/Sunday, 06:00 AM thru 03:00 PM, various lane closures, Monday December 22nd, 2025 thru Tuesday December 23rd, 2025 Monday/ Tuesday, 06:00 AM thru 03:00 PM, various lane closures, Monday December 29th, 2025, 10:00 AM thru 03:00 PM, various lane closures, Tuesday December 30th, 2025, 06:00 AM thru 03:00 PM, various lane closures, Monday January 5th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday January 6th, 2026 thru Sunday January 18th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures Thu, 11 Dec 2025 10:51:09 -0500 41.2276501790599 -73.8072275052251 Holland Tunnel eastbound : construction Port Authority NY/NJ: construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan) Not currently Scheduled Fri, 21 Nov 2025 05:00:14 -0500 40.7287127034813 -74.0314944941165 American Dream Mall : golf tournament Meadowlands Complex: golf tournament on American Dream Mall at (East Rutherford) Angry Birds Holiday Birdie Bash, Sunday December 21st, 2025 thru Sunday December 21st, 2025, 12:00 PM thru 04:00 PM Fri, 14 Nov 2025 12:28:04 -0500 40.8103304020617 -74.0684148072978 American Dream Mall : special event Meadowlands Complex: special event on American Dream Mall at (East Rutherford) Brunch with Santa at Carpaccio, Saturday December 13th, 2025 thru Sunday December 21st, 2025, Saturday/ Sunday, 11:00 AM thru 01:00 PM, Saturday December 13th, 2025 thru Sunday December 21st, 2025, Saturday/ Sunday, 01:00 PM thru 03:00 PM Fri, 14 Nov 2025 12:25:24 -0500 40.8103304020617 -74.0684148072978 US 1 southbound : gas main work NYSDOT - Region 8: gas main work on US 1 southbound between Kilmer Road (Larchmont) and Pine Ridge Road (Larchmont) 2025082778794/32642509 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Monday December 29th, 2025, 10:00 AM thru 03:30 PM, right lane closure, Tuesday December 30th, 2025, 09:30 AM thru 03:30 PM, right lane closure Mon, 01 Dec 2025 15:30:53 -0500 40.9245663426011 -73.7578595886348 NY 9A both directions : gas main repairs NYSDOT - Region 8: gas main repairs on NY 9A both directions between Lindsey Avenue (Cortlandt) and Craft Lane (Cortlandt) 2024081733525/32642309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday December 30th, 2025, 09:30 AM thru 03:30 PM, alternating traffic Mon, 01 Dec 2025 15:30:53 -0500 41.2586639460075 -73.9347738638777 US 9 northbound : safety improvements NYSDOT - Region 8: safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Wednesday December 17th, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic Mon, 01 Dec 2025 15:30:52 -0500 42.2768869121599 -73.7582045659377 US 6 both directions : utility work NYSDOT - Region 8: utility work on US 6 both directions between Country Place (Cortlandt) and Mohegan Avenue (Cortlandt) 2025083099140/32640009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Monday December 29th, 2025, 10:00 AM thru 03:30 PM, various lane closures, Tuesday December 30th, 2025, 09:30 AM thru 03:30 PM, Mon, 01 Dec 2025 15:30:45 -0500 41.3223936222299 -73.8539776055572 I-690 westbound : bridge inspection NYSDOT - Region 3: bridge inspection on I-690 westbound between Exit 16N and Exit 16S - NY 635 Thompson Road (Syracuse) and Exit 15 - Midler Avenue (Syracuse) ; Alternating left and right lane closures, Thursday December 11th, 2025 thru Monday December 22nd, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Thursday December 11th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Mon, 01 Dec 2025 15:10:13 -0500 43.0592996600382 -76.0884826911175 I-690 eastbound : bridge inspection NYSDOT - Region 3: bridge inspection on I-690 eastbound between Exit 15 - Midler Avenue (Syracuse) and Exit 16N and Exit 16S - NY 635 Thompson Road (Syracuse) ; Alternating lane closures, Thursday December 11th, 2025 thru Monday December 22nd, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Thursday December 11th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Mon, 01 Dec 2025 15:08:42 -0500 43.0567648257162 -76.1085851207084 NY 31 both directions : bridge inspection NYSDOT - Region 3: bridge inspection on NY 31 both directions between SWEENEY PL (Elbridge) and CARMER RD (Elbridge) ; Alternating one-way traffic with flaggers, Monday November 24th,2025 thru Friday December 19th,2025, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes of 1 lane open westbound, eastbound Fri, 21 Nov 2025 17:00:01 -0500 43.0739846057158 -76.4800523028579 WILLIAMSBURG ST E northbound : construction NYSDOT - Region 11: construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for boom, knuckle boom and concrete pump to work on new building., Monday November 10th, 2025 thru Thursday February 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Mon, 10 Nov 2025 14:38:09 -0500 40.7030458103153 -73.959863822677 DOWNING ST southbound : construction NYSDOT - Region 11: construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Monday November 10th, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Mon, 10 Nov 2025 14:36:11 -0500 40.6827627244944 -73.9607048046656 31ST ST eastbound : construction NYSDOT - Region 11: construction on 31ST ST eastbound between 3RD AVE (New York) and 4TH AVE (New York) for major gas installation., Monday November 10th, 2025 thru Tuesday February 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Mon, 10 Nov 2025 14:26:23 -0500 40.6582157884672 -74.0033311742987 COMMONWEALTH AVE northbound : crane operations NYSDOT - Region 11: crane operations on COMMONWEALTH AVE northbound between WATSON AVE (New York) and GLEASON AVE (New York), Monday November 10th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 09:00 AM thru 11:59 PM All lanes closed, Saturday November 15th, 2025 thru Saturday December 27th, 2025, 09:00 AM thru 04:00 PM All lanes closed Mon, 10 Nov 2025 14:06:23 -0500 40.8276586288536 -73.8672948729618 SAXON AVE northbound : construction NYSDOT - Region 11: construction on SAXON AVE northbound between SEDGWICK AVE (New York) and VAN CORTLANDT PARK S (New York) for boom, knuckle boom and concrete pump work on new building., Monday November 10th, 2025 thru Friday February 6th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed Mon, 10 Nov 2025 14:03:45 -0500 40.8827386634501 -73.8902753208819 KINGSBRIDGE TER both directions : construction NYSDOT - Region 11: construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Monday November 10th, 2025 thru Thursday February 5th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed Mon, 10 Nov 2025 13:55:14 -0500 40.8695884010572 -73.9062973238768 ANN ST eastbound : construction NYSDOT - Region 11: construction on ANN ST eastbound between BROADWAY (New York) and NASSAU ST (New York) for knuckle boom, concrete pump operations., Monday November 10th, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Mon, 10 Nov 2025 13:38:29 -0500 40.7113094459571 -74.0085394459571 NY 310 both directions : culvert repairs NYSDOT - Region 7: culvert repairs and reconstruction on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) Rte. 310 over tributary to Nettle Creek is closed while the culvert is replaced. Thru traffic should follow the signed detour. , Continuous Monday November 10th, 2025 12:00 AM thru Friday January 16th, 2026 11:59 PM All lanes closed and detoured Mon, 10 Nov 2025 14:20:05 -0500 44.6589531722522 -75.1495084569147 IRVING AVE southbound : roadwork NYSDOT - Region 3: drainage improvements and roadwork on IRVING AVE southbound between E FAYETTE ST (Syracuse) and E ADAMS ST (Syracuse) ; Alternating one-way traffic with flaggers, Monday November 10th, 2025 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:30 PM 1 Right lane of 3 lanes closed Wed, 19 Nov 2025 05:27:24 -0500 43.0482557827827 -76.1377129687328 NY 5 both directions : installation of traffic management systems NYSDOT - Region 3: installation of traffic management systems and utility work on NY 5 both directions between Almond Street (Syracuse) and University Ave (Syracuse), Continuous Monday November 10th, 2025 12:00 AM thru Wednesday April 1st, 2026 11:59 PM 1 Left lane of 2 lanes closed Mon, 10 Nov 2025 11:21:59 -0500 43.0507848486549 -76.1418987948504 LODI ST both directions : bridge work NYSDOT - Region 3: bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Monday November 10th, 2025 thru Wednesday April 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open Wed, 19 Nov 2025 05:26:03 -0500 43.0511038900477 -76.1306383947195 NY 133 both directions : utility work NYSDOT - Region 8: utility work on NY 133 both directions between Calam Avenue (Ossining) and Donald Lane (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday December 20th, 2025, 08:00 AM thru 02:00 PM, alternating traffic, Monday December 22nd, 2025 thru Tuesday December 23rd, 2025 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday December 30th, 2025 thru Wednesday December 31st, 2025 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic Sat, 13 Dec 2025 14:01:13 -0500 41.1669813418883 -73.8471258001685 George Washington Bridge westbound : construction Port Authority NY/NJ: construction on George Washington Bridge Lower Level westbound ramp from Exit 1A - Henry Hudson Parkway (New York) to Exit 1A - Henry Hudson Parkway (New York) Not currently Scheduled Fri, 14 Nov 2025 14:30:03 -0500 40.8472980929564 -73.9426981417847 CT 2 westbound : drainage improvements CT DOT-Newington-HWY-Oper Ctr: drainage improvements and safety improvements on CT 2 westbound between Exit 20 - CT 354/Parum Road (Colchester) and Exit 21 - CT 11 (Colchester), Continuous Monday October 27th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM 1 Right lane of 2 lanes closed Fri, 07 Nov 2025 15:51:45 -0500 41.5651901295201 -72.3119260314349 NY 5S westbound : bridge work NYSDOT - Region 2: bridge work on NY 5S westbound ramp to/from Culver Ave (Utica) The west bound ramps to and from Culver Ave will be fully closed to traffic with a signed detour in place. The detour will utilize Turner Street, Pitcher Street, Dwyer Ave and Culver Ave.There may also be lane or shoulder closures under the bridge, Continuous Monday November 10th, 2025 7:00 AM thru Saturday December 20th, 2025 4:00 PM ramp closed Fri, 12 Dec 2025 06:58:40 -0500 43.0961 -75.1927 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Never Forget Tribute Classic Arkansas vs. Houston, Saturday December 20th, 2025, 05:30 PM thru 08:30 PM Thu, 06 Nov 2025 11:54:10 -0500 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : concert Prudential Center: concert on Prudential Center - ROCK at (Newark) Trans-Siberian Orchestra The Ghosts of Christmas Eve, Friday December 19th, 2025, 03:00 PM thru 06:00 PM, Friday December 19th, 2025, 08:00 PM thru 11:00 PM Thu, 06 Nov 2025 11:52:15 -0500 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game Prudential Center: hockey game on Prudential Center - ROCK at (Newark) NY Sirens vs. Toronto, Sunday December 21st, 2025 thru Sunday December 21st, 2025, 12:00 PM thru 03:00 PM Thu, 06 Nov 2025 11:49:01 -0500 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game Prudential Center: hockey game on Prudential Center - ROCK at (Newark) NY Sirens vs. Boston, Wednesday December 17th, 2025, 07:00 AM thru 10:00 PM Thu, 06 Nov 2025 11:46:31 -0500 40.7335901472838 -74.1711848974228 CT-99 southbound : drainage improvements CT DOT-Newington-HWY-Oper Ctr: drainage improvements on CT-99 southbound between TOWN LINE RD (Rocky Hill) and MAIN ST at 18 (Cromwell) There will be alternating lane closures, Monday November 17th, 2025 thru Saturday January 17th, 2026, Monday thru Friday, 07:30 AM thru 04:30 PM All lanes open Thu, 06 Nov 2025 11:04:22 -0500 41.6831756396396 -72.6543309468652 CT-99 northbound : drainage improvements CT DOT-Newington-HWY-Oper Ctr: drainage improvements on CT-99 northbound between 18 (Cromwell) and TOWN LINE RD (Rocky Hill) There will be alternating lane closures, Monday November 17th, 2025 thru Saturday January 17th, 2026, Monday thru Friday, 07:30 AM thru 04:30 PM All lanes open Thu, 06 Nov 2025 11:01:44 -0500 41.58672418565 -72.646917497722 Pier 17 : concert TRANSCOM, Jersey City: concert on Pier 17 at (New York) Chet Faker A Love For Strangers Tour, Saturday May 30th, 2026, 07:00 PM thru 10:00 PM Thu, 06 Nov 2025 10:50:37 -0500 40.7060155761017 -74.0019401907921 I-95 both directions : tree trimming CT DOT-Bridgeport-Oper: tree trimming on I-95 both directions between Exit 54 - CT 146 (Branford) and Exit 58 - CT 77 (Guilford), Monday November 10th, 2025 thru Friday March 27th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed Tue, 04 Nov 2025 15:35:10 -0500 41.2856011135857 -72.836374610245 NY 119 westbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on NY 119 westbound between Prospect Avenue (White Plains) and Hillside Avenue (White Plains) 202408111179/32627709 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 9th, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday December 29th, 2025, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday December 30th, 2025, 09:30 AM thru 03:30 PM, shoulder closure Fri, 05 Dec 2025 15:31:12 -0500 41.0408101099963 -73.7889581167476 NY 100 northbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on NY 100 northbound between Tarrytown Road (White Plains) and Mclean Ave (White Plains) 202408111179/32627609 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 9th, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, shoulder closure, Tuesday December 30th, 2025, 09:00 AM thru 04:00 PM, shoulder closure Fri, 05 Dec 2025 16:01:09 -0500 41.0416710415818 -73.7909131556263 I-81 southbound : roadwork NYSDOT - Region 3: roadwork on I-81 southbound ramp to Exit 96 - SB I-481; Dewitt (Cicero) Opening of new ramp, Continuous Monday November 3rd, 2025 08:00 AM thru Wednesday December 31st, 2025 11:59 PM All lanes open Mon, 03 Nov 2025 06:29:47 -0500 43.1440723518671 -76.1107025433008 I-81 southbound : longterm construction NYSDOT - Region 3: longterm construction on I-81 southbound ramp to Exit 29S - I-481 South; Dewitt (North Syracuse) Permanent ramp closure , Continuous Monday November 3rd, 2025 08:00 AM thru Wednesday December 31st, 2025 11:59 PM All lanes closed Mon, 03 Nov 2025 06:21:51 -0500 43.13957 -76.1153361854178 E 92ND ST both directions : construction NYSDOT - Region 11: construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday October 31st, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Fri, 31 Oct 2025 15:31:46 -0400 40.6490314360646 -73.9131969285917 CRESTON AVE southbound : crane operations NYSDOT - Region 11: crane operations on CRESTON AVE southbound between E 196TH ST (New York) and E KINGSBRIDGE RD (New York), Friday October 31st, 2025 thru Wednesday January 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Fri, 31 Oct 2025 15:21:03 -0400 40.8683490023029 -73.8941895835655 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Ed Sheeran "The Loop Tour" , Friday September 4th, 2026 thru Saturday September 5th, 2026, Friday/Saturday, 05:30 PM thru 11:00 PM Fri, 31 Oct 2025 13:30:08 -0400 40.8134600702536 -74.0742874145508 NY 9A northbound : safety improvements NYSDOT - Region 8: safety improvements on NY 9A northbound