All NJ Active Events All Active Events in New Jersey en-us Mon, 13 Jul 2026 09:38:29 -0400 Copyright 511nj.org 1 US 30 eastbound : Construction NJDOT - TOC South: Roadwork on US 30 Eastbound near East of NJ 50/CR 563 (Egg Harbor City), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:33:10 -0400 39.5258979797363 -74.6434631347656 NJ 23 southbound : Construction NJDOT - STMC: Roadwork on NJ 23 Southbound near North of Paterson Hamburg Tpke (West Milford Twp), Monday July 13, 2026 09:00 AM thru 11:00 AM, right lane closed Mon, 13 Jul 2026 09:33:09 -0400 41.0129814147949 -74.3745346069336 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound near North of Paterson Hamburg Tpke (West Milford Twp), Monday July 13, 2026 09:00 AM thru 11:00 AM, right lane closed Mon, 13 Jul 2026 09:32:49 -0400 41.0129814147949 -74.3745346069336 NJ 124 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Eastbound at Madison St/Elm St (Morristown) Thursday July 16, 2026 04:00 PM thru 11:00 PM, intersection Mon, 13 Jul 2026 09:32:53 -0400 40.7923049926758 -74.4763793945312 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 45 - CR 527/Glenside Ave (Summit) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Friday July 17, 2026 09:00 AM thru 02:00 PM, right shoulder closed Mon, 13 Jul 2026 09:32:54 -0400 40.6994934082031 -74.3617706298828 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 45 - CR 527/Glenside Ave (Summit) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Thursday July 16, 2026 09:00 AM thru 02:00 PM, right shoulder closed Mon, 13 Jul 2026 09:32:50 -0400 40.6994934082031 -74.3617706298828 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound between South of Sandhill Rd/Major Rd (South Brunswick Twp) and South of Washington Rd (West Windsor Twp), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 04:00 AM, right shoulder closed Mon, 13 Jul 2026 09:32:51 -0400 40.4037704467773 -74.5500793457031 NJ 31 northbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Northbound between NJ 57/Washington Ave (Washington Twp) and South of US 46 (White Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 09:32:57 -0400 40.7586402893066 -74.9749526977539 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near East of NJ 50/CR 563 (Egg Harbor City), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:32:58 -0400 39.5258979797363 -74.6434631347656 NJ 35 northbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Northbound near South of CR 689/Lawrence Pkwy (Old Bridge Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:32:55 -0400 40.4530220031738 -74.242073059082 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 521/Montague River Rd (Montague Twp) and I-80 (Mount Olive Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:32:56 -0400 41.3001518249512 -74.7946395874023 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 521/Montague River Rd (Montague Twp) and I-80 (Mount Olive Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:33:00 -0400 41.3001518249512 -74.7946395874023 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound between South of CR 617/Rues Ln (East Brunswick Twp) and CR 606/Milltown Rd (East Brunswick Twp), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 05:00 AM, right lane closed Mon, 13 Jul 2026 09:33:02 -0400 40.4201431274414 -74.3756790161133 NJ 35 northbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Northbound near South of CR 689/Lawrence Pkwy (Old Bridge Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:32:59 -0400 40.4530220031738 -74.242073059082 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound at CR 62 (Paramus) Tuesday July 14, 2026 04:00 AM thru 05:00 AM, ramp Mon, 13 Jul 2026 09:33:05 -0400 40.9259872436523 -74.0904235839844 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Friday July 17, 2026 05:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:33:06 -0400 40.8061561584473 -74.4446868896484 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound between North of North Maple Ave (Bernards Twp) and South of NJ 53/Tabor Rd (Morris Plains), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 09:33:03 -0400 40.7309837341309 -74.5413513183594 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Thursday July 16, 2026 05:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:33:04 -0400 40.8061561584473 -74.4446868896484 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between NJ 49 (Millville) and South of Orange St (Millville), Thursday July 16, 2026 04:00 PM thru 11:00 PM, right shoulder closed Mon, 13 Jul 2026 09:33:07 -0400 39.3963966369629 -75.0370101928711 US 206 southbound : Delays NJ DOT - STMC: Delays on US 206 Southbound from South of CR 613/Drakesdale Rd (Mount Olive Twp) to CR 613/Flanders Netcong Rd (Mount Olive Twp), All lanes open Mon, 13 Jul 2026 09:32:07 -0400 40.8626708984375 -74.6971206665039 I-195 eastbound : Delays NJ DOT - TOC South: Delays on I-195 Eastbound from West of Exit 31 - CR 547 (Howell Twp) to East of Exit 31 - CR 547 (Howell Twp), All lanes open Mon, 13 Jul 2026 09:25:43 -0400 40.1662750244141 -74.1819076538086 NJ 17 southbound : Crash NJ DOT - STMC: Crash on NJ 17 Southbound North of Midland Av (Paramus), 1 left lane of 3 lanes closed Mon, 13 Jul 2026 09:22:05 -0400 40.957145690918 -74.0750350952148 Atlantic City-Brigantine Connector northbound : Construction South Jersey Transp. Auth.: Construction , street sweeping on Atlantic City-Brigantine Connector northbound South of Bacharach Blvd/Convention Center (Atlantic City) to NJ 87/Brigantine Blvd (Atlantic City) All lanes and both shoulder of 3 lanes closed intermittently until 2:30 PM MOVE OVER FOR HIGHWAY WORKERS Mon, 13 Jul 2026 09:19:09 -0400 39.362806 -74.444512 Atlantic City-Brigantine Connector southbound : Construction South Jersey Transp. Auth.: Construction , street sweeping on Atlantic City-Brigantine Connector southbound South of US 30 - Absecon Blvd (Atlantic City) to Exit A - Midtown, Downbeach (Atlantic City) All lanes and both shoulder closed intermittently until 2:30 PM MOVE OVER FOR HIGHWAY WORKERS Mon, 13 Jul 2026 09:19:09 -0400 39.374373 -74.443447 I-295 southbound : Crash NJ DOT - TOC South: Crash on I-295 Southbound South of Exit 29 - US 30 (Barrington), 1 left lane of 3 lanes closed Mon, 13 Jul 2026 09:07:16 -0400 39.8726806640625 -75.0621490478516 New Jersey Turnpike - Eastern Spur southbound : Roadwork NJ Turnpike Auth.: Roadwork on New Jersey Turnpike - Eastern Spur Southbound between South of Northern Mixing Bowl (North Bergen Twp) and North of Interchange 16E - NJ 3/Lincoln Tunnel (Secaucus) 1 right lane closed until 4:00 P.M. Mon, 13 Jul 2026 09:00:00 -0400 40.8108671 -74.02969375 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound near East of CR 575/Pomona Rd (Galloway Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:00:12 -0400 39.470775604248 -74.5639724731445 US 130 northbound : Construction NJDOT - TOC South: Roadwork on US 130 Northbound near North of NJ 38 (Pennsauken Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:00:12 -0400 39.9362373352051 -75.077766418457 NJ 181 both directions : Construction NJ DOT - STMC: Roadwork on NJ 181 Both Directions between North of Pine Cone Lane (Sparta Twp) and CR 605/Stanhope Rd (Sparta Twp) Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Mon, 13 Jul 2026 09:00:12 -0400 41.026008605957 -74.6316223144531 NJ 45 northbound : Construction NJDOT - TOC South: Roadwork on NJ 45 between North of CR 650/South Evergreen Av (Woodbury) and North of CR 632/Berkeley Rd/Mantua Rd (Deptford Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:13 -0400 39.8291015625 -75.1586532592773 I-195 eastbound : Construction NJDOT - TOC South: Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and Exit 3 - Hamilton Square-Yardville Rd (Hamilton Twp), Monday July 13, 2026 09:00 AM thru 02:00 PM, , moving operation Mon, 13 Jul 2026 09:00:13 -0400 40.1839637756348 -74.7235107421875 I-78 eastbound : Construction NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:13 -0400 40.6507987976074 -74.7552947998047 NJ 181 southbound : Construction NJ DOT - STMC: Roadwork on NJ 181 Southbound At Pine Cone Lane (Sparta Twp) Monday July 13, 2026 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes, right shoulder closed Mon, 13 Jul 2026 09:00:12 -0400 41.0247611999512 -74.6307220458984 I-676 southbound : Construction NJDOT - TOC South: Roadwork on I-676 Southbound near Exit 3 - Morgan Blvd (Camden), Monday July 13, 2026 09:00 AM thru 02:00 PM, left lane closed Mon, 13 Jul 2026 09:00:11 -0400 39.912036895752 -75.1158294677734 NJ 27 southbound : Construction NJ DOT - STMC: Roadwork on NJ 27 Southbound North of McClellan St (Newark) Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:12 -0400 40.6941719055176 -74.2003936767578 I-78 eastbound : Construction NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, left lane closed Mon, 13 Jul 2026 09:00:12 -0400 40.6438446044922 -74.6615905761719 NJ 4 westbound : Construction NJDOT - STMC: Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:16 -0400 40.862434387207 -73.9752578735352 US 46 eastbound : Construction NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Monday July 13, 2026 09:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 09:00:16 -0400 40.8538780212402 -74.9309310913086 NJ 4 eastbound : Construction NJDOT - STMC: Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane Mon, 13 Jul 2026 09:00:16 -0400 40.9222297668457 -74.0780715942383 US 46 eastbound : Construction NJDOT - STMC: Roadwork on US 46 Eastbound between East of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of I-287 (Parsippany-Troy Hills Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, left lane closed Mon, 13 Jul 2026 09:00:16 -0400 40.8789024353027 -74.4479675292969 Pulaski Skyway northbound : Construction NJDOT - STMC: Roadwork on Pulaski Skyway at South Kearny (South Kearny) Monday July 13, 2026 09:00 AM thru 03:00 PM, ramp Mon, 13 Jul 2026 09:00:17 -0400 40.7344398498535 -74.1040878295898 NJ 23 southbound : Construction NJDOT - STMC: Roadwork on NJ 23 Southbound near I-287 (Riverdale), Monday July 13, 2026 09:00 AM thru 02:00 PM, left lane closed Mon, 13 Jul 2026 09:00:17 -0400 40.989501953125 -74.3105850219727 NJ 31 southbound : Construction NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Monday July 13, 2026 09:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 09:00:17 -0400 40.8320922851562 -75.0009841918945 NJ 94 both directions : Construction NJ DOT - STMC: Roadwork on NJ 94 Both Directions between Hainsburgh River Rd (Knowlton Twp) and North of Mount Pleasant Rd (Blairstown Twp) Monday July 13, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Mon, 13 Jul 2026 09:00:11 -0400 40.9495010375977 -75.0654983520508 I-78 westbound : Construction NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:11 -0400 40.6438446044922 -74.6615905761719 US 322 eastbound : Construction NJDOT - TOC South: Roadwork on US 322 Eastbound near East of NJ 47 (Glassboro), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:11 -0400 39.701732635498 -75.1063919067383 NJ 55 southbound : Construction NJDOT - TOC South: Roadwork on NJ 55 Southbound between South of Exit 32 - NJ 56 (Vineland) and South of Exit 29 - CR 552/Sherman Av (Vineland), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:00:11 -0400 39.4677238464355 -75.0743255615234 I-78 eastbound : Construction NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:11 -0400 40.6438446044922 -74.6615905761719 NJ 23 southbound : Construction NJDOT - STMC: Roadwork on NJ 23 Southbound between North of Maple Lake Rd (Kinnelon) and North of Alexander Av (Pequannock Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:00:10 -0400 41.0106353759766 -74.3676071166992 NJ 47 northbound : Construction NJ DOT - TOC South: Roadwork on NJ 47 Northbound At CR 647/Bankbridge Rd/Foxrun Rd (Deptford Twp) Monday July 13, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed Mon, 13 Jul 2026 09:00:10 -0400 39.7966842651367 -75.1167449951172 NJ 94 both directions : Construction NJ DOT - STMC: Roadwork on NJ 94 Both Directions between South of CR 660/Main St (Blairstown Twp) and South of CR 661/Ramsey Rd (Frelinghuysen Twp) Monday July 13, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Mon, 13 Jul 2026 09:00:10 -0400 40.9844207763672 -74.9690017700195 I-80 eastbound : Construction NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) and East of Exit 39 - NJ 53 (Denville Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:10 -0400 40.9112358093262 -74.5174102783203 US 130 southbound : Construction NJDOT - TOC South: Roadwork on US 130 Southbound near North of NJ 38 (Pennsauken Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:00:11 -0400 39.937198638916 -75.0763702392578 I-78 eastbound : Construction NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:00:13 -0400 40.6438446044922 -74.6615905761719 NJ 284 both directions : Construction NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Mon, 13 Jul 2026 09:00:10 -0400 41.2077941894531 -74.6071701049805 NJ 23 southbound : Construction NJDOT - STMC: Roadwork on NJ 23 Southbound between New York State Line (Montague Twp) and North of Holland Mountain Rd (Hardyston Twp), Monday July 13, 2026 09:00 AM thru 04:00 PM, right shoulder closed, moving operation Mon, 13 Jul 2026 09:00:10 -0400 41.3515243530273 -74.6860427856445 NJ 10 eastbound : Construction NJDOT - STMC: Roadwork on NJ 10 between In the vicinity of CR 656 (Randolph Twp) and In the vicinity of Mount Pleasant Tpke (Randolph Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:10 -0400 40.8642539978027 -74.5590133666992 US 202 southbound : Construction NJDOT - STMC: Roadwork on US 202 Southbound near South of CR 620/Burnt Mills Rd (Bedminster Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:00:09 -0400 40.642406463623 -74.6376724243164 NJ 31 northbound : Construction NJDOT - STMC: Roadwork on NJ 31 Northbound near North of CR 633/Old Allerton Rd (Clinton Twp), Monday July 13, 2026 09:00 AM thru 12:00 PM, left lane closed Mon, 13 Jul 2026 09:00:14 -0400 40.6338882446289 -74.8842086791992 US 46 eastbound : Construction NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:16 -0400 40.8931846618652 -74.2573089599609 NJ 15 northbound : Construction NJDOT - STMC: Roadwork on NJ 15 Northbound near South of CR 615/Edison Rd (Jefferson Twp), Monday July 13, 2026 09:00 AM thru 02:00 PM, right lane closed Mon, 13 Jul 2026 09:00:16 -0400 40.9537734985352 -74.5959930419922 NJ 35 northbound : Construction NJDOT - STMC: Roadwork on NJ 35 Northbound near South of CR 689/Lawrence Pkwy (Old Bridge Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:00:16 -0400 40.4530220031738 -74.242073059082 I-80 westbound : Construction NJDOT - STMC: Roadwork on I-80 Westbound between East of Exit 63 - NJ 17 North (Lodi) and East of Exit 62 - Garden State Parkway (Saddle Brook Twp), left shoulder Mon, 13 Jul 2026 09:00:16 -0400 40.8869895935059 -74.0695648193359 NJ 23 northbound : Construction NJDOT - STMC: Roadwork on NJ 23 Northbound near South of US 202 (Wayne Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:00:15 -0400 40.9115524291992 -74.2641754150391 US 22 eastbound : Construction NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 09:00:15 -0400 40.6294021606445 -74.4338760375977 US 46 westbound : Construction NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and East of CR 618/Mountain Lakes Blvd (Mountain Lakes), Monday July 13, 2026 09:00 AM thru 03:00 PM, left lane closed Mon, 13 Jul 2026 09:00:15 -0400 40.8705444335938 -74.4194183349609 US 46 westbound : Construction NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:15 -0400 40.8899612426758 -74.1311798095703 I-78 westbound : Construction NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 45 - CR 527/Glenside Ave (Summit) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Monday July 13, 2026 09:00 AM thru 02:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:15 -0400 40.6994934082031 -74.3617706298828 I-295 southbound : Construction NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Monday July 13, 2026 09:00 AM thru 02:00 PM, left lane closed Mon, 13 Jul 2026 09:00:14 -0400 39.7506637573242 -75.3757171630859 I-80 eastbound : Construction NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 47A - I-280 (Fairfield Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 09:00:14 -0400 40.8766288757324 -74.3279571533203 I-78 eastbound : Construction NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Mon, 13 Jul 2026 09:00:14 -0400 40.6507987976074 -74.7552947998047 NJ 23 northbound : Construction NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and New York State Line (Montague Twp), Monday July 13, 2026 09:00 AM thru 04:00 PM, right shoulder closed, moving operation Mon, 13 Jul 2026 09:00:14 -0400 41.0932235717773 -74.5273742675781 I-678 southbound : Construction Port Authority NY/NJ: Construction, construction on I-678 southbound Terminal 4 Departures (New York) 1 Left lane of 2 lanes closed Mon, 13 Jul 2026 08:51:10 -0400 40.6448309659714 -73.7911481229447 Garden State Parkway northbound : Delays NJ Turnpike Auth.: Delays on Garden State Parkway northbound South of Toms River Toll Plaza (Toms River Twp) to Exit 90 - CR 549/Chambers Bridge Rd (Brick Twp) All lanes open 6 mile delay due to volume Mon, 13 Jul 2026 08:46:36 -0400 39.9957067184507 -74.2071002561433 New Jersey Turnpike northbound : Roadwork NJ Turnpike Auth.: Roadwork on New Jersey Turnpike outer roadway Northbound at Interchange 7 - US 206 (Bordentown Twp) ramp closed until 11:00 A.M. Mon, 13 Jul 2026 08:44:00 -0400 40.12167958 -74.7033949 Garden State Parkway southbound : Delays NJ Turnpike Auth.: Delays on Garden State Parkway southbound South of Essex Toll Plaza (Bloomfield) to South of Exit 147 - Clinton Ave (East Orange) All lanes open 2 mile delay due to volume Mon, 13 Jul 2026 08:41:59 -0400 40.8029683688597 -74.1857535750698 Garden State Parkway northbound : Delays NJ Turnpike Auth.: Delays on Garden State Parkway northbound North of Exit 147 - Clinton Ave (East Orange) to South of Exit 150 - Hoover Avenue (Bloomfield) All lanes open 2 1/2 mile delay due to volume Mon, 13 Jul 2026 08:34:20 -0400 40.7765154575779 -74.2017927402088 I-678 northbound : Construction Port Authority NY/NJ: Construction on I-678 northbound Terminal 4 (New York) 1 Left lane of 3 lanes closed Mon, 13 Jul 2026 08:36:20 -0400 40.6449727386418 -73.7897825344338 Garden State Parkway northbound : Delays NJ Turnpike Auth.: Delays on Garden State Parkway northbound South of Exit 143 - NJ 124 (Irvington Twp) to South of Exit 145 - I-280 (East Orange) All lanes open 3 mile delay due to volume Mon, 13 Jul 2026 08:30:34 -0400 40.7193351545277 -74.2342025506245 Goethals Bridge eastbound : Delays Port Authority NY/NJ: Delays on Goethals Bridge eastbound New York Side (New York) All lanes open due to heavy truck congestion on I-278/Staten Island Expressway at Foerest/Gulf Exit. The travel time is 10 minutes from Interstate 278 and the New Jersey Turnpike Exit 13 to the West Shore Expressway Mon, 13 Jul 2026 09:27:33 -0400 40.6286841670006 -74.1839081776886 NJ 24 eastbound : Construction NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Monday July 13, 2026 05:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 08:06:08 -0400 40.8061561584473 -74.4446868896484 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 45 - CR 527/Glenside Ave (Summit) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Wednesday July 15, 2026 09:00 AM thru 02:00 PM, right shoulder closed Mon, 13 Jul 2026 08:05:51 -0400 40.6994934082031 -74.3617706298828 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound between North of North Maple Ave (Bernards Twp) and South of NJ 53/Tabor Rd (Morris Plains), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:05:52 -0400 40.7309837341309 -74.5413513183594 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Wednesday July 15, 2026 05:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 08:05:49 -0400 40.8061561584473 -74.4446868896484 NJ 7 southbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Southbound near Wittpenn Bridge (Jersey City), Monday July 13, 2026 10:00 AM thru 02:00 PM, right lane closed Mon, 13 Jul 2026 08:05:55 -0400 40.7414054870605 -74.0818405151367 NJ 35 northbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Northbound near South of CR 689/Lawrence Pkwy (Old Bridge Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 08:05:56 -0400 40.4530220031738 -74.242073059082 NJ 35 northbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Northbound near South of CR 689/Lawrence Pkwy (Old Bridge Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 08:05:59 -0400 40.4530220031738 -74.242073059082 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound between North of North Maple Ave (Bernards Twp) and South of NJ 53/Tabor Rd (Morris Plains), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:06:00 -0400 40.7309837341309 -74.5413513183594 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 521/Montague River Rd (Montague Twp) and I-80 (Mount Olive Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 08:05:57 -0400 41.3001518249512 -74.7946395874023 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 45 - CR 527/Glenside Ave (Summit) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Tuesday July 14, 2026 09:00 AM thru 02:00 PM, right shoulder closed Mon, 13 Jul 2026 08:05:58 -0400 40.6994934082031 -74.3617706298828 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Monday July 13, 2026 05:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 08:06:03 -0400 40.8061561584473 -74.4446868896484 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of NJ 163 (Knowlton Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:06:04 -0400 40.901065826416 -75.0738143920898 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Tuesday July 14, 2026 05:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 08:06:01 -0400 40.8061561584473 -74.4446868896484 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound at East of I-80 (Knowlton Twp) Tuesday July 14, 2026 07:00 AM thru 03:00 PM, ramp Mon, 13 Jul 2026 08:06:02 -0400 40.9267196655273 -75.0911026000977 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near East of CR 614/Water St (Independence Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:05:53 -0400 40.8642311096191 -74.8759078979492 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near East of NJ 31 (White Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:06:06 -0400 40.833812713623 -74.9970397949219 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near North of Exit 22 - US 202 (Far Hills), Wednesday July 15, 2026 10:00 AM thru 02:00 PM, left lane closed Mon, 13 Jul 2026 08:06:07 -0400 40.6713371276855 -74.6226043701172 NJ 17 northbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Northbound near North of Garden State Parkway (Paramus), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 05:00 AM, at least one lane closed Mon, 13 Jul 2026 08:06:05 -0400 40.9417991638184 -74.0715560913086 NJ 35 northbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Northbound near South of CR 689/Lawrence Pkwy (Old Bridge Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 08:06:11 -0400 40.4530220031738 -74.242073059082 NJ 7 southbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Southbound near Wittpenn Bridge (Jersey City), Tuesday July 14, 2026 10:00 AM thru 02:00 PM, right lane closed Mon, 13 Jul 2026 08:06:12 -0400 40.7414054870605 -74.0818405151367 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near West of NJ 163 (Knowlton Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:06:08 -0400 40.9081764221191 -75.0751724243164 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 45 - CR 527/Glenside Ave (Summit) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Monday July 13, 2026 09:00 AM thru 02:00 PM, right shoulder closed Mon, 13 Jul 2026 08:06:10 -0400 40.6994934082031 -74.3617706298828 NJ 17 northbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Northbound near North of Garden State Parkway (Paramus), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Mon, 13 Jul 2026 08:06:15 -0400 40.9417991638184 -74.0715560913086 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound between North of North Maple Ave (Bernards Twp) and South of NJ 53/Tabor Rd (Morris Plains), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:06:13 -0400 40.7309837341309 -74.5413513183594 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:06:14 -0400 40.8538780212402 -74.9309310913086 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Friday July 24, 2026 10:00 AM thru 03:30 PM, intersection Mon, 13 Jul 2026 08:03:17 -0400 40.7204971313477 -74.0934066772461 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near East of I-287 (Parsippany-Troy Hills Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:21 -0400 40.8641662597656 -74.4003524780273 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between Little Ferry Circle (Little Ferry) and East of Central Ave (South Hackensack Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:22 -0400 40.852123260498 -74.0318756103516 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Wednesday July 22, 2026 10:00 AM thru 03:30 PM, intersection Mon, 13 Jul 2026 08:03:19 -0400 40.7204971313477 -74.0934066772461 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:03:20 -0400 41.0953254699707 -74.5298080444336 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near West of CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:23 -0400 40.8636894226074 -74.394645690918 NJ 35 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Northbound near North of 6th Av (Brick Twp), Tuesday July 21, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:03:12 -0400 40.0134735107422 -74.0575637817383 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound near South of Wilson Av (Middletown Twp), Wednesday July 22, 2026 12:00 AM thru 05:00 AM, right shoulder closed Mon, 13 Jul 2026 08:03:13 -0400 40.4256019592285 -74.1027374267578 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between East of Central Ave (South Hackensack Twp) and Little Ferry Circle (Little Ferry), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:10 -0400 40.8566703796387 -74.050048828125 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near CR 42/Outwater Ln (Saddle Brook Twp), Wednesday July 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:03:11 -0400 40.8862648010254 -74.0908279418945 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:03:16 -0400 41.0953254699707 -74.5298080444336 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:03:14 -0400 41.0953254699707 -74.5298080444336 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Saturday August 1, 2026 08:00 PM thru Sunday August 2, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:03:07 -0400 41.0953254699707 -74.5298080444336 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Monday July 20, 2026 10:00 AM thru 03:30 PM, intersection Mon, 13 Jul 2026 08:03:09 -0400 40.7204971313477 -74.0934066772461 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between Little Ferry Circle (Little Ferry) and East of Central Ave (South Hackensack Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:01 -0400 40.852123260498 -74.0318756103516 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:02:50 -0400 41.0953254699707 -74.5298080444336 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of 5th St (Saddle Brook Twp), Monday July 20, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:02:52 -0400 40.8910217285156 -74.1005325317383 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of 5th St (Saddle Brook Twp), Tuesday July 21, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:03:05 -0400 40.8910217285156 -74.1005325317383 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between East of Central Ave (South Hackensack Twp) and Little Ferry Circle (Little Ferry), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:06 -0400 40.8566703796387 -74.050048828125 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound near South of Wilson Av (Middletown Twp), Thursday July 23, 2026 12:00 AM thru 05:00 AM, right shoulder closed Mon, 13 Jul 2026 08:03:03 -0400 40.4256019592285 -74.1027374267578 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:03:15 -0400 41.0953254699707 -74.5298080444336 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Thursday July 23, 2026 10:00 AM thru 03:30 PM, intersection Mon, 13 Jul 2026 08:02:57 -0400 40.7204971313477 -74.0934066772461 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Tuesday July 21, 2026 10:00 AM thru 03:30 PM, intersection Mon, 13 Jul 2026 08:03:04 -0400 40.7204971313477 -74.0934066772461 US 46 westbound : Construction NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Monday July 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:00:09 -0400 40.8705444335938 -74.4194183349609 US 46 eastbound : Construction NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of I-287 (Parsippany-Troy Hills Twp), Monday July 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:00:09 -0400 40.8908996582031 -74.512825012207 US 22 westbound : Construction NJDOT - STMC: Roadwork on US 22 Westbound near East of Ridge Rd (Readington Twp), Monday July 13, 2026 08:00 AM thru 04:00 PM, right shoulder closed Mon, 13 Jul 2026 08:00:10 -0400 40.6115341186523 -74.7188186645508 US 206 northbound : Construction NJDOT - STMC: Roadwork on US 206 between South of CR 517 (Andover Twp) and I-80 (Mount Olive Twp), Monday July 13, 2026 08:00 AM thru 04:00 PM, right shoulder closed Mon, 13 Jul 2026 08:00:10 -0400 40.9807510375977 -74.739387512207 JFK Expressway southbound : Construction Port Authority NY/NJ: Construction, construction on JFK Expressway southbound ramp to Terminals 5/7 (New York) 1 Right lane of 2 lanes closed Mon, 13 Jul 2026 08:00:02 -0400 40.6462471362587 -73.7854007982102 NJ 23 southbound : Construction NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Monday July 13, 2026 08:00 AM thru 02:00 PM, right shoulder closed Mon, 13 Jul 2026 08:00:08 -0400 41.1034126281738 -74.5682983398438 US 22 eastbound : Construction NJDOT - STMC: Roadwork on US 22 Eastbound near Wilson Av (North Plainfield), Monday July 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 08:00:08 -0400 40.624153137207 -74.442985534668 NJ 440 southbound : Construction NJDOT - STMC: Roadwork on NJ 440 Southbound at South of CR 616/New Brunswick Ave (Woodbridge Twp) Monday July 13, 2026 08:00 AM thru 03:00 PM, ramp Mon, 13 Jul 2026 08:00:13 -0400 40.5200843811035 -74.295783996582 US 206 northbound : Construction NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 517 (Andover Twp), Monday July 13, 2026 08:00 AM thru 04:00 PM, right shoulder closed Mon, 13 Jul 2026 08:00:11 -0400 40.9041709899902 -74.722282409668 NJ 35 southbound : Construction NJDOT - STMC: Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Monday July 13, 2026 08:00 AM thru 03:30 PM, ramp Mon, 13 Jul 2026 08:00:13 -0400 40.4643707275391 -74.2710800170898 JFK Expressway southbound : Construction Port Authority NY/NJ: Construction, construction on JFK Expressway southbound ramp to Terminals 5/7 (New York) 1 Right lane of 2 lanes closed Mon, 13 Jul 2026 07:59:23 -0400 40.6462471362587 -73.7854007982102 NJ 24 westbound : Delays NJ DOT - STMC: Delays on NJ 24 Westbound At Exit 7 - NJ 124/JFK Parkway (Millburn Twp), All lanes open Mon, 13 Jul 2026 07:21:53 -0400 40.7396278381348 -74.3693389892578 George Washington Bridge eastbound : Construction Port Authority NY/NJ: Construction, construction on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) 1 Left lane of 2 lanes closed motorists will not be able to make the left turn onto Center Avenue through July 2026. Mon, 13 Jul 2026 07:12:13 -0400 40.8554885303696 -73.9716333729092 US 206 northbound : roadwork NJDOT - TOC South: Roadwork on US 206 near North of CR 541/Stokes Rd (Shamong Twp), Thursday July 16, 2026 09:00 AM thru 04:00 PM, right shoulder closed Mon, 13 Jul 2026 07:05:51 -0400 39.7804985046387 -74.7384033203125 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of CR 575/Pomona Rd (Galloway Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Mon, 13 Jul 2026 07:05:49 -0400 39.470775604248 -74.5639724731445 NJ 45 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 45 near North of NJ 49 (Salem), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:05:50 -0400 39.5774269104004 -75.464714050293 NJ 49 both directions : Construction NJ DOT - TOC South: Roadwork on NJ 49 Both Directions between CR 630/Fortmott Rd (Pennsville Twp) and East of CR 551/South Hook Rd (Pennsville Twp) Monday July 13, 2026 07:00 AM thru 05:00 PM, right shoulder closed eastbound; right shoulder closed westbound Mon, 13 Jul 2026 07:00:08 -0400 39.6396713256836 -75.5164566040039 NJ 70 both directions : Construction NJ DOT - TOC South: Roadwork on NJ 70 Both Directions between NJ 38 (Pennsauken Twp) and East of CR 636/Cuthbert Blvd (Cherry Hill Twp) Monday July 13, 2026 07:00 AM thru 03:30 PM, 1 left lane, 1 right lane of 3 lanes closed eastbound; 1 left lane of 3 lanes closed westbound Mon, 13 Jul 2026 07:00:08 -0400 39.9343376159668 -75.0728378295898 NJ 23 northbound : Construction NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and North of Maple Lake Rd (Kinnelon), Monday July 13, 2026 07:00 AM thru 05:00 PM, right lane closed Mon, 13 Jul 2026 07:00:08 -0400 40.9582290649414 -74.2821197509766 US 22 westbound : Construction NJDOT - STMC: Roadwork on US 22 Westbound near CR 643/Summit Rd (Mountainside), Monday July 13, 2026 07:00 AM thru 03:00 PM, Mon, 13 Jul 2026 07:00:08 -0400 40.6813697814941 -74.3404922485352 NJ 15 southbound : Construction NJDOT - STMC: Roadwork on NJ 15 Southbound near South of NJ 181 (Sparta Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:08 -0400 41.0605049133301 -74.6457595825195 US 206 northbound : Construction NJDOT - STMC: Roadwork on US 206 between North of CR 607/Lackawanna Dr (Byram Twp) and South of CR 517 (Byram Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:09 -0400 40.9515151977539 -74.7346878051758 NJ 53 northbound : Construction NJDOT - STMC: Roadwork on NJ 53 Northbound near US 202 (Morris Plains), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 07:00:08 -0400 40.8297424316406 -74.4777145385742 NJ 47 southbound : Construction NJDOT - TOC South: Roadwork on NJ 47 Southbound near North of NJ 41/Hurfville Rd (Deptford Twp), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 07:00:09 -0400 39.7858963012695 -75.1046295166016 NJ 47 northbound : Construction NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 534/Cooper St (Deptford Twp), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 07:00:10 -0400 39.8232421875 -75.1247100830078 I-195 westbound : Construction NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 6 - New Jersey Turnpike (Robbinsville), Monday July 13, 2026 07:00 AM thru 05:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:10 -0400 40.1777191162109 -74.546142578125 NJ 47 both directions : Construction NJ DOT - TOC South: Roadwork on NJ 47 Both Directions At CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Mon, 13 Jul 2026 07:00:10 -0400 39.6175880432129 -75.0805435180664 NJ 18 northbound : Construction NJDOT - STMC: Roadwork on NJ 18 Northbound between NJ 172/George St (New Brunswick) and North of NJ 27 (New Brunswick), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed local lane Mon, 13 Jul 2026 07:00:07 -0400 40.4869422912598 -74.4321594238281 NJ 47 southbound : Construction NJDOT - TOC South: Roadwork on NJ 47 Southbound near North of CR 651/Greentree Rd (Glassboro), left shoulder Mon, 13 Jul 2026 07:00:07 -0400 39.7142219543457 -75.1119918823242 I-295 southbound : Construction NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:07 -0400 39.7488327026367 -75.3786315917969 US 202 northbound : Construction NJDOT - STMC: Roadwork on US 202 Northbound between Corporate Dr North (Bridgewater Twp) and North of I-287 (Bedminster Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:09 -0400 40.6355895996094 -74.6349105834961 NJ 47 both directions : Construction NJ DOT - TOC South: Roadwork on NJ 47 Both Directions At CR 651/Greentree Rd (Glassboro) Monday July 13, 2026 07:00 AM thru 03:30 PM, 1 right lane of 3 lanes closed northbound; 1 right lane of 3 lanes closed southbound Mon, 13 Jul 2026 07:00:09 -0400 39.7128715515137 -75.1113967895508 NJ 47 northbound : Construction NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 630/Barns-Blackwood Rd (Washington Twp), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 07:00:09 -0400 39.7811126708984 -75.1024780273438 NJ 47 both directions : Construction NJ DOT - TOC South: Roadwork on NJ 47 Both Directions South of CR 534/Cooper St (Deptford Twp) Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Mon, 13 Jul 2026 07:00:09 -0400 39.8234214782715 -75.1246871948242 US 22 eastbound : Construction NJDOT - STMC: Roadwork on US 22 Eastbound near Mountain Ave (Mountainside), Monday July 13, 2026 07:00 AM thru 03:00 PM, Mon, 13 Jul 2026 07:00:09 -0400 40.674446105957 -74.3500366210938 US 40 westbound : Construction NJDOT - TOC South: Roadwork on US 40 Westbound near East of CR 646 (Pilesgrove Twp), Continuous Monday July 13, 2026 07:00 AM thru Wednesday July 15, 2026 04:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:09 -0400 39.6711387634277 -75.3919296264648 NJ 15 southbound : Construction NJDOT - STMC: Roadwork on NJ 15 Southbound near North of NJ 181/Espanong Rd/Weldon Rd (Jefferson Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:08 -0400 40.9870910644531 -74.6023788452148 NJ 138 westbound : Construction NJDOT - TOC South: Roadwork on NJ 138 Westbound between NJ 35 (Wall Twp) and In the vicinity of NJ 18 (Wall Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation Mon, 13 Jul 2026 07:00:10 -0400 40.1755752563477 -74.0419006347656 I-295 northbound : Construction NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 7 (Oldmans Twp) and North of Exit 11 - US 322 (Logan Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:11 -0400 39.7355995178223 -75.4010162353516 I-295 northbound : Construction NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:11 -0400 39.9504470825195 -74.9297866821289 NJ 15 northbound : Construction NJDOT - STMC: Roadwork on NJ 15 Northbound near South of Blue Heron Dr (Sparta Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:08 -0400 41.0041046142578 -74.6125259399414 NJ 124 eastbound : Construction NJDOT - STMC: Roadwork on NJ 124 Eastbound between In the vicinity of Alexander Av (Madison) and In the Vicinity of CR 649/John F Kennedy Pkwy (Summit), Monday July 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:08 -0400 40.7553787231445 -74.4095764160156 NJ 124 westbound : Construction NJDOT - STMC: Roadwork on NJ 124 Westbound between In the Vicinity of CR 649/John F Kennedy Pkwy (Summit) and In the vicinity of Alexander Av (Madison), Monday July 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:08 -0400 40.7389144897461 -74.3685150146484 NJ 15 northbound : Construction NJDOT - STMC: Roadwork on NJ 15 Northbound near North of NJ 181/Espanong Rd/Weldon Rd (Jefferson Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:08 -0400 40.9774017333984 -74.6025238037109 NJ 57 eastbound : Construction NJ DOT - STMC: Roadwork on NJ 57 Eastbound At CR 519/Uniontown Rd (Lopatcong Twp) Monday July 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:08 -0400 40.7022018432617 -75.1369171142578 NJ 47 northbound : Construction NJDOT - TOC South: Roadwork on NJ 47 Northbound near CR 651/Greentree Rd (Glassboro), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 07:00:08 -0400 39.7128715515137 -75.1113967895508 I-295 southbound : Construction NJDOT - TOC South: Roadwork on I-295 Southbound between North of Exit 11 - US 322 (Logan Twp) and North of Exit 7 (Oldmans Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:07 -0400 39.7856674194336 -75.3339538574219 US 1 southbound : Construction NJDOT - STMC: Roadwork on US 1 Southbound near I-287 (Edison Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:07 -0400 40.5285949707031 -74.3541107177734 I-295 southbound : Construction NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:14 -0400 40.0001487731934 -74.8623733520508 US 30 eastbound : Construction NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 07:00:15 -0400 39.9204940795898 -75.0875701904297 NJ 138 eastbound : Construction NJDOT - TOC South: Roadwork on NJ 138 Eastbound between In the vicinity of NJ 18 (Wall Twp) and NJ 35 (Wall Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation Mon, 13 Jul 2026 07:00:14 -0400 40.1713485717773 -74.0686111450195 I-80 eastbound : Construction NJDOT - STMC: Roadwork on I-80 Eastbound near West of Exit 12 - CR 521/Hope-Blairstown Rd (Knowlton Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:07 -0400 40.9336128234863 -75.0240249633789 NJ 35 northbound : Construction NJDOT - TOC South: Roadwork on NJ 35 Northbound at South of Industrial Way (Eatontown) Monday July 13, 2026 07:00 AM thru 03:00 PM, ramp Mon, 13 Jul 2026 07:00:07 -0400 40.2750434875488 -74.0442733764648 NJ 47 southbound : Construction NJDOT - TOC South: Roadwork on NJ 47 Southbound near South of CR 534/Cooper St (Deptford Twp), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 07:00:09 -0400 39.826099395752 -75.1247634887695 US 9 southbound : Construction NJDOT - STMC: Roadwork on US 9 Southbound between North of Garden State Parkway (Sayreville) and South of CR 673/Ernston Rd (Old Bridge Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:11 -0400 40.4735565185547 -74.294189453125 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 07:00:15 -0400 39.9166641235352 -75.0873565673828 I-195 eastbound : Construction NJDOT - TOC South: Roadwork on I-195 Eastbound between West of Exit 6 - New Jersey Turnpike (Robbinsville) and West of Exit 11 - CR 524 (Upper Freehold Twp), left shoulder Mon, 13 Jul 2026 07:00:15 -0400 40.1985168457031 -74.6166915893555 I-78 westbound : Construction NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), left shoulder Mon, 13 Jul 2026 07:00:10 -0400 40.6438446044922 -74.6615905761719 I-195 eastbound : Construction NJDOT - TOC South: Roadwork on I-195 Eastbound between West of Exit 6 - New Jersey Turnpike (Robbinsville) and West of Exit 11 - CR 524 (Upper Freehold Twp), Monday July 13, 2026 07:00 AM thru 05:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:10 -0400 40.1985168457031 -74.6166915893555 NJ 94 both directions : Construction NJ DOT - STMC: Roadwork on NJ 94 Both Directions between CR 517/Mcafee Rd (Vernon Twp) and South of CR 515/Stockholm Rd (Vernon Twp) Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Mon, 13 Jul 2026 07:00:10 -0400 41.1787300109863 -74.5391387939453 NJ 77 both directions : Construction NJ DOT - TOC South: Roadwork on NJ 77 Both Directions North of CR 611/Elmer-Shirley Rd (Upper Pittsgrove Twp) Monday July 13, 2026 07:00 AM thru 04:30 PM, 1 right lane of 2 lanes closed southbound; 1 right lane of 2 lanes closed northbound Mon, 13 Jul 2026 07:00:10 -0400 39.5798416137695 -75.2400131225586 I-195 westbound : Construction NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 6 - New Jersey Turnpike (Robbinsville), left shoulder Mon, 13 Jul 2026 07:00:10 -0400 40.1777191162109 -74.546142578125 I-280 westbound : Construction NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Monday July 13, 2026 07:00 AM thru 05:30 PM, right shoulder closed Mon, 13 Jul 2026 07:00:10 -0400 40.8557586669922 -74.3595123291016 I-78 westbound : Construction NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 07:00:10 -0400 40.663402557373 -74.4206008911133 NJ 47 northbound : Construction NJDOT - TOC South: Roadwork on NJ 47 Northbound near NJ 55 (Deptford Twp), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Mon, 13 Jul 2026 07:00:09 -0400 39.7944488525391 -75.1144409179688 New Jersey Turnpike - Western Spur northbound : Delays NJ Turnpike Auth.: Delays on New Jersey Turnpike - Western Spur northbound Southern Mixing Bowl (Newark) to North of Interchange 15E - US 1&9 (Newark) All lanes open 1 1/2 mile delay due to volume Mon, 13 Jul 2026 06:51:57 -0400 40.7136246569829 -74.1405310515837 New Jersey Turnpike northbound : Roadwork NJ Turnpike Auth.: Roadwork on New Jersey Turnpike Northbound North of Interchange 5 - CR 541 (Springfield Twp) 1 right lane closed until 5:00 P.M. Mon, 13 Jul 2026 06:47:00 -0400 40.05017068 -74.7922664 New Jersey Turnpike - Hudson County Extension eastbound : Delays NJ Turnpike Auth.: Delays on New Jersey Turnpike - Hudson County Extension eastbound New Jersey Turnpike South (Newark) to West of Newark Bay Bridge (Newark) All lanes open 1 1/2 mile delay due to volume Mon, 13 Jul 2026 06:42:24 -0400 40.7072812017215 -74.1539946517155 Holland Tunnel eastbound : Delays Port Authority NY/NJ: Delays on Holland Tunnel South Tube eastbound New Jersey Side - Toll Plaza (Jersey City) All lanes open The travel time to the New York side is 20 minutes from New Jersey Turnpike Exit 14C and 20 minutes from New Jersey 139 at Tonnelle Circle Mon, 13 Jul 2026 09:28:24 -0400 40.7296896536881 -74.0360969388153 Atlantic City-Brigantine Connector southbound : street sweeping South Jersey Transp. Auth.: street sweeping on Atlantic City-Brigantine Connector southbound South of US 30 - Absecon Blvd (Atlantic City) to Exit A - Midtown, Downbeach (Atlantic City) MOVE OVER FOR HIGHWAY WORKERS, Monday July 13th, 2026, 08:30 AM thru 02:30 PM All lanes and both shoulder closed intermittently Mon, 13 Jul 2026 09:18:39 -0400 39.3743728857265 -74.4434467702315 Atlantic City-Brigantine Connector northbound : street sweeping South Jersey Transp. Auth.: street sweeping on Atlantic City-Brigantine Connector northbound South of Bacharach Blvd/Convention Center (Atlantic City) to NJ 87/Brigantine Blvd (Atlantic City) MOVE OVER FOR HIGHWAY WORKERS, Monday July 13th, 2026, 08:30 AM thru 02:30 PM All lanes and both shoulder closed intermittently Mon, 13 Jul 2026 09:18:49 -0400 39.3628055871071 -74.4445116903303 NJ 139 Lower eastbound : Heavy traffic NJ DOT - STMC: Heavy Traffic on NJ 139 Lower Eastbound from Tonnelle Avenue (Jersey City) to Jersey Ave (Jersey City), All lanes open Mon, 13 Jul 2026 06:05:44 -0400 40.7390594482422 -74.0677337646484 I-287 northbound : Construction NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Monday July 13, 2026 06:00 AM thru 02:00 PM, right shoulder closed Mon, 13 Jul 2026 06:00:08 -0400 40.8037414550781 -74.4586410522461 I-287 southbound : Construction NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Monday July 13, 2026 06:00 AM thru 02:00 PM, right shoulder closed Mon, 13 Jul 2026 06:00:08 -0400 40.8074913024902 -74.4528350830078 NJ 42 southbound : Construction NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Monday July 13, 2026 06:00 AM thru 04:00 PM, right shoulder closed Mon, 13 Jul 2026 06:00:08 -0400 39.7623252868652 -75.0479965209961 US 206 northbound : Construction NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Monday July 13, 2026 06:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 06:00:09 -0400 40.513240814209 -74.6323852539062 US 206 northbound : Construction NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Monday July 13, 2026 06:00 AM thru 03:00 PM, right shoulder closed Mon, 13 Jul 2026 06:00:09 -0400 40.5338592529297 -74.6204376220703 NJ 495 : Operational Activity Port Authority NY/NJ: Operational Activity on NJ 495 XBL East of New Jersey Turnpike (North Bergen Twp) to West of Boulevard East (Weehawken Twp) All lanes open until 9:30 AM. Mon, 13 Jul 2026 09:09:33 -0400 40.780166 -74.052561 NJ 55 southbound : Overturned tractor trailer NJ DOT - TOC South: Crash on NJ 55 Southbound Ramp To Exit 48 - Ellis Mill Rd (Glassboro), 1 right lane of 2 lanes, ramp lane, right shoulder closed Mon, 13 Jul 2026 07:25:26 -0400 39.6961402893066 -75.1449584960938 George Washington Bridge eastbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level eastbound Upper Trans Manhattan Expressway (Manhattan), Monday July 13th, 2026 thru Friday July 17th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed, Friday July 17th, 2026 thru Saturday July 18th, 2026, 11:00 PM thru 08:00 AM 2 Right lanes of 3 lanes closed Sun, 12 Jul 2026 23:15:07 -0400 40.8487127917007 -73.9379939585037 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday July 13th, 2026 thru Friday July 17th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 3 Right lanes of 4 lanes closed, Friday July 17th, 2026 thru Saturday July 18th, 2026, 11:00 PM thru 08:00 AM 3 Right lanes of 4 lanes closed Sun, 12 Jul 2026 23:10:12 -0400 40.853132227618 -73.9604530811854 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday July 13th, 2026 thru Friday July 17th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed and detoured, Friday July 17th, 2026 thru Saturday July 18th, 2026, 10:00 PM thru 08:00 AM All lanes closed and detoured Sun, 12 Jul 2026 23:06:02 -0400 40.8503109474918 -73.9451532427298 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Tuesday July 14th, 2026 thru Thursday July 16th, 2026, Tuesday/Thursday, 10:30 AM thru 03:30 PM 1 Right lane of 3 lanes closed Sun, 12 Jul 2026 22:12:12 -0400 40.8531602214053 -73.9608166538239 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday July 13th, 2026 thru Friday July 17th, 2026, Monday/Wednesday/Friday, 10:30 AM thru 03:30 PM 1 Left lane of 3 lanes closed Sun, 12 Jul 2026 22:10:59 -0400 40.8531043352152 -73.9605632983703 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday July 13th, 2026 thru Saturday July 18th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed Sun, 12 Jul 2026 22:07:38 -0400 40.8531882266682 -73.9607156488956 George Washington Bridge westbound : construction Port Authority NY/NJ: construction on George Washington Bridge Lower Level westbound Lower Trans Manhattan Expressway (Manhattan) to Exit 1A - Henry Hudson Parkway (New York), Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed Sun, 12 Jul 2026 22:06:36 -0400 40.8490913345011 -73.938634164458 George Washington Bridge eastbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level eastbound ramp to Exit 1A - Henry Hudson Parkway (New York), Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 10:30 AM thru 04:30 PM 1 Right lane of 2 lanes closed Sun, 12 Jul 2026 22:04:12 -0400 40.8497116562624 -73.943470446464 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday July 13th, 2026, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed, Tuesday July 14th, 2026 thru Friday July 17th, 2026, Tuesday/Wednesday/Thursday/Friday, 05:00 AM thru 02:30 PM 1 Right lane of 3 lanes closed Sun, 12 Jul 2026 22:01:23 -0400 40.8503149417318 -73.9451738445992 Outerbridge Crossing eastbound : bridge construction Port Authority NY/NJ: bridge construction on Outerbridge Crossing eastbound New Jersey Side (Perth Amboy) to New York Side (Staten Island), Monday July 13th, 2026 thru Friday July 17th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed Sun, 12 Jul 2026 21:57:00 -0400 40.5243661801743 -74.2539612140789 Outerbridge Crossing westbound : bridge construction Port Authority NY/NJ: bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Monday July 13th, 2026 thru Friday July 17th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Friday July 17th, 2026 thru Saturday July 18th, 2026, 11:59 PM thru 08:00 AM 1 Right lane of 2 lanes closed Sun, 12 Jul 2026 21:50:59 -0400 40.5252375281003 -74.2396988762201 Bayonne Bridge northbound : bridge construction Port Authority NY/NJ: bridge construction on Bayonne Bridge northbound New York Side (Staten Island) to New Jersey Side (Bayonne), Thursday July 16th, 2026 thru Friday July 17th, 2026, 10:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed Sun, 12 Jul 2026 21:40:22 -0400 40.6386068897788 -74.1436463158628 Bayonne Bridge northbound : bridge construction Port Authority NY/NJ: bridge construction on Bayonne Bridge northbound New York Side (Staten Island) to New Jersey Side (Bayonne), Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 2 lanes closed Sun, 12 Jul 2026 21:38:06 -0400 40.6386967417575 -74.1436083015642 Holland Tunnel eastbound : construction Port Authority NY/NJ: construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Monday July 13th, 2026 thru Thursday July 16th, 2026, Monday/Wednesday, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed Sun, 12 Jul 2026 21:34:50 -0400 40.7286968585655 -74.0313134541787 Holland Tunnel eastbound : construction Port Authority NY/NJ: construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Sunday July 12th, 2026 thru Friday July 17th, 2026, Sunday/Tuesday/Thursday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed Sun, 12 Jul 2026 21:32:52 -0400 40.7287190409247 -74.0315566010617 Holland Tunnel westbound : construction Port Authority NY/NJ: construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Monday July 13th, 2026 thru Thursday July 16th, 2026, Monday/Wednesday, 11:30 PM thru 05:30 AM 1 Left lane of 2 lanes closed Sun, 12 Jul 2026 19:35:20 -0400 40.7262011810979 -74.0110182676856 Holland Tunnel westbound : construction Port Authority NY/NJ: construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Sunday July 12th, 2026 thru Friday July 17th, 2026, Sunday/Tuesday/Thursday, 11:30 PM thru 05:30 AM 1 Right lane of 2 lanes closed Sun, 12 Jul 2026 19:33:13 -0400 40.7262306984097 -74.011214190458 Lincoln Tunnel both directions : construction Port Authority NY/NJ: construction on Lincoln Tunnel Center Tube both directions New York Side (New York) to New Jersey Side (Weehawken Twp), Tuesday July 14th, 2026 thru Friday July 17th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed and detoured Sun, 12 Jul 2026 19:27:58 -0400 40.7601256076192 -74.003009019048 Lincoln Tunnel eastbound : construction Port Authority NY/NJ: construction on Lincoln Tunnel South Tube eastbound New Jersey Side (Weehawken Twp) to New York Side (Manhattan), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 11:00 PM thru 05:00 AM All lanes closed and detoured Sun, 12 Jul 2026 19:20:03 -0400 40.7666783739716 -74.0196709969691 Van Wyck Expressway southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Van Wyck Expressway southbound ramp to Cargo Service Road (New York), Monday July 13th, 2026 thru Saturday July 18th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed Sun, 12 Jul 2026 14:00:00 -0400 40.6616392047803 -73.8031381736005 Pan Am Road eastbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Pan Am Road eastbound between Lot 8 (Employee Lot) (New York) and 130th Place (New York), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 11:00 PM thru 05:00 AM All lanes closed Sun, 12 Jul 2026 13:45:52 -0400 40.6618588063646 -73.8202983050432 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Saturday July 18, 2026 08:00 PM thru Sunday July 19, 2026 12:00 AM, at least one lane closed, (2nd lane closed from 08:00 PM to 12:00 AM) Sun, 12 Jul 2026 13:35:05 -0400 40.8037414550781 -74.4586410522461 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 6 - New Jersey Turnpike (Robbinsville), left shoulder Sun, 12 Jul 2026 13:35:06 -0400 40.1777191162109 -74.546142578125 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 534/Cooper St (Deptford Twp), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:35:09 -0400 39.8232421875 -75.1247100830078 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of Taylors Ln/New Albany Rd (Cinnaminson Twp) and South of Creek Rd (Delran Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 07:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 06:00 AM) Sun, 12 Jul 2026 13:34:59 -0400 40.0081558227539 -74.9707565307617 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between East of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 11 - CR 524 (Upper Freehold Twp), left shoulder Sun, 12 Jul 2026 13:35:39 -0400 40.1747856140137 -74.4714889526367 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and East of Exit 11 - CR 524 (Upper Freehold Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, right shoulder closed Sun, 12 Jul 2026 13:35:36 -0400 40.1648216247559 -74.437126159668 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near South of CR 534/Cooper St (Deptford Twp), Wednesday July 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:35:37 -0400 39.826099395752 -75.1247634887695 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM) Sun, 12 Jul 2026 13:35:40 -0400 39.930305480957 -75.1140441894531 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between South of Creek Rd (Delran Twp) and North of Taylors Ln/New Albany Rd (Cinnaminson Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Sun, 12 Jul 2026 13:35:41 -0400 40.0236930847168 -74.9391021728516 US 1 northbound : roadwork NJDOT - STMC: Roadwork on US 1 Northbound between South of CR 531/Main St (Edison Twp) and North of I-287 (Edison Twp), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 05:00 AM, left lane closed Sun, 12 Jul 2026 13:35:34 -0400 40.5236968994141 -74.3606414794922 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of I-295/US 40 (Pennsville Twp) and US 322 (Logan Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed Sun, 12 Jul 2026 13:35:35 -0400 39.6813011169434 -75.4920349121094 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between East of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 8 - CR 539 (Robbinsville), left shoulder Sun, 12 Jul 2026 13:35:31 -0400 40.1769256591797 -74.508659362793 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM) Sun, 12 Jul 2026 