between Catherine Street (Cortlandt) and Craft Lane (Cortlandt) 202508113798/32570309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure Wed, 03 Dec 2025 15:32:18 -0500 41.2579980493405 -73.9346193324568 Sports Illustrated Stadium : concert New York Red Bulls: concert on Sports Illustrated Stadium at (Harrison) IRON MAIDENUN FOR YOUR LIVES WORLD TOUR with Megadeath & Anthrax, Saturday September 5th, 2026 thru Sunday September 6th, 2026, Saturday/ Sunday, 06:00 PM thru 11:00 PM Thu, 11 Dec 2025 15:08:44 -0500 40.7366914609768 -74.1502866405472 Merritt Parkway/CT 15 both directions : attenuator repairs CT DOT-Bridgeport-Oper: attenuator repairs and guard rail repairs on Merritt Parkway/CT 15 both directions between Exit 53 - CT 110/Main Street (Stratford) and Wilbur Cross Parkway at Exit 67 - I-91 (Meriden), Sunday October 26th, 2025 thru Thursday January 22nd, 2026, Sunday/Monday/Tuesday/Wednesday, 07:00 AM thru 05:00 AM 1 Left lane of 3 lanes closed Wed, 29 Oct 2025 10:40:02 -0400 41.2451702037748 -73.1021791849009 NY 82 southbound : utility work NYSDOT - Region 8: utility work on NY 82 southbound between Inky Lane (East Fishkill) and All Angels Hill Road (East Fishkill) 2025082620751/32623809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic Fri, 12 Dec 2025 16:00:59 -0500 41.5667141917573 -73.8453397707966 LaSalle Expressway both directions : bridge rehabilitation NITTEC: bridge rehabilitation on LaSalle Expressway both directions Exit - 77th Street (Niagara Falls) to City of Niagara Falls; Town of Wheatfield Line (Wheatfield), Monday October 27th, 2025 thru Tuesday March 31st, 2026, Sunday thru Saturday, 07:30 AM thru 03:30 PM 1 Right lane of 3 lanes closed Mon, 27 Oct 2025 16:26:02 -0400 43.0795738752297 -78.9760261908304 NY 120 northbound : substructure repairs NYSDOT - Region 8: substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday December 30th, 2025, 09:00 AM thru 03:30 PM, alternating traffic Wed, 03 Dec 2025 08:29:58 -0500 41.1587286177264 -73.7649941844928 NY 9A both directions : gas main work NYSDOT - Region 8: gas main work on NY 9A both directions between Jackson Avenue (Hastings-on-Hudson) and Lawrence Street (Ardsley) 202508438563/32621709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday December 20th, 2025, 09:30 AM thru 02:00 PM, alternating traffic, Monday December 22nd, 2025 thru Tuesday December 23rd, 2025 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday December 30th, 2025 thru Wednesday December 31st, 2025 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, alternating traffic Sat, 13 Dec 2025 14:01:12 -0500 40.9974725201095 -73.8574945019798 Central Park, NYC : skating NYC Mayors Office: skating on Central Park, NYC at (New York) Public Skating Session Wollman Rink, Tuesday October 28th,2025 thru Sunday March 15th,2026, Monday/Tuesday, 10:00 AM thru 02:30 PM , Sunday October 26th,2025 thru Sunday March 15th,2026, Wednesday/Thursday, 10:00 AM thru 09:00 PM , Sunday October 26th,2025 thru Sunday March 15th,2026, Friday/Saturday, 10:00 AM thru 10:00 PM , Sunday November 2nd,2025 thru Sunday March 15th,2026, Sunday, 10:00 AM thru 09:00 PM Mon, 27 Oct 2025 20:00:11 -0400 40.7713599587163 -73.9738109939706 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee) Not currently Scheduled Sat, 25 Oct 2025 08:00:03 -0400 40.8503032998066 -73.9451137967747 NY 30 northbound : utility work NYSDOT - Region 2: utility work on NY 30 northbound between Storrie Street (Amsterdam) and Sunset Road (Amsterdam) Motorists will encountera north bound lane closure with flaggers in place, Monday December 1st, 2025 thru Friday December 19th, 2025, Monday thru Friday, 06:00 AM thru 06:00 PM, Fri, 12 Dec 2025 06:56:32 -0500 42.9450513988111 -74.1869423833435 GLENMORE AVE eastbound : construction NYSDOT - Region 11: construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for trenching to install conduit for major service., Saturday October 25th,2025 thru Saturday December 20th,2025, Saturday, 08:00 AM thru 06:00 PM All lanes closed eastbound, Sun, 14 Dec 2025 18:00:01 -0500 40.6715178058165 -73.9072899552577 CHRISTOPHER AVE both directions : construction NYSDOT - Region 11: construction on CHRISTOPHER AVE both directions between GLENMORE AVE (New York) and GLENMORE AVE (New York) for trenching to install conduit for major service., Saturday October 25th,2025 thru Saturday December 20th,2025, Saturday, 08:00 AM thru 06:00 PM All lanes closed northbound, southbound Sun, 14 Dec 2025 18:00:01 -0500 40.6714006540178 -73.9062947663118 DOUGLASS ST both directions : construction NYSDOT - Region 11: construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations (in conjunction with new building project)., Friday October 24th, 2025 thru Wednesday December 24th, 2025, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed Wed, 22 Oct 2025 13:02:20 -0400 40.681824178509 -73.9882137910488 DEGRAW ST both directions : construction NYSDOT - Region 11: construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations (in conjunction with new building project)., Friday October 24th, 2025 thru Wednesday December 24th, 2025, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed Wed, 22 Oct 2025 13:00:39 -0400 40.6811623659315 -73.9886006878747 CEDAR AVE both directions : construction NYSDOT - Region 11: construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer construction., Friday October 24th, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Wed, 22 Oct 2025 12:53:07 -0400 40.8564424167739 -73.9172061895807 US-6 both directions : intersection improvements CT DOT-Newington-HWY-Oper Ctr: intersection improvements on US-6 both directions between AGNEY AVE (Plymouth) and N MAIN ST (Plymouth) Motorists can expect alternating one-way traffic will occur during off-peak hours on Route 6. Police Officers and traffic control signing patterns will guide motorists through the work zone during construction., Continuous Monday October 13th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes open Tue, 21 Oct 2025 11:38:30 -0400 41.6783785730466 -73.0094399150531 I-291 westbound : guard rail repairs CT DOT-Newington-HWY-Oper Ctr: guard rail repairs on I-291 westbound between I-84 (Manchester) and Exit 2 - I-91 (Windsor), Monday October 27th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 2 lanes closed Tue, 21 Oct 2025 11:34:29 -0400 41.7926358673283 -72.5706081340895 CT 2 westbound : bridge rehabilitation CT DOT-Newington-HWY-Oper Ctr: bridge rehabilitation and traffic shift on CT 2 westbound between Exit 16 - CT 149/Westchester Road (Colchester), Continuous Monday October 27th, 2025 12:00 AM thru Tuesday January 27th, 2026 11:59 PM 1 Right lane of 2 lanes closed Tue, 21 Oct 2025 11:31:33 -0400 41.5913792874927 -72.3940005231607 CT 2 westbound : bridge replacement CT DOT-Newington-HWY-Oper Ctr: bridge replacement on CT 2 westbound Exit ramp Exit 16 - CT 149/Westchester Road (Colchester), Continuous Monday October 27th, 2025 12:00 AM thru Tuesday January 27th, 2026 11:59 PM All lanes closed Tue, 21 Oct 2025 11:29:18 -0400 41.591445873463 -72.3944130851139 I-84 eastbound : guard rail repairs NYSDOT - Region 8: guard rail repairs on I-84 eastbound between Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) and Exit 58 - Ludingtonville Road - CR 43 (Kent) D265499/DAY/32611709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane construction embargo Fri, 28 Nov 2025 14:09:32 -0500 41.5234270392404 -73.8893501123558 I-84 westbound : guard rail repairs NYSDOT - Region 8: guard rail repairs on I-84 westbound between Exit 58 - Ludingtonville Road - CR 43 (Kent) and Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) D265499/DAY/32611509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures Fri, 28 Nov 2025 14:09:04 -0500 41.5483373551328 -73.7302807428232 I-87 Northway northbound : reconstruction NYSDOT - Region 7: reconstruction on I-87 Northway northbound (Champlain) delays due to construction, Continuous Monday October 20th, 2025 12:00 AM thru Friday May 1st, 2026 11:59 PM 2 lanes of 3 lanes closed Mon, 20 Oct 2025 11:47:57 -0400 45.0087259481627 -73.45112 NY 17 [Orange] eastbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on NY 17 [Orange] eastbound between Exit 122A - Fletcher Street (Goshen) and Exit 124 - NY 17A (Goshen) D265186/B1003160/32610709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures Fri, 12 Dec 2025 14:30:58 -0500 41.3942530060746 -74.3344266470799 I-481 southbound : longterm construction NYSDOT - Region 3: longterm construction on I-481 southbound ramp to Exit 9N; I-81 N (Cicero) ; Alternating shoulder closures, Wednesday October 15th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes and both shoulder closed Thu, 16 Oct 2025 19:38:24 -0400 43.1413219276 -76.1114834932004 I-81 northbound : longterm construction NYSDOT - Region 3: longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Wednesday October 15th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 06:30 AM thru 03:00 PM All lanes open Thu, 16 Oct 2025 19:30:35 -0400 43.0683034483795 -76.1666975761777 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Upper Level westbound New York Side (New York) to New Jersey Side (Fort Lee) Not currently Scheduled Sat, 18 Oct 2025 05:00:01 -0400 40.8502411229551 -73.9450557920844 Prudential Center - ROCK : hockey game Prudential Center: hockey game on Prudential Center - ROCK at (Newark) NY Sirens vs. Vancouver, Wednesday December 31st,2025 01:00 PM thru 04:00 PM Sat, 29 Nov 2025 15:00:11 -0500 40.7335901472838 -74.1711848974228 STATE ST eastbound : construction NYSDOT - Region 11: construction on STATE ST eastbound between HENRY ST (New York) and SIDNEY PL (New York) to install NYCDEP sewer and water main for DDC., Wednesday October 15th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed Wed, 15 Oct 2025 16:52:32 -0400 40.6913859999591 -73.9958539998365 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Seton Hall vs. St. John's, Friday March 6th, 2026, 09:00 PM thru 11:59 PM Wed, 15 Oct 2025 16:30:34 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Seton Hall vs. Georgetown, Saturday February 21st, 2026, 06:00 PM thru 09:00 PM Wed, 15 Oct 2025 16:29:13 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Seton Hall vs. DePaul, Wednesday February 18th, 2026, 08:00 PM thru 11:00 PM Wed, 15 Oct 2025 16:28:01 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Seton Hall vs. Providence, Wednesday February 11th, 2026, 07:30 PM thru 10:30 PM Wed, 15 Oct 2025 16:26:19 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Seton Hall vs. Marquette, Saturday January 31st, 2026 thru Saturday January 31st, 2026, 12:00 PM thru 03:00 PM Wed, 15 Oct 2025 16:24:46 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Seton Hall vs. Xavier, Wednesday January 28th, 2026, 07:30 PM thru 10:30 PM Wed, 15 Oct 2025 16:23:37 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Seton Hall vs. Butler, Saturday January 17th, 2026 thru Saturday January 17th, 2026, 12:00 PM thru 03:00 PM Wed, 15 Oct 2025 16:21:51 -0400 40.7335901472838 -74.1711848974228 47TH ST westbound : crane operations NYSDOT - Region 11: crane operations on 47TH ST westbound between 17TH AVE (New York) and 16TH AVE (New York), Sunday October 19th, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed Wed, 15 Oct 2025 16:21:36 -0400 40.6307153155366 -73.9819556279563 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Seton Hall vs. UCONN, Tuesday January 13th, 2026, 08:00 PM thru 11:00 PM Wed, 15 Oct 2025 16:20:34 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Seton Hall vs. Creighton, Sunday January 4th, 2026 thru Sunday January 4th, 2026, 12:00 PM thru 03:00 PM Wed, 15 Oct 2025 16:19:10 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : basketball game Prudential Center: basketball game on Prudential Center - ROCK at (Newark) Seton Hall vs. Villanova, Tuesday December 23rd, 2025, 07:00 AM thru 10:00 PM Wed, 15 Oct 2025 16:17:59 -0400 40.7335901472838 -74.1711848974228 HENRY ST southbound : construction NYSDOT - Region 11: construction on HENRY ST southbound between JORALEMON ST (New York) and STATE ST (New York) to install NYCDEP sewer and water main for DDC., Wednesday October 15th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed Wed, 15 Oct 2025 15:53:54 -0400 40.6930976473502 -73.9951239970282 WHITNEY AVE : bridge work CT DOT-Bridgeport-Oper: bridge work on WHITNEY AVE between CT 10 (Hamden) and CT-40 at I-91 (North Haven) There will be alternating lane closures , Monday October 6th, 2025 thru Friday December 19th, 2025, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open Wed, 15 Oct 2025 12:46:53 -0400 41.4034080731122 -72.8983524695366 CT 9 northbound : bridge work CT DOT-Newington-HWY-Oper Ctr: bridge work on CT 9 northbound Exit ramp Exit 28 - CT 72 (New Britain) There will be a lane closure for the duration of the project on the Route 9 northbound off-ramp to Route 72 westbound, from April 28, 2025, to Fall/Winter of 2025, Continuous Monday April 28th, 2025 12:00 AM thru Thursday August 27th, 2026 11:59 PM All lanes open Wed, 15 Oct 2025 12:00:31 -0400 41.667950411787 -72.7731321482433 HIMROD ST northbound : construction NYSDOT - Region 11: construction on HIMROD ST northbound between IRVING AVE (New York) and WYCKOFF AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Tuesday October 14th, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 14 Oct 2025 12:03:09 -0400 40.7014314525138 -73.9185095433413 NY 59 westbound : line striping NYSDOT - Region 8: line striping on NY 59 westbound between N Airmont Road (Suffern) and Hemion Road (Suffern) 202508113226/32603809 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday December 17th, 2025, 09:00 AM thru 03:30 PM, shoulder closure Sat, 13 Dec 2025 14:01:11 -0500 41.1124124548877 -74.1147248365587 40TH RD eastbound : construction NYSDOT - Region 11: construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Saturday October 11th, 2025 thru Tuesday December 16th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Sat, 11 Oct 2025 17:44:24 -0400 40.751697585238 -73.9360703568378 40TH AVE westbound : construction NYSDOT - Region 11: construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Saturday October 11th, 2025 thru Tuesday December 16th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Sat, 11 Oct 2025 17:42:48 -0400 40.7516360529548 -73.9338072145731 40TH AVE westbound : construction NYSDOT - Region 11: construction on 40TH AVE westbound between 30TH ST (New York) for concrete operations., Saturday October 11th, 2025 thru Tuesday December 16th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Sat, 11 Oct 2025 17:40:36 -0400 40.7519810160893 -73.9348125402234 30TH ST southbound : construction NYSDOT - Region 11: construction on 30TH ST southbound between 39TH AVE (New York) and 40TH AVE (New York) for concrete operations., Saturday October 11th, 2025 thru Tuesday December 16th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Sat, 11 Oct 2025 17:37:50 -0400 40.753077478311 -73.9337299765134 E TREMONT AVE both directions : construction NYSDOT - Region 11: construction on E TREMONT AVE both directions between ADAMS ST (New York) and E 180TH ST (New York) for cable pulling., Saturday October 11th, 2025 thru Tuesday December 30th, 2025, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed Sat, 11 Oct 2025 17:29:58 -0400 40.8396063313459 -73.8698151179737 NJ 71 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 71 Both Directions At South of Shark River Bridge (Belmar) Tuesday December 2, 2025 06:00 AM thru Friday March 13, 2026 04:00 PM, All lanes closed and detoured northbound; All lanes closed and detoured southbound Thu, 27 Nov 2025 08:04:49 -0500 40.1846885681152 -74.0237121582031 I-678 southbound : construction NYSDOT - Region 11: construction on I-678 southbound ramp from Rockaway Boulevard (New York) Subject to change without notice., Continuous Tuesday October 14th, 2025 07:00 AM thru Sunday December 21st, 2025 11:59 PM All lanes closed Thu, 20 Nov 2025 13:22:32 -0500 40.6715077634471 -73.8014424878543 NY 52 both directions : milling NYSDOT - Region 8: milling and paving operations on NY 52 both directions between NY 311 (Kent) and Windy Hill Road (Kent) D265427/32599809 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled Fri, 12 Dec 2025 16:00:52 -0500 41.4677149973937 -73.6656918518398 NY 100 both directions : culvert repairs NYSDOT - Region 8: culvert repairs on NY 100 both directions between Moseman Avenue (Somers) and Amawalk Road - NY 35 (Somers) D265424/32597209 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Wednesday October 22nd, 2025 12:00 PM thru Sunday February 1st, 2026 11:59 PM all lanes closed and detoured Wed, 10 Dec 2025 13:59:58 -0500 41.2499376709774 -73.7409249332072 Westchester Ave - NY 120A eastbound : safety improvements NYSDOT - Region 8: safety improvements on Westchester Ave - NY 120A eastbound between Webb Avenue (Rye Brook) and Brook Lane (Rye Brook) 2025082616353/32596909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 9th, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, right lane closure, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, right lane closure, Tuesday December 30th, 2025, 10:00 AM thru 04:00 PM, right lane closure Fri, 05 Dec 2025 16:01:09 -0500 41.0082889286289 -73.6958169267576 PARKSIDE AVE eastbound : construction NYSDOT - Region 11: construction on PARKSIDE AVE eastbound between NOSTRAND AVE (New York) and NEW YORK AVE (New York) for booming and pumping operations for new building project., Friday October 10th, 2025 thru Friday December 26th, 2025, 09:00 AM thru 04:00 PM All lanes closed, Saturday October 11th, 2025 thru Saturday December 27th, 2025, 08:00 AM thru 04:00 PM All lanes closed Tue, 07 Oct 2025 12:08:50 -0400 40.6562525649649 -73.9501162447162 CRUGER AVE northbound : construction NYSDOT - Region 11: construction on CRUGER AVE northbound between SAGAMORE ST (New York) and BRONXDALE AVE (New York) for MTA contract C-35311 work zone and MPT-6., Tuesday October 7th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes closed Tue, 07 Oct 2025 12:01:13 -0400 40.8487077959156 -73.8669832906411 NY 306 southbound : safety improvements NYSDOT - Region 8: safety improvements on NY 306 southbound between Viola Road (Ramapo) 8761/32594209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday December 30th, 2025 thru Wednesday December 31st, 2025 Tuesday/ Wednesday, 07:00 AM thru 03:30 PM, alternating traffic Mon, 01 Dec 2025 15:30:51 -0500 41.1350209542268 -74.0666352797808 I-87 Northway northbound : reconstruction NYSDOT - Region 7: reconstruction on I-87 Northway northbound END ROUTE I-87; US-Canadian Line (Champlain) 8 car lanes NB reduced to 3 (max) lanes , Continuous Thursday September 25th, 2025 12:00 AM thru Sunday February 28th, 2027 11:59 PM 5 lanes of 8 lanes closed Mon, 20 Oct 2025 11:28:45 -0400 45.0087514673341 -73.452063085427 US 9W both directions : road rehabilitation NYSDOT - Region 8: road rehabilitation on US 9W both directions between Horton Lane (Ulster) and Flatbush Road - NY 32 (Ulster) D265485/32592909 - This work is weather permitting. Plan travel accordingly; delays may exist road Not currently scheduled Fri, 12 Dec 2025 17:00:36 -0500 41.9097651736713 -73.9776909 Van Wyck Expressway southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Van Wyck Expressway southbound ramp to Terminal 1 Departures (New York) Not currently Scheduled Fri, 07 Nov 2025 00:11:25 -0500 40.6445359378504 -73.7937185183404 NY 100A both directions : road rehabilitation NYSDOT - Region 8: road rehabilitation on NY 100A both directions between Dobbs Ferry Road - NY 100B (Greenburgh) and Grasslands Road - NY 100C/NY 100 (Mount Pleasant) D265312/NIGHT/32591309 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday December 14th, 2025 thru Friday December 19th, 2025 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday December 21st, 2025 thru Wednesday December 24th, 2025 Sunday/ Monday/ Tuesday, 09:00 PM thru 06:00 AM, alternating traffic Fri, 12 Dec 2025 10:49:57 -0500 41.0366831581945 -73.8094342755831 Sprain Brook State Pkwy southbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/DAY/B5501520/32407809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures Fri, 12 Dec 2025 15:00:46 -0500 40.9374000810124 -73.8375394124374 I-678 southbound : construction NYSDOT - Region 11: construction on I-678 southbound ramp to Exit 1B-2 - North Conduit Avenue; NY 27 (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Wednesday December 31st, 2025 11:59 PM 1 Left lane of 2 lanes closed Thu, 20 Nov 2025 12:04:50 -0500 40.6679217406375 -73.8019715631074 VAN WYCK EXPY northbound : construction NYSDOT - Region 11: construction on VAN WYCK EXPY northbound from 130TH AVE (New York) to ROCKAWAY BLVD (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Wednesday December 31st, 2025 11:59 PM 1 Left lane of 3 lanes closed service road Thu, 20 Nov 2025 12:03:20 -0500 40.671532151843 -73.8006821056682 VAN WYCK EXPY northbound : construction NYSDOT - Region 11: construction on VAN WYCK EXPY northbound from 107TH AVE (New York) to LIBERTY AVE (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Wednesday December 31st, 2025 11:59 PM 1 Left lane of 3 lanes closed service road Thu, 20 Nov 2025 12:04:05 -0500 40.6888580296107 -73.8083979289217 94TH AVE westbound : construction NYSDOT - Region 11: construction on 94TH AVE westbound from 138TH PL (New York) to ATLANTIC AVE at VAN WYCK EXPY (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday December 30th, 2025 11:59 PM 1 Right lane of 2 lanes closed Wed, 01 Oct 2025 16:39:30 -0400 40.6975454390777 -73.8116876771096 VAN WYCK EXPY southbound : construction NYSDOT - Region 11: construction on VAN WYCK EXPY southbound from 91ST AVE (New York) to ATLANTIC AVE (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday December 30th, 2025 11:59 PM 1 Right lane of 3 lanes closed service road, Wednesday October 1st, 2025 thru Tuesday December 30th, 2025, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Center lane of 3 lanes closed service road Wed, 01 Oct 2025 16:37:33 -0400 40.6994789636022 -73.8151977287679 VAN WYCK EXPY northbound : construction NYSDOT - Region 11: construction on VAN WYCK EXPY northbound from ATLANTIC AVE (New York) to ARCHER AVE (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday December 30th, 2025 11:59 PM 1 Right lane of 3 lanes closed service road, Wednesday October 1st, 2025 thru Tuesday December 30th, 2025, Monday thru Friday, 09:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed service road Wed, 01 Oct 2025 16:35:03 -0400 40.6972889048365 -73.8133645766331 Jones Beach Theater : concert TRANSCOM, Jersey City: concert on Jones Beach Theater at (Nassau) Riley Green + Justin Moore, Drake White & Hannah McFarland Music As Cowboy As It Gets Tour 2026, Saturday June 20th, 2026, 07:00 PM thru 10:00 PM Wed, 01 Oct 2025 15:46:25 -0400 40.6009345428201 -73.5021140821265 Prudential Center - ROCK : show Prudential Center: show on Prudential Center - ROCK at (Newark) Disney On Ice, Thursday January 8th,2026 07:00 PM thru 10:00 PM , Friday January 9th,2026 11:00 AM thru 02:00 PM , Friday January 9th,2026 07:00 PM thru 10:00 PM , Saturday January 10th,2026 11:00 AM thru 02:00 PM , Saturday January 10th,2026 03:00 PM thru 06:00 PM , Saturday January 10th,2026 07:00 PM thru 10:00 PM , Sunday January 11th,2026 12:00 PM thru 03:00 PM , Sunday January 11th,2026 04:00 PM thru 07:00 PM Sun, 02 Nov 2025 22:00:10 -0500 40.7335901472838 -74.1711848974228 NY 5 both directions : deck work NYSDOT - Region 3: deck work on NY 5 both directions between Highbridge St (Manlius) and Brooklea Dr (Manlius) ; Alternating lane closures Not currently Scheduled Thu, 16 Oct 2025 15:00:02 -0400 43.0293271654546 -76.0147634609073 FRONT ST both directions : construction NYSDOT - Region 11: construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Infrastructure., Tuesday September 30th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed Tue, 30 Sep 2025 14:11:17 -0400 40.6298736574019 -74.074681331908 NY 414 northbound : bridge work NYSDOT - Region 6: bridge work on NY 414 northbound Exit - Center Way (Corning) to City of Corning; Town of Corning Line (Corning) 2 lanes reduced to 1 Lane, Friday November 14th, 2025 thru Sunday March 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed Fri, 14 Nov 2025 13:46:41 -0500 42.1536122690267 -77.0532249048905 N 10TH ST westbound : construction NYSDOT - Region 11: construction on N 10TH ST westbound between DRIGGS AVE (New York) and BEDFORD AVE (New York) for material delivery and boom truck operations., Tuesday September 30th, 2025 thru Friday December 26th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 30 Sep 2025 13:46:36 -0400 40.7187494184372 -73.9547735840386 Taconic State Parkway northbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations and emergency repairs on Taconic State Parkway northbound between W Stevens Avenue (Mount Pleasant) and Exit 2 - Broadway - NY 141 (Mount Pleasant) D265281/B5502029/32531909 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Sunday August 15th, 2021 12:00 AM thru Friday December 19th, 2025 11:59 PM left lane closed to traffic Fri, 07 Nov 2025 12:33:14 -0500 41.0972101764976 -73.7941801232275 Bruckner Boulevard eastbound : construction NYSDOT - Region 11: construction on Bruckner Boulevard eastbound between Cypress Avenue (New York) and East 138th Street (New York) Subject to change without notice. Bridge Washing. Not currently Scheduled Thu, 02 Oct 2025 03:00:01 -0400 40.8031780868518 -73.916640610372 JFK Expressway southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on JFK Expressway southbound ramp to Terminal 8 Departures (New York) Not currently Scheduled Fri, 05 Dec 2025 14:00:01 -0500 40.6477557896924 -73.7868001933764 George Washington Bridge westbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on George Washington Bridge Lower Level westbound Exit 1B - Harlem River Drive/Amsterdam Avenue (Manhattan) to Exit 1A - Henry Hudson Parkway (Manhattan) Not currently Scheduled Sun, 28 Sep 2025 04:38:55 -0400 40.8460346865928 -73.9302980817569 NY 17 [Orange] southbound : road widening NYSDOT - Region 8: drainage improvements and road widening on NY 17 [Orange] southbound between Municipal Plaza (Tuxedo) and Eagle Valley Road (Tuxedo) 202508113210/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure, Monday December 22nd, 2025 thru Tuesday December 23rd, 2025 Monday/ Tuesday, 09:00 AM thru 03:30 PM, right lane closure Fri, 28 Nov 2025 09:55:53 -0500 41.1574094623159 -74.1927219458147 Citi Field : concert NY Mets: concert on Citi Field at (New York) My Chemical Romance, Saturday August 8th, 2026, 07:00 PM thru 11:00 PM Wed, 24 Sep 2025 09:04:50 -0400 40.756717 -73.845806 I-481 southbound : roadwork NYSDOT - Region 3: roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; follow detour, Continuous Wednesday October 1st, 2025 09:00 AM thru Wednesday April 1st, 2026 06:00 PM All lanes closed Wed, 24 Sep 2025 08:45:43 -0400 43.0770386536211 -76.0565899021584 E 4TH ST southbound : construction NYSDOT - Region 11: construction on E 4TH ST southbound between AVENUE F (New York) and 18TH AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Tuesday September 23rd, 2025 thru Thursday December 18th, 2025, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 23 Sep 2025 14:14:26 -0400 40.6334387855162 -73.9745740945571 NY 9A northbound : utility work NYSDOT - Region 8: utility work on NY 9A northbound between Clement Street (Yonkers) and Potomac Street (Yonkers) 202508732308/32571209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 08:00 AM thru 06:00 PM, lane shift, Monday December 29th, 2025, 10:00 AM thru 06:00 PM, lane shift, Tuesday December 30th, 2025, 08:00 AM thru 06:00 PM, lane shift Thu, 04 Dec 2025 08:46:50 -0500 40.9577409453773 -73.8710433766861 I-481 southbound : barrier repairs NYSDOT - Region 3: barrier repairs on I-481 southbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 4 - I-690 (De Witt) lane width restriction of 13 ft, Monday September 29th, 2025 thru Wednesday April 1st, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 AM All lanes open Sat, 20 Sep 2025 09:20:50 -0400 43.0835156751128 -76.0537152970186 I-678 northbound : construction NYSDOT - Region 11: construction on I-678 northbound ramp to Exit 4 - Liberty Avenue (New York) Subject to change without notice., Continuous Monday September 22nd, 2025 07:00 AM thru Monday January 5th, 2026 11:59 PM All lanes closed Fri, 19 Sep 2025 15:25:03 -0400 40.6895599807531 -73.8090099924025 NY 125 both directions : road rehabilitation NYSDOT - Region 8: road rehabilitation and safety improvements on NY 125 both directions between (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday December 3rd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic Mon, 01 Dec 2025 15:30:49 -0500 40.9495652455678 -73.7679336643097 I-95 both directions : bridge work CT DOT-Bridgeport-Oper: bridge work on I-95 both directions between Exit 64 - CT 145 (Westbrook), Continuous Friday September 5th, 2025 12:00 AM thru Tuesday December 30th, 2025 11:59 PM left shoulder closed Wed, 17 Sep 2025 12:36:42 -0400 41.2938159029068 -72.4890861877269 PADDOCK AVE both directions : traffic shift CT DOT-Newington-HWY-Oper Ctr: bridge work and traffic shift on PADDOCK AVE both directions between OVERLOOK RD (Meriden) Motorists can expect the continuation of alternating one-way traffic (on the Paddock Avenue Bridge in Meriden, however, traffic will shift to the newly constructed side of the bridge. The shift is anticipated to take place on Thursday night, September 18, 2025, and continue for a year and a half. Traffic signal control will be in place to guide motorists through the work zone. Note that the temporary sidewalk will shift as well on the outside of the bridge., Continuous Thursday September 18th, 2025 09:00 PM thru Thursday March 18th, 2027 11:59 PM All lanes open Wed, 17 Sep 2025 10:00:53 -0400 41.5165592456215 -72.7761139784463 Taconic State Parkway northbound : bridge painting NYSDOT - Region 8: bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/NIGHT/B5502190/32562109 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday December 7th, 2025 thru Wednesday December 24th, 2025 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 07:00 PM thru 06:00 AM, various lane closures, Monday December 29th, 2025 thru Wednesday December 31st, 2025 Monday/ Tuesday, 07:00 PM thru 06:00 AM, various lane closures Sat, 06 Dec 2025 06:01:12 -0500 41.214176255425 -73.8099295125967 NY 304 both directions : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday December 1st, 2025 thru Wednesday December 24th, 2025, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures, Monday December 29th, 2025 thru Wednesday December 31st, 2025 Monday/ Tuesday, 08:00 PM thru 06:00 AM, various lane closures, Monday January 5th, 2026 thru Saturday January 17th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures Thu, 11 Dec 2025 09:07:03 -0500 41.1022130012201 -73.9975242716889 NY 304 both directions : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 16th, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Wednesday December 17th, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, various lane closures, Tuesday December 30th, 2025, 09:00 AM thru 04:00 PM,, Monday January 5th, 2026, 10:00 AM thru 04:00 PM, various lane closures, Tuesday January 6th, 2026 thru Friday January 16th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures Thu, 11 Dec 2025 09:15:39 -0500 41.102241601259 -73.9975224113617 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound near CR 511/Boonton Av (Butler), Continuous Friday September 12, 2025 09:00 PM thru Friday December 19, 2025 03:00 PM, right lane closed Sun, 14 Sep 2025 20:50:44 -0400 40.9917144775391 -74.3463745117188 NY 9D both directions : utility work NYSDOT - Region 8: utility work on NY 9D both directions between (Cortlandt) and Lapis Drive (Fishkill) 2024081748389/325 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 09:00 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday December 30th, 2025 thru Wednesday December 31st, 2025 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:00:57 -0500 41.3207040154168 -73.9782061550817 NY 403 both directions : utility work NYSDOT - Region 8: utility work on NY 403 both directions between NY 9D (Philipstown) and US 9 (Philipstown) 2024081748389/32549409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday December 30th, 2025 thru Wednesday December 31st, 2025 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:00:57 -0500 41.3759055950357 -73.9435780103813 NY 301 both directions : utility work NYSDOT - Region 8: utility work on NY 301 both directions between Morris Avenue (Cold Spring) and US 9 (Philipstown) 2024081748389/32549309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday December 30th, 2025 thru Wednesday December 31st, 2025 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:00:57 -0500 41.4202268953459 -73.9544115710153 NY 376 both directions : utility work NYSDOT - Region 8: utility work on NY 376 both directions between NY 52 (East Fishkill) 2024081748389/32549209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday September 30th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:01:03 -0500 41.5540470685042 -73.7958147775909 NY 376 both directions : utility work NYSDOT - Region 8: utility work on NY 376 both directions between Diddell Road (Wappinger) and Orchard Place (East Fishkill) 2024081748389/32549109 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday December 30th, 2025 thru Wednesday December 31st, 2025 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:00:57 -0500 41.6229186704964 -73.8545041532291 NY 216 both directions : utility work NYSDOT - Region 8: utility work on NY 216 both directions between Old Route 52 (East Fishkill) and Executive Drive (Beekman) 2024081748389/32549009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday December 30th, 2025 thru Wednesday December 31st, 2025 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:00:56 -0500 41.57136602678 -73.7474434071591 NY 52 both directions : utility work NYSDOT - Region 8: utility work on NY 52 both directions between Leetown Road (East Fishkill) and NY 376 (East Fishkill) 2024081748389/32548909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday December 30th, 2025 thru Wednesday December 31st, 2025 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:00:56 -0500 41.5350388380262 -73.7331190373692 NY 82 both directions : utility work NYSDOT - Region 8: utility work on NY 82 both directions between START ROUTE NY 82 - NY 52 (Fishkill) and Taconic State Parkway (East Fishkill) 2024081748389/32548809 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday December 29th, 2025, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday December 30th, 2025 thru Wednesday December 31st, 2025 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:00:56 -0500 41.6254005432129 -73.774299621582 I-81 northbound : roadwork NYSDOT - Region 3: roadwork on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) NB lane shift to SB side for I-81 project, Continuous Wednesday September 17th, 2025 12:00 AM thru Wednesday December 31st, 2025 03:30 PM All lanes open Mon, 15 Sep 2025 11:06:12 -0400 43.0199887207626 -76.1403830073767 US 9W both directions : longterm construction NYSDOT - Region 8: longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Saturday December 20th, 2025 thru Sunday December 21st, 2025, Saturday/Sunday, 08:00 AM thru 06:00 PM, alternating traffic, Monday December 22nd, 2025 thru Tuesday December 23rd, 2025 Monday/ Tuesday, 09:00 AM thru 03:30 PM, alternating traffic, Monday December 29th, 2025 thru Tuesday December 30th, 2025 Monday/ Tuesday, 09:00 AM thru 03:30 PM, alternating traffic Sun, 14 Dec 2025 18:00:51 -0500 41.1545673868665 -73.9280837094239 Nassau Veterans Memorial Coliseum : show Nassau Coliseum: show on Nassau Veterans Memorial Coliseum at (Hempstead) Hot Wheels Monster Trucks� Live Glow-N-Fire , Saturday January 17th, 2026 thru Saturday January 17th, 2026, 12:30 PM thru 03:30 PM, Saturday January 17th, 2026, 07:30 PM thru 10:30 PM, Sunday January 18th, 2026, 02:30 PM thru 05:30 PM Tue, 02 Sep 2025 16:46:57 -0400 40.7231306900108 -73.5879765162273 Nassau Veterans Memorial Coliseum : trade expo Nassau Coliseum: trade expo on Nassau Veterans Memorial Coliseum at (Hempstead) New York Bridal & Wedding Expo , Saturday January 10th, 2026 thru Sunday January 11th, 2026, Saturday/ Sunday, 12:00 PM thru 05:00 PM Tue, 02 Sep 2025 16:43:14 -0400 40.7231306900108 -73.5879765162273 Westchester County Center : concert Westchester Co. DPW: concert on Westchester County Center at (White Plains) Willie Colon and Friends Live at Westchester Salsa Weekend, Saturday December 20th, 2025, 08:00 PM thru 11:00 PM Tue, 02 Sep 2025 16:28:56 -0400 41.037023446777 -73.7786552837533 US 9W southbound : water main work NYSDOT - Region 8: water main work on US 9W southbound between Catherine Street (Esopus) and Miranda Court (Esopus) 202508113265/32537609 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:00:56 -0500 41.8891590403409 -73.9748411 LODI ST both directions : bridge work NYSDOT - Region 3: bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse) Lane Shift, Friday August 29th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open Fri, 29 Aug 2025 10:21:28 -0400 43.0511291936884 -76.1306790612849 US-6 eastbound : drainage improvements CT DOT-Bridgeport-Oper: drainage improvements on US-6 eastbound between MANSFIELD AVE (Mansfield) and CT-633 (Mansfield) Route 6 eastbound will be reduced from 2 lanes of travel to 1 lane , Continuous Wednesday September 10th, 2025 09:00 AM thru Thursday August 6th, 2026 11:59 PM All lanes open Thu, 28 Aug 2025 16:45:01 -0400 41.7290468516066 -72.227656361376 NY 207 both directions : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations on NY 207 both directions between Hatfield Lane (Goshen) and Matthews Street (Goshen) D265186/B1003160/32532809 - 24/7 LANE CLOSURE - This work is weather permitting. Plan travel accordingly; delays may exist, Continuous Monday October 20th, 2025 12:00 AM thru Sunday December 21st, 2025 11:59 PM right lane closed to traffic Tue, 09 Dec 2025 11:26:15 -0500 41.3952664103638 -74.333429384128 Pier 17 : concert TRANSCOM, Jersey City: concert on Pier 17 at (New York) Belle & Sebastian, Friday May 22nd, 2026 thru Saturday May 23rd, 2026, Friday/Saturday, 07:00 PM thru 10:00 PM Tue, 26 Aug 2025 17:10:44 -0400 40.7060155761017 -74.0019401907921 Meadowlands Sports Complex : outdoor market Meadowlands Complex: outdoor market on Meadowlands Sports Complex at (East Rutherford) Meadowlands Marketplace, Saturday September 20th, 2025 thru Saturday December 27th, 2025, 08:00 AM thru 04:00 PM Fri, 14 Nov 2025 13:17:13 -0500 40.814458826268 -74.0719699859619 NY 394 both directions : roadwork NITTEC: roadwork on NY 394 both directions between Victoria Rd (North Harmony) and Stow Rd (North Harmony), Monday August 25th, 2025 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed Wed, 08 Oct 2025 18:52:33 -0400 42.159138473702 -79.4250231474714 NY 430 both directions : roadwork NITTEC: roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed Thu, 21 Aug 2025 15:29:31 -0400 42.228271563566 -79.437626101146 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Ottawa Senators, Sunday April 12th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:43:59 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Pittsburgh Penguins, Thursday April 9th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:43:09 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Philadelphia Flyers, Tuesday April 7th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:42:15 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Montreal Canadiens, Saturday April 4th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:41:15 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Washington Capitals, Thursday April 2nd, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:39:59 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game TRANSCOM, Jersey City: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Chicago Blackhawks, Sunday March 29th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:37:05 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Boston Bruins, Monday March 16th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:36:15 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Los Angeles Kings, Saturday March 14th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:35:12 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Calgary Flames, Thursday March 12th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:34:07 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Detroit Red Wings, Sunday March 8th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:33:17 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. New York Rangers, Saturday March 7th, 2026, 03:00 PM thru 06:00 PM Thu, 21 Aug 2025 11:32:11 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Toronto Maple Leafs, Wednesday March 4th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:31:03 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Florida Panthers, Tuesday March 3rd, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:30:01 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Buffalo Sabres, Wednesday February 25th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:27:34 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. New York Islanders, Thursday February 5th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 11:26:23 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Nashville Predators, Thursday January 29th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 10:59:51 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Winnipeg Jets, Tuesday January 27th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 10:58:42 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Carolina Hurricanes, Saturday January 17th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 10:57:24 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Seattle Kraken, Wednesday January 14th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 10:56:12 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Carolina Hurricanes, Sunday January 4th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 10:54:56 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Utah Hockey Club, Saturday January 3rd, 2026, 03:00 PM thru 06:00 PM Thu, 21 Aug 2025 10:53:48 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Washington Capitals, Saturday December 27th, 2025, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 10:43:40 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : hockey game NJ Devils: hockey game on Prudential Center - ROCK (Newark) NJ Devils vs. Buffalo Sabres, Sunday December 21st, 2025, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 10:41:07 -0400 40.7335901472838 -74.1711848974228 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Carolina Hurricanes, Tuesday April 14th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 09:08:50 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Montreal Canadiens, Sunday April 12th, 2026, 06:00 PM thru 09:00 PM Thu, 21 Aug 2025 09:07:53 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Ottawa Senators, Saturday April 11th, 2026, 01:00 PM thru 04:00 PM Thu, 21 Aug 2025 09:06:42 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Toronto Maple Leafs, Thursday April 9th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 09:05:20 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Florida Panthers, Saturday March 28th, 2026, 01:00 PM thru 04:00 PM Thu, 21 Aug 2025 08:59:11 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Dallas Stars, Thursday March 26th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 08:53:59 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Chicago Blackhawks, Tuesday March 24th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 08:52:58 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Columbus Blue Jackets, Sunday March 22nd, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 08:57:54 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Calgary Flames, Saturday March 14th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 08:50:50 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Los Angeles Kings, Friday March 13th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 08:48:16 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Florida Panthers, Sunday March 1st, 2026, 04:00 PM thru 07:00 PM Thu, 21 Aug 2025 08:46:54 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Nashville Predators, Saturday January 31st, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 08:45:37 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. New York Rangers, Wednesday January 28th, 2026, 07:30 PM thru 10:30 PM Thu, 21 Aug 2025 08:44:42 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Buffalo Sabres, Saturday January 24th, 2026, 01:00 PM thru 04:00 PM Thu, 21 Aug 2025 08:43:38 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. New Jersey Devils, Tuesday January 6th, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 08:42:26 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Toronto Maple Leafs, Saturday January 3rd, 2026, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 08:41:20 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Utah, Thursday January 1st, 2026, 03:00 PM thru 06:00 PM Thu, 21 Aug 2025 08:40:11 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. New York Rangers, Saturday December 27th, 2025, 06:00 PM thru 09:00 PM Thu, 21 Aug 2025 08:37:57 -0400 40.711673 -73.726249 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. New Jersey Devils, Tuesday December 23rd, 2025, 07:00 PM thru 10:00 PM Thu, 21 Aug 2025 08:36:48 -0400 40.711673 -73.726249 Taconic State Parkway southbound : bridge maintenance operations NYSDOT - Region 8: bridge maintenance operations and emergency repairs on Taconic State Parkway southbound between Exit 2 - Sprain Brook State Parkway (Mount Pleasant) and W Stevens Avenue (North Castle) D265281/B5502029/32521709 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Friday August 15th, 2025 12:00 AM thru Friday December 19th, 2025 11:59 PM left lane closed to traffic Fri, 07 Nov 2025 12:33:06 -0500 41.0970831784949 -73.7942163756719 UBS Arena : hockey game NY Islanders: hockey game on UBS Arena (Hempstead) NY Islanders vs. Vancouver Canucks, Friday December 19th, 2025, 07:00 PM thru 10:00 PM Wed, 20 Aug 2025 09:36:34 -0400 40.711673 -73.726249 NY 134 both directions : road rehabilitation NYSDOT - Region 8: road rehabilitation on NY 134 both directions between NY 9A (Ossining) and McDonalds Road (Yorktown) D265484/NIGHT/32514009 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday December 7th, 2025 thru Friday December 19th, 2025 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic Mon, 08 Dec 2025 06:41:40 -0500 41.182641079317 -73.8463599655841 Sprain Brook State Pkwy northbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled Fri, 12 Dec 2025 14:00:23 -0500 40.9994016461718 -73.8315931199211 16TH ST eastbound : construction NYSDOT - Region 11: construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Saturday February 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Wed, 05 Nov 2025 14:43:07 -0500 40.6649164687827 -73.9897387000132 US 9W both directions : bridge replacement NYSDOT TMC - Albany: bridge replacement on US 9W both directions between Hickory Circle and Pictuay Rd (Bethlehem) one lane open in both directions, NB lane shift in place, Continuous Tuesday August 5th, 2025 04:00 PM thru Friday July 3rd, 2026 05:00 PM All lanes open Wed, 06 Aug 2025 09:45:02 -0400 42.5340517856205 -73.8058262254228 Sprain Brook State Pkwy southbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled Fri, 12 Dec 2025 15:00:46 -0500 40.9997212573467 -73.8317358776219 I-81 northbound : roadwork NYSDOT - Region 3: roadwork on I-81 northbound at Exit 29N - NY 481; North Syracuse; Oswego (Cicero) ; Alternating shoulder closures, Monday December 30th, 2024 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM right shoulder closed Mon, 28 Jul 2025 11:50:19 -0400 43.1434813852132 -76.1107322436608 MetLife Stadium : football game NY Jets: football game on MetLife Stadium at (East Rutherford) Jets vs. Patriots, Sunday December 28th, 2025, 01:00 PM thru 04:00 PM Mon, 28 Jul 2025 11:48:18 -0400 40.8134600702536 -74.0742874145508 MetLife Stadium : football game NY Giants: football game on MetLife Stadium at (East Rutherford) Giants vs. Vikings , Sunday December 21st, 2025, 01:00 PM thru 04:00 PM Mon, 28 Jul 2025 11:47:09 -0400 40.8134600702536 -74.0742874145508 Pier 17 : concert TRANSCOM, Jersey City: concert on Pier 17 at (New York), Sunday December 21st, 2025, 07:00 PM thru 10:00 PM Mon, 28 Jul 2025 08:50:14 -0400 40.7060155761017 -74.0019401907921 I-95 northbound : construction CT DOT-Bridgeport-Oper: construction on I-95 northbound Entrance ramp Exit 43 - CT 122/First Avenue (West Haven) The Exit 43 on-ramp to I-95 northbound which is located on First Avenue in West Haven will be closed on July 21, 2025, until November 2027. Motorists traveling to I-95 northbound may take the detour route to Interchange 44 via First Avenue southbound, Route 122 (Kimberly Avenue), and Ella T. Grasso Boulevard in New Haven. Alternatively, motorists traveling to I-95 northbound may take the detour route to Interchange 44 via Campbell Avenue northbound, Boston Post Road, and Ella T. Grasso Boulevard in New Haven., Continuous Monday July 21st, 2025 12:00 AM thru Monday November 1st, 2027 11:59 PM All lanes closed Wed, 23 Jul 2025 11:56:14 -0400 41.2833756315923 -72.9500218771974 NY 28 both directions : bridge replacement NYSDOT - Region 2: bridge replacement on NY 28 both directions between Exit - Mohawk Street; I-90; Steele Street (Herkimer) and Marginal Road (Herkimer) Motorists will encounter long term lane shifts and daily north bound sidewalk closures under the bridge for the I-90 bridge replacement, Continuous Monday June 16th, 2025 6:00 AM thru Tuesday December 30th, 2025 6:00 PM Fri, 28 Nov 2025 09:40:16 -0500 43.0176476218537 -74.9935529126271 NY 983B - Nepperhan Avenue eastbound : water main work NYSDOT - Region 8: water main work on NY 983B - Nepperhan Avenue eastbound between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure Mon, 01 Dec 2025 15:30:49 -0500 40.9339060509521 -73.8927787737692 EMERSON PL southbound : construction NYSDOT - Region 11: construction and crane operations on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday July 18th, 2025 thru Tuesday January 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed Tue, 21 Oct 2025 16:08:57 -0400 40.6960054480198 -73.9626344823933 NY 17A both directions : culvert repairs NYSDOT - Region 8: culvert repairs on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32458709 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:01:01 -0500 41.2505509407061 -74.3109799695187 I-81 southbound : roadwork NYSDOT - Region 3: roadwork on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Continuous Friday July 11th, 2025 07:00 AM thru Saturday October 31st, 2026 03:00 PM All lanes open Sat, 19 Jul 2025 21:15:35 -0400 43.047668293587 -76.1426372866984 NY 79 westbound : construction NYSDOT - Region 3: construction on NY 79 westbound between N. Corn St. (Ithaca) and N. Meadow Street (Ithaca), Tuesday February 25th, 2025 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed Sun, 06 Jul 2025 14:22:49 -0400 42.4401479913659 -76.5062534728382 Battery Park Underpass both directions : construction NYSDOT - Region 11: construction on Battery Park Underpass both directions between West Street (Manhattan) and FDR Drive (Manhattan) Periodically the northbound and/or southbound tube will be fully closed nightly ., Monday June 30th, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 11:00 PM thru 04:00 AM All lanes closed Mon, 30 Jun 2025 16:22:37 -0400 40.7032603601858 -74.0163583127948 NY 126 both directions : construction NYSDOT - Region 7: construction on NY 126 both directions Town of New Bremen; Village of Croghan (New Bremen) Route 126 now open to two way traffic. , Continuous Friday December 5th, 2025 12:00 AM thru Thursday April 30th, 2026 11:59 PM All lanes open Fri, 05 Dec 2025 12:17:19 -0500 43.8894137234091 -75.4027849508917 Pier 17 : concert TRANSCOM, Jersey City: concert on Pier 17 at (New York) Jesse McCartney The Weightless Tour, Friday December 19th, 2025 thru Saturday December 20th, 2025, Friday/Saturday, 07:30 PM thru 10:00 PM Wed, 25 Jun 2025 11:00:21 -0400 40.7060155761017 -74.0019401907921 US 9W both directions : drainage improvements NYSDOT - Region 8: drainage improvements on US 9W both directions between NY 218 (Highlands) and Quaker Avenue - CR 107 (Cornwall) D265262/32427409 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday April 7th, 2025 12:00 AM thru Friday December 26th, 2025 11:59 PM 1 lane closed to traffic Wed, 26 Nov 2025 13:31:24 -0500 41.3771406249868 -73.9836180210114 I-90 westbound : bridge work NYSDOT - Region 2: bridge work on I-90 westbound ramp to Genesee Street South/ Downtown Utica (Utica) Lane closures under the bridge on Genesee Street are expected, Friday August 29th, 2025 thru Tuesday December 30th, 2025, Sunday thru Saturday, 07:00 AM thru 03:30 PM, ramp closed Fri, 05 Dec 2025 07:17:25 -0500 43.1127281754969 -75.2110874039845 NY 5S both directions : bridge construction NYSDOT - Region 2: bridge construction on NY 5S both directions between Shrine Road (Glen) and Dufel Road (Glen) Motorists will encounter lane and shoulder closures in both directions, Tuesday September 2nd, 2025 thru Tuesday December 30th, 2025, Sunday thru Saturday, 06:00 AM thru 06:00 PM, Fri, 28 Nov 2025 09:40:55 -0500 42.9309737071676 -74.2884422227187 I-690 westbound : installation of sign structure NYSDOT - Region 3: installation of sign structure and noise wall construction and roadwork on I-690 westbound between Exit 15 - Midler Avenue (Syracuse) and Exit 14 - Teall Avenue (Syracuse), Continuous Monday July 7th, 2025 09:00 AM thru Monday February 2nd, 2026 03:00 PM 1 Right lane and shoulder of 3 lanes closed Mon, 28 Jul 2025 10:38:23 -0400 43.0588370827059 -76.0990369304555 I-690 westbound : roadwork NYSDOT - Region 3: roadwork on I-690 westbound between Exit 14 - Teall Avenue (Syracuse) and Exit 13 - Townsend Street (Syracuse), Continuous Thursday July 10th, 2025 03:00 PM thru Sunday February 1st, 2026 03:00 PM 1 Left lane of 3 lanes closed Sat, 21 Jun 2025 19:31:53 -0400 43.0522917811831 -76.125857684436 NY 94 eastbound : culvert repairs NYSDOT - Region 8: culvert repairs on NY 94 eastbound between Pennings Lane (Warwick) and Warwick Turnpike (Warwick) D265402/32408909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday December 2nd, 2025 thru Tuesday December 23rd, 2025, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic Mon, 01 Dec 2025 16:01:01 -0500 41.2365347333814 -74.3893882412888 Fedral Circle eastbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Fedral Circle eastbound ramp to North Service Road (New York) Not currently Scheduled Wed, 10 Sep 2025 04:00:03 -0400 40.6574376735635 -73.8076826815214 Van Wyck Expressway northbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Van Wyck Expressway northbound ramp from Federal Circle (New York) Not currently Scheduled Fri, 13 Jun 2025 05:45:00 -0400 40.6600391175994 -73.8058394748001 Doremus Avenue southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Doremus Avenue southbound at Firmench Way (Newark) Not currently Scheduled Fri, 13 Jun 2025 04:00:02 -0400 40.7027989256034 -74.1363889342315 Corbin Street southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Corbin Street southbound at Bay Avenue (Elizabeth) Not currently Scheduled Fri, 13 Jun 2025 04:00:02 -0400 40.6808943944569 -74.1661294680708 NJ 71 southbound : roadwork NJ DOT - TOC South: Roadwork on NJ 71 Southbound At South of Shark River Bridge (Belmar) Thursday June 12, 2025 09:30 PM thru Friday June 13, 2025 05:00 AM, 2 left lanes of 3 lanes closed Fri, 13 Jun 2025 05:00:03 -0400 40.1846885681152 -74.0237121582031 NY 5 eastbound : road rehabilitation NYSDOT - Region 3: road rehabilitation on NY 5 eastbound between Route 695 (Camillus) and West Genesee Street (Geddes) Not currently Scheduled Wed, 18 Jun 2025 15:30:02 -0400 43.055519239992 -76.2334996599613 NJ 18 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 18 Northbound between South of Exit 19 - NJ 34 (Colts Neck Twp) and South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp), Thursday June 12, 2025 07:00 AM thru 03:00 PM, right shoulder closed Thu, 12 Jun 2025 15:00:12 -0400 40.2814140319824 -74.1344451904297 NJ 18 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 18 Southbound between South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp) and South of Exit 19 - NJ 34 (Colts Neck Twp), left shoulder Thu, 12 Jun 2025 15:00:12 -0400 40.3417434692383 -74.2804183959961 US 9 northbound : roadwork NJ DOT - TOC South: Roadwork on US 9 Northbound between North of CR 571/Indian Head Rd (Toms River Twp) and CR 620/Church Rd (Toms River Twp) Monday June 9, 2025 09:00 PM thru Saturday June 14, 2025 05:00 AM, All lanes closed and detoured Sat, 14 Jun 2025 05:00:01 -0400 39.9955101013184 -74.2116622924805 NJ 38 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 38 Eastbound At Cherry Hill Mall (Cherry Hill Twp) Friday June 6, 2025 09:00 AM thru 03:00 PM, 1 left lane of 3 lanes closed Fri, 06 Jun 2025 15:00:18 -0400 39.9390411376953 -75.0226669311523 RENWICK AVE both directions : roadwork NYSDOT - Region 3: roadwork on RENWICK AVE both directions between VAN BUREN ST (Syracuse) and E CASTLE ST at S McBride St (Syracuse) Permanent road closure , Continuous Wednesday June 4th, 2025 12:00 AM thru Monday July 31st, 2028 11:59 PM All lanes closed Fri, 27 Jun 2025 07:09:39 -0400 43.0375081304917 -76.14151 E RAYNOR AVE both directions : roadwork NYSDOT - Region 3: roadwork on E RAYNOR AVE both directions between FINEVIEW PL (Syracuse) and HENRY ST (Syracuse) Permanent road closure, Continuous Wednesday June 4th, 2025 12:00 AM thru Monday July 31st, 2028 11:59 PM All lanes closed Fri, 27 Jun 2025 07:22:03 -0400 43.0357909089078 -76.1416191112315 FINEVIEW PL both directions : roadwork NYSDOT - Region 3: roadwork on FINEVIEW PL both directions between RENWICK AVE (Syracuse) and STANDART ST (Syracuse) Permanent Road Closure, Continuous Wednesday June 11th, 2025 12:00 AM thru Monday July 31st, 2028 11:59 PM All lanes closed Fri, 27 Jun 2025 07:19:19 -0400 43.0371160398121 -76.1415755230853 NY 28 both directions : construction NYSDOT - Region 2: construction on NY 28 both directions area of South Inlet Raquette Lake (Raquette Lake) Motorists will encounter lane or shoulder closures with flaggers in place, Wednesday June 4th, 2025 thru Saturday December 20th, 2025 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 06:00 PM, Fri, 12 Dec 2025 06:43:44 -0500 43.8071129362516 -74.609983699413 NJ 70 westbound : construction NJ DOT - TOC South: Construction on NJ 70 Westbound between East of CR 674/Greentree Rd (Cherry Hill Twp) and East of New Jersey Turnpike (Cherry Hill Twp) Wednesday June 4, 2025 07:00 AM thru 03:30 PM, 1 right lane of 4 lanes closed Wed, 04 Jun 2025 15:30:01 -0400 39.9045906066895 -74.9711456298828 American Dream Mall : soccer game Meadowlands Complex: soccer game on American Dream Mall at (East Rutherford) Cup of Dreams, Sunday July 26th, 2026, 09:00 AM thru 10:00 PM Fri, 30 May 2025 09:39:57 -0400 40.8103304020617 -74.0684148072978 CT 72 eastbound : bridge work CT DOT-Newington-HWY-Oper Ctr: bridge work on CT 72 eastbound Exit ramp Exit 9 - CT 9/CT 71 (New Britain) There will be a lane closure , Continuous Monday April 28th, 2025 12:00 AM thru Wednesday December 31st, 2025 11:59 PM All lanes open Wed, 07 May 2025 11:09:32 -0400 41.6694643618757 -72.7782062035326 CT 9 northbound : bridge work CT DOT-Newington-HWY-Oper Ctr: bridge work on CT 9 northbound Exit ramp Exit 28 - CT 72 (New Britain) There will be a