13:35:33 -0400 39.930305480957 -75.1140441894531 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near CR 644/Haddonfield Rd (Pennsauken Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, left lane closed Sun, 12 Jul 2026 13:34:50 -0400 39.9807662963867 -75.0153350830078 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near South of CR 534/Cooper St (Deptford Twp), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:51 -0400 39.826099395752 -75.1247634887695 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near North of CR 646/Deptford Av (Deptford Twp), Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:48 -0400 39.8418121337891 -75.1250534057617 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near US 1 (Trenton), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, right lane closed Sun, 12 Jul 2026 13:34:49 -0400 40.2109413146973 -74.7665863037109 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:55 -0400 39.9166641235352 -75.0873565673828 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near NJ 55 (Deptford Twp), Friday July 17, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:56 -0400 39.7944488525391 -75.1144409179688 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound near Exit 31 - CR 547 (Howell Twp), Thursday July 23, 2026 10:00 AM thru 12:00 PM, right shoulder closed Sun, 12 Jul 2026 13:34:53 -0400 40.1636428833008 -74.1547088623047 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between US 322 (Logan Twp) and North of I-295/US 40 (Pennsville Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, left lane closed Sun, 12 Jul 2026 13:34:54 -0400 39.8027801513672 -75.3490753173828 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of Taylors Ln/New Albany Rd (Cinnaminson Twp) and South of Creek Rd (Delran Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Sun, 12 Jul 2026 13:34:57 -0400 40.0081558227539 -74.9707565307617 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Thursday July 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sun, 12 Jul 2026 13:34:58 -0400 40.0001487731934 -74.8623733520508 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Friday July 17, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:35:03 -0400 39.9204940795898 -75.0875701904297 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near South of CR 534/Cooper St (Deptford Twp), Friday July 17, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:35:04 -0400 39.826099395752 -75.1247634887695 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound between West of Exit 6 - New Jersey Turnpike (Robbinsville) and West of Exit 11 - CR 524 (Upper Freehold Twp), Monday July 13, 2026 07:00 AM thru 05:00 PM, right shoulder closed Sun, 12 Jul 2026 13:35:00 -0400 40.1985168457031 -74.6166915893555 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of I-295/US 40 (Pennsville Twp) and US 322 (Logan Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right lane closed Sun, 12 Jul 2026 13:35:07 -0400 39.6813011169434 -75.4920349121094 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 630/Barns-Blackwood Rd (Washington Twp), Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:35:08 -0400 39.7811126708984 -75.1024780273438 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 6 - New Jersey Turnpike (Robbinsville), left shoulder Sun, 12 Jul 2026 13:34:44 -0400 40.1777191162109 -74.546142578125 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between South of Creek Rd (Delran Twp) and North of Taylors Ln/New Albany Rd (Cinnaminson Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 07:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 06:00 AM) Sun, 12 Jul 2026 13:34:47 -0400 40.0236930847168 -74.9391021728516 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Wednesday July 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:45 -0400 39.9204940795898 -75.0875701904297 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 630/Barns-Blackwood Rd (Washington Twp), Wednesday July 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:46 -0400 39.7811126708984 -75.1024780273438 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound at West of Exit 11 - CR 524 (Upper Freehold Twp) Tuesday July 14, 2026 11:00 PM thru Wednesday July 15, 2026 05:00 AM, ramp Sun, 12 Jul 2026 13:35:38 -0400 40.1778030395508 -74.51611328125 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 630/Barns-Blackwood Rd (Washington Twp), Thursday July 16, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:35:14 -0400 39.7811126708984 -75.1024780273438 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound at North of Exit 31 - Woodcrest Station (Cherry Hill Twp) Thursday July 16, 2026 09:00 AM thru 03:00 PM, ramp Sun, 12 Jul 2026 13:35:16 -0400 39.8760948181152 -75.0148239135742 NJ 138 westbound : roadwork NJDOT - TOC South: Roadwork on NJ 138 Westbound between NJ 35 (Wall Twp) and In the vicinity of NJ 18 (Wall Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation Sun, 12 Jul 2026 13:35:12 -0400 40.1755752563477 -74.0419006347656 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between South of Creek Rd (Delran Twp) and North of Taylors Ln/New Albany Rd (Cinnaminson Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, at least one lane closed Sun, 12 Jul 2026 13:35:13 -0400 40.0236930847168 -74.9391021728516 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 672/CR 557 (Buena) and East of CR 648 (Upper Pittsgrove Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, left lane closed Sun, 12 Jul 2026 13:35:19 -0400 39.5391159057617 -74.9546356201172 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between South of Orange St (Millville) and South of NJ 49 (Millville), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right shoulder closed Sun, 12 Jul 2026 13:35:20 -0400 39.3671836853027 -75.0211639404297 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound near West of NJ 495 (North Bergen Twp), Tuesday July 21, 2026 10:00 AM thru 03:00 PM, right lane closed Sun, 12 Jul 2026 13:35:18 -0400 40.7771987915039 -74.0454483032227 NJ 55 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Northbound near South of Exit 39 - US 40 (Vineland), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 03:00 AM, right lane closed Sun, 12 Jul 2026 13:35:10 -0400 39.5672721862793 -75.0619201660156 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 6 - New Jersey Turnpike (Robbinsville), Monday July 13, 2026 07:00 AM thru 05:00 PM, right shoulder closed Sun, 12 Jul 2026 13:35:11 -0400 40.1777191162109 -74.546142578125 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between East of Jones Rd (Englewood) and In the vicinity of Spring Valley Rd (Paramus), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 05:00 AM, right shoulder closed Sun, 12 Jul 2026 13:35:26 -0400 40.8708305358887 -73.9724349975586 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 8 - CR 539 (Robbinsville) and East of Exit 3 - Hamilton Square-Yardville Rd (Hamilton Twp), left shoulder Sun, 12 Jul 2026 13:35:27 -0400 40.1893997192383 -74.580810546875 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 06:00 AM, right lane closed Sun, 12 Jul 2026 13:35:24 -0400 39.7551803588867 -75.0467071533203 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 534/Cooper St (Deptford Twp), Friday July 17, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:35:25 -0400 39.8232421875 -75.1247100830078 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 630/Barns-Blackwood Rd (Washington Twp), Friday July 17, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:35:30 -0400 39.7811126708984 -75.1024780273438 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and East of Exit 11 - CR 524 (Upper Freehold Twp), left shoulder Sun, 12 Jul 2026 13:35:28 -0400 40.1648216247559 -74.437126159668 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Saturday July 18, 2026 10:00 PM thru Sunday July 19, 2026 09:00 AM, right lane closed Sun, 12 Jul 2026 13:35:22 -0400 40.8557586669922 -74.3595123291016 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near CR 534/Cooper St (Deptford Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sun, 12 Jul 2026 13:35:21 -0400 39.8275260925293 -75.1247940063477 NJ 45 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 45 between North of CR 650/South Evergreen Av (Woodbury) and North of CR 632/Berkeley Rd/Mantua Rd (Deptford Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sun, 12 Jul 2026 13:34:41 -0400 39.8291015625 -75.1586532592773 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near CR 651/Greentree Rd (Glassboro), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:05 -0400 39.7128715515137 -75.1113967895508 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of Schooner Landing Rd (Maurice River Twp) and North of NJ 347 (Maurice River Twp), left shoulder Sun, 12 Jul 2026 13:34:06 -0400 39.3408241271973 -75.005859375 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound between West of Exit 8 - CR 539 (Robbinsville) and East of Exit 11 - CR 524 (Upper Freehold Twp), left shoulder Sun, 12 Jul 2026 13:34:03 -0400 40.1893997192383 -74.580810546875 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of CR 619/Wheat Rd (Vineland) and West Chestnut Av (Vineland), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, left lane closed Sun, 12 Jul 2026 13:34:09 -0400 39.5087127685547 -75.0414428710938 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near South of CR 534/Cooper St (Deptford Twp), Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:10 -0400 39.826099395752 -75.1247634887695 US 1 northbound : roadwork NJDOT - STMC: Roadwork on US 1 Northbound near South of NJ 18 (New Brunswick), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right lane closed Sun, 12 Jul 2026 13:34:07 -0400 40.4821586608887 -74.4193496704102 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Friday July 17, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:08 -0400 39.9166641235352 -75.0873565673828 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between US 322 (Logan Twp) and North of I-295/US 40 (Pennsville Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, left lane closed Sun, 12 Jul 2026 13:34:11 -0400 39.8027801513672 -75.3490753173828 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound between West of Exit 8 - CR 539 (Robbinsville) and East of Exit 11 - CR 524 (Upper Freehold Twp), Tuesday July 14, 2026 07:00 AM thru 05:00 PM, right shoulder closed Sun, 12 Jul 2026 13:34:13 -0400 40.1893997192383 -74.580810546875 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound at East of Exit 16 - CR 537/Great Adventure (Jackson Twp) Thursday July 16, 2026 09:00 AM thru 03:00 PM, ramp, right partial lane Sun, 12 Jul 2026 13:34:14 -0400 40.1599540710449 -74.4234161376953 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 05:00 AM, right lane closed Sun, 12 Jul 2026 13:34:17 -0400 40.1918411254883 -74.7536239624023 US 1 northbound : roadwork NJDOT - STMC: Roadwork on US 1 Northbound between South of CR 531/Main St (Edison Twp) and North of I-287 (Edison Twp), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 05:00 AM, left lane closed Sun, 12 Jul 2026 13:34:18 -0400 40.5236968994141 -74.3606414794922 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound at East of Exit 16 - CR 537/Great Adventure (Jackson Twp) Tuesday July 14, 2026 09:00 AM thru 03:00 PM, ramp, right partial lane Sun, 12 Jul 2026 13:34:15 -0400 40.1599540710449 -74.4234161376953 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 03:00 AM, at least one lane closed Sun, 12 Jul 2026 13:34:16 -0400 39.930305480957 -75.1140441894531 US 9 northbound : roadwork NJDOT - STMC: Roadwork on US 9 Northbound near South of Ferry Rd (Old Bridge Twp), Friday July 17, 2026 09:00 AM thru 04:00 PM, right shoulder closed Sun, 12 Jul 2026 13:33:52 -0400 40.3830680847168 -74.308219909668 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of I-295/US 40 (Pennsville Twp) and US 322 (Logan Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right lane closed Sun, 12 Jul 2026 13:33:59 -0400 39.6813011169434 -75.4920349121094 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Thursday July 16, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:56 -0400 39.9166641235352 -75.0873565673828 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near NJ 55 (Deptford Twp), Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:57 -0400 39.7944488525391 -75.1144409179688 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near South of CR 534/Cooper St (Deptford Twp), Thursday July 16, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:02 -0400 39.826099395752 -75.1247634887695 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near East of Boulevard (Garfield), Saturday July 18, 2026 09:00 PM thru Sunday July 19, 2026 04:00 AM, right lane closed Sun, 12 Jul 2026 13:34:00 -0400 40.8923149108887 -74.1039657592773 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between US 322 (Logan Twp) and North of I-295/US 40 (Pennsville Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, left lane closed Sun, 12 Jul 2026 13:34:01 -0400 39.8027801513672 -75.3490753173828 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near CR 644/Haddonfield Rd (Pennsauken Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, left lane closed Sun, 12 Jul 2026 13:34:22 -0400 39.9807662963867 -75.0153350830078 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 6 - New Jersey Turnpike (Robbinsville), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, right shoulder closed Sun, 12 Jul 2026 13:34:23 -0400 40.1777191162109 -74.546142578125 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near West of NJ 495 (North Bergen Twp), Tuesday July 21, 2026 10:00 AM thru 03:00 PM, right shoulder closed Sun, 12 Jul 2026 13:34:19 -0400 40.7771987915039 -74.0454483032227 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between West Chestnut Av (Vineland) and South of CR 619/Wheat Rd (Vineland), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right shoulder closed Sun, 12 Jul 2026 13:34:20 -0400 39.4798393249512 -75.0436096191406 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM) Sun, 12 Jul 2026 13:34:24 -0400 39.930305480957 -75.1140441894531 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between South of Creek Rd (Delran Twp) and North of Taylors Ln/New Albany Rd (Cinnaminson Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 07:00 AM, at least one lane closed Sun, 12 Jul 2026 13:34:25 -0400 40.0236930847168 -74.9391021728516 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near North of NJ 41/Hurfville Rd (Deptford Twp), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:27 -0400 39.7858963012695 -75.1046295166016 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Thursday July 16, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:31 -0400 39.9204940795898 -75.0875701904297 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near south of Exit 69 - US 206 (Lawrence Twp), Monday July 13, 2026 10:00 AM thru 03:00 PM, left lane closed Sun, 12 Jul 2026 13:34:32 -0400 40.2856750488281 -74.7296447753906 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near North of NJ 41/Hurfville Rd (Deptford Twp), Thursday July 16, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:28 -0400 39.7858963012695 -75.1046295166016 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between US 322 (Logan Twp) and North of I-295/US 40 (Pennsville Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 06:00 AM, left lane closed Sun, 12 Jul 2026 13:34:29 -0400 39.8027801513672 -75.3490753173828 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between East of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 8 - CR 539 (Robbinsville), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, right shoulder closed Sun, 12 Jul 2026 13:34:35 -0400 40.1769256591797 -74.508659362793 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 05:00 AM, right lane closed Sun, 12 Jul 2026 13:34:36 -0400 40.1918411254883 -74.7536239624023 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near US 1 (Trenton), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, right lane closed Sun, 12 Jul 2026 13:34:33 -0400 40.2109413146973 -74.7665863037109 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near CR 644/Haddonfield Rd (Pennsauken Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, left lane closed Sun, 12 Jul 2026 13:34:34 -0400 39.9807662963867 -75.0153350830078 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 534/Cooper St (Deptford Twp), Thursday July 16, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:38 -0400 39.8232421875 -75.1247100830078 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Friday July 17, 2026 09:00 PM thru Saturday July 18, 2026 05:00 AM, right lane closed Sun, 12 Jul 2026 13:34:39 -0400 40.1918411254883 -74.7536239624023 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 630/Barns-Blackwood Rd (Washington Twp), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:37 -0400 39.7811126708984 -75.1024780273438 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near NJ 55 (Deptford Twp), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:34:43 -0400 39.7944488525391 -75.1144409179688 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of I-295/US 40 (Pennsville Twp) and US 322 (Logan Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 06:00 AM, right lane closed Sun, 12 Jul 2026 13:33:53 -0400 39.6813011169434 -75.4920349121094 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of Taylors Ln/New Albany Rd (Cinnaminson Twp) and South of Creek Rd (Delran Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, at least one lane closed Sun, 12 Jul 2026 13:33:54 -0400 40.0081558227539 -74.9707565307617 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Friday July 17, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sun, 12 Jul 2026 13:33:49 -0400 40.0001487731934 -74.8623733520508 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Saturday July 18, 2026 08:00 PM thru Sunday July 19, 2026 12:00 AM, at least one lane closed Sun, 12 Jul 2026 13:33:50 -0400 40.8037414550781 -74.4586410522461 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of NJ 49 (Millville) and South of Orange St (Millville), left shoulder Sun, 12 Jul 2026 13:33:47 -0400 39.3936080932617 -75.0362930297852 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near North of CR 651/Greentree Rd (Glassboro), left shoulder Sun, 12 Jul 2026 13:33:48 -0400 39.7142219543457 -75.1119918823242 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between East of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 8 - CR 539 (Robbinsville), Tuesday July 14, 2026 07:00 AM thru 05:00 PM, right shoulder closed Sun, 12 Jul 2026 13:33:51 -0400 40.1769256591797 -74.508659362793 NJ 35 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Northbound at South of Industrial Way (Eatontown) Monday July 13, 2026 07:00 AM thru 03:00 PM, ramp Sun, 12 Jul 2026 13:33:44 -0400 40.2750434875488 -74.0442733764648 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 672/CR 557 (Buena) and East of CR 648 (Upper Pittsgrove Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, left lane closed Sun, 12 Jul 2026 13:33:45 -0400 39.5391159057617 -74.9546356201172 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between US 322 (Logan Twp) and North of I-295/US 40 (Pennsville Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, left lane closed Sun, 12 Jul 2026 13:33:42 -0400 39.8027801513672 -75.3490753173828 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 534/Cooper St (Deptford Twp), Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:43 -0400 39.8232421875 -75.1247100830078 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:35 -0400 39.9166641235352 -75.0873565673828 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between South of Orange St (Millville) and South of NJ 49 (Millville), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right shoulder closed Sun, 12 Jul 2026 13:33:36 -0400 39.3671836853027 -75.0211639404297 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between East of Jones Rd (Englewood) and In the vicinity of Spring Valley Rd (Paramus), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 05:00 AM, right shoulder closed Sun, 12 Jul 2026 13:33:39 -0400 40.8708305358887 -73.9724349975586 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between East of CR 648 (Upper Pittsgrove Twp) and CR 672/CR 557 (Buena), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed Sun, 12 Jul 2026 13:33:40 -0400 39.5974540710449 -75.1650848388672 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Wednesday July 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:32 -0400 39.9166641235352 -75.0873565673828 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near NJ 55 (Deptford Twp), Thursday July 16, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:34 -0400 39.7944488525391 -75.1144409179688 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near North of NJ 41/Hurfville Rd (Deptford Twp), Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:30 -0400 39.7858963012695 -75.1046295166016 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:31 -0400 39.9204940795898 -75.0875701904297 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 534/Cooper St (Deptford Twp), Wednesday July 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:11 -0400 39.8232421875 -75.1247100830078 US 1 southbound : roadwork NJDOT - TOC South: Roadwork on US 1 Southbound near Mulberry St (Trenton), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, left lane closed Sun, 12 Jul 2026 13:33:12 -0400 40.2384338378906 -74.7416229248047 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sun, 12 Jul 2026 13:33:18 -0400 40.0001487731934 -74.8623733520508 NJ 138 eastbound : roadwork NJDOT - TOC South: Roadwork on NJ 138 Eastbound between In the vicinity of NJ 18 (Wall Twp) and NJ 35 (Wall Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation Sun, 12 Jul 2026 13:33:19 -0400 40.1713485717773 -74.0686111450195 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 03:00 AM, at least one lane closed Sun, 12 Jul 2026 13:33:16 -0400 39.930305480957 -75.1140441894531 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 8 - CR 539 (Robbinsville) and East of Exit 3 - Hamilton Square-Yardville Rd (Hamilton Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 05:00 AM, right shoulder closed Sun, 12 Jul 2026 13:33:17 -0400 40.1893997192383 -74.580810546875 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 03:00 AM, at least one lane closed Sun, 12 Jul 2026 13:33:09 -0400 39.930305480957 -75.1140441894531 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound at East of Exit 16 - CR 537/Great Adventure (Jackson Twp) Friday July 17, 2026 09:00 AM thru 03:00 PM, ramp, right partial lane Sun, 12 Jul 2026 13:32:50 -0400 40.1599540710449 -74.4234161376953 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sun, 12 Jul 2026 13:32:54 -0400 40.0001487731934 -74.8623733520508 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between East of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 8 - CR 539 (Robbinsville), left shoulder Sun, 12 Jul 2026 13:32:51 -0400 40.1769256591797 -74.508659362793 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between East of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 11 - CR 524 (Upper Freehold Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, right shoulder closed Sun, 12 Jul 2026 13:32:53 -0400 40.1747856140137 -74.4714889526367 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound near East of Exit 31 - CR 547 (Howell Twp), Thursday July 23, 2026 12:00 PM thru 02:00 PM, right shoulder closed Sun, 12 Jul 2026 13:32:56 -0400 40.1635131835938 -74.1527786254883 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound between West of Exit 6 - New Jersey Turnpike (Robbinsville) and West of Exit 11 - CR 524 (Upper Freehold Twp), left shoulder Sun, 12 Jul 2026 13:33:41 -0400 40.1985168457031 -74.6166915893555 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound at West of Exit 8 - CR 539 (Robbinsville) Friday July 17, 2026 11:00 PM thru Saturday July 18, 2026 05:00 AM, ramp Sun, 12 Jul 2026 13:33:25 -0400 40.1870307922363 -74.5738906860352 US 9 northbound : roadwork NJDOT - STMC: Roadwork on US 9 Northbound near South of Ferry Rd (Old Bridge Twp), Thursday July 16, 2026 09:00 AM thru 04:00 PM, right shoulder closed Sun, 12 Jul 2026 13:33:26 -0400 40.3830680847168 -74.308219909668 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound at East of Exit 16 - CR 537/Great Adventure (Jackson Twp) Wednesday July 15, 2026 09:00 AM thru 03:00 PM, ramp, right partial lane Sun, 12 Jul 2026 13:33:23 -0400 40.1599540710449 -74.4234161376953 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near CR 644/Haddonfield Rd (Pennsauken Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, left lane closed Sun, 12 Jul 2026 13:33:24 -0400 39.9807662963867 -75.0153350830078 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of CR 646/Deptford Av (Deptford Twp), Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:29 -0400 39.8389511108398 -75.1250839233398 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near North of NJ 41/Hurfville Rd (Deptford Twp), Wednesday July 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:27 -0400 39.7858963012695 -75.1046295166016 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of I-295/US 40 (Pennsville Twp) and US 322 (Logan Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right lane closed Sun, 12 Jul 2026 13:33:28 -0400 39.6813011169434 -75.4920349121094 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:21 -0400 39.9204940795898 -75.0875701904297 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near NJ 55 (Deptford Twp), Wednesday July 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:22 -0400 39.7944488525391 -75.1144409179688 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between East of CR 648 (Upper Pittsgrove Twp) and CR 672/CR 557 (Buena), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right lane closed Sun, 12 Jul 2026 13:33:20 -0400 39.5974540710449 -75.1650848388672 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound at West of Exit 8 - CR 539 (Robbinsville) Monday July 13, 2026 11:00 PM thru Tuesday July 14, 2026 05:00 AM, ramp Sun, 12 Jul 2026 13:33:37 -0400 40.1870307922363 -74.5738906860352 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 05:00 AM, right lane closed Sun, 12 Jul 2026 13:33:38 -0400 40.1918411254883 -74.7536239624023 NJ 45 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 45 between North of CR 650/South Evergreen Av (Woodbury) and North of CR 632/Berkeley Rd/Mantua Rd (Deptford Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sun, 12 Jul 2026 13:33:02 -0400 39.8291015625 -75.1586532592773 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of Taylors Ln/New Albany Rd (Cinnaminson Twp) and South of Creek Rd (Delran Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 07:00 AM, at least one lane closed Sun, 12 Jul 2026 13:33:03 -0400 40.0081558227539 -74.9707565307617 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near US 1 (Trenton), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, right lane closed Sun, 12 Jul 2026 13:33:06 -0400 40.2109413146973 -74.7665863037109 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near North of NJ 41/Hurfville Rd (Deptford Twp), Friday July 17, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sun, 12 Jul 2026 13:33:07 -0400 39.7858963012695 -75.1046295166016 NJ 55 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Southbound between South of Exit 32 - NJ 56 (Vineland) and South of Exit 29 - CR 552/Sherman Av (Vineland), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Sun, 12 Jul 2026 13:33:04 -0400 39.4677238464355 -75.0743255615234 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 05:00 AM, right lane closed Sun, 12 Jul 2026 13:33:05 -0400 40.1918411254883 -74.7536239624023 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound between West of CR 536/Pump Branch Rd (Winslow Twp) and East of CR 722/Waterford-Blue Anchor Rd (Winslow Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right lane closed Sun, 12 Jul 2026 13:33:08 -0400 39.7236480712891 -74.8605804443359 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sun, 12 Jul 2026 13:32:59 -0400 40.0001487731934 -74.8623733520508 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between South of Orange St (Millville) and South of NJ 49 (Millville), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right shoulder closed Sun, 12 Jul 2026 13:33:13 -0400 39.3671836853027 -75.0211639404297 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of NJ 49 (Millville) and South of Orange St (Millville), left shoulder Sun, 12 Jul 2026 13:33:15 -0400 39.3936080932617 -75.0362930297852 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between North of Sally Harden Rd (Wantage Twp) and New York State Line (Wantage Twp) Thursday July 16, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Sat, 11 Jul 2026 07:24:45 -0400 41.2445907592773 -74.5786895751953 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between North of Sally Harden Rd (Wantage Twp) and New York State Line (Wantage Twp) Friday July 17, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Sat, 11 Jul 2026 07:24:49 -0400 41.2445907592773 -74.5786895751953 NJ 94 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 94 Both Directions between Hainsburgh River Rd (Knowlton Twp) and North of Mount Pleasant Rd (Blairstown Twp) Monday July 13, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Sat, 11 Jul 2026 07:20:42 -0400 40.9495010375977 -75.0654983520508 NJ 94 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 94 Both Directions between South of CR 660/Main St (Blairstown Twp) and South of CR 661/Ramsey Rd (Frelinghuysen Twp) Monday July 13, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Sat, 11 Jul 2026 07:18:29 -0400 40.9844207763672 -74.9690017700195 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near Mountain Ave (Mountainside), Thursday July 16, 2026 07:00 AM thru 03:00 PM, Fri, 10 Jul 2026 23:27:42 -0400 40.674446105957 -74.3500366210938 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near CR 614/Van Houten Av (Clifton), Friday July 17, 2026 09:00 PM thru Saturday July 18, 2026 07:00 AM, left lane closed, moving operation Fri, 10 Jul 2026 23:27:43 -0400 40.8741111755371 -74.1732330322266 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of Vaux Hall Rd (Union Twp), Friday July 17, 2026 10:00 PM thru Saturday July 18, 2026 06:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 23:27:41 -0400 40.6975326538086 -74.2500610351562 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near Mountain Ave (Mountainside), Monday July 13, 2026 07:00 AM thru 03:00 PM, Fri, 10 Jul 2026 23:27:46 -0400 40.674446105957 -74.3500366210938 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near South of NJ 31 (East Amwell Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 23:27:47 -0400 40.4177169799805 -74.8789749145508 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between CR 640/Riverview Dr (Totowa) and East of CR 625/Hollywood Av (Fairfield Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 08:00 AM, right shoulder closed Fri, 10 Jul 2026 23:27:44 -0400 40.8947486877441 -74.2347564697266 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound between Corporate Dr North (Bridgewater Twp) and North of I-287 (Bedminster Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:27:45 -0400 40.6355895996094 -74.6349105834961 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between CR 640/Riverview Dr (Totowa) and East of CR 625/Hollywood Av (Fairfield Twp), Friday July 17, 2026 09:00 PM thru Saturday July 18, 2026 07:00 AM, at least one lane closed Fri, 10 Jul 2026 23:27:49 -0400 40.8947486877441 -74.2347564697266 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near CR 640/Riverview Dr (Totowa), Friday July 17, 2026 09:00 PM thru Saturday July 18, 2026 07:00 AM, at least one lane closed, (2nd lane closed from 11:30 PM to 06:00 AM) Fri, 10 Jul 2026 23:27:50 -0400 40.8947486877441 -74.2347564697266 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near North of Barley Sheaf Rd/River Rd (Readington Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 05:00 AM, right lane closed Fri, 10 Jul 2026 23:27:52 -0400 40.5192604064941 -74.8130493164062 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near CR 614/Van Houten Av (Clifton), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 23:27:53 -0400 40.8741111755371 -74.1732330322266 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound between Corporate Dr North (Bridgewater Twp) and North of I-287 (Bedminster Twp), Thursday July 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:27:25 -0400 40.6355895996094 -74.6349105834961 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near Mountain Ave (Mountainside), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, Fri, 10 Jul 2026 23:27:26 -0400 40.674446105957 -74.3500366210938 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near East of Boulevard (Garfield), Friday July 17, 2026 09:00 PM thru Saturday July 18, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 23:27:23 -0400 40.8923149108887 -74.1039657592773 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 621/Hook Mountain Rd (Montville Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 08:00 AM, left lane closed Fri, 10 Jul 2026 23:27:24 -0400 40.8705444335938 -74.4194183349609 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near South of NJ 31 (East Amwell Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, left lane closed Fri, 10 Jul 2026 23:27:21 -0400 40.4177169799805 -74.8789749145508 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near South of NJ 31 (East Amwell Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 23:27:22 -0400 40.4177169799805 -74.8789749145508 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near CR 643/Summit Rd (Mountainside), Thursday July 16, 2026 07:00 AM thru 03:00 PM, Fri, 10 Jul 2026 23:27:19 -0400 40.6813697814941 -74.3404922485352 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of CR 620/Burnt Mills Rd (Bedminster Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 23:27:38 -0400 40.642406463623 -74.6376724243164 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near West of Garden State Parkway (Clifton), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 06:00 AM, left lane closed, moving operation Fri, 10 Jul 2026 23:27:39 -0400 40.8776435852051 -74.1606979370117 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near South of NJ 31 (East Amwell Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 23:27:29 -0400 40.4177169799805 -74.8789749145508 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound between Corporate Dr North (Bridgewater Twp) and North of I-287 (Bedminster Twp), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:27:30 -0400 40.6355895996094 -74.6349105834961 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near East of Boulevard (Garfield), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 23:27:27 -0400 40.8923149108887 -74.1039657592773 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near CR 643/Summit Rd (Mountainside), Monday July 13, 2026 07:00 AM thru 03:00 PM, Fri, 10 Jul 2026 23:27:28 -0400 40.6813697814941 -74.3404922485352 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound between Corporate Dr North (Bridgewater Twp) and North of I-287 (Bedminster Twp), Friday July 17, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:27:34 -0400 40.6355895996094 -74.6349105834961 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 577/Springfield Ave (Union Twp) and East of CR 626/West Chestnut St (Union Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 05:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 23:27:35 -0400 40.6883430480957 -74.3105697631836 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Friday July 17, 2026 10:00 PM thru Saturday July 18, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 23:27:31 -0400 40.5741958618164 -74.6357498168945 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near West of Garden State Parkway (Clifton), Friday July 17, 2026 09:00 PM thru Saturday July 18, 2026 07:00 AM, left lane closed, moving operation Fri, 10 Jul 2026 23:27:33 -0400 40.8776435852051 -74.1606979370117 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound between North of I-287 (Edison Twp) and South of CR 531/Main St (Edison Twp), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 05:00 AM, left lane closed Fri, 10 Jul 2026 23:27:36 -0400 40.5337295532227 -74.3469924926758 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near Mountain Ave (Mountainside), Friday July 17, 2026 07:00 AM thru 03:00 PM, Fri, 10 Jul 2026 23:27:37 -0400 40.674446105957 -74.3500366210938 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near CR 614/Van Houten Av (Clifton), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 06:00 AM, left lane closed, moving operation Fri, 10 Jul 2026 23:27:06 -0400 40.8741111755371 -74.1732330322266 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near South of NJ 31 (East Amwell Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, left lane closed Fri, 10 Jul 2026 23:27:08 -0400 40.4177169799805 -74.8789749145508 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between New York State Line (Montague Twp) and North of Holland Mountain Rd (Hardyston Twp), Monday July 13, 2026 09:00 AM thru 04:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:27:01 -0400 41.3515243530273 -74.6860427856445 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near West of Garden State Parkway (Clifton), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 06:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 23:27:02 -0400 40.8776435852051 -74.1606979370117 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between West of Michigan Av (Union Twp) and East of CR 626/West Chestnut St (Union Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 05:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 23:26:59 -0400 40.689323425293 -74.3030624389648 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of CR 620/Burnt Mills Rd (Bedminster Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 23:27:00 -0400 40.642406463623 -74.6376724243164 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near CR 643/Summit Rd (Mountainside), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, Fri, 10 Jul 2026 23:27:03 -0400 40.6813697814941 -74.3404922485352 US 1&9/Tonnelle Avenue northbound : roadwork NJDOT - STMC: Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 06:00 AM, , moving operation Fri, 10 Jul 2026 23:27:04 -0400 40.7846755981445 -74.0333938598633 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of Garden State Parkway (Union Twp), Friday July 17, 2026 10:00 PM thru Saturday July 18, 2026 06:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 23:26:56 -0400 40.69189453125 -74.2652740478516 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near West of Garden State Parkway (Clifton), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 23:26:58 -0400 40.8776435852051 -74.1606979370117 US 1&9 southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 06:00 AM, , moving operation Fri, 10 Jul 2026 23:26:54 -0400 40.8407135009766 -74.0031814575195 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between New York State Line (Montague Twp) and North of Holland Mountain Rd (Hardyston Twp), Wednesday July 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:26:55 -0400 41.3515243530273 -74.6860427856445 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near East of Boulevard (Garfield), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 23:27:13 -0400 40.8923149108887 -74.1039657592773 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near Mountain Ave (Mountainside), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, Fri, 10 Jul 2026 23:27:14 -0400 40.674446105957 -74.3500366210938 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound between North of I-287 (Edison Twp) and South of CR 531/Main St (Edison Twp), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 05:00 AM, left lane closed Fri, 10 Jul 2026 23:27:11 -0400 40.5337295532227 -74.3469924926758 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of CR 620/Burnt Mills Rd (Bedminster Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 23:27:12 -0400 40.642406463623 -74.6376724243164 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between New York State Line (Montague Twp) and North of Holland Mountain Rd (Hardyston Twp), Friday July 17, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:27:15 -0400 41.3515243530273 -74.6860427856445 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound between Corporate Dr North (Bridgewater Twp) and North of I-287 (Bedminster Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:27:05 -0400 40.6355895996094 -74.6349105834961 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of CR 620/Burnt Mills Rd (Bedminster Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 23:27:09 -0400 40.642406463623 -74.6376724243164 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of CR 620/Burnt Mills Rd (Bedminster Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 23:27:10 -0400 40.642406463623 -74.6376724243164 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near West of Garden State Parkway (Clifton), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 06:00 AM, left lane closed, moving operation Fri, 10 Jul 2026 23:26:49 -0400 40.8776435852051 -74.1606979370117 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near West of Michigan Av (Union Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 05:00 AM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:26:53 -0400 40.688835144043 -74.3068161010742 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near CR 643/Summit Rd (Mountainside), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, Fri, 10 Jul 2026 23:26:50 -0400 40.6813697814941 -74.3404922485352 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near CR 626/West Chestnut St (Union Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 05:00 AM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:26:52 -0400 40.6912841796875 -74.2881698608398 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near East of Boulevard (Garfield), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 23:27:16 -0400 40.8923149108887 -74.1039657592773 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near CR 614/Van Houten Av (Clifton), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 06:00 AM, left lane closed, moving operation Fri, 10 Jul 2026 23:27:17 -0400 40.8741111755371 -74.1732330322266 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 07:00 AM, right shoulder closed Fri, 10 Jul 2026 23:27:18 -0400 40.5741958618164 -74.6357498168945 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound between NJ 172/George St (New Brunswick) and North of NJ 27 (New Brunswick), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed local lane Fri, 10 Jul 2026 23:21:26 -0400 40.4869422912598 -74.4321594238281 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and New York State Line (Montague Twp), Wednesday July 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:21:27 -0400 41.0932235717773 -74.5273742675781 NJ 19 southbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Southbound between North of CR 621/Valley Rd (Paterson) and South of CR 509/Broad St (Clifton), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 05:00 AM, at least one lane closed Fri, 10 Jul 2026 23:21:24 -0400 40.902172088623 -74.1713562011719 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Brown Rd (Wantage Twp) and North of CR 519/Greenville Rd (Wantage Twp), Wednesday July 15, 2026 09:00 AM thru 03:30 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:21:30 -0400 41.2475433349609 -74.6251068115234 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between In the vicinity of Spring Valley Rd (Paramus) and East of Jones Rd (Englewood), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 05:00 AM, right shoulder closed Fri, 10 Jul 2026 23:21:31 -0400 40.9175720214844 -74.0600509643555 NJ 19 southbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Southbound between North of CR 621/Valley Rd (Paterson) and South of CR 509/Broad St (Clifton), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Fri, 10 Jul 2026 23:21:28 -0400 40.902172088623 -74.1713562011719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 06:00 AM, local lane Fri, 10 Jul 2026 23:21:21 -0400 40.7143363952637 -74.289680480957 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and New York State Line (Montague Twp), Friday July 17, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:21:22 -0400 41.0932235717773 -74.5273742675781 NJ 19 southbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Southbound between North of CR 621/Valley Rd (Paterson) and South of CR 509/Broad St (Clifton), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 05:00 AM, at least one lane closed Fri, 10 Jul 2026 23:21:37 -0400 40.902172088623 -74.1713562011719 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound near South of US 202 (Wayne Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 23:21:35 -0400 40.9115524291992 -74.2641754150391 NJ 19 southbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Southbound between North of CR 621/Valley Rd (Paterson) and South of CR 509/Broad St (Clifton), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 05:00 AM, at least one lane closed Fri, 10 Jul 2026 23:21:33 -0400 40.902172088623 -74.1713562011719 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Saturday July 18, 2026 01:00 AM thru 06:00 AM, at least one lane closed, (2nd lane closed from 01:00 AM to 06:00 AM) Fri, 10 Jul 2026 23:21:34 -0400 40.8037414550781 -74.4586410522461 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Friday July 17, 2026 10:00 PM thru Saturday July 18, 2026 08:00 AM, right lane closed Fri, 10 Jul 2026 23:21:32 -0400 40.8557586669922 -74.3595123291016 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between In the vicinity of Spring Valley Rd (Paramus) and East of Jones Rd (Englewood), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 05:00 AM, right shoulder closed Fri, 10 Jul 2026 23:21:14 -0400 40.9175720214844 -74.0600509643555 NJ 19 southbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Southbound between North of CR 621/Valley Rd (Paterson) and South of CR 509/Broad St (Clifton), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Fri, 10 Jul 2026 23:21:12 -0400 40.902172088623 -74.1713562011719 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and New York State Line (Montague Twp), Tuesday July 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:21:13 -0400 41.0932235717773 -74.5273742675781 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 47A - I-280 (Fairfield Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:21:18 -0400 40.8766288757324 -74.3279571533203 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 12:00 AM, at least one lane closed Fri, 10 Jul 2026 23:21:19 -0400 40.8074913024902 -74.4528350830078 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and New York State Line (Montague Twp), Monday July 13, 2026 09:00 AM thru 04:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:21:16 -0400 41.0932235717773 -74.5273742675781 NJ 31 northbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Northbound near North of CR 633/Old Allerton Rd (Clinton Twp), Monday July 13, 2026 09:00 AM thru 12:00 PM, left lane closed Fri, 10 Jul 2026 23:21:20 -0400 40.6338882446289 -74.8842086791992 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near West of Exit 12 - CR 521/Hope-Blairstown Rd (Knowlton Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:21:02 -0400 40.9336128234863 -75.0240249633789 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound near South of Broad St (Newark), Friday July 17, 2026 08:00 AM thru 03:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:21:03 -0400 40.7146797180176 -74.1840133666992 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Saturday July 18, 2026 01:00 AM thru 06:00 AM, at least one lane closed Fri, 10 Jul 2026 23:21:00 -0400 40.8037414550781 -74.4586410522461 NJ 19 southbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Southbound between North of CR 621/Valley Rd (Paterson) and South of CR 509/Broad St (Clifton), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Fri, 10 Jul 2026 23:21:01 -0400 40.902172088623 -74.1713562011719 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between New York State Line (Montague Twp) and North of Holland Mountain Rd (Hardyston Twp), Tuesday July 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:21:06 -0400 41.3515243530273 -74.6860427856445 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and New York State Line (Montague Twp), Thursday July 16, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:21:07 -0400 41.0932235717773 -74.5273742675781 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 47A - I-280 (Fairfield Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:21:04 -0400 40.8766288757324 -74.3279571533203 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Friday July 17, 2026 09:00 PM thru Saturday July 18, 2026 10:00 AM, left lane closed Fri, 10 Jul 2026 23:21:08 -0400 40.8692970275879 -74.4592742919922 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound between NJ 172/George St (New Brunswick) and North of NJ 27 (New Brunswick), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed local lane Fri, 10 Jul 2026 23:21:09 -0400 40.4869422912598 -74.4321594238281 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 47A - I-280 (Fairfield Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:21:10 -0400 40.8766288757324 -74.3279571533203 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 12:00 AM, at least one lane closed, (2nd lane closed from 08:00 PM to 12:00 AM) Fri, 10 Jul 2026 23:20:52 -0400 40.8074913024902 -74.4528350830078 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between New York State Line (Montague Twp) and North of Holland Mountain Rd (Hardyston Twp), Thursday July 16, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation Fri, 10 Jul 2026 23:20:54 -0400 41.3515243530273 -74.6860427856445 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 47A - I-280 (Fairfield Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:20:50 -0400 40.8766288757324 -74.3279571533203 NJ 28 westbound : roadwork NJDOT - STMC: Roadwork on NJ 28 Westbound at CR 643/Mountain Ave (Somerville) Friday July 17, 2026 07:00 PM thru Saturday July 18, 2026 05:00 AM, intersection Fri, 10 Jul 2026 23:20:51 -0400 40.5713729858398 -74.6206970214844 NJ 19 southbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Southbound between North of CR 621/Valley Rd (Paterson) and South of CR 509/Broad St (Clifton), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 05:00 AM, at least one lane closed Fri, 10 Jul 2026 23:20:58 -0400 40.902172088623 -74.1713562011719 NJ 19 southbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Southbound between North of CR 621/Valley Rd (Paterson) and South of CR 509/Broad St (Clifton), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Fri, 10 Jul 2026 23:20:56 -0400 40.902172088623 -74.1713562011719 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 47A - I-280 (Fairfield Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 23:20:57 -0400 40.8766288757324 -74.3279571533203 NJ 77 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 77 Both Directions North of CR 611/Elmer-Shirley Rd (Upper Pittsgrove Twp) Monday July 13, 2026 07:00 AM thru 04:30 PM, 1 right lane of 2 lanes closed southbound; 1 right lane of 2 lanes closed northbound Fri, 10 Jul 2026 16:14:54 -0400 39.5798416137695 -75.2400131225586 New Jersey Turnpike northbound : roadwork NJ Turnpike Auth.: roadwork on New Jersey Turnpike northbound North of Interchange 5 - CR 541 (Springfield Twp), Monday July 13th, 2026, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed Fri, 10 Jul 2026 15:04:17 -0400 40.0500880159779 -74.7922215809239 New Jersey Turnpike northbound : bridge work NJ Turnpike Auth.: bridge work on New Jersey Turnpike northbound South of Interchange 3 - NJ 168 (Woodbury Heights), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 09:00 PM thru 03:00 AM 1 Right lane of 2 lanes closed Fri, 10 Jul 2026 15:00:50 -0400 39.8183936458239 -75.1580491268205 New Jersey Turnpike - Western Spur southbound : roadwork NJ Turnpike Auth.: roadwork on New Jersey Turnpike - Western Spur southbound North of Interchange 15W - I-280 (Kearny) to North of Interchange 15E - US 1&9 (Newark) joint repairs , Monday July 13th, 2026 thru Tuesday July 14th, 2026, 07:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed Fri, 10 Jul 2026 14:36:24 -0400 40.7670922561759 -74.1094033176762 New Jersey Turnpike - Pennsylvania Ext. westbound : line striping NJ Turnpike Auth.: line striping on New Jersey Turnpike - Pennsylvania Ext. westbound West of New Jersey Turnpike South (Mansfield Twp) to West of Toll Plaza (Florence Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 07:00 PM thru 03:00 AM 1 Left lane of 3 lanes closed Fri, 10 Jul 2026 14:33:08 -0400 40.0954473979576 -74.7488159068594 New Jersey Turnpike northbound : milling NJ Turnpike Auth.: milling and paving operations on New Jersey Turnpike Outer Roadway northbound South of Interchange 9 - NJ 18 (Milltown) to North of Interchange 9 - NJ 18 (East Brunswick Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 06:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed Fri, 10 Jul 2026 14:28:26 -0400 40.4444891368847 -74.4258065178692 New Jersey Turnpike southbound : roadwork NJ Turnpike Auth.: roadwork on New Jersey Turnpike Outer Roadway southbound between North of Interchange 14 - I-78/US 1&9 (Newark) and Interchange 6 - Pennsylvania Turnpike (Mansfield Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 07:00 PM thru 05:00 AM All lanes closed Fri, 10 Jul 2026 14:17:05 -0400 40.7125224726015 -74.1442700730626 New Jersey Turnpike southbound : milling NJ Turnpike Auth.: milling and paving operations on New Jersey Turnpike Outer Roadway southbound North of Interchange 14 - I-78/US 1&9 (Newark) to North of Interchange 13A - Newark Liberty International Airport/US 1&9 (Elizabeth), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 09:00 PM thru 02:00 AM All lanes closed Fri, 10 Jul 2026 14:06:03 -0400 40.7035951112786 -74.1537987106693 New Jersey Turnpike southbound : guard rail repairs NJ Turnpike Auth.: guard rail repairs on New Jersey Turnpike Outer Roadway southbound between South of Interchange 11 - Garden State Parkway (Woodbridge Twp) and Interchange 7A - I-195 (Robbinsville), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 09:00 PM thru 04:00 PM All lanes closed Fri, 10 Jul 2026 14:04:04 -0400 40.539682306657 -74.3159794313534 New Jersey Turnpike southbound : roadwork NJ Turnpike Auth.: roadwork on New Jersey Turnpike Inner Roadway southbound South of Interchange 10 - NJ 440/I-287 (Edison Twp) to North of Interchange 9 - NJ 18 (New Brunswick), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 09:00 PM thru 05:00 AM All lanes closed Fri, 10 Jul 2026 13:58:54 -0400 40.5236286415185 -74.3474385451954 New Jersey Turnpike southbound : milling NJ Turnpike Auth.: milling and paving operations on New Jersey Turnpike Outer Roadway southbound between North of Interchange 9 - NJ 18 (East Brunswick Twp) and South of Interchange 9 - NJ 18 (East Brunswick Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 09:00 PM thru 05:00 AM All lanes closed Fri, 10 Jul 2026 13:51:14 -0400 40.4789516369886 -74.4050704455689 New Jersey Turnpike southbound : street sweeping NJ Turnpike Auth.: street sweeping on New Jersey Turnpike Outer Roadway southbound North of Interchange 8A - NJ 32 (South Brunswick Twp) to South of Interchange 6 - Pennsylvania Turnpike (Mansfield Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 09:00 PM thru 03:00 AM All lanes closed Fri, 10 Jul 2026 13:49:18 -0400 40.3656956537061 -74.467227519287 New Jersey Turnpike southbound : line striping NJ Turnpike Auth.: line striping on New Jersey Turnpike Outer Roadway southbound South of Interchange 8 - NJ 33 (East Windsor Twp) to South of Interchange 7A - I-195 (Robbinsville), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 09:00 PM thru 05:00 AM All lanes closed Fri, 10 Jul 2026 13:46:39 -0400 40.2598481566253 -74.5133753564852 New Jersey Turnpike - Western Spur southbound : expansion joint repairs NJ Turnpike Auth.: expansion joint repairs on New Jersey Turnpike - Western Spur southbound North of Interchange 15W - I-280 (Kearny) to North of Interchange 15E - US 1&9 (Newark), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 09:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed Fri, 10 Jul 2026 13:44:09 -0400 40.7609919126162 -74.114701491235 New Jersey Turnpike : mowing NJ Turnpike Auth.: mowing on New Jersey Turnpike Outer Roadway Entrance ramp Interchange 7 - US 206 (Bordentown Twp), Monday July 13th, 2026, 09:00 AM thru 11:00 AM All lanes closed Fri, 10 Jul 2026 13:35:51 -0400 40.1250642220906 -74.6961748871775 New Jersey Turnpike southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Outer Roadway southbound Entrance ramp Interchange 10 - NJ 