lane closure , Continuous Monday April 28th, 2025 12:00 AM thru Wednesday December 31st, 2025 11:59 PM All lanes open Wed, 07 May 2025 11:06:10 -0400 41.6677766157139 -72.773069581657 Sprain Brook State Pkwy both directions : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/NIGHT/B5501670/32355109 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled Sat, 13 Dec 2025 06:01:13 -0500 40.9996611334915 -73.8317070153773 NY 5 both directions : utility work NYSDOT - Region 3: utility work on NY 5 both directions between Halfway Road (Elbridge) and Village of Elbridge; Town of Elbridge (Elbridge) ; Alternating one-way traffic with flaggers, Thursday May 8th, 2025 thru Saturday December 20th, 2025, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open Tue, 06 May 2025 10:57:44 -0400 43.037718733097 -76.4064738610999 NY 17 [Orange] westbound : road rehabilitation NYSDOT - Region 8: road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121 - I 84 (Wallkill) D265297/32353009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closures Mon, 08 Dec 2025 11:59:48 -0500 41.406187486549 -74.3436179426726 NY 17 [Orange] eastbound : road rehabilitation NYSDOT - Region 8: road rehabilitation on NY 17 [Orange] eastbound between Exit 121 - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32352909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 8th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 08:30 AM thru 03:30 PM, Mon, 08 Dec 2025 12:00:02 -0500 41.4454484731229 -74.3676952963526 NJ 35 northbound : bridge construction NJ DOT - STMC: bridge construction on NJ 35 northbound at NJ 440 Connector (Perth Amboy) 2 way traffic on southbound roadway, Monday April 28th, 2025 thru Tuesday March 17th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 AM All lanes closed Sun, 27 Apr 2025 15:40:47 -0400 40.5170624888784 -74.2850537600094 Meadowlands Racetrack : racing Meadowlands Complex: racing on Meadowlands Racetrack at (East Rutherford), Saturday October 18th,2025 thru Saturday December 27th,2025, Friday/Saturday, 06:20 PM thru 11:00 PM , Thursday December 4th,2025 thru Thursday December 18th,2025, Thursday, 06:20 PM thru 11:00 PM Thu, 20 Nov 2025 23:00:10 -0500 40.8202318285764 -74.0717875957489 NY 417 both directions : culvert repairs NITTEC: bridge replacement and culvert repairs on NY 417 both directions Hancock Street (Salamanca) to Franklin Street (Salamanca), Tuesday April 22nd, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed Fri, 02 May 2025 21:00:18 -0400 42.1574063668297 -78.7307082009779 HOLABIRD AVE both directions : signal repair CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on HOLABIRD AVE both directions between WHITING ST (Winchester) and CT-8 (Winchester) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 22:07:15 -0400 41.9237190384277 -73.0592894227051 CT-262 eastbound : paving operations CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on CT-262 eastbound between FERN HILL RD (Watertown) and CT-262 (Watertown) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 22:02:58 -0400 41.6217552449464 -73.1077381503619 CLAY ST both directions : signal repair CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on CLAY ST both directions between RANDOLPH AVE (Thomaston) and UNION ST at ELM ST (Thomaston) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 21:50:21 -0400 41.6772653112453 -73.077000002543 ELM ST both directions : signal repair CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on ELM ST both directions between UNION ST (Thomaston) and MEADOW ST at CENTER ST (Thomaston) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 21:48:12 -0400 41.6710791060027 -73.073820002776 MOUNTAIN RD both directions : signal repair CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on MOUNTAIN RD both directions between CT-189 (Simsbury) and CT-189 (Bloomfield) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 21:35:42 -0400 41.9081194792518 -72.7614159828073 COGWHEEL LN both directions : signal repair CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on COGWHEEL LN both directions CT-67 (Seymour) to SILVERMINE RD (Seymour) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 21:32:50 -0400 41.3962694180132 -73.0482201821929 US-202 both directions : signal repair CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on US-202 both directions between ANTOLINI RD (New Hartford) and CT-179 (Canton) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 21:39:41 -0400 41.8301074761401 -73.0165715364227 CHURCH ST N both directions : paving operations CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on CHURCH ST N both directions between CENTRAL AVE (New Hartford) and BRIDGE ST at CENTRAL AVE (New Hartford) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 21:37:50 -0400 41.8780833231806 -72.9804749847709 WATERSIDE DR both directions : paving operations CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on WATERSIDE DR both directions between US-6 (Farmington) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 21:37:22 -0400 41.7070499687653 -72.814566406252 SEYMOUR RD both directions : signal repair CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on SEYMOUR RD both directions between HATCHETT HILL RD (East Granby) and INTERNATIONAL DR (East Granby) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 21:36:39 -0400 41.9170578799489 -72.7393805747123 I-91 both directions : milling CT DOT-Newington-HWY-Oper Ctr: crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open Fri, 18 Apr 2025 15:43:06 -0400 41.9301325635453 -72.6086323688485 VAIL RD both directions : paving operations CT DOT-Newington-HWY-Oper Ctr: paving operations and signal repair on VAIL RD both directions between GARELLA RD (Bethel) and US-6 (Bethel) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open Sun, 20 Apr 2025 21:36:09 -0400 41.4200464623948 -73.3932176440402 I-87 Northway northbound : roadwork NYSDOT TMC - Albany: roadwork and toll plaza repairs on I-87 Northway northbound at END ROUTE I-87; US-Canadian Line (Champlain) Starting on 4/21/25, border crossing will be restricted to trailers over 16'4" in height, 8'5" in width and over 53' in length. , Monday April 21st, 2025 thru Sunday December 31st, 2028, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open Tue, 15 Apr 2025 12:28:14 -0400 45.0088070713115 -73.4520669874605 US 62 both directions : construction NITTEC: construction and road rehabilitation on US 62 both directions Exit - I-290 Youngmann Expressway; Ridge Lea Road (Amherst) to Admirals Walk (Wheatfield), Wednesday April 9th, 2025 thru Saturday January 31st, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 4 lanes closed Fri, 05 Dec 2025 09:36:28 -0500 43.0013818438718 -78.8223999687479 BRIDGE ST eastbound : bridge rehabilitation NYSDOT - Region 7: bridge rehabilitation and longterm construction on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays , Monday April 21st, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open Fri, 05 Dec 2025 11:18:44 -0500 43.9743621931654 -75.6148611815249 NY 3 both directions : drainage improvements NYSDOT - Region 7: drainage improvements and longterm construction and road rehabilitation on NY 3 both directions (Piercefield) No active work at this time. All lanes and shoulders open to traffic, Wednesday April 2nd, 2025 thru Tuesday June 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open Fri, 05 Dec 2025 11:40:55 -0500 44.24 -74.5938098640825 NY 9D northbound : tunnel repairs NYSDOT - Region 8: tunnel repairs on NY 9D northbound between Fair Street (Cold Spring) and Hartsook Lane (Cold Spring) D265238-202508112949/32312109 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist, Continuous Thursday April 17th, 2025 7:00 AM thru Wednesday December 31st, 2025 3:00 PM alternating traffic Wed, 12 Nov 2025 08:50:28 -0500 41.4412377311786 -73.9755173946684 E 20TH ST eastbound : construction NYSDOT - Region 11: construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for Sandrespc-East side coastal resiliency. Not currently Scheduled Fri, 30 May 2025 16:00:02 -0400 40.7339459926314 -73.9777251260145 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Upper Level westbound New York Side (New York) to New Jersey Side (Fort Lee) Not currently Scheduled Fri, 12 Sep 2025 23:01:28 -0400 40.8503485061781 -73.9456096634449 NY 324 both directions : roadwork NITTEC: roadwork on NY 324 both directions between Grand Island Boulevard; Exit - I-190; Staley Road (Grand Island) and Baseline Road (Grand Island), Monday March 31st, 2025 thru Saturday January 31st, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 3 lanes closed Thu, 27 Mar 2025 16:22:12 -0400 43.0078534393526 -78.9496167878315 NY 96 Bushnell Basin : longterm construction NYSDOT - Region 4: longterm construction on NY 96 Bushnell Basin ramp to I-490 WB (Perinton), Continuous Monday March 31st, 2025 07:00 AM thru Wednesday December 31st, 2025 05:00 PM All lanes closed ramp Thu, 09 Oct 2025 12:03:31 -0400 43.0582116089122 -77.4732653941324 I-490 eastbound : bridge replacement NYSDOT - Region 4: bridge replacement on I-490 eastbound between Exit 26 - NY 31 (Perinton) and Exit 28 - I-490; Ramp (Perinton), Continuous Monday April 7th, 2025 07:00 AM thru Wednesday December 31st, 2025 05:00 PM 1 Right lane of 2 lanes closed Mon, 08 Dec 2025 13:37:58 -0500 43.07748 -77.48448 I-490 westbound : bridge replacement NYSDOT - Region 4: bridge replacement on I-490 westbound between Exit 28 - I-490; Ramp (Perinton) and Exit 26 - NY 31 (Perinton), Continuous Tuesday April 1st, 2025 07:00 AM thru Wednesday December 31st, 2025 05:00 PM 1 Left lane of 2 lanes closed Thu, 09 Oct 2025 12:02:04 -0400 43.0455238653937 -77.4629282921857 I-291 both directions : sign work CT DOT-Newington-HWY-Oper Ctr: sign work on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be temporary lane and shoulder closures on I-291 east and westbound as needed., Sunday March 30th, 2025 thru Thursday December 25th, 2025, Sunday/Monday, 07:00 PM thru 06:00 AM All lanes open Tue, 18 Mar 2025 14:24:09 -0400 41.8187034844627 -72.6665119969427 CT-27 both directions : traffic signal repairs CT DOT-Bridgeport-Oper: traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Tue, 18 Mar 2025 14:20:27 -0400 41.3723807420596 -71.9607437418571 CT-27 both directions : traffic signal repairs CT DOT-Bridgeport-Oper: traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Tue, 18 Mar 2025 14:18:10 -0400 41.3739177758271 -71.9597814827819 CT-80 both directions : traffic signal repairs CT DOT-Newington-HWY-Oper Ctr: traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Tue, 18 Mar 2025 14:15:23 -0400 41.3618851931144 -72.4890468574507 CT-17 both directions : traffic signal repairs CT DOT-Newington-HWY-Oper Ctr: traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Tue, 18 Mar 2025 14:13:25 -0400 41.56999543402 -72.6332315618146 CT-205 both directions : traffic signal repairs CT DOT-Newington-HWY-Oper Ctr: traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Tue, 18 Mar 2025 13:10:07 -0400 41.7433984776431 -71.9084645304895 CT-213 both directions : traffic signal repairs CT DOT-Bridgeport-Oper: traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Tue, 18 Mar 2025 13:05:23 -0400 41.3429521379385 -72.1082557434474 CT-195 both directions : traffic signal repairs CT DOT-Newington-HWY-Oper Ctr: traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Tue, 18 Mar 2025 13:06:23 -0400 41.7367994691932 -72.1985874657479 CT-195 both directions : traffic signal repairs CT DOT-Newington-HWY-Oper Ctr: traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Tue, 18 Mar 2025 09:53:33 -0400 41.7327536807551 -72.2000158957735 CT-195 both directions : traffic signal repairs CT DOT-Newington-HWY-Oper Ctr: traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Tue, 18 Mar 2025 09:51:17 -0400 41.7303639490505 -72.200794985583 NY 31 eastbound : tree trimming NYSDOT - Region 3: tree trimming on NY 31 eastbound between Burnet Rd (Cicero) and Barcaidine Dr (Cicero) ; Alternating one-way traffic with flaggers Not currently Scheduled Fri, 14 Mar 2025 16:00:02 -0400 43.1776210071071 -76.1464347994208 I-91 northbound : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed Thu, 13 Mar 2025 12:18:59 -0400 41.5193857330771 -72.7709669789192 Wilbur Croos Parkway northbound : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed Thu, 13 Mar 2025 12:16:48 -0400 41.5226183481307 -72.7702775793347 Wilbur Cross Parkway northbound : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed Thu, 13 Mar 2025 12:13:34 -0400 41.5307047378802 -72.7686626296511 I-91 northbound : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed Thu, 13 Mar 2025 12:09:05 -0400 41.5262873434517 -72.7685768659052 MILLER AVE both directions : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open Thu, 13 Mar 2025 12:05:55 -0400 41.5128141692076 -72.7831997160832 Broad Street both directions : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open Thu, 13 Mar 2025 12:03:45 -0400 41.5416079111396 -72.7864113925736 GRAVEL ST both directions : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open Thu, 13 Mar 2025 11:59:54 -0400 41.5396481489067 -72.7739282824416 E MAIN ST both directions : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open Thu, 13 Mar 2025 11:57:51 -0400 41.5269066566557 -72.7717849549507 PADDOCK AVE both directions : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open Thu, 13 Mar 2025 11:55:40 -0400 41.5166325805332 -72.7761160737295 Wilbur Cross Parkway both directions : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open Thu, 13 Mar 2025 11:52:58 -0400 41.489486374134 -72.8121609699769 I-691 both directions : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open Thu, 13 Mar 2025 11:49:28 -0400 41.5565792740473 -72.8849001996386 I-91 both directions : reconstruction CT DOT-Newington-HWY-Oper Ctr: reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open Thu, 13 Mar 2025 11:45:39 -0400 41.4805664202627 -72.7694151669794 Taconic State Parkway northbound : roadwork NYSDOT - Region 8: roadwork on Taconic State Parkway northbound ramp from NY 134 (Yorktown) D264582/B5502190/32288809 - Use caution when entering roadway; 24/7 shoulder closure on ramp, Continuous Friday March 14th, 2025 12:00 AM thru Tuesday December 30th, 2025 11:59 PM right shoulder closed to traffic Thu, 13 Nov 2025 09:54:40 -0500 41.2166899773989 -73.8100684372273 I-384 both directions : bridge work CT DOT-Newington-HWY-Oper Ctr: bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open Tue, 11 Mar 2025 09:50:12 -0400 41.7718776392713 -72.5815170414514 I-84 both directions : paving operations CT DOT-Newington-HWY-Oper Ctr: paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open Tue, 11 Mar 2025 09:42:47 -0400 41.4416911758141 -73.2494110307396 CT 2 westbound : safety improvements CT DOT-Newington-HWY-Oper Ctr: safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open Mon, 10 Mar 2025 12:05:36 -0400 41.7074947856795 -72.5787743284625 CT 2 eastbound : safety improvements CT DOT-Newington-HWY-Oper Ctr: safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open Mon, 10 Mar 2025 11:59:42 -0400 41.7272370864118 -72.6121301133836 CT-140 both directions : road rehabilitation CT DOT-Newington-HWY-Oper Ctr: road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed Mon, 10 Mar 2025 11:13:34 -0400 41.9154453005273 -72.4289572859988 NJ 495 westbound : construction Port Authority NY/NJ: construction on NJ 495 westbound West of Boulevard East (Weehawken Twp) to Pleasant Avenue (Weehawken Twp) Not currently Scheduled Sat, 07 Jun 2025 00:32:32 -0400 40.7647447881079 -74.0241058427629 US 20 both directions : bridge replacement NITTEC: bridge replacement on US 20 both directions Exit - Aurora Expressway (Elma) to Leydecker Road (Orchard Park), Thursday March 6th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed westbound; 1 Right lane of 3 lanes closed eastbound Thu, 06 Mar 2025 12:20:06 -0500 42.8306381938417 -78.69697 I-481 northbound : bridge work NYSDOT - Region 3: bridge work on I-481 northbound between Exit 4 - I-690 (De Witt) and Exit 5E - Kirkville Road; CR 53 (De Witt) Not currently Scheduled Sat, 26 Jul 2025 16:00:01 -0400 43.0517720717347 -76.0498892792486 E 20TH ST eastbound : construction NYSDOT - Region 11: construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for East Side Coast Resiliency., Saturday March 8th,2025 thru Saturday April 1st,2028, Saturday, 08:00 AM thru 04:00 PM All lanes closed eastbound, Fri, 28 Mar 2025 16:00:04 -0400 40.7329707978494 -73.9754179576393 I-81 southbound : bridge demolition NYSDOT - Region 3: bridge demolition on I-81 southbound between Exit 29S - I-481 South; Dewitt (Cicero) and East Taft Road; CR 19 (North Syracuse), Continuous Tuesday March 11th, 2025 06:00 AM thru Wednesday December 31st, 2025 06:00 PM 1 Left lane of 2 lanes closed Sun, 06 Jul 2025 15:03:45 -0400 43.1402058399563 -76.1142041600437 I-81 southbound : bridge demolition NYSDOT - Region 3: bridge demolition on I-81 southbound under South Bay Road; CR 208 (Cicero) ; Alternating lane closures, Continuous Monday February 24th, 2025 06:00 PM thru Saturday March 28th, 2026 06:00 AM All lanes open Fri, 28 Feb 2025 16:54:29 -0500 43.1495741839323 -76.110251013138 I-91 southbound : bridge rehabilitation CT DOT-Newington-HWY-Oper Ctr: bridge rehabilitation on I-91 southbound Entrance ramp Exit 31 - Founders Bridge/Asylum Avenue (Hartford) The State Street on-ramp to I-91 southbound at the Founders Bridge will be closed for the duration of the project to facilitate the temporary traffic patterns on I-91 southbound during staged construction. Detours will be posted to direct motorists seeking I-91 southbound to use either the South Morgan Street on-ramp to I-91 southbound at Columbus Boulevard, or the Sheldon Street on-ramp to the Whitehead Highway at Columbus Boulevard where they can access I-91 southbound. Motorists on I-84 eastbound seeking I-91 southbound will be required to merge with I-91 southbound traffic due to the temporary traffic patterns on I-91 southbound during staged construction. Currently, I-84 eastbound motorists entering I-91 southbound traffic have a dedicated lane provided., Continuous Monday March 10th, 2025 12:00 AM thru Wednesday September 30th, 2026 11:59 PM All lanes closed Wed, 26 Feb 2025 16:18:30 -0500 41.7654633836434 -72.6688104527909 I-91 southbound : bridge rehabilitation CT DOT-Newington-HWY-Oper Ctr: bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open Wed, 26 Feb 2025 16:15:59 -0500 41.7612930074914 -72.666223052622 936E; I-81 NB Service Road northbound : roadwork NYSDOT - Region 3: roadwork on 936E; I-81 NB Service Road northbound ramp to Exit 23 - NY 370 East; Park Street (Syracuse) closed until further notice, Continuous Wednesday January 1st, 2025 12:00 AM thru Wednesday December 31st, 2025 11:59 PM All lanes closed Tue, 14 Jan 2025 08:57:14 -0500 43.0691018900013 -76.1673109965394 I-95 northbound : traffic shift CT DOT-Bridgeport-Oper: traffic shift on I-95 northbound between Exit 91 - CT 234 (Stonington) The I-95 northbound lane shift beginning before Exit 91 and extending for approximately 2,200 feet will guide traffic to the left side while construction work is being performed along the right side of the Bridge over Taugwonk Road, Continuous Monday May 6th, 2024 12:00 AM thru Friday May 1st, 2026 11:59 PM All lanes open Fri, 26 Apr 2024 15:59:03 -0400 41.3755674871862 -71.9117302541614 I-95 northbound : traffic shift CT DOT-Bridgeport-Oper: traffic shift on I-95 northbound between Exit 93 - CT 216 (North Stonington) I-95 northbound lane shift beginning before Exit 93 and extending for approximately 1,600 feet will guide traffic to the left side while construction work is being performed along the right side of the Bridge over Route 216., Continuous Monday May 6th, 2024 12:00 AM thru Friday May 1st, 2026 11:59 PM All lanes open Fri, 26 Apr 2024 16:02:06 -0400 41.4380876750241 -71.8020829892548 Hugh L. Carey Tunnel East Tube REVERSIBLE Lane southbound : operational activity MTA Bridges & Tunnels: operational activity on Hugh L. Carey Tunnel East Tube REVERSIBLE Lane southbound (Manhattan) ORT Gantry/Portal Entrance to Brooklyn with two-way traffic in the east tube to allow for 3 lanes to be open in the peak direction from Manhattan to Brooklyn, Monday May 20th, 2024 thru Friday May 19th, 2034, Monday thru Friday, 04:30 PM thru 07:00 PM All lanes open Wed, 24 Sep 2025 08:02:55 -0400 40.7008517426846 -74.0151052341667 STRATFORD AVE both directions : bridge rehabilitation CT DOT-Bridgeport-Oper: bridge rehabilitation on STRATFORD AVE both directions between FAIRFIELD AVE (Bridgeport) and KOSSUTH ST (Bridgeport) There will be lane shifts , Continuous Tuesday April 1st, 2025 09:00 AM thru Wednesday November 11th, 2026 11:59 PM All lanes open Thu, 23 Jan 2025 10:49:57 -0500 41.1796647892214 -73.1872048652678 NJ 495 eastbound : operational activity Port Authority NY/NJ: operational activity on NJ 495 XBL eastbound East of New Jersey Turnpike (North Bergen Twp) to West of Boulevard East (Weehawken Twp), Monday January 6th, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes open Mon, 24 Nov 2025 05:54:12 -0500 40.7802924837655 -74.0531059513204 MONTGOMERY ST northbound : longterm construction NYSDOT - Region 11: longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed Wed, 16 Nov 2022 10:50:32 -0500 40.7105157662331 -73.9846639415583 Franklin D. Roosevelt Drive southbound : longterm construction NYSDOT - Region 11: longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed Tue, 09 Jul 2024 08:49:26 -0400 40.7278047369277 -73.9718333512239 NY 52 westbound : bridge rehabilitation NYSDOT - Region 8: bridge rehabilitation on NY 52 westbound between Brookside Farms Road (Newburgh) and 5th Avenue (Newburgh) D265160/B1026780/32112309 - Plan travel accordingly; delays may exist, Continuous Wednesday January 1st, 2025 12:00 AM thru Friday December 19th, 2025 11:59 PM right lane closed to traffic Tue, 21 Oct 2025 05:59:18 -0400 41.5130253486982 -74.0492785615146 South Ave southbound : longterm construction NYSDOT - Region 4: bridge rehabilitation and longterm construction on South Ave southbound ramp to I-490 Eastbound (Rochester) RAMP CLOSED, Continuous Thursday August 15th, 2024 09:00 AM thru Wednesday December 31st, 2025 04:00 PM All lanes closed ramp Tue, 17 Dec 2024 09:42:43 -0500 43.1524435297133 -77.6073289140658 CT-99 southbound : traffic signal repairs CT DOT-Newington-HWY-Oper Ctr: traffic signal repairs on CT-99 southbound between CT-314 (Wethersfield) and PARSONAGE ST (Rocky Hill) Intermittent lane closures may be expected, Thursday January 30th, 2025 thru Friday November 20th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open Thu, 30 Jan 2025 12:52:30 -0500 41.7236668801369 -72.6681522506849 CT-99 northbound : traffic signal repairs CT DOT-Newington-HWY-Oper Ctr: traffic signal repairs on CT-99 northbound between PARSONAGE ST (Rocky Hill) and CT-314 (Wethersfield), Thursday January 30th, 2025 thru Friday November 20th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open Thu, 30 Jan 2025 12:50:20 -0500 41.6725833242854 -72.6455022972523 GARDEN RD both directions : bridge work NYSDOT - Region 7: bridge work on GARDEN RD both directions RT-26 (Philadelphia) to Sophia Street (Philadelphia) Garden Rd over Indian River Bridge #P021Closed to Traffic until further notice, Continuous Thursday November 2nd, 2023 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed Mon, 07 Jul 2025 13:08:59 -0400 44.1589685052784 -75.7085867284068 I-86 both directions : bridge work NITTEC: bridge work and roadwork on I-86 both directions Exit 25 - NY 953E Buffalo Street; Ramp (Olean) to Exit 27 - NY 16 (Hinsdale) Not currently Scheduled Sat, 23 Nov 2024 17:00:00 -0500 42.0881686601411 -78.4584613888009 NY 126 both directions : intersection improvements NYSDOT - Region 7: intersection improvements on NY 126 both directions (Wilna) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open Fri, 05 Dec 2025 14:34:26 -0500 43.9778987922716 -75.6096251086944 Verrazano-Narrows Bridge eastbound : operational activity MTA Bridges & Tunnels: operational activity and special event on Verrazano-Narrows Bridge Upper Level eastbound Staten Island Plaza (New York) to Brooklyn Side (New York) high occupancy lane open, Monday January 16th, 2023 thru Friday January 9th, 2032, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes open HOV lanes Fri, 28 Nov 2025 17:32:46 -0500 40.601972817484 -74.0630151588912 US-44 both directions : drainage improvements CT DOT-Newington-HWY-Oper Ctr: drainage improvements on US-44 both directions between ASHPOHTAG RD (Norfolk) and RIVER PL (Norfolk) There will be a temporary signal installed to coordinate one-way alternating traffic on Route 44 in Norfolk , Continuous Monday December 2nd, 2024 12:00 AM thru Wednesday September 16th, 2026 11:59 PM All lanes open Tue, 10 Dec 2024 16:01:50 -0500 42.0017688487872 -73.2208815671589 Taconic State Parkway northbound : bridge painting NYSDOT - Region 8: bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/DAY/B5502190/32231509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday December 15th, 2025 thru Friday December 19th, 2025, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Saturday December 20th, 2025, 06:00 AM thru 03:00 PM, various lane closures, Monday December 22nd, 2025 thru Tuesday December 23rd, 2025 Monday/ Tuesday, 06:00 AM thru 03:00 PM, various lane closures, Monday December 29th, 2025, 10:00 AM thru 03:00 PM, various lane closures, Tuesday December 30th, 2025, 03:00 AM thru 06:00 AM, various lane closures Sat, 13 Dec 2025 15:01:07 -0500 41.2374103841422 -73.8127512749973 Hugh L. Carey Tunnel West Tube REVERSIBLE Lane northbound : operational activity MTA Bridges & Tunnels: operational activity on Hugh L. Carey Tunnel West Tube REVERSIBLE Lane northbound ORT Gantry/Portal Entrance (Manhattan) high occupancy lane open with two way traffic in the west tube to allow for 3 lanes to be open in the peak direction from Brooklyn to Manhattan, Monday January 9th, 2023 thru Friday January 2nd, 2032, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes open Wed, 24 Sep 2025 07:52:02 -0400 40.7006724832944 -74.0151690403261 Verrazano-Narrows Bridge westbound : operational activity MTA Bridges & Tunnels: operational activity and special event on Verrazano-Narrows Bridge Upper Level westbound Brooklyn Side (New York) to Staten Island Approach (New York) high occupancy lane open, Monday January 9th, 2023 thru Friday January 2nd, 2032, Monday thru Friday, 03:00 PM thru 08:00 PM All lanes open Wed, 24 Sep 2025 07:47:43 -0400 40.6107353011812 -74.0321419741063 Queens Midtown Tunnel South Tube HOV Lane westbound : operational activity MTA Bridges & Tunnels: operational activity on Queens Midtown Tunnel South Tube HOV Lane westbound Queens Side (New York) high occupancy lane open with two way traffic in the south tube to allow for 3 lanes to be open in the peak direction, from Queens to Manhattan, Monday January 9th, 2023 thru Friday January 2nd, 2032, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes open Wed, 24 Sep 2025 07:59:30 -0400 40.7433067164922 -73.9616068085932 I-87 Major Deegan Expressway northbound : longterm construction NYSDOT - Region 11: longterm construction on I-87 Major Deegan Expressway northbound at East 138th Street; Ramp (New York), Continuous Monday April 25th, 2022 12:00 AM thru Friday April 24th, 2026 11:59 PM 1 Right lane of 3 lanes closed Wed, 15 Jan 2025 14:34:10 -0500 40.81333792311 -73.9312675044011 I-87 Major Deegan Expressway southbound : longterm construction NYSDOT - Region 11: longterm construction on I-87 Major Deegan Expressway southbound at East 138th Street (New York), Continuous Monday April 25th, 2022 12:00 AM thru Friday April 24th, 2026 11:59 PM 1 Right lane of 3 lanes closed Wed, 15 Jan 2025 14:35:17 -0500 40.8139032842454 -73.931187896638 I-86 eastbound : bridge work NITTEC: bridge work on I-86 eastbound ramp to Exit 9 closed. Use Exit 10. (Ellery), Continuous Wednesday April 3rd, 2024 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes closed Thu, 11 Apr 2024 10:09:59 -0400 42.1520159817899 -79.3829712351742 CT 9 both directions : construction CT DOT-Newington-HWY-Oper Ctr: construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open Thu, 03 Aug 2023 10:57:45 -0400 41.5634343060034 -72.6478939121526 CT-82 both directions : operational activity CT DOT-Newington-HWY-Oper Ctr: operational activity on CT-82 both directions between ANDREWS RD (Haddam) and LUMBER YARD RD (East Haddam) bridge openings for marine traffic. Not currently Scheduled Sat, 31 Aug 2024 17:15:10 -0400 41.4508631266508 -72.4668265428378 I-481 northbound : longterm construction NYSDOT - Region 3: longterm construction and roadwork on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and NY 481 at Exit 10 - Circle Drive (Cicero) ; Alternating lane closures, Wednesday January 1st, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open, Monday January 1st, 2024 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open Fri, 11 Apr 2025 20:53:12 -0400 43.0788996742981 -76.0533786518552 I-81 southbound : longterm construction NYSDOT - Region 3: longterm construction and roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Wednesday January 1st, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open, Monday January 1st, 2024 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open Fri, 11 Apr 2025 20:51:40 -0400 43.1724728355271 -76.1148169620748 I-81 southbound : roadwork NYSDOT - Region 3: roadwork on I-81 southbound at Exit 29S - I-481 South; Dewitt (Cicero) ; Alternating shoulder closures, Wednesday January 1st, 2025 thru Wednesday December 31st, 2025, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes open, Monday January 1st, 2024 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open Fri, 11 Apr 2025 20:50:35 -0400 43.1373913183594 -76.1171886816406 NY 481 southbound : roadwork NYSDOT - Region 3: roadwork on NY 481 southbound between Exit 10 - Circle Drive (Cicero) and I-481 at Exit 8 - Northern Boulevard (Cicero), Wednesday