440/I-287 (Edison Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 07:00 PM thru 05:00 AM All lanes closed Fri, 10 Jul 2026 13:30:25 -0400 40.527979838992 -74.3419558056234 New Jersey Turnpike southbound : roadwork NJ Turnpike Auth.: roadwork on New Jersey Turnpike Outer Roadway southbound Entrance ramp Interchange 8 - NJ 33 (East Windsor Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 09:00 PM thru 05:00 AM All lanes closed Fri, 10 Jul 2026 13:19:34 -0400 40.2646941522508 -74.5135326396417 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 607/Lackawanna Dr (Byram Twp) and South of CR 517 (Byram Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:14:51 -0400 40.9515151977539 -74.7346878051758 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound at Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) Tuesday July 14, 2026 11:00 PM thru Wednesday July 15, 2026 05:00 AM, ramp Fri, 10 Jul 2026 13:14:54 -0400 40.9101753234863 -74.5060501098633 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound at Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) Wednesday July 15, 2026 11:00 PM thru Thursday July 16, 2026 05:00 AM, ramp Fri, 10 Jul 2026 13:14:56 -0400 40.9101753234863 -74.5060501098633 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound at Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) Thursday July 16, 2026 11:00 PM thru Friday July 17, 2026 05:00 AM, ramp Fri, 10 Jul 2026 13:14:52 -0400 40.9101753234863 -74.5060501098633 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound at Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) Monday July 13, 2026 11:00 PM thru Tuesday July 14, 2026 05:00 AM, ramp Fri, 10 Jul 2026 13:14:53 -0400 40.9101753234863 -74.5060501098633 New Jersey Turnpike - Pennsylvania Ext. westbound : line striping NJ Turnpike Auth.: line striping on New Jersey Turnpike - Pennsylvania Ext. westbound East of Toll Plaza (Florence Twp) to West of Toll Plaza (Florence Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 07:00 PM thru 03:00 AM 2 Left lanes of 3 lanes closed Fri, 10 Jul 2026 13:14:46 -0400 40.0948675083203 -74.7675627908097 NJ 44 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 44 Both Directions between CR 678/Berkeley Rd (Paulsboro) and CR 640/Delaware St (West Deptford Twp) Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, 1 right lane of 2 lanes closed eastbound; 1 right lane of 2 lanes closed westbound Fri, 10 Jul 2026 13:12:17 -0400 39.8262786865234 -75.2553024291992 NJ 44 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 44 Both Directions between CR 678/Berkeley Rd (Paulsboro) and CR 640/Delaware St (West Deptford Twp) Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 06:00 AM, 1 right lane of 2 lanes closed eastbound; 1 right lane of 2 lanes closed westbound Fri, 10 Jul 2026 13:12:21 -0400 39.8262786865234 -75.2553024291992 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Tuesday July 14, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:12:08 -0400 40.5338592529297 -74.6204376220703 NJ 44 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 44 Both Directions between CR 678/Berkeley Rd (Paulsboro) and CR 640/Delaware St (West Deptford Twp) Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, 1 right lane of 2 lanes closed eastbound; 1 right lane of 2 lanes closed westbound Fri, 10 Jul 2026 13:12:11 -0400 39.8262786865234 -75.2553024291992 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound near South of CR 527/Old Bridge Tpke/Edgeboro Rd (East Brunswick Twp), Monday July 13, 2026 10:00 PM thru Tuesday July 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Fri, 10 Jul 2026 13:11:51 -0400 40.4623031616211 -74.4038238525391 NJ 18 southbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Southbound between New Jersey Turnpike (East Brunswick Twp) and South of CR 527/Old Bridge Tpke/Edgeboro Rd (East Brunswick Twp), Monday July 13, 2026 10:00 PM thru Tuesday July 14, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Fri, 10 Jul 2026 13:11:53 -0400 40.4728813171387 -74.4093704223633 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Thursday July 16, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:12:06 -0400 40.513240814209 -74.6323852539062 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Friday July 17, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:12:07 -0400 40.5338592529297 -74.6204376220703 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Wednesday July 15, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:12:03 -0400 40.513240814209 -74.6323852539062 NJ 18 southbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Southbound between New Jersey Turnpike (East Brunswick Twp) and South of CR 527/Old Bridge Tpke/Edgeboro Rd (East Brunswick Twp), Monday July 13, 2026 10:00 PM thru Tuesday July 14, 2026 05:00 AM, at least one lane closed Fri, 10 Jul 2026 13:12:05 -0400 40.4728813171387 -74.4093704223633 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Friday July 17, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:11:57 -0400 40.513240814209 -74.6323852539062 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Monday July 13, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:11:58 -0400 40.513240814209 -74.6323852539062 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Thursday July 16, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:11:54 -0400 40.5338592529297 -74.6204376220703 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Tuesday July 14, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:11:56 -0400 40.513240814209 -74.6323852539062 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Wednesday July 15, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:12:02 -0400 40.5338592529297 -74.6204376220703 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Monday July 13, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 13:11:59 -0400 40.5338592529297 -74.6204376220703 NJ 18 northbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Northbound between South of CR 527/Old Bridge Tpke/Edgeboro Rd (East Brunswick Twp) and New Jersey Turnpike (East Brunswick Twp), Monday July 13, 2026 10:00 PM thru Tuesday July 14, 2026 05:00 AM, at least one lane closed Fri, 10 Jul 2026 13:12:01 -0400 40.4623031616211 -74.4038238525391 NJ 70 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Both Directions between NJ 38 (Pennsauken Twp) and East of CR 636/Cuthbert Blvd (Cherry Hill Twp) Monday July 13, 2026 07:00 AM thru 03:30 PM, 1 left lane, 1 right lane of 3 lanes closed eastbound; 1 left lane of 3 lanes closed westbound Fri, 10 Jul 2026 13:10:21 -0400 39.9343376159668 -75.0728378295898 NJ 79 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 79 Both Directions between South of NJ 18 (Marlboro Twp) and North of Wyncrest Rd (Marlboro Twp) Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, 1 right lane of 2 lanes closed eastbound; 1 right lane of 2 lanes closed westbound Fri, 10 Jul 2026 13:08:34 -0400 40.3081092834473 -74.2511367797852 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Friday July 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:24 -0400 40.8931846618652 -74.2573089599609 NJ 124 westbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Westbound between In the Vicinity of CR 649/John F Kennedy Pkwy (Summit) and In the vicinity of Alexander Av (Madison), Tuesday July 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:59 -0400 40.7389144897461 -74.3685150146484 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between East of Exit 63 - NJ 17 North (Lodi) and East of Exit 62 - Garden State Parkway (Saddle Brook Twp), left shoulder Fri, 10 Jul 2026 12:52:00 -0400 40.8869895935059 -74.0695648193359 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and East of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Friday July 17, 2026 10:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 12:52:06 -0400 40.663402557373 -74.4206008911133 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound near I-287 (Riverdale), Monday July 13, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 12:52:03 -0400 40.989501953125 -74.3105850219727 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of I-287 (Parsippany-Troy Hills Twp), Tuesday July 14, 2026 08:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:05 -0400 40.8908996582031 -74.512825012207 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between East of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of I-287 (Parsippany-Troy Hills Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:52:09 -0400 40.8789024353027 -74.4479675292969 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound near I-287 (Edison Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:07 -0400 40.5285949707031 -74.3541107177734 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Thursday July 16, 2026 08:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:08 -0400 40.8705444335938 -74.4194183349609 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Tuesday July 14, 2026 08:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:13 -0400 40.8705444335938 -74.4194183349609 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:14 -0400 40.8899612426758 -74.1311798095703 NJ 124 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Eastbound between In the vicinity of Alexander Av (Madison) and In the Vicinity of CR 649/John F Kennedy Pkwy (Summit), Tuesday July 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:11 -0400 40.7553787231445 -74.4095764160156 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between East of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of I-287 (Parsippany-Troy Hills Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:52:12 -0400 40.8789024353027 -74.4479675292969 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Friday July 17, 2026 08:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:15 -0400 40.8705444335938 -74.4194183349609 NJ 124 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Eastbound between In the vicinity of Alexander Av (Madison) and In the Vicinity of CR 649/John F Kennedy Pkwy (Summit), Monday July 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:17 -0400 40.7553787231445 -74.4095764160156 Pulaski Skyway northbound : roadwork NJDOT - STMC: Roadwork on Pulaski Skyway at South Kearny (South Kearny) Monday July 13, 2026 09:00 AM thru 03:00 PM, ramp Fri, 10 Jul 2026 12:52:18 -0400 40.7344398498535 -74.1040878295898 NJ 124 westbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Westbound between In the Vicinity of CR 649/John F Kennedy Pkwy (Summit) and In the vicinity of Alexander Av (Madison), Monday July 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:21 -0400 40.7389144897461 -74.3685150146484 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:22 -0400 40.8931846618652 -74.2573089599609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 621/Hook Mountain Rd (Montville Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, left lane closed Fri, 10 Jul 2026 12:52:20 -0400 40.8705444335938 -74.4194183349609 NJ 124 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Eastbound between In the vicinity of Alexander Av (Madison) and In the Vicinity of CR 649/John F Kennedy Pkwy (Summit), Friday July 17, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:49 -0400 40.7553787231445 -74.4095764160156 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound near I-287 (Edison Twp), Friday July 17, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:53 -0400 40.5285949707031 -74.3541107177734 US 1&9/Tonnelle Avenue northbound : roadwork NJDOT - STMC: Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, , moving operation Fri, 10 Jul 2026 12:51:54 -0400 40.7846755981445 -74.0333938598633 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound near I-287 (Edison Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:51 -0400 40.5285949707031 -74.3541107177734 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound near I-287 (Edison Twp), Thursday July 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:52 -0400 40.5285949707031 -74.3541107177734 NJ 124 westbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Westbound between In the Vicinity of CR 649/John F Kennedy Pkwy (Summit) and In the vicinity of Alexander Av (Madison), Wednesday July 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:57 -0400 40.7389144897461 -74.3685150146484 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:58 -0400 40.8931846618652 -74.2573089599609 US 1&9/Tonnelle Avenue northbound : roadwork NJDOT - STMC: Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, , moving operation Fri, 10 Jul 2026 12:51:55 -0400 40.7846755981445 -74.0333938598633 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between East of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of I-287 (Parsippany-Troy Hills Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:52:01 -0400 40.8789024353027 -74.4479675292969 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:52:02 -0400 40.8899612426758 -74.1311798095703 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), left shoulder Fri, 10 Jul 2026 12:51:15 -0400 40.6438446044922 -74.6615905761719 US 1&9 southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, , moving operation Fri, 10 Jul 2026 12:51:17 -0400 40.8407135009766 -74.0031814575195 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound near I-287 (Edison Twp), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:13 -0400 40.5285949707031 -74.3541107177734 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:14 -0400 40.8931846618652 -74.2573089599609 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Wednesday July 15, 2026 08:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:40 -0400 40.8705444335938 -74.4194183349609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 621/Hook Mountain Rd (Montville Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, left lane closed Fri, 10 Jul 2026 12:51:41 -0400 40.8705444335938 -74.4194183349609 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:38 -0400 40.8899612426758 -74.1311798095703 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of I-287 (Parsippany-Troy Hills Twp), Wednesday July 15, 2026 08:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:39 -0400 40.8908996582031 -74.512825012207 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of I-287 (Parsippany-Troy Hills Twp), Monday July 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:30 -0400 40.8908996582031 -74.512825012207 Pulaski Skyway northbound : roadwork NJDOT - STMC: Roadwork on Pulaski Skyway at South Kearny (South Kearny) Thursday July 16, 2026 09:00 AM thru 03:00 PM, ramp Fri, 10 Jul 2026 12:51:31 -0400 40.7344398498535 -74.1040878295898 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 621/Hook Mountain Rd (Montville Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, left lane closed Fri, 10 Jul 2026 12:51:11 -0400 40.8705444335938 -74.4194183349609 NJ 124 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Eastbound between In the vicinity of Alexander Av (Madison) and In the Vicinity of CR 649/John F Kennedy Pkwy (Summit), Thursday July 16, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:12 -0400 40.7553787231445 -74.4095764160156 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 621/Hook Mountain Rd (Montville Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, left lane closed Fri, 10 Jul 2026 12:51:10 -0400 40.8705444335938 -74.4194183349609 Pulaski Skyway northbound : roadwork NJDOT - STMC: Roadwork on Pulaski Skyway at South Kearny (South Kearny) Tuesday July 14, 2026 09:00 AM thru 03:00 PM, ramp Fri, 10 Jul 2026 12:51:44 -0400 40.7344398498535 -74.1040878295898 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:45 -0400 40.8899612426758 -74.1311798095703 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of I-287 (Parsippany-Troy Hills Twp), Thursday July 16, 2026 08:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:48 -0400 40.8908996582031 -74.512825012207 Pulaski Skyway northbound : roadwork NJDOT - STMC: Roadwork on Pulaski Skyway at South Kearny (South Kearny) Wednesday July 15, 2026 09:00 AM thru 03:00 PM, ramp Fri, 10 Jul 2026 12:51:46 -0400 40.7344398498535 -74.1040878295898 NJ 124 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Eastbound between In the vicinity of Alexander Av (Madison) and In the Vicinity of CR 649/John F Kennedy Pkwy (Summit), Wednesday July 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:47 -0400 40.7553787231445 -74.4095764160156 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and East of CR 618/Mountain Lakes Blvd (Mountain Lakes), Thursday July 16, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:51:43 -0400 40.8705444335938 -74.4194183349609 NJ 124 westbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Westbound between In the Vicinity of CR 649/John F Kennedy Pkwy (Summit) and In the vicinity of Alexander Av (Madison), Friday July 17, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:23 -0400 40.7389144897461 -74.3685150146484 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between East of Exit 63 - NJ 17 North (Lodi) and East of Exit 62 - Garden State Parkway (Saddle Brook Twp), left shoulder Fri, 10 Jul 2026 12:51:24 -0400 40.8869895935059 -74.0695648193359 US 1&9 southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, , moving operation Fri, 10 Jul 2026 12:51:21 -0400 40.8407135009766 -74.0031814575195 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Monday July 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:22 -0400 40.8705444335938 -74.4194183349609 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and East of CR 618/Mountain Lakes Blvd (Mountain Lakes), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:51:28 -0400 40.8705444335938 -74.4194183349609 NJ 124 westbound : roadwork NJDOT - STMC: Roadwork on NJ 124 Westbound between In the Vicinity of CR 649/John F Kennedy Pkwy (Summit) and In the vicinity of Alexander Av (Madison), Thursday July 16, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:29 -0400 40.7389144897461 -74.3685150146484 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and West of I-287 (Parsippany-Troy Hills Twp), Friday July 17, 2026 08:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:26 -0400 40.8908996582031 -74.512825012207 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:27 -0400 40.8931846618652 -74.2573089599609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between East of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of I-287 (Parsippany-Troy Hills Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:51:20 -0400 40.8789024353027 -74.4479675292969 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and East of CR 618/Mountain Lakes Blvd (Mountain Lakes), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:51:18 -0400 40.8705444335938 -74.4194183349609 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:51:19 -0400 40.8899612426758 -74.1311798095703 US 1&9 southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, , moving operation Fri, 10 Jul 2026 12:51:32 -0400 40.8407135009766 -74.0031814575195 US 1&9 southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, , moving operation Fri, 10 Jul 2026 12:51:36 -0400 40.8407135009766 -74.0031814575195 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and East of CR 618/Mountain Lakes Blvd (Mountain Lakes), Friday July 17, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:51:37 -0400 40.8705444335938 -74.4194183349609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between East of CR 618/Mountain Lakes Blvd (Mountain Lakes) and West of I-287 (Parsippany-Troy Hills Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:51:33 -0400 40.8789024353027 -74.4479675292969 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between East of Exit 63 - NJ 17 North (Lodi) and East of Exit 62 - Garden State Parkway (Saddle Brook Twp), left shoulder Fri, 10 Jul 2026 12:51:35 -0400 40.8869895935059 -74.0695648193359 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between East of Exit 63 - NJ 17 North (Lodi) and East of Exit 62 - Garden State Parkway (Saddle Brook Twp), left shoulder Fri, 10 Jul 2026 12:50:51 -0400 40.8869895935059 -74.0695648193359 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between East of Exit 63 - NJ 17 North (Lodi) and East of Exit 62 - Garden State Parkway (Saddle Brook Twp), left shoulder Fri, 10 Jul 2026 12:51:03 -0400 40.8869895935059 -74.0695648193359 Pulaski Skyway northbound : roadwork NJDOT - STMC: Roadwork on Pulaski Skyway at South Kearny (South Kearny) Friday July 17, 2026 09:00 AM thru 03:00 PM, ramp Fri, 10 Jul 2026 12:51:08 -0400 40.7344398498535 -74.1040878295898 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and East of CR 618/Mountain Lakes Blvd (Mountain Lakes), Monday July 13, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:50:52 -0400 40.8705444335938 -74.4194183349609 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions At CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) Thursday July 16, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 12:47:29 -0400 39.6175880432129 -75.0805435180664 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions At CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) Friday July 17, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 12:47:37 -0400 39.6175880432129 -75.0805435180664 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions At CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) Wednesday July 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 12:47:21 -0400 39.6175880432129 -75.0805435180664 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions At CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 12:46:58 -0400 39.6175880432129 -75.0805435180664 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions At CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 12:47:09 -0400 39.6175880432129 -75.0805435180664 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:46:00 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:58 -0400 40.6507987976074 -74.7552947998047 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and East of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Thursday July 16, 2026 10:00 AM thru 02:00 PM, right lane closed Fri, 10 Jul 2026 12:45:59 -0400 40.663402557373 -74.4206008911133 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:44 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Fri, 10 Jul 2026 12:45:52 -0400 40.6507987976074 -74.7552947998047 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:56 -0400 40.663402557373 -74.4206008911133 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Fri, 10 Jul 2026 12:45:57 -0400 40.6507987976074 -74.7552947998047 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 12:45:53 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and East of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Wednesday July 15, 2026 10:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 12:45:55 -0400 40.663402557373 -74.4206008911133 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:48 -0400 40.6507987976074 -74.7552947998047 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and East of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Monday July 13, 2026 10:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 12:45:49 -0400 40.663402557373 -74.4206008911133 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:45:45 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:46 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Friday July 17, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:50 -0400 40.663402557373 -74.4206008911133 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 12:45:51 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:37 -0400 40.6507987976074 -74.7552947998047 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), left shoulder Fri, 10 Jul 2026 12:45:36 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:39 -0400 40.663402557373 -74.4206008911133 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:38 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and East of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Friday July 17, 2026 10:00 AM thru 02:00 PM, right lane closed Fri, 10 Jul 2026 12:45:13 -0400 40.663402557373 -74.4206008911133 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), left shoulder Fri, 10 Jul 2026 12:45:08 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:15 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 12:45:17 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:45:16 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Fri, 10 Jul 2026 12:45:18 -0400 40.6507987976074 -74.7552947998047 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 12:45:20 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:19 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:22 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 12:45:21 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and East of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Thursday July 16, 2026 10:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 12:45:25 -0400 40.663402557373 -74.4206008911133 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:23 -0400 40.663402557373 -74.4206008911133 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:45:27 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Fri, 10 Jul 2026 12:45:26 -0400 40.6507987976074 -74.7552947998047 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:28 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), left shoulder Fri, 10 Jul 2026 12:45:30 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and East of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Monday July 13, 2026 10:00 AM thru 02:00 PM, right lane closed Fri, 10 Jul 2026 12:45:29 -0400 40.663402557373 -74.4206008911133 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:45:32 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Thursday July 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:31 -0400 40.663402557373 -74.4206008911133 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 10 Jul 2026 12:45:35 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:33 -0400 40.6507987976074 -74.7552947998047 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:44:50 -0400 40.6507987976074 -74.7552947998047 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and East of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Tuesday July 14, 2026 10:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 12:44:53 -0400 40.663402557373 -74.4206008911133 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:44:51 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 12:45:03 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp), left shoulder Fri, 10 Jul 2026 12:44:58 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between Exit 24 - CR 523/Oldwick Rd (Tewksbury Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Fri, 10 Jul 2026 12:45:43 -0400 40.6507987976074 -74.7552947998047 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and East of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Tuesday July 14, 2026 10:00 AM thru 02:00 PM, right lane closed Fri, 10 Jul 2026 12:45:41 -0400 40.663402557373 -74.4206008911133 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and East of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Wednesday July 15, 2026 10:00 AM thru 02:00 PM, right lane closed Fri, 10 Jul 2026 12:45:42 -0400 40.663402557373 -74.4206008911133 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions At CR 646/Deptford Av (Deptford Twp) Tuesday July 14, 2026 07:00 AM thru 03:30 PM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Fri, 10 Jul 2026 12:41:49 -0400 39.8403816223145 -75.1250686645508 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions South of CR 534/Cooper St (Deptford Twp) Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 12:40:02 -0400 39.8234214782715 -75.1246871948242 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions South of CR 534/Cooper St (Deptford Twp) Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 12:39:57 -0400 39.8234214782715 -75.1246871948242 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions South of CR 534/Cooper St (Deptford Twp) Thursday July 16, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 12:40:13 -0400 39.8234214782715 -75.1246871948242 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions South of CR 534/Cooper St (Deptford Twp) Wednesday July 15, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 12:40:07 -0400 39.8234214782715 -75.1246871948242 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions South of CR 534/Cooper St (Deptford Twp) Friday July 17, 2026 07:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 12:40:18 -0400 39.8234214782715 -75.1246871948242 NJ 47 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Both Directions At CR 651/Greentree Rd (Glassboro) Monday July 13, 2026 07:00 AM thru 03:30 PM, 1 right lane of 3 lanes closed northbound; 1 right lane of 3 lanes closed southbound Fri, 10 Jul 2026 12:37:37 -0400 39.7128715515137 -75.1113967895508 NJ 47 southbound : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Southbound At CR 534/Cooper St (Deptford Twp) Wednesday July 15, 2026 09:00 AM thru 03:30 PM, 1 right lane of 2 lanes closed Fri, 10 Jul 2026 12:36:33 -0400 39.8275260925293 -75.1247940063477 NJ 47 northbound : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Northbound At CR 647/Bankbridge Rd/Foxrun Rd (Deptford Twp) Friday July 17, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed Fri, 10 Jul 2026 12:35:24 -0400 39.7966842651367 -75.1167449951172 NJ 47 northbound : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Northbound At CR 647/Bankbridge Rd/Foxrun Rd (Deptford Twp) Tuesday July 14, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed Fri, 10 Jul 2026 12:35:07 -0400 39.7966842651367 -75.1167449951172 NJ 47 northbound : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Northbound At CR 647/Bankbridge Rd/Foxrun Rd (Deptford Twp) Monday July 13, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed Fri, 10 Jul 2026 12:34:59 -0400 39.7966842651367 -75.1167449951172 NJ 47 northbound : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Northbound At CR 647/Bankbridge Rd/Foxrun Rd (Deptford Twp) Thursday July 16, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed Fri, 10 Jul 2026 12:35:18 -0400 39.7966842651367 -75.1167449951172 NJ 47 northbound : roadwork NJ DOT - TOC South: Roadwork on NJ 47 Northbound At CR 647/Bankbridge Rd/Foxrun Rd (Deptford Twp) Wednesday July 15, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed Fri, 10 Jul 2026 12:35:12 -0400 39.7966842651367 -75.1167449951172 NJ 48 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 48 Both Directions At CR 551/Pennsville-Auburn Rd (Carneys Point Twp) Tuesday July 14, 2026 07:00 AM thru 04:00 PM, 1 right lane of 2 lanes closed southbound; 1 right lane of 2 lanes closed northbound Fri, 10 Jul 2026 12:28:53 -0400 39.702091217041 -75.4399185180664 NJ 48 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 48 Both Directions At CR 551/Pennsville-Auburn Rd (Carneys Point Twp) Friday July 17, 2026 07:00 AM thru 04:00 PM, 1 right lane of 2 lanes closed southbound; 1 right lane of 2 lanes closed northbound Fri, 10 Jul 2026 12:29:09 -0400 39.702091217041 -75.4399185180664 NJ 48 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 48 Both Directions At CR 551/Pennsville-Auburn Rd (Carneys Point Twp) Thursday July 16, 2026 07:00 AM thru 04:00 PM, 1 right lane of 2 lanes closed southbound; 1 right lane of 2 lanes closed northbound Fri, 10 Jul 2026 12:29:04 -0400 39.702091217041 -75.4399185180664 NJ 48 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 48 Both Directions At CR 551/Pennsville-Auburn Rd (Carneys Point Twp) Wednesday July 15, 2026 07:00 AM thru 04:00 PM, 1 right lane of 2 lanes closed southbound; 1 right lane of 2 lanes closed northbound Fri, 10 Jul 2026 12:28:58 -0400 39.702091217041 -75.4399185180664 NJ 79 southbound : roadwork NJ DOT - TOC South: Roadwork on NJ 79 Southbound North of CR 46/Dutch Rd (Freehold Twp) Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, All lanes closed and detoured Fri, 10 Jul 2026 12:23:25 -0400 40.2694053649902 -74.2652359008789 NJ 79 southbound : roadwork NJ DOT - TOC South: Roadwork on NJ 79 Southbound North of CR 46/Dutch Rd (Freehold Twp) Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 05:00 AM, All lanes closed and detoured Fri, 10 Jul 2026 12:23:46 -0400 40.2694053649902 -74.2652359008789 NJ 79 southbound : roadwork NJ DOT - TOC South: Roadwork on NJ 79 Southbound North of CR 46/Dutch Rd (Freehold Twp) Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, All lanes closed and detoured Fri, 10 Jul 2026 12:23:39 -0400 40.2694053649902 -74.2652359008789 NJ 79 southbound : roadwork NJ DOT - TOC South: Roadwork on NJ 79 Southbound North of CR 46/Dutch Rd (Freehold Twp) Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, All lanes closed and detoured Fri, 10 Jul 2026 12:23:15 -0400 40.2694053649902 -74.2652359008789 NJ 79 southbound : roadwork NJ DOT - TOC South: Roadwork on NJ 79 Southbound North of CR 46/Dutch Rd (Freehold Twp) Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, All lanes closed and detoured Fri, 10 Jul 2026 12:23:09 -0400 40.2694053649902 -74.2652359008789 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions between CR 630/Fortmott Rd (Pennsville Twp) and East of CR 551/South Hook Rd (Pennsville Twp) Friday July 17, 2026 07:00 AM thru 05:00 PM, right shoulder closed eastbound; right shoulder closed westbound Fri, 10 Jul 2026 12:17:44 -0400 39.6396713256836 -75.5164566040039 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions between CR 630/Fortmott Rd (Pennsville Twp) and East of CR 551/South Hook Rd (Pennsville Twp) Wednesday July 15, 2026 07:00 AM thru 05:00 PM, right shoulder closed eastbound; right shoulder closed westbound Fri, 10 Jul 2026 12:17:30 -0400 39.6396713256836 -75.5164566040039 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions between CR 630/Fortmott Rd (Pennsville Twp) and East of CR 551/South Hook Rd (Pennsville Twp) Tuesday July 14, 2026 07:00 AM thru 05:00 PM, right shoulder closed eastbound; right shoulder closed westbound Fri, 10 Jul 2026 12:17:25 -0400 39.6396713256836 -75.5164566040039 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions between CR 630/Fortmott Rd (Pennsville Twp) and East of CR 551/South Hook Rd (Pennsville Twp) Thursday July 16, 2026 07:00 AM thru 05:00 PM, right shoulder closed eastbound; right shoulder closed westbound Fri, 10 Jul 2026 12:17:40 -0400 39.6396713256836 -75.5164566040039 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions between CR 630/Fortmott Rd (Pennsville Twp) and East of CR 551/South Hook Rd (Pennsville Twp) Monday July 13, 2026 07:00 AM thru 05:00 PM, right shoulder closed eastbound; right shoulder closed westbound Fri, 10 Jul 2026 12:17:20 -0400 39.6396713256836 -75.5164566040039 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Monday July 13, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 11:23:10 -0400 39.7506637573242 -75.3757171630859 US 322 eastbound : roadwork NJDOT - TOC South: Roadwork on US 322 Eastbound near East of NJ 47 (Glassboro), Friday July 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:23:09 -0400 39.701732635498 -75.1063919067383 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound near Exit 3 - Morgan Blvd (Camden), Tuesday July 14, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 11:23:12 -0400 39.912036895752 -75.1158294677734 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, acceleration lane closed Fri, 10 Jul 2026 11:23:11 -0400 40.0096321105957 -74.8508987426758 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near South of CR 692/Franklin Av (Berlin), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right shoulder closed, moving operation Fri, 10 Jul 2026 11:23:19 -0400 39.8100128173828 -74.9308166503906 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near South of CR 559 Alternate/Ocean Heights Av (Somers Point), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:23:20 -0400 39.3305549621582 -74.5934982299805 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near South of CR 559 Alternate/Ocean Heights Av (Somers Point), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:23:23 -0400 39.3305549621582 -74.5934982299805 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near South of CR 559 Alternate/Ocean Heights Av (Somers Point), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:23:18 -0400 39.3305549621582 -74.5934982299805 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near South of CR 692/Franklin Av (Berlin), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right shoulder closed, moving operation Fri, 10 Jul 2026 11:23:28 -0400 39.8100128173828 -74.9308166503906 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:23:29 -0400 39.7488327026367 -75.3786315917969 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, acceleration lane closed Fri, 10 Jul 2026 11:23:16 -0400 40.0096321105957 -74.8508987426758 NJ 33 eastbound : roadwork NJDOT - TOC South: Roadwork on NJ 33 Eastbound between East of CR 622/South Olden Ave (Hamilton Twp) and West of White Horse-Hamilton Square Rd (Hamilton Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 11:23:13 -0400 40.2260437011719 -74.7329864501953 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 11:23:22 -0400 39.7551803588867 -75.0467071533203 NJ 33 westbound : roadwork NJDOT - TOC South: Roadwork on NJ 33 Westbound between West of White Horse-Hamilton Square Rd (Hamilton Twp) and East of CR 622/South Olden Ave (Hamilton Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 11:23:14 -0400 40.2285346984863 -74.6670455932617 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:23:21 -0400 39.9504470825195 -74.9297866821289 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of US 40/Black Horse Pike/US 322 (Pleasantville) and Reading Av (Pleasantville), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:23:26 -0400 39.3931465148926 -74.5296401977539 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 7 (Oldmans Twp) and North of Exit 11 - US 322 (Logan Twp), Thursday July 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:23:27 -0400 39.7355995178223 -75.4010162353516 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound near Exit 3 - Morgan Blvd (Camden), Wednesday July 15, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 11:23:25 -0400 39.912036895752 -75.1158294677734 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Monday July 13, 2026 06:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:38 -0400 39.7623252868652 -75.0479965209961 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between Exit 1 - Collings Ave (Camden) and Exit 3 - Morgan Blvd (Camden), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, at least one lane closed Fri, 10 Jul 2026 11:22:33 -0400 39.9021301269531 -75.1126327514648 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 11:22:36 -0400 39.7551803588867 -75.0467071533203 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of NJ 33 Business (Freehold Twp) and South of Schibanoff Ln (Freehold Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, right lane closed Fri, 10 Jul 2026 11:22:32 -0400 40.258731842041 -74.2914352416992 US 322 eastbound : roadwork NJDOT - TOC South: Roadwork on US 322 Eastbound near East of NJ 47 (Glassboro), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:40 -0400 39.701732635498 -75.1063919067383 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound at South of Exit 10 - Center Square Rd (Logan Twp) Monday July 13, 2026 11:00 PM thru Tuesday July 14, 2026 05:00 AM, ramp Fri, 10 Jul 2026 11:23:04 -0400 39.7576751708984 -75.3662109375 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between North of Exit 11 - US 322 (Logan Twp) and North of Exit 7 (Oldmans Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:23:03 -0400 39.7856674194336 -75.3339538574219 NJ 168 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 168 Southbound near North of NJ 42 (Gloucester Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:23:08 -0400 39.8173332214355 -75.0680465698242 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of US 40/Black Horse Pike/US 322 (Pleasantville) and Reading Av (Pleasantville), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:23:07 -0400 39.3931465148926 -74.5296401977539 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Thursday July 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:26 -0400 39.9504470825195 -74.9297866821289 US 322 eastbound : roadwork NJDOT - TOC South: Roadwork on US 322 Eastbound near East of NJ 47 (Glassboro), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:21 -0400 39.701732635498 -75.1063919067383 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound near North of Central Ave (Linwood), Tuesday July 14, 2026 09:00 AM thru 12:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:25 -0400 39.3597450256348 -74.5669174194336 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 11:22:24 -0400 39.7551803588867 -75.0467071533203 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and Exit 3 - Hamilton Square-Yardville Rd (Hamilton Twp), Tuesday July 14, 2026 09:00 AM thru 02:00 PM, , moving operation Fri, 10 Jul 2026 11:22:44 -0400 40.1839637756348 -74.7235107421875 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near Exit 1 - Collings Ave (Camden), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Fri, 10 Jul 2026 11:22:42 -0400 39.9021301269531 -75.1126327514648 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of NJ 33 Business (Freehold Twp) and South of Schibanoff Ln (Freehold Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, right lane closed Fri, 10 Jul 2026 11:22:43 -0400 40.258731842041 -74.2914352416992 NJ 36 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Southbound near Long Branch Av (Long Branch), Tuesday July 14, 2026 09:30 PM thru Wednesday July 15, 2026 05:30 AM, right shoulder closed Fri, 10 Jul 2026 11:22:49 -0400 40.3132629394531 -73.9845886230469 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Friday July 17, 2026 06:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:45 -0400 39.7623252868652 -75.0479965209961 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between Exit 1 - Collings Ave (Camden) and Exit 3 - Morgan Blvd (Camden), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, at least one lane closed Fri, 10 Jul 2026 11:22:51 -0400 39.9021301269531 -75.1126327514648 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near North of NJ 38 (Pennsauken Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 11:22:47 -0400 39.9362373352051 -75.077766418457 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between North of Exit 11 - US 322 (Logan Twp) and North of Exit 7 (Oldmans Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:52 -0400 39.7856674194336 -75.3339538574219 NJ 168 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 168 Southbound near North of NJ 42 (Gloucester Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:22:50 -0400 39.8173332214355 -75.0680465698242 NJ 33 eastbound : roadwork NJDOT - TOC South: Roadwork on NJ 33 Eastbound between East of CR 622/South Olden Ave (Hamilton Twp) and West of White Horse-Hamilton Square Rd (Hamilton Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 11:22:46 -0400 40.2260437011719 -74.7329864501953 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and Exit 3 - Hamilton Square-Yardville Rd (Hamilton Twp), Monday July 13, 2026 09:00 AM thru 02:00 PM, , moving operation Fri, 10 Jul 2026 11:22:57 -0400 40.1839637756348 -74.7235107421875 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near North of NJ 38 (Pennsauken Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 11:22:53 -0400 39.937198638916 -75.0763702392578 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:23:00 -0400 39.7488327026367 -75.3786315917969 NJ 36 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Southbound near Long Branch Av (Long Branch), Monday July 13, 2026 09:30 PM thru Tuesday July 14, 2026 05:30 AM, right shoulder closed Fri, 10 Jul 2026 11:22:59 -0400 40.3132629394531 -73.9845886230469 US 206 northbound : roadwork NJDOT - TOC South: Roadwork on US 206 between South of Cold Soil Rd (Lawrence Twp) and Eggert Crossing Rd (Lawrence Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, right shoulder closed Fri, 10 Jul 2026 11:23:02 -0400 40.2999954223633 -74.7274703979492 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 11:23:01 -0400 39.7551803588867 -75.0467071533203 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near North of NJ 38 (Pennsauken Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 11:22:15 -0400 39.9362373352051 -75.077766418457 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near South of Exit 10 - Center Square Rd (Logan Twp), Tuesday July 14, 2026 11:00 PM thru Wednesday July 15, 2026 05:00 AM, acceleration lane closed Fri, 10 Jul 2026 11:22:11 -0400 39.7556991577148 -75.3689651489258 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Thursday July 16, 2026 06:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:12 -0400 39.7623252868652 -75.0479965209961 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Tuesday July 14, 2026 06:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:10 -0400 39.7623252868652 -75.0479965209961 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound between I-295 (Hamilton Twp) and Exit 3 - Hamilton Square-Yardville Rd (Hamilton Twp), Wednesday July 15, 2026 09:00 AM thru 02:00 PM, , moving operation Fri, 10 Jul 2026 11:21:50 -0400 40.1839637756348 -74.7235107421875 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound at North of Exit 10 - Center Square Rd (Logan Twp) Tuesday July 14, 2026 11:00 PM thru Wednesday July 15, 2026 05:00 AM, ramp Fri, 10 Jul 2026 11:22:20 -0400 39.7638473510742 -75.3582534790039 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between North of Exit 11 - US 322 (Logan Twp) and North of Exit 7 (Oldmans Twp), Thursday July 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:09 -0400 39.7856674194336 -75.3339538574219 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:18 -0400 39.7488327026367 -75.3786315917969 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound at Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) Thursday July 16, 2026 11:00 PM thru Friday July 17, 2026 05:00 AM, ramp Fri, 10 Jul 2026 11:22:29 -0400 40.0096321105957 -74.8508987426758 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound near South of Florence Av (Long Branch), Monday July 13, 2026 09:30 PM thru Tuesday July 14, 2026 05:30 AM, right shoulder closed Fri, 10 Jul 2026 11:22:17 -0400 40.3120536804199 -73.9877777099609 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound near South of Florence Av (Long Branch), Thursday July 16, 2026 09:30 PM thru Friday July 17, 2026 05:30 AM, right shoulder closed Fri, 10 Jul 2026 11:22:22 -0400 40.3120536804199 -73.9877777099609 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near Exit 1 - Collings Ave (Camden), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Fri, 10 Jul 2026 11:22:28 -0400 39.9021301269531 -75.1126327514648 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between North of Exit 11 - US 322 (Logan Twp) and North of Exit 7 (Oldmans Twp), Friday July 17, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:54 -0400 39.7856674194336 -75.3339538574219 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Thursday July 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:53 -0400 39.7488327026367 -75.3786315917969 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Friday July 17, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:56 -0400 39.9504470825195 -74.9297866821289 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 7 (Oldmans Twp) and North of Exit 11 - US 322 (Logan Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:55 -0400 39.7355995178223 -75.4010162353516 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near West of New Jersey Turnpike (Lawnside), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 02:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 11:21:59 -0400 39.8690185546875 -75.0417327880859 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between North of Exit 11 - US 322 (Logan Twp) and North of Exit 7 (Oldmans Twp), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:57 -0400 39.7856674194336 -75.3339538574219 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound near North of Chapman Blvd (Somers Point), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:22:00 -0400 39.3295135498047 -74.5948028564453 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound near North of Chapman Blvd (Somers Point), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:22:01 -0400 39.3295135498047 -74.5948028564453 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near West of New Jersey Turnpike (Lawnside), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 02:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 11:22:04 -0400 39.8690185546875 -75.0417327880859 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Friday July 17, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:02 -0400 39.7488327026367 -75.3786315917969 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and CR 651/Greentree Rd (Washington Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, left lane closed Fri, 10 Jul 2026 11:21:51 -0400 39.7411499023438 -75.0439682006836 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound near Exit 3 - Morgan Blvd (Camden), Monday July 13, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 11:22:06 -0400 39.912036895752 -75.1158294677734 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 7 (Oldmans Twp) and North of Exit 11 - US 322 (Logan Twp), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:22:08 -0400 39.7355995178223 -75.4010162353516 NJ 36 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Southbound near Long Branch Av (Long Branch), Thursday July 16, 2026 09:30 PM thru Friday July 17, 2026 05:30 AM, right shoulder closed Fri, 10 Jul 2026 11:22:05 -0400 40.3132629394531 -73.9845886230469 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near West of New Jersey Turnpike (Lawnside), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 02:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 11:22:16 -0400 39.8690185546875 -75.0417327880859 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound near Exit 3 - Morgan Blvd (Camden), Friday July 17, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 11:22:07 -0400 39.912036895752 -75.1158294677734 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound at Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) Wednesday July 15, 2026 11:00 PM thru Thursday July 16, 2026 05:00 AM, ramp Fri, 10 Jul 2026 11:21:47 -0400 40.0096321105957 -74.8508987426758 NJ 36 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Southbound near Long Branch Av (Long Branch), Wednesday July 15, 2026 09:30 PM thru Thursday July 16, 2026 05:30 AM, right shoulder closed Fri, 10 Jul 2026 11:21:49 -0400 40.3132629394531 -73.9845886230469 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near South of CR 692/Franklin Av (Berlin), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right shoulder closed, moving operation Fri, 10 Jul 2026 11:21:39 -0400 39.8100128173828 -74.9308166503906 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and CR 651/Greentree Rd (Washington Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, left lane closed Fri, 10 Jul 2026 11:21:23 -0400 39.7411499023438 -75.0439682006836 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of NJ 33 Business (Freehold Twp) and South of Schibanoff Ln (Freehold Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, right lane closed Fri, 10 Jul 2026 11:21:22 -0400 40.258731842041 -74.2914352416992 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near North of NJ 38 (Pennsauken Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 11:21:25 -0400 39.9362373352051 -75.077766418457 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Wednesday July 15, 2026 06:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:16 -0400 39.7623252868652 -75.0479965209961 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound near South of Florence Av (Long Branch), Tuesday July 14, 2026 09:30 PM thru Wednesday July 15, 2026 05:30 AM, right shoulder closed Fri, 10 Jul 2026 11:21:15 -0400 40.3120536804199 -73.9877777099609 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near South of CR 692/Franklin Av (Berlin), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right shoulder closed, moving operation Fri, 10 Jul 2026 11:21:18 -0400 39.8100128173828 -74.9308166503906 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of US 40/Black Horse Pike/US 322 (Pleasantville) and Reading Av (Pleasantville), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:21:17 -0400 39.3931465148926 -74.5296401977539 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound near South of Exit 10 - Center Square Rd (Logan Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 11:21:29 -0400 39.7556991577148 -75.3689651489258 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of NJ 33 Business (Freehold Twp) and South of Schibanoff Ln (Freehold Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, right lane closed Fri, 10 Jul 2026 11:21:33 -0400 40.258731842041 -74.2914352416992 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:31 -0400 39.9504470825195 -74.9297866821289 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 7 (Oldmans Twp) and North of Exit 11 - US 322 (Logan Twp), Friday July 17, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:35 -0400 39.7355995178223 -75.4010162353516 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound near Exit 3 - Morgan Blvd (Camden), Thursday July 16, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 10 Jul 2026 11:21:34 -0400 39.912036895752 -75.1158294677734 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near Exit 10 - Center Square Rd (Logan Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 11:21:37 -0400 39.7618942260742 -75.3608627319336 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:36 -0400 39.9504470825195 -74.9297866821289 NJ 35 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Northbound between South of Curtis Point Dr (Brick Twp) and South of Bridge Av (Bay Head), Thursday July 16, 2026 10:00 AM thru 02:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:27 -0400 40.0205459594727 -74.0555191040039 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near Exit 1 - Collings Ave (Camden), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Fri, 10 Jul 2026 11:21:26 -0400 39.9021301269531 -75.1126327514648 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 7 (Oldmans Twp) and North of Exit 11 - US 322 (Logan Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:28 -0400 39.7355995178223 -75.4010162353516 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound near South of Florence Av (Long Branch), Wednesday July 15, 2026 09:30 PM thru Thursday July 16, 2026 05:30 AM, right shoulder closed Fri, 10 Jul 2026 11:21:42 -0400 40.3120536804199 -73.9877777099609 NJ 168 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 168 Southbound near North of NJ 42 (Gloucester Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:21:43 -0400 39.8173332214355 -75.0680465698242 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between South of Bridge Av (Bay Head) and South of Curtis Point Dr (Brick Twp), Thursday July 16, 2026 10:00 AM thru 02:00 PM, right shoulder closed Fri, 10 Jul 2026 11:21:45 -0400 40.0690078735352 -74.0440139770508 NJ 33 westbound : roadwork NJDOT - TOC South: Roadwork on NJ 33 Westbound between West of White Horse-Hamilton Square Rd (Hamilton Twp) and East of CR 622/South Olden Ave (Hamilton Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 11:21:10 -0400 40.2285346984863 -74.6670455932617 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near West of New Jersey Turnpike (Lawnside), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 02:00 AM, right lane closed, moving operation Fri, 10 Jul 2026 11:21:14 -0400 39.8690185546875 -75.0417327880859 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near North of NJ 38 (Pennsauken Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 11:21:19 -0400 39.9362373352051 -75.077766418457 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound near North of Chapman Blvd (Somers Point), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right shoulder closed Fri, 10 Jul 2026 11:21:21 -0400 39.3295135498047 -74.5948028564453 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and CR 651/Greentree Rd (Washington Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, left lane closed Fri, 10 Jul 2026 11:21:20 -0400 39.7411499023438 -75.0439682006836 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound between Exit 1 - Collings Ave (Camden) and Exit 3 - Morgan Blvd (Camden), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, at least one lane closed Fri, 10 Jul 2026 11:20:51 -0400 39.9021301269531 -75.1126327514648 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near North of NJ 38 (Pennsauken Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 11:20:58 -0400 39.937198638916 -75.0763702392578 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound between South of CR 655/Fries Mill Rd (Washington Twp) and CR 651/Greentree Rd (Washington Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, left lane closed Fri, 10 Jul 2026 11:20:52 -0400 39.7411499023438 -75.0439682006836 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near Exit 10 - Center Square Rd (Logan Twp), Monday July 13, 2026 11:00 PM thru Tuesday July 14, 2026 05:00 AM, acceleration lane closed Fri, 10 Jul 2026 11:21:09 -0400 39.7618942260742 -75.3608627319336 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near North of NJ 38 (Pennsauken Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 11:21:03 -0400 39.937198638916 -75.0763702392578 Marsh Street both directions : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Marsh Street both directions at Export Street (Newark) alternating lane closure, Tuesday July 14th, 2026 thru Wednesday July 15th, 2026, 08:00 PM thru 05:00 AM All lanes open Fri, 10 Jul 2026 11:15:25 -0400 40.6920582482992 -74.1422192460315 McLester Street both directions : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on McLester Street both directions between Polaris Street (Elizabeth) and Tripoli Street (Elizabeth) alternating lane closure , Monday July 13th, 2026 thru Wednesday July 15th, 2026, 07:00 PM thru 01:00 AM All lanes open Fri, 10 Jul 2026 11:12:08 -0400 40.6677716594242 -74.1645522119913 NJ 10 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 10 between In the vicinity of CR 656 (Randolph Twp) and In the vicinity of Mount Pleasant Tpke (Randolph Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 10:47:49 -0400 40.8642539978027 -74.5590133666992 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) and East of Exit 39 - NJ 53 (Denville Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 10:47:48 -0400 40.9112358093262 -74.5174102783203 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 66 - Hudson St (Hackensack), Thursday July 16, 2026 09:00 AM thru 12:00 PM, right lane closed local lane Fri, 10 Jul 2026 10:47:51 -0400 40.8669776916504 -74.0402221679688 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 66 - Hudson St (Hackensack), Friday July 17, 2026 09:00 AM thru 12:00 PM, right lane closed local lane Fri, 10 Jul 2026 10:47:50 -0400 40.8669776916504 -74.0402221679688 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near Exit 67 - River Rd (Ridgefield Park), Friday July 17, 2026 12:00 PM thru 03:00 PM, right lane closed local lane Fri, 10 Jul 2026 10:47:54 -0400 40.8671379089355 -74.0334243774414 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) and East of Exit 39 - NJ 53 (Denville Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 10:47:53 -0400 40.9112358093262 -74.5174102783203 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) and East of Exit 39 - NJ 53 (Denville Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 10:47:56 -0400 40.9112358093262 -74.5174102783203 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near Exit 67 - River Rd (Ridgefield Park), Thursday July 16, 2026 12:00 PM thru 03:00 PM, right lane closed local lane Fri, 10 Jul 2026 10:47:55 -0400 40.8671379089355 -74.0334243774414 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) and East of Exit 39 - NJ 53 (Denville Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 10:47:57 -0400 40.9112358093262 -74.5174102783203 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) and East of Exit 39 - NJ 53 (Denville Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 10:47:58 -0400 40.9112358093262 -74.5174102783203 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Tuesday July 14, 2026 07:00 AM thru 05:30 PM, right shoulder closed Fri, 10 Jul 2026 10:44:53 -0400 40.8557586669922 -74.3595123291016 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Friday July 17, 2026 01:00 AM thru 06:00 AM, at least one lane closed, (2nd lane closed from 01:00 AM to 05:00 AM) Fri, 10 Jul 2026 10:44:51 -0400 40.8074913024902 -74.4528350830078 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between Exit 9 - CR 622/River Rd (Piscataway Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 10:44:48 -0400 40.5406608581543 -74.5083847045898 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between Exit 9 - CR 622/River Rd (Piscataway Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 04:00 AM, left lane closed Fri, 10 Jul 2026 10:44:50 -0400 40.5406608581543 -74.5083847045898 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between Exit 9 - CR 622/River Rd (Piscataway Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 10:44:49 -0400 40.5406608581543 -74.5083847045898 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 14 - US 22 (Bridgewater Twp) and Exit 9 - CR 622/River Rd (Piscataway Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 04:00 AM, left lane closed Fri, 10 Jul 2026 10:45:17 -0400 40.5802421569824 -74.5797653198242 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 14 - US 22 (Bridgewater Twp) and Exit 9 - CR 622/River Rd (Piscataway Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 04:00 AM, left lane closed Fri, 10 Jul 2026 10:44:56 -0400 40.5802421569824 -74.5797653198242 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between Exit 9 - CR 622/River Rd (Piscataway Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 10:44:55 -0400 40.5406608581543 -74.5083847045898 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between Exit 9 - CR 622/River Rd (Piscataway Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 04:00 AM, left lane closed Fri, 10 Jul 2026 10:44:59 -0400 40.5406608581543 -74.5083847045898 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Monday July 13, 2026 07:00 AM thru 05:30 PM, right shoulder closed Fri, 10 Jul 2026 10:44:57 -0400 40.8557586669922 -74.3595123291016 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 14 - US 22 (Bridgewater Twp) and Exit 9 - CR 622/River Rd (Piscataway Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 04:00 AM, left lane closed Fri, 10 Jul 2026 10:45:00 -0400 40.5802421569824 -74.5797653198242 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Wednesday July 15, 2026 10:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 10:45:02 -0400 40.8557586669922 -74.3595123291016 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 14 - US 22 (Bridgewater Twp) and Exit 9 - CR 622/River Rd (Piscataway Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 04:00 AM, left lane closed Fri, 10 Jul 2026 10:45:04 -0400 40.5802421569824 -74.5797653198242 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Thursday July 16, 2026 10:00 PM thru Friday July 17, 2026 06:00 AM, right lane closed Fri, 10 Jul 2026 10:45:07 -0400 40.8557586669922 -74.3595123291016 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 14 - US 22 (Bridgewater Twp) and Exit 9 - CR 622/River Rd (Piscataway Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 10:45:06 -0400 40.5802421569824 -74.5797653198242 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between Exit 9 - CR 622/River Rd (Piscataway Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 04:00 AM, left lane closed Fri, 10 Jul 2026 10:45:08 -0400 40.5406608581543 -74.5083847045898 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between Exit 9 - CR 622/River Rd (Piscataway Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 10:45:11 -0400 40.5406608581543 -74.5083847045898 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 14 - US 22 (Bridgewater Twp) and Exit 9 - CR 622/River Rd (Piscataway Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 10:45:10 -0400 40.5802421569824 -74.5797653198242 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 14 - US 22 (Bridgewater Twp) and Exit 9 - CR 622/River Rd (Piscataway Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 10:45:13 -0400 40.5802421569824 -74.5797653198242 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Friday July 17, 2026 01:00 AM thru 06:00 AM, at least one lane closed Fri, 10 Jul 2026 10:45:12 -0400 40.8074913024902 -74.4528350830078 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between Exit 9 - CR 622/River Rd (Piscataway Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 04:00 AM, left lane closed Fri, 10 Jul 2026 10:45:15 -0400 40.5406608581543 -74.5083847045898 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 14 - US 22 (Bridgewater Twp) and Exit 9 - CR 622/River Rd (Piscataway Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 04:00 AM, right lane closed Fri, 10 Jul 2026 10:45:14 -0400 40.5802421569824 -74.5797653198242 NJ 94 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 94 Both Directions between CR 517/Mcafee Rd (Vernon Twp) and South of CR 515/Stockholm Rd (Vernon Twp) Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 10:26:16 -0400 41.1787300109863 -74.5391387939453 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway Local Lanes southbound Entrance ramp Exit 109 - CR 520 (Middletown Twp), Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 11:00 PM thru 05:00 AM All lanes closed Fri, 10 Jul 2026 10:12:24 -0400 40.3364670660693 -74.1019143784947 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway Local Lanes northbound Entrance ramp Exit 124 - Main St (Sayreville), Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 10:00 PM thru 05:00 AM All lanes closed Fri, 10 Jul 2026 10:14:38 -0400 40.4769580257239 -74.297689867291 Garden State Parkway northbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway northbound Exit ramp Exit 125 - NJ 35 (Sayreville), Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 10:00 PM thru 05:00 AM All lanes closed Fri, 10 Jul 2026 10:13:47 -0400 40.4921168018272 -74.3006391988254 Garden State Parkway northbound : paving operations NJ Turnpike Auth.: milling and paving operations on Garden State Parkway northbound Exit ramp Exit 116 - PNC Arts Center (Holmdel Twp), Monday July 13th, 2026 thru Wednesday July 15th, 2026, Monday/Tuesday, 11:00 PM thru 04:00 AM All lanes closed Fri, 10 Jul 2026 10:05:40 -0400 40.3876924508311 -74.1763033389687 Garden State Parkway northbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway Local Lanes northbound Entrance ramp Exit 116 - PNC Arts Center (Holmdel Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 11:00 PM thru 04:00 AM All lanes closed Fri, 10 Jul 2026 10:03:47 -0400 40.3937938480092 -74.1817284626562 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway southbound North of Toms River Toll Plaza (Toms River Twp) to South of Toms River Toll Plaza (Toms River Twp), Thursday July 16th, 2026 thru Friday July 17th, 2026, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed Fri, 10 Jul 2026 10:01:19 -0400 40.0211591307566 -74.1847445390789 Garden State Parkway southbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway southbound North of Colonia Service Area (Woodbridge Twp) to North of Exit 129 - New Jersey Turnpike (Woodbridge Twp), Thursday July 16th, 2026 thru Friday July 17th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 5 lanes closed, Thursday July 16th, 2026 thru Friday July 17th, 2026, 10:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed, Thursday July 16th, 2026 thru Friday July 17th, 2026, 11:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed Fri, 10 Jul 2026 10:00:20 -0400 40.5915901008183 -74.3243271973181 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway southbound South of Exit 165A-B - Ridgewood Ave (Paramus) to North of Exit 157 - US 46 (Elmwood Park), Thursday July 16th, 2026 thru Friday July 17th, 2026, 11:00 PM thru 06:00 AM 2 Left lanes of 3 lanes closed Fri, 10 Jul 2026 09:58:44 -0400 40.9532399454985 -74.0661236342402 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway southbound New Gretna Toll Plaza (Bass River Twp) to South of Exit 48 - US 9 (Port Republic), Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed Fri, 10 Jul 2026 09:57:45 -0400 39.6123772800204 -74.4261086037903 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway Local Lanes northbound North of Exit 114 - Red Hill Rd (Holmdel Twp) to South of Exit 116 - PNC Arts Center (Holmdel Twp), Wednesday July 15th, 2026 thru Friday July 17th, 2026, Wednesday/Thursday, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Wednesday July 15th, 2026 thru Friday July 17th, 2026, Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed Fri, 10 Jul 2026 09:56:35 -0400 40.3807920005155 -74.1574824013273 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 09:55:51 -0400 41.2077941894531 -74.6071701049805 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 09:55:57 -0400 41.2077941894531 -74.6071701049805 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 09:55:46 -0400 41.2077941894531 -74.6071701049805 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway Local Lanes northbound North of Garden State Parkway - Jon Bon Jovi Service Area (Sayreville) to Garden State Parkway at North of Exit 127 - US 9/I-287/NJ 440 (Woodbridge Twp), Wednesday July 15th, 2026 thru Friday July 17th, 2026, Wednesday/Thursday, 08:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Wednesday July 15th, 2026 thru Friday July 17th, 2026, Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed Fri, 10 Jul 2026 09:54:58 -0400 40.4572660496915 -74.2757973453307 Garden State Parkway northbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway northbound South of Exit 130B-A - US 1 (Woodbridge Twp) to North of Exit 135 - Central Ave (Clark Twp), Wednesday July 15th, 2026 thru Friday July 17th, 2026, Wednesday/Thursday, 08:00 PM thru 06:00 AM 1 Right lane of 5 lanes closed, Wednesday July 15th, 2026 thru Friday July 17th, 2026, Wednesday/Thursday, 09:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed Fri, 10 Jul 2026 09:52:51 -0400 40.5517097098759 -74.3164519367462 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Wednesday July 15, 2026 06:00 PM thru Thursday July 16, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 09:52:03 -0400 41.2077941894531 -74.6071701049805 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Friday July 17, 2026 06:00 PM thru Saturday July 18, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 09:51:37 -0400 41.2077941894531 -74.6071701049805 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Thursday July 16, 2026 06:00 PM thru Friday July 17, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 09:51:53 -0400 41.2077941894531 -74.6071701049805 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Tuesday July 14, 2026 06:00 PM thru Wednesday July 15, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 09:52:14 -0400 41.2077941894531 -74.6071701049805 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Monday July 13, 2026 06:00 PM thru Tuesday July 14, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound Fri, 10 Jul 2026 09:52:31 -0400 41.2077941894531 -74.6071701049805 Garden State Parkway southbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway southbound North of Colonia Service Area (Woodbridge Twp) to North of Exit 130B-A - US 1 (Woodbridge Twp), Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 5 lanes closed, Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 10:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed, Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 11:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed Fri, 10 Jul 2026 09:50:41 -0400 40.5979615589112 -74.3198114615833 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway northbound Larry Doby Service Area (Bloomfield) to South of Exit 153A - NJ 3 (Clifton), Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 11:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed Fri, 10 Jul 2026 09:48:42 -0400 40.8370264359519 -74.1794129840988 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway southbound South of Exit 156 - US 46 (Clifton) to South of Exit 155B - Passaic (Clifton), Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Wednesday July 15th, 2026 thru Thursday July 16th, 2026, 11:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed Fri, 10 Jul 2026 09:47:23 -0400 40.8879958120585 -74.1453781986545 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway northbound South of Exit 48 - US 9 (Port Republic) to South of Exit 52 - CR 654/East Greenbush Rd (Bass River Twp), Tuesday July 14th, 2026 thru Wednesday July 15th, 2026, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed Fri, 10 Jul 2026 09:45:35 -0400 39.5342934181141 -74.4932422714259 Garden State Parkway northbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway Local Lanes northbound North of Exit 116 - PNC Arts Center (Holmdel Twp) to South of Exit 120 - Laurence Harbor (Aberdeen Twp), Tuesday July 14th, 2026 thru Wednesday July 15th, 2026, 08:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Tuesday July 14th, 2026 thru Wednesday July 15th, 2026, 09:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed Fri, 10 Jul 2026 09:44:33 -0400 40.4029518573683 -74.1921215130029 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway northbound North of Exit 38A - Atlantic City Expressway (Egg Harbor Twp) to South of Frank Sinatra Service Area (Galloway Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed Fri, 10 Jul 2026 09:42:55 -0400 39.41577670919 -74.5516254619321 Garden State Parkway southbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway southbound Raritan Toll Plaza (Sayreville) to Garden State Parkway Local Lanes at Exit 123 - US 9 (Sayreville), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 10:00 PM thru 06:00 AM 2 Right lanes of 5 lanes closed Fri, 10 Jul 2026 09:39:42 -0400 40.488581478636 -74.3024823259723 Garden State Parkway southbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway southbound North of Colonia Service Area (Woodbridge Twp) to South of Exit 130 - US 1 (Woodbridge Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 5 lanes closed, Monday July 13th, 2026 thru Tuesday July 14th, 2026, 09:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed Fri, 10 Jul 2026 09:38:10 -0400 40.5915901008183 -74.3243271973181 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway northbound North of Exit 130B-A - US 1 (Woodbridge Twp) to North of Exit 135 - Central Ave (Clark Twp), Monday July 13th, 2026 thru Wednesday July 15th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM 1 Left lane of 5 lanes closed, Monday July 13th, 2026 thru Wednesday July 15th, 2026, Monday/Tuesday, 09:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed, Monday July 13th, 2026 thru Wednesday July 15th, 2026, Monday/Tuesday, 10:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed Fri, 10 Jul 2026 09:35:59 -0400 40.5584975385846 -74.3199508200237 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway northbound Exit 138 - CR 509 (Kenilworth) to South of Union Toll Plaza (Hillside Twp), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 5 lanes closed, Monday July 13th, 2026 thru Tuesday July 14th, 2026, 10:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed Fri, 10 Jul 2026 09:30:46 -0400 40.6791865943964 -74.2781340216811 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway southbound South of Exit 156 - US 46 (Clifton) to South of Exit 153A - NJ 3 (Bloomfield), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Tuesday July 14th, 2026 thru Tuesday July 14th, 2026, 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed, Thursday July 16th, 2026 thru Friday July 17th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday July 17th, 2026 thru Friday July 17th, 2026, 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed Fri, 10 Jul 2026 09:28:49 -0400 40.8879958120585 -74.1453781986545 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between East of Exit 38 - US 46 (Denville Twp) and West of Exit 38 - US 46 (Denville Twp), Friday July 17, 2026 09:00 AM thru 02:00 PM, right lane closed Fri, 10 Jul 2026 09:20:48 -0400 40.8963356018066 -74.4875030517578 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane Fri, 10 Jul 2026 09:14:49 -0400 40.9222297668457 -74.0780715942383 NJ 53 northbound : roadwork NJDOT - STMC: Roadwork on NJ 53 Northbound near US 202 (Morris Plains), Monday July 13, 2026 07:00 AM thru 03:30 PM, right shoulder closed Fri, 10 Jul 2026 09:14:47 -0400 40.8297424316406 -74.4777145385742 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 09:14:51 -0400 40.862434387207 -73.9752578735352 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 09:14:50 -0400 40.862434387207 -73.9752578735352 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Friday July 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 09:15:02 -0400 40.862434387207 -73.9752578735352 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane Fri, 10 Jul 2026 09:15:00 -0400 40.9222297668457 -74.0780715942383 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane Fri, 10 Jul 2026 09:15:05 -0400 40.9222297668457 -74.0780715942383 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Friday July 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane Fri, 10 Jul 2026 09:15:03 -0400 40.9222297668457 -74.0780715942383 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 09:15:06 -0400 40.862434387207 -73.9752578735352 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane Fri, 10 Jul 2026 09:14:54 -0400 40.9222297668457 -74.0780715942383 NJ 53 northbound : roadwork NJDOT - STMC: Roadwork on NJ 53 Northbound near South of I-80 (Denville Twp), Tuesday July 14, 2026 07:00 AM thru 03:30 PM, right shoulder closed Fri, 10 Jul 2026 09:14:52 -0400 40.8879089355469 -74.4791793823242 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 09:14:59 -0400 40.862434387207 -73.9752578735352 NJ 15 northbound : roadwork NJDOT - STMC: Roadwork on NJ 15 Northbound near South of CR 615/Edison Rd (Jefferson Twp), Monday July 13, 2026 09:00 AM thru 02:00 PM, right lane closed Fri, 10 Jul 2026 09:11:52 -0400 40.9537734985352 -74.5959930419922 NJ 15 southbound : roadwork NJDOT - STMC: Roadwork on NJ 15 Southbound near South of NJ 181 (Sparta Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 09:11:54 -0400 41.0605049133301 -74.6457595825195 NJ 15 southbound : roadwork NJDOT - STMC: Roadwork on NJ 15 Southbound near North of NJ 181/Espanong Rd/Weldon Rd (Jefferson Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 09:11:53 -0400 40.9870910644531 -74.6023788452148 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near West of Exit 38 - US 46 (Denville Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 10 Jul 2026 09:11:47 -0400 40.9053802490234 -74.4967422485352 NJ 15 northbound : roadwork NJDOT - STMC: Roadwork on NJ 15 Northbound near North of NJ 181/Espanong Rd/Weldon Rd (Jefferson Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 09:11:49 -0400 40.9774017333984 -74.6025238037109 NJ 15 northbound : roadwork NJDOT - STMC: Roadwork on NJ 15 Northbound near South of Blue Heron Dr (Sparta Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 09:11:48 -0400 41.0041046142578 -74.6125259399414 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near East of Exit 39 - NJ 53 (Parsippany-Troy Hills Twp), Thursday July 16, 2026 09:00 AM thru 02:00 PM, right lane closed Fri, 10 Jul 2026 09:11:50 -0400 40.8811836242676 -74.4693603515625 NJ 440 southbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Southbound at South of CR 616/New Brunswick Ave (Woodbridge Twp) Monday July 13, 2026 08:00 AM thru 03:00 PM, ramp Fri, 10 Jul 2026 08:20:49 -0400 40.5200843811035 -74.295783996582 NJ 440 southbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Southbound at South of CR 616/New Brunswick Ave (Woodbridge Twp) Wednesday July 15, 2026 08:00 AM thru 03:00 PM, ramp Fri, 10 Jul 2026 08:20:47 -0400 40.5200843811035 -74.295783996582 NJ 440 southbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Southbound at South of CR 616/New Brunswick Ave (Woodbridge Twp) Thursday July 16, 2026 08:00 AM thru 03:00 PM, ramp Fri, 10 Jul 2026 08:20:52 -0400 40.5200843811035 -74.295783996582 NJ 440 southbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Southbound at South of CR 616/New Brunswick Ave (Woodbridge Twp) Tuesday July 14, 2026 08:00 AM thru 03:00 PM, ramp Fri, 10 Jul 2026 08:20:51 -0400 40.5200843811035 -74.295783996582 NJ 440 southbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Southbound at South of CR 616/New Brunswick Ave (Woodbridge Twp) Friday July 17, 2026 08:00 AM thru 03:00 PM, ramp Fri, 10 Jul 2026 08:20:50 -0400 40.5200843811035 -74.295783996582 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Thursday July 16, 2026 06:00 AM thru 02:00 PM, right shoulder closed Fri, 10 Jul 2026 08:17:49 -0400 40.8037414550781 -74.4586410522461 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Thursday July 16, 2026 06:00 AM thru 02:00 PM, right shoulder closed Fri, 10 Jul 2026 08:17:48 -0400 40.8074913024902 -74.4528350830078 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Monday July 13, 2026 06:00 AM thru 02:00 PM, right shoulder closed Fri, 10 Jul 2026 08:17:51 -0400 40.8037414550781 -74.4586410522461 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Tuesday July 14, 2026 06:00 AM thru 02:00 PM, right shoulder closed Fri, 10 Jul 2026 08:17:50 -0400 40.8074913024902 -74.4528350830078 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Tuesday July 14, 2026 06:00 AM thru 02:00 PM, right shoulder closed Fri, 10 Jul 2026 08:17:54 -0400 40.8037414550781 -74.4586410522461 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Monday July 13, 2026 06:00 AM thru 02:00 PM, right shoulder closed Fri, 10 Jul 2026 08:17:53 -0400 40.8074913024902 -74.4528350830078 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Wednesday July 15, 2026 06:00 AM thru 02:00 PM, right shoulder closed Fri, 10 Jul 2026 08:17:56 -0400 40.8037414550781 -74.4586410522461 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Wednesday July 15, 2026 06:00 AM thru 02:00 PM, right shoulder closed Fri, 10 Jul 2026 08:17:47 -0400 40.8074913024902 -74.4528350830078 US 9 northbound : roadwork NJDOT - STMC: Roadwork on US 9 Northbound between South of CR 673/Ernston Rd (Old Bridge Twp) and North of Garden State Parkway (Sayreville), Friday July 17, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 10 Jul 2026 07:38:47 -0400 40.4530830383301 -74.2974166870117 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 517 (Andover Twp) and I-80 (Mount Olive Twp), Friday July 17, 2026 08:00 AM thru 04:00 PM, right shoulder closed Fri, 10 Jul 2026 07:35:48 -0400 40.9807510375977 -74.739387512207 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of Willowbrook Mall Exit (Wayne Twp) and West of CR 633/Rifle Camp Rd (Little Falls Twp), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 06:00 AM, at least one lane closed Thu, 09 Jul 2026 21:21:44 -0400 40.8928108215332 -74.2630310058594 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 30 - North Maple Ave (Harding Twp) and North of Exit 21 - I-78 (Bedminster Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right shoulder closed Thu, 09 Jul 2026 21:21:45 -0400 40.7352104187012 -74.5365447998047 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 633/Rifle Camp Rd (Little Falls Twp) and West of NJ 62/Union Blvd (Totowa), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:30 PM to 05:00 AM) Thu, 09 Jul 2026 21:21:48 -0400 40.8773384094238 -74.2034454345703 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of Vaux Hall Rd (Union Twp), Thursday July 16, 2026 10:00 PM thru Friday July 17, 2026 05:00 AM, right lane closed, moving operation Thu, 09 Jul 2026 21:21:43 -0400 40.6975326538086 -74.2500610351562 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 62/Union Blvd (Totowa) and West of CR 633/Rifle Camp Rd (Little Falls Twp), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:30 PM to 05:00 AM) Thu, 09 Jul 2026 21:21:49 -0400 40.8931198120117 -74.2255477905273 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Friday July 17, 2026 10:00 AM thru 03:30 PM, intersection Thu, 09 Jul 2026 21:21:20 -0400 40.7204971313477 -74.0934066772461 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near North of Barley Sheaf Rd/River Rd (Readington Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, right lane closed Thu, 09 Jul 2026 21:21:21 -0400 40.5192604064941 -74.8130493164062 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near New Jersey Turnpike - Eastern Spur (Secaucus), Thursday July 16, 2026 09:00 AM thru 01:00 PM, left lane closed Thu, 09 Jul 2026 21:21:18 -0400 40.7869300842285 -74.0491027832031 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 09 Jul 2026 21:21:15 -0400 40.6294021606445 -74.4338760375977 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between McBride Av/Little Falls Av (Little Falls Twp) and NJ 23/Pompton Av (Wayne Twp), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 06:00 AM, at least one lane closed