January 1st, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 08:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Wednesday January 1st, 2025 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed Fri, 11 Apr 2025 20:34:17 -0400 43.1455254451859 -76.1221909784557 I-481 southbound : longterm construction NYSDOT - Region 3: longterm construction on I-481 southbound ramp to I-81 soutbound (Syracuse) ; follow detour Not currently Scheduled Mon, 28 Jul 2025 09:00:00 -0400 43.007882 -76.1307105 NY 26 both directions : intersection improvements NYSDOT - Region 7: intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open Fri, 05 Dec 2025 14:35:10 -0500 43.7882979619324 -75.493499612246 NY 3 both directions : intersection improvements NYSDOT - Region 7: intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open Fri, 05 Dec 2025 14:35:54 -0500 43.97639096423 -75.9206566174228 PADDOCK AVE both directions : safety improvements CT DOT-Newington-HWY-Oper Ctr: safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open Thu, 07 Mar 2024 15:20:03 -0500 41.5174594752907 -72.7760683819175 Wilbur Cross Parkway southbound : safety improvements CT DOT-Newington-HWY-Oper Ctr: safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open Thu, 07 Mar 2024 15:16:00 -0500 41.4903336747235 -72.8111794141745 GRAVEL ST both directions : safety improvements CT DOT-Newington-HWY-Oper Ctr: safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open Thu, 07 Mar 2024 15:24:46 -0500 41.5396815823528 -72.7739275476406 E MAIN ST both directions : safety improvements CT DOT-Newington-HWY-Oper Ctr: safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open Thu, 07 Mar 2024 15:22:17 -0500 41.5269250909782 -72.7718679094017 Wilbur Cross Parkway northbound : safety improvements CT DOT-Newington-HWY-Oper Ctr: safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open Thu, 07 Mar 2024 15:12:32 -0500 41.4895897788774 -72.8120144799237 I-91 both directions : safety improvements CT DOT-Bridgeport-Oper: safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open Thu, 07 Mar 2024 15:00:12 -0500 41.4805664202627 -72.7694151669794 NJ 47 both directions : bridge replacement NJ DOT - TOC South: bridge replacement on NJ 47 both directions CR 551/Broadway Av (Westville) to US 130 (Westville), Continuous Friday May 10th, 2024 01:50 AM thru Wednesday December 31st, 2025 11:59 PM All lanes shift northbound; All lanes open southbound Fri, 10 May 2024 13:48:01 -0400 39.8703414582983 -75.1255272596073 I-481 northbound : bridge work NYSDOT - Region 3: bridge work on I-481 northbound between Exit 3E - NY 92; NY 5 (De Witt) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane and shoulder closures , Thursday January 2nd, 2025 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open Mon, 30 Dec 2024 07:25:24 -0500 43.0295516302413 -76.061994834147 I-481 southbound : longterm construction NYSDOT - Region 3: longterm construction on I-481 southbound between Exit 3W - NY 5; NY 92 (De Witt) and START ROUTE I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 2nd, 2025 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open Mon, 30 Dec 2024 07:30:40 -0500 43.0375103201886 -76.0562886161356 I-81 southbound : longterm construction NYSDOT - Region 3: longterm construction on I-81 southbound at Exit 16A - ramp to I-481 NB (Syracuse) ; follow detour, Continuous Wednesday January 1st, 2025 12:00 AM thru Wednesday December 31st, 2025 03:00 PM All lanes closed Sat, 19 Jul 2025 21:07:26 -0400 43.0093816184579 -76.1359687860938 I-81 northbound : longterm construction NYSDOT - Region 3: longterm construction on I-81 northbound between Exit 16 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating lane closures, Thursday January 2nd,2025 thru Wednesday December 31st,2025, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes of 3 lanes open northbound, Tue, 31 Dec 2024 20:00:00 -0500 42.9525099313604 -76.1383334247012 NY 481 southbound : roadwork NYSDOT - Region 3: roadwork on NY 481 southbound between Exit 10 - Circle Drive (Cicero) and I-481 at Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Wednesday January 1st, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open, Wednesday January 1st, 2025 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open Fri, 11 Apr 2025 21:00:38 -0400 43.1455254451859 -76.1221909784557 I-81 northbound : roadwork NYSDOT - Region 3: longterm construction and roadwork on I-81 northbound at Exit 29S - I-481 South; Dewitt (Cicero), Wednesday January 1st, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 07:00 AM thru 06:00 PM right shoulder closed, Monday January 1st, 2024 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM right shoulder closed Fri, 11 Apr 2025 20:46:05 -0400 43.13736 -76.11687 I-81 southbound : longterm construction NYSDOT - Region 3: longterm construction on I-81 southbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 16 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Continuous Wednesday January 1st, 2025 07:00 AM thru Wednesday December 31st, 2025 03:00 PM All lanes open Sun, 06 Jul 2025 14:52:34 -0400 43.0199654196533 -76.1405422028076 I-481 southbound : roadwork NYSDOT - Region 3: roadwork on I-481 southbound at Exit 9S; I-81 S (Cicero) ; Alternating shoulder closures, Wednesday January 1st, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 09:00 AM thru 06:00 PM right shoulder closed, Wednesday January 1st, 2025 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 06:00 PM right shoulder closed Fri, 11 Apr 2025 20:58:51 -0400 43.1421735019012 -76.1179109337318 US 9W southbound : longterm construction NYSDOT - Region 8: longterm construction on US 9W southbound between Short Clove Road (Haverstraw) and NY 304 (Haverstraw) 202308107656/202508112934/32258309, Continuous Sunday June 1st, 2025 12:00 AM thru Wednesday December 31st, 2025 11:59 PM shoulder closed to traffic Wed, 10 Dec 2025 08:45:33 -0500 41.1818643344955 -73.9546288848317 Wilbur Cross Parkway northbound : bridge rehabilitation CT DOT-Bridgeport-Oper: bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open Thu, 30 Jan 2025 14:37:32 -0500 41.4740419643666 -72.8261757262468 I-95 northbound : traffic shift CT DOT-Bridgeport-Oper: traffic shift on I-95 northbound between Exit 73 - Society Road (East Lyme), Continuous Monday December 9th, 2024 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes shift Tue, 26 Nov 2024 16:04:12 -0500 41.3565718563192 -72.214689772417 MONROE AVE southbound : crane operations NYSDOT - Region 11: crane operations on MONROE AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Not currently Scheduled Mon, 24 Feb 2025 14:00:02 -0500 40.844662256326 -73.9066721138037 I-481 northbound : longterm construction NYSDOT - Region 3: longterm construction on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 3W - NY 5; NY 92 (De Witt) ; Alternating lane closures, Monday January 29th, 2024 thru Wednesday December 31st, 2025, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open Mon, 30 Dec 2024 07:24:16 -0500 43.0066262010899 -76.1314588421352 I-481 southbound : bridge work NYSDOT - Region 3: bridge work on I-481 southbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 4 - I-690 (De Witt) ; Alternating left and right lane and shoulder closures , Friday March 15th, 2024 thru Wednesday December 31st, 2025, Monday thru Friday, 09:00 AM thru 07:00 PM All lanes open Sun, 06 Jul 2025 14:59:01 -0400 43.0788953577289 -76.0536879910796 US-44 both directions : drainage improvements CT DOT-Newington-HWY-Oper Ctr: drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open Tue, 06 Aug 2024 14:27:16 -0400 41.9957435092704 -73.2084612356667 I-690 eastbound : bridge work NYSDOT - Region 3: bridge work on I-690 eastbound between I-81 Northbound Interchange (Syracuse) and Exit 14 - Teall Avenue (Syracuse), Continuous Monday August 12th, 2024 09:00 AM thru Sunday March 1st, 2026 06:00 PM 1 Right lane of 3 lanes closed Tue, 07 Oct 2025 11:42:37 -0400 43.0511107200294 -76.1464889115476 US 11 both directions : construction NYSDOT - Region 7: construction on US 11 both directions in the vicinity of HALLAHAN RD (Lawrence) Narrow Bridge, Continuous Sunday December 15th, 2024 08:59 PM thru Friday December 31st, 2027 11:59 PM All lanes open Sun, 15 Dec 2024 20:59:41 -0500 44.7720819404316 -74.713616527616 N CROUSE AVE both directions : roadwork NYSDOT - Region 3: roadwork on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; Alternating lane closures, Monday December 22nd, 2025 thru Wednesday December 31st, 2025, Monday thru Friday, 08:00 AM thru 04:30 PM All lanes open Thu, 11 Dec 2025 08:29:10 -0500 43.0521147182966 -76.1364027375165 Franklin D. Roosevelt Drive southbound : construction NYSDOT - Region 11: construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed Tue, 09 Jul 2024 09:03:51 -0400 40.7277922790805 -73.9718350037954 Franklin D. Roosevelt Drive northbound : construction NYSDOT - Region 11: construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed Tue, 09 Jul 2024 09:11:46 -0400 40.7105141485963 -73.9844673287239 Merritt Parkway/CT 15 northbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 14:05:00 -0400 41.1416179112197 -73.4303407996334 Merritt Parkway/CT 15 northbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open Fri, 30 Aug 2024 14:18:36 -0400 41.2025669859324 -73.2706994672254 Merritt Parkway/CT 15 southbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open Fri, 30 Aug 2024 14:15:15 -0400 41.2026373385738 -73.2707707804604 Merritt Parkway/CT 15 northbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 14:12:13 -0400 41.1639862802303 -73.3765201458733 Merritt Parkway/CT 15 southbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open Fri, 30 Aug 2024 14:09:22 -0400 41.163836605048 -73.3765250337718 RIVERVIEW RD both directions : bridge work NYSDOT TMC - Albany: bridge work on RIVERVIEW RD both directions CLAM STEAM RD and BOYACK RD (Halfmoon) alternating lanes closed controlled by traffic signals, Continuous Wednesday January 15th, 2025 12:00 AM thru Friday December 19th, 2025 11:59 PM All lanes open Tue, 04 Mar 2025 12:49:36 -0500 42.8004478849381 -73.7648774716053 Merritt Parkway/CT 15 northbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 14:36:44 -0400 41.2372621131813 -73.1537451660687 Merritt Parkway/CT 15 southbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open Fri, 30 Aug 2024 14:32:11 -0400 41.23714 -73.1537 Merritt Parkway/CT 15 northbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 14:28:29 -0400 41.232251052938 -73.2202872751974 Merritt Parkway/CT 15 southbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open Fri, 30 Aug 2024 14:22:09 -0400 41.2322594126244 -73.2203546593361 I-95 northbound : traffic shift CT DOT-Bridgeport-Oper: traffic shift on I-95 northbound between Exit 89 - Mystic Street/Allyn Street (Mystic) and Exit 90 - CT 27 (Stonington) Northbound Lane Shift Traffic will be guided to the right side while construction work is being performed along the left sides of Bridge Nos. 01788 over Cow Hill Road, 01791 over Route 27, and 01794 over Jerry Browne Road , Continuous Sunday April 28th, 2024 12:00 AM thru Friday May 1st, 2026 11:59 PM All lanes open Wed, 24 Apr 2024 16:05:25 -0400 41.3711071329196 -71.9784150494447 Wilbur Cross Parkway southbound : sign work CT DOT-Bridgeport-Oper: sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 14:55:55 -0400 41.3392274079127 -72.9768650068213 Wilbur Cross Parkway northbound : sign work CT DOT-Bridgeport-Oper: sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 14:52:29 -0400 41.2469390566038 -73.0841683018868 Wilbur Cross Parkway southbound : sign work CT DOT-Bridgeport-Oper: sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 14:49:22 -0400 41.2471424670274 -73.0842002925262 PADDOCK AVE both directions : bridge replacement CT DOT-Newington-HWY-Oper Ctr: bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed Fri, 06 Sep 2024 16:08:13 -0400 41.5154088064909 -72.7762032474925 Franklin D. Roosevelt Drive both directions : construction NYSDOT - Region 11: construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed Mon, 17 Feb 2025 12:22:20 -0500 40.7105046728805 -73.9845899067924 Franklin D. Roosevelt Drive southbound : construction NYSDOT - Region 11: construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed Mon, 17 Feb 2025 12:34:50 -0500 40.7123692092545 -73.9778161330783 I-86 both directions : bridge work NITTEC: bridge work on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Strunk Road (Ellicott), Tuesday February 27th, 2024 thru Monday November 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 2 lanes closed Fri, 21 Jun 2024 07:32:38 -0400 42.1575160355567 -79.4751194458882 Merritt Parkway/CT 15 southbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open Fri, 30 Aug 2024 12:11:29 -0400 41.0990391535228 -73.5993448725647 Merritt Parkway/CT 15 northbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 12:11:55 -0400 41.0835460512845 -73.6652740401934 Merritt Parkway/CT 15 southbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open Fri, 30 Aug 2024 11:59:13 -0400 41.0854141824493 -73.6646267651018 Merritt Parkway/CT 15 northbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 11:59:55 -0400 41.0386522870321 -73.6742386995256 I-81 northbound : roadwork NYSDOT - Region 3: roadwork on I-81 northbound between Exit 16 (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse), Continuous Wednesday January 1st, 2025 09:00 AM thru Wednesday December 31st, 2025 03:00 PM 1 Left lane of 2 lanes closed Tue, 14 Jan 2025 07:37:07 -0500 43.0038065380288 -76.1336260158901 Merritt Parkway/CT 15 southbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open Fri, 30 Aug 2024 13:50:59 -0400 41.1422758156831 -73.428232637025 Merritt Parkway/CT 15 northbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 13:46:55 -0400 41.1118944378698 -73.5465893491124 Merritt Parkway/CT 15 southbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open Fri, 30 Aug 2024 13:44:07 -0400 41.1188887084348 -73.5185917831058 Merritt Parkway/CT 15 northbound : sign work CT DOT-Bridgeport-Oper: sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open Fri, 30 Aug 2024 13:39:22 -0400 41.1009904705882 -73.5755838823529 Franklin D. Roosevelt Drive southbound : construction NYSDOT - Region 11: construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed Tue, 09 Jul 2024 09:07:41 -0400 40.7123453695051 -73.9778327654616 NY 31 : bridge rehabilitation NYSDOT - Region 4: bridge rehabilitation and longterm construction on NY 31 ramp to I-490 Eastbound (Rochester) RAMP CLOSED, Continuous Thursday August 15th, 2024 09:00 AM thru Wednesday December 31st, 2025 04:00 PM All lanes closed ramp Tue, 17 Dec 2024 09:43:11 -0500 43.1511861395552 -77.6072980233321 NY 33A westbound : bridge work NYSDOT - Region 4: bridge work on NY 33A westbound over Erie Canal (Rochester), Continuous Tuesday December 31st, 2024 12:00 AM thru Wednesday December 31st, 2025 11:59 PM 1 Right lane of 2 lanes closed Tue, 31 Dec 2024 06:17:27 -0500 43.1402832232763 -77.6657956524986