Thu, 09 Jul 2026 21:21:16 -0400 40.8886032104492 -74.2180786132812 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Monday July 13, 2026 08:00 AM thru 03:30 PM, ramp Thu, 09 Jul 2026 21:21:12 -0400 40.4643707275391 -74.2710800170898 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 615/Fairfield Av (Fairfield Twp) and McBride Av/Little Falls Av (Little Falls Twp), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 06:00 AM, at least one lane closed Thu, 09 Jul 2026 21:21:13 -0400 40.8872985839844 -74.280647277832 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 577/Springfield Ave (Union Twp) and East of CR 626/West Chestnut St (Union Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, right lane closed, moving operation Thu, 09 Jul 2026 21:21:09 -0400 40.6883430480957 -74.3105697631836 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near West of Michigan Av (Union Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, right shoulder closed, moving operation Thu, 09 Jul 2026 21:21:11 -0400 40.688835144043 -74.3068161010742 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 615/Fairfield Av (Fairfield Twp) and McBride Av/Little Falls Av (Little Falls Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, right shoulder closed Thu, 09 Jul 2026 21:21:24 -0400 40.8872985839844 -74.280647277832 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, left lane closed Thu, 09 Jul 2026 21:21:08 -0400 40.8692970275879 -74.4592742919922 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Friday July 17, 2026 09:00 AM thru 03:30 PM, right shoulder closed Thu, 09 Jul 2026 21:21:42 -0400 40.8538780212402 -74.9309310913086 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 09 Jul 2026 21:21:31 -0400 40.6294021606445 -74.4338760375977 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Wednesday July 15, 2026 08:00 AM thru 03:30 PM, ramp Thu, 09 Jul 2026 21:21:41 -0400 40.4643707275391 -74.2710800170898 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between McBride Av/Little Falls Av (Little Falls Twp) and West of NJ 23/Old Turnpike Rd (Wayne Twp), Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:30 PM to 05:00 AM) Thu, 09 Jul 2026 21:21:30 -0400 40.8886032104492 -74.2180786132812 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, local lane Thu, 09 Jul 2026 21:21:39 -0400 40.7143363952637 -74.289680480957 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 517 (Andover Twp), Friday July 17, 2026 08:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 21:21:29 -0400 40.9041709899902 -74.722282409668 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 62/Union Blvd (Totowa) and West of CR 633/Rifle Camp Rd (Little Falls Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right shoulder closed Thu, 09 Jul 2026 21:21:38 -0400 40.8931198120117 -74.2255477905273 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 30 - North Maple Ave (Harding Twp) and North of Exit 21 - I-78 (Bedminster Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right shoulder closed Thu, 09 Jul 2026 21:21:27 -0400 40.7352104187012 -74.5365447998047 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound near West of New Jersey Turnpike - Eastern Spur (Secaucus), Wednesday July 15, 2026 10:00 AM thru 03:00 PM, left lane closed Thu, 09 Jul 2026 21:21:22 -0400 40.7892379760742 -74.051399230957 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 633/Rifle Camp Rd (Little Falls Twp) and West of NJ 62/Union Blvd (Totowa), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, right shoulder closed Thu, 09 Jul 2026 21:21:23 -0400 40.8773384094238 -74.2034454345703 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 09 Jul 2026 21:21:37 -0400 40.6294021606445 -74.4338760375977 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Old Turnpike Rd (Wayne Twp) and McBride Av/Little Falls Av (Little Falls Twp), Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:30 PM to 05:00 AM) Thu, 09 Jul 2026 21:21:46 -0400 40.8944778442383 -74.2463455200195 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 62/Union Blvd (Totowa) and West of CR 633/Rifle Camp Rd (Little Falls Twp), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 06:00 AM, at least one lane closed Thu, 09 Jul 2026 21:21:35 -0400 40.8931198120117 -74.2255477905273 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Friday July 17, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 09 Jul 2026 21:21:36 -0400 40.6294021606445 -74.4338760375977 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near CR 626/West Chestnut St (Union Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, right shoulder closed, moving operation Thu, 09 Jul 2026 21:21:33 -0400 40.6912841796875 -74.2881698608398 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between McBride Av/Little Falls Av (Little Falls Twp) and NJ 23/Pompton Av (Wayne Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 06:00 AM, right shoulder closed Thu, 09 Jul 2026 21:21:26 -0400 40.8886032104492 -74.2180786132812 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near North of Barley Sheaf Rd/River Rd (Readington Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, right lane closed Thu, 09 Jul 2026 21:21:34 -0400 40.5192604064941 -74.8130493164062 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Thursday July 16, 2026 10:00 PM thru Friday July 17, 2026 06:00 AM, right lane closed Thu, 09 Jul 2026 21:20:47 -0400 40.5741958618164 -74.6357498168945 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and North of Maple Lake Rd (Kinnelon), Friday July 17, 2026 07:00 AM thru 05:00 PM, right lane closed Thu, 09 Jul 2026 21:20:49 -0400 40.9582290649414 -74.2821197509766 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between West of Michigan Av (Union Twp) and East of CR 626/West Chestnut St (Union Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, right lane closed, moving operation Thu, 09 Jul 2026 21:20:48 -0400 40.689323425293 -74.3030624389648 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of Willowbrook Mall Exit (Wayne Twp) and West of CR 633/Rifle Camp Rd (Little Falls Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, right shoulder closed Thu, 09 Jul 2026 21:20:50 -0400 40.8928108215332 -74.2630310058594 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near North of Barley Sheaf Rd/River Rd (Readington Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, right lane closed Thu, 09 Jul 2026 21:20:54 -0400 40.5192604064941 -74.8130493164062 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near North of Barley Sheaf Rd/River Rd (Readington Twp), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, right lane closed Thu, 09 Jul 2026 21:20:53 -0400 40.5192604064941 -74.8130493164062 NJ 28 westbound : roadwork NJDOT - STMC: Roadwork on NJ 28 Westbound at CR 643/Mountain Ave (Somerville) Thursday July 16, 2026 07:00 PM thru Friday July 17, 2026 05:00 AM, intersection Thu, 09 Jul 2026 21:20:57 -0400 40.5713729858398 -74.6206970214844 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 09 Jul 2026 21:20:56 -0400 40.6294021606445 -74.4338760375977 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between North of Maple Lake Rd (Kinnelon) and North of Alexander Av (Pequannock Twp), Friday July 17, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 09 Jul 2026 21:20:59 -0400 41.0106353759766 -74.3676071166992 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 07:00 AM, right shoulder closed Thu, 09 Jul 2026 21:20:58 -0400 40.5741958618164 -74.6357498168945 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Friday July 17, 2026 08:00 AM thru 02:00 PM, right shoulder closed Thu, 09 Jul 2026 21:21:01 -0400 41.1034126281738 -74.5682983398438 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 633/Rifle Camp Rd (Little Falls Twp) and West of NJ 62/Union Blvd (Totowa), Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 06:00 AM, at least one lane closed Thu, 09 Jul 2026 21:21:00 -0400 40.8773384094238 -74.2034454345703 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Friday July 17, 2026 09:00 AM thru 03:30 PM, right shoulder closed Thu, 09 Jul 2026 21:21:03 -0400 40.8320922851562 -75.0009841918945 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of Garden State Parkway (Union Twp), Thursday July 16, 2026 10:00 PM thru Friday July 17, 2026 06:00 AM, right lane closed, moving operation Thu, 09 Jul 2026 21:21:02 -0400 40.69189453125 -74.2652740478516 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Thursday July 16, 2026 08:00 AM thru 03:30 PM, ramp Thu, 09 Jul 2026 21:21:06 -0400 40.4643707275391 -74.2710800170898 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Old Turnpike Rd (Wayne Twp) and West of CR 633/Rifle Camp Rd (Little Falls Twp), Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:30 PM to 05:00 AM) Thu, 09 Jul 2026 21:21:05 -0400 40.8944778442383 -74.2463455200195 NJ 181 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 181 Both Directions between North of Pine Cone Lane (Sparta Twp) and CR 605/Stanhope Rd (Sparta Twp) Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Thu, 09 Jul 2026 16:40:56 -0400 41.026008605957 -74.6316223144531 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound North of McClellan St (Newark) Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Thu, 09 Jul 2026 16:32:45 -0400 40.6941719055176 -74.2003936767578 NJ 181 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 181 Southbound At Pine Cone Lane (Sparta Twp) Monday July 13, 2026 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes, right shoulder closed Thu, 09 Jul 2026 16:24:51 -0400 41.0247611999512 -74.6307220458984 NJ 181 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 181 Southbound At Pine Cone Lane (Sparta Twp) Tuesday July 14, 2026 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes, right shoulder closed Thu, 09 Jul 2026 16:25:10 -0400 41.0247611999512 -74.6307220458984 NJ 181 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 181 Both Directions between Espanong Rd (Jefferson Twp) and North of Prospect Point Rd (Sparta Twp) Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, right shoulder closed eastbound; right shoulder closed westbound Thu, 09 Jul 2026 16:21:38 -0400 40.9705619812012 -74.6023483276367 NJ 181 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 181 Both Directions between Espanong Rd (Jefferson Twp) and North of Prospect Point Rd (Sparta Twp) Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, right shoulder closed eastbound; right shoulder closed westbound Thu, 09 Jul 2026 16:21:46 -0400 40.9705619812012 -74.6023483276367 NJ 181 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 181 Both Directions between Espanong Rd (Jefferson Twp) and North of Prospect Point Rd (Sparta Twp) Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, right shoulder closed eastbound; right shoulder closed westbound Thu, 09 Jul 2026 16:21:41 -0400 40.9705619812012 -74.6023483276367 I-676 both directions : roadwork NJ DOT - TOC South: Roving Repairs on I-676 Both Directions between I-76 (Gloucester City) and Exit 5B - Linden St/N. 8th St (Camden) Tuesday July 14, 2026 09:00 AM thru 11:00 AM, 1 left lane of 3 lanes closed northbound; 1 left lane of 3 lanes closed southbound Thu, 09 Jul 2026 13:39:01 -0400 39.8972206115723 -75.1086959838867 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 517 (Andover Twp), Tuesday July 14, 2026 08:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 13:26:51 -0400 40.9041709899902 -74.722282409668 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 517 (Andover Twp), Wednesday July 15, 2026 08:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 13:26:49 -0400 40.9041709899902 -74.722282409668 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 517 (Andover Twp), Thursday July 16, 2026 08:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 13:26:53 -0400 40.9041709899902 -74.722282409668 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 517 (Andover Twp), Monday July 13, 2026 08:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 13:26:50 -0400 40.9041709899902 -74.722282409668 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 517 (Andover Twp) and I-80 (Mount Olive Twp), Thursday July 16, 2026 08:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 13:20:48 -0400 40.9807510375977 -74.739387512207 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 07:00 AM, right shoulder closed Thu, 09 Jul 2026 13:20:51 -0400 40.5741958618164 -74.6357498168945 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between North of Maple Lake Rd (Kinnelon) and North of Alexander Av (Pequannock Twp), Monday July 13, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 09 Jul 2026 13:20:50 -0400 41.0106353759766 -74.3676071166992 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 517 (Andover Twp) and I-80 (Mount Olive Twp), Wednesday July 15, 2026 08:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 13:20:53 -0400 40.9807510375977 -74.739387512207 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between North of Maple Lake Rd (Kinnelon) and North of Alexander Av (Pequannock Twp), Wednesday July 15, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 09 Jul 2026 13:20:52 -0400 41.0106353759766 -74.3676071166992 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 517 (Andover Twp) and I-80 (Mount Olive Twp), Monday July 13, 2026 08:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 13:20:56 -0400 40.9807510375977 -74.739387512207 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 07:00 AM, right shoulder closed Thu, 09 Jul 2026 13:20:54 -0400 40.5741958618164 -74.6357498168945 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Wednesday July 15, 2026 10:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed Thu, 09 Jul 2026 13:20:58 -0400 40.5741958618164 -74.6357498168945 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between North of Maple Lake Rd (Kinnelon) and North of Alexander Av (Pequannock Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 09 Jul 2026 13:20:57 -0400 41.0106353759766 -74.3676071166992 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between North of Maple Lake Rd (Kinnelon) and North of Alexander Av (Pequannock Twp), Thursday July 16, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 09 Jul 2026 13:21:01 -0400 41.0106353759766 -74.3676071166992 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 07:00 AM, right shoulder closed Thu, 09 Jul 2026 13:21:00 -0400 40.5741958618164 -74.6357498168945 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Tuesday July 14, 2026 10:00 PM thru Wednesday July 15, 2026 06:00 AM, right lane closed Thu, 09 Jul 2026 13:21:02 -0400 40.5741958618164 -74.6357498168945 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and North of Maple Lake Rd (Kinnelon), Thursday July 16, 2026 07:00 AM thru 05:00 PM, right lane closed Thu, 09 Jul 2026 13:21:05 -0400 40.9582290649414 -74.2821197509766 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Monday July 13, 2026 10:00 PM thru Tuesday July 14, 2026 06:00 AM, right lane closed Thu, 09 Jul 2026 13:21:04 -0400 40.5741958618164 -74.6357498168945 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 517 (Andover Twp) and I-80 (Mount Olive Twp), Tuesday July 14, 2026 08:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 13:20:59 -0400 40.9807510375977 -74.739387512207 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and North of Maple Lake Rd (Kinnelon), Wednesday July 15, 2026 07:00 AM thru 05:00 PM, right lane closed Thu, 09 Jul 2026 13:17:48 -0400 40.9582290649414 -74.2821197509766 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and North of Maple Lake Rd (Kinnelon), Tuesday July 14, 2026 07:00 AM thru 05:00 PM, right lane closed Thu, 09 Jul 2026 13:17:50 -0400 40.9582290649414 -74.2821197509766 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and North of Maple Lake Rd (Kinnelon), Monday July 13, 2026 07:00 AM thru 05:00 PM, right lane closed Thu, 09 Jul 2026 13:17:49 -0400 40.9582290649414 -74.2821197509766 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound At CR 519/Uniontown Rd (Lopatcong Twp) Tuesday July 14, 2026 07:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 12:20:33 -0400 40.7022018432617 -75.1369171142578 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound At CR 519/Uniontown Rd (Lopatcong Twp) Monday July 13, 2026 07:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 12:20:24 -0400 40.7022018432617 -75.1369171142578 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound At CR 519/Uniontown Rd (Lopatcong Twp) Wednesday July 15, 2026 07:00 AM thru 04:00 PM, right shoulder closed Thu, 09 Jul 2026 12:20:41 -0400 40.7022018432617 -75.1369171142578 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from West of CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Thursday July 16, 2026 07:00 PM thru Friday July 17, 2026 06:00 AM, All lanes open Thu, 09 Jul 2026 12:14:57 -0400 40.7015914916992 -75.142578125 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from West of CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Friday July 17, 2026 07:00 PM thru Saturday July 18, 2026 06:00 AM, All lanes open Thu, 09 Jul 2026 12:15:10 -0400 40.7015914916992 -75.142578125 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from West of CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Wednesday July 15, 2026 07:00 PM thru Thursday July 16, 2026 06:00 AM, All lanes open Thu, 09 Jul 2026 12:14:44 -0400 40.7015914916992 -75.142578125 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from West of CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Tuesday July 14, 2026 07:00 PM thru Wednesday July 15, 2026 06:00 AM, All lanes open Thu, 09 Jul 2026 12:14:26 -0400 40.7015914916992 -75.142578125 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from West of CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Monday July 13, 2026 07:00 PM thru Tuesday July 14, 2026 06:00 AM, All lanes open Thu, 09 Jul 2026 12:14:11 -0400 40.7015914916992 -75.142578125 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, left lane closed Thu, 09 Jul 2026 10:44:48 -0400 40.8692970275879 -74.4592742919922 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, left lane closed Thu, 09 Jul 2026 10:44:51 -0400 40.8692970275879 -74.4592742919922 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, left lane closed Thu, 09 Jul 2026 10:44:49 -0400 40.8692970275879 -74.4592742919922 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near CR 626/West Chestnut St (Union Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, right shoulder closed, moving operation Thu, 09 Jul 2026 10:14:51 -0400 40.6912841796875 -74.2881698608398 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Thursday July 16, 2026 09:00 AM thru 03:30 PM, right shoulder closed Thu, 09 Jul 2026 10:14:52 -0400 40.8538780212402 -74.9309310913086 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 577/Springfield Ave (Union Twp) and East of CR 626/West Chestnut St (Union Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, right lane closed, moving operation Thu, 09 Jul 2026 10:14:53 -0400 40.6883430480957 -74.3105697631836 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between West of Michigan Av (Union Twp) and East of CR 626/West Chestnut St (Union Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, right lane closed, moving operation Thu, 09 Jul 2026 10:14:49 -0400 40.689323425293 -74.3030624389648 US 9 southbound : roadwork NJDOT - STMC: Roadwork on US 9 Southbound between North of Garden State Parkway (Sayreville) and South of CR 673/Ernston Rd (Old Bridge Twp), Thursday July 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed Thu, 09 Jul 2026 10:11:55 -0400 40.4735565185547 -74.294189453125 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of Vaux Hall Rd (Union Twp), Wednesday July 15, 2026 10:00 PM thru Thursday July 16, 2026 05:00 AM, right lane closed, moving operation Thu, 09 Jul 2026 10:11:53 -0400 40.6975326538086 -74.2500610351562 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near West of Michigan Av (Union Twp), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, right shoulder closed, moving operation Thu, 09 Jul 2026 10:11:57 -0400 40.688835144043 -74.3068161010742 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Thursday July 16, 2026 10:00 AM thru 03:30 PM, intersection Thu, 09 Jul 2026 10:11:51 -0400 40.7204971313477 -74.0934066772461 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of Garden State Parkway (Union Twp), Wednesday July 15, 2026 10:00 PM thru Thursday July 16, 2026 06:00 AM, right lane closed, moving operation Thu, 09 Jul 2026 10:11:58 -0400 40.69189453125 -74.2652740478516 US 9 northbound : roadwork NJDOT - STMC: Roadwork on US 9 Northbound between South of CR 673/Ernston Rd (Old Bridge Twp) and North of Garden State Parkway (Sayreville), Thursday July 16, 2026 07:00 AM thru 03:00 PM, right shoulder closed Thu, 09 Jul 2026 10:11:56 -0400 40.4530830383301 -74.2974166870117 NJ 28 westbound : roadwork NJDOT - STMC: Roadwork on NJ 28 Westbound at CR 643/Mountain Ave (Somerville) Wednesday July 15, 2026 07:00 PM thru Thursday July 16, 2026 05:00 AM, intersection Thu, 09 Jul 2026 08:47:48 -0400 40.5713729858398 -74.6206970214844 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Tuesday July 14, 2026 08:00 AM thru 02:00 PM, right shoulder closed Thu, 09 Jul 2026 08:47:49 -0400 41.1034126281738 -74.5682983398438 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Thursday July 16, 2026 09:00 AM thru 03:30 PM, right shoulder closed Thu, 09 Jul 2026 08:47:51 -0400 40.8320922851562 -75.0009841918945 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Wednesday July 15, 2026 08:00 AM thru 02:00 PM, right shoulder closed Thu, 09 Jul 2026 08:47:50 -0400 41.1034126281738 -74.5682983398438 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Monday July 13, 2026 08:00 AM thru 02:00 PM, right shoulder closed Thu, 09 Jul 2026 08:47:54 -0400 41.1034126281738 -74.5682983398438 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Thursday July 16, 2026 08:00 AM thru 02:00 PM, right shoulder closed Thu, 09 Jul 2026 08:47:52 -0400 41.1034126281738 -74.5682983398438 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 06:00 AM, local lane Fri, 10 Jul 2026 12:44:56 -0400 40.7143363952637 -74.289680480957 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 06:00 AM, local lane Thu, 09 Jul 2026 08:44:57 -0400 40.7143363952637 -74.289680480957 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 06:00 AM, local lane Thu, 09 Jul 2026 08:44:59 -0400 40.7143363952637 -74.289680480957 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Wednesday July 15, 2026 09:00 AM thru 03:30 PM, right shoulder closed Wed, 08 Jul 2026 16:44:51 -0400 40.8320922851562 -75.0009841918945 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Tuesday July 14, 2026 09:00 AM thru 03:30 PM, right shoulder closed Wed, 08 Jul 2026 16:41:51 -0400 40.8538780212402 -74.9309310913086 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Monday July 13, 2026 09:00 AM thru 03:30 PM, right shoulder closed Wed, 08 Jul 2026 16:41:52 -0400 40.8538780212402 -74.9309310913086 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Monday July 13, 2026 09:00 AM thru 03:30 PM, right shoulder closed Wed, 08 Jul 2026 16:41:54 -0400 40.8320922851562 -75.0009841918945 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Wednesday July 15, 2026 09:00 AM thru 03:30 PM, right shoulder closed Wed, 08 Jul 2026 16:41:53 -0400 40.8538780212402 -74.9309310913086 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Tuesday July 14, 2026 09:00 AM thru 03:30 PM, right shoulder closed Wed, 08 Jul 2026 16:41:55 -0400 40.8320922851562 -75.0009841918945 Corbin Street southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Corbin Street southbound between Kellogg Street (Newark) and Marsh Street (Newark), Monday July 13th, 2026 thru Tuesday July 14th, 2026, 06:00 PM thru 04:00 AM 1 Left lane of 3 lanes closed Wed, 08 Jul 2026 15:36:52 -0400 40.7019943346333 -74.1521057540969 Port Street both directions : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Port Street both directions between Brewster Road (Newark) and Marlin Street (Newark) only one lane will be open, Thursday July 9th, 2026 thru Wednesday July 15th, 2026, Monday/Tuesday/Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open Wed, 08 Jul 2026 15:26:36 -0400 40.7062396980057 -74.1557390185184 NJ 27 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 27 Both Directions Ramp To CR 623/North Broad St (Elizabeth) Friday July 17, 2026 09:00 PM thru Saturday July 18, 2026 05:00 AM, All lanes closed and detoured northbound; All lanes closed and detoured southbound Wed, 08 Jul 2026 15:18:09 -0400 40.6747550964355 -74.213020324707 NJ 27 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 27 Both Directions Ramp To CR 623/North Broad St (Elizabeth) Thursday July 16, 2026 09:00 PM thru Friday July 17, 2026 05:00 AM, All lanes closed and detoured northbound; All lanes closed and detoured southbound Wed, 08 Jul 2026 15:18:03 -0400 40.6747550964355 -74.213020324707 NJ 27 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 27 Both Directions Ramp To CR 623/North Broad St (Elizabeth) Wednesday July 15, 2026 09:00 PM thru Thursday July 16, 2026 05:00 AM, All lanes closed and detoured northbound; All lanes closed and detoured southbound Wed, 08 Jul 2026 15:17:58 -0400 40.6747550964355 -74.213020324707 Port Street both directions : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Port Street both directions between Marlin Street (Newark) and Doremus Avenue (Newark), Wednesday July 8th, 2026 thru Wednesday July 15th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 04:00 AM All lanes closed Wed, 08 Jul 2026 15:13:24 -0400 40.7022995993578 -74.1445108797716 NJ 27 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 27 Both Directions North of CR 610/Grand St (Elizabeth) Tuesday July 14, 2026 09:00 PM thru Wednesday July 15, 2026 05:00 AM, 1 right lane of 4 lanes closed northbound; 1 right lane of 4 lanes closed southbound Wed, 08 Jul 2026 15:11:21 -0400 40.6694717407227 -74.2158126831055 NJ 27 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 27 Both Directions North of CR 610/Grand St (Elizabeth) Monday July 13, 2026 09:00 PM thru Tuesday July 14, 2026 05:00 AM, 1 right lane of 4 lanes closed northbound; 1 right lane of 4 lanes closed southbound Wed, 08 Jul 2026 15:11:10 -0400 40.6694717407227 -74.2158126831055 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of Ridge Rd (Readington Twp), Monday July 13, 2026 08:00 AM thru 04:00 PM, right shoulder closed Wed, 08 Jul 2026 14:44:53 -0400 40.6115341186523 -74.7188186645508 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of Ridge Rd (Readington Twp), Tuesday July 14, 2026 08:00 AM thru 04:00 PM, right shoulder closed Wed, 08 Jul 2026 14:44:57 -0400 40.6115341186523 -74.7188186645508 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near CR 626/West Chestnut St (Union Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, right shoulder closed, moving operation Wed, 08 Jul 2026 07:56:50 -0400 40.6912841796875 -74.2881698608398 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of Garden State Parkway (Union Twp), Tuesday July 14, 2026 10:00 PM thru Wednesday July 15, 2026 06:00 AM, right lane closed, moving operation Wed, 08 Jul 2026 07:56:57 -0400 40.69189453125 -74.2652740478516 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 577/Springfield Ave (Union Twp) and East of CR 626/West Chestnut St (Union Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, right lane closed, moving operation Wed, 08 Jul 2026 07:57:00 -0400 40.6883430480957 -74.3105697631836 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near West of Michigan Av (Union Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, right shoulder closed, moving operation Wed, 08 Jul 2026 07:57:04 -0400 40.688835144043 -74.3068161010742 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of Vaux Hall Rd (Union Twp), Tuesday July 14, 2026 10:00 PM thru Wednesday July 15, 2026 05:00 AM, right lane closed, moving operation Wed, 08 Jul 2026 07:57:03 -0400 40.6975326538086 -74.2500610351562 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between West of Michigan Av (Union Twp) and East of CR 626/West Chestnut St (Union Twp), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, right lane closed, moving operation Wed, 08 Jul 2026 07:57:06 -0400 40.689323425293 -74.3030624389648 US 9 southbound : roadwork NJDOT - STMC: Roadwork on US 9 Southbound between North of Garden State Parkway (Sayreville) and South of CR 673/Ernston Rd (Old Bridge Twp), Wednesday July 15, 2026 07:00 AM thru 03:00 PM, right shoulder closed Wed, 08 Jul 2026 07:57:07 -0400 40.4735565185547 -74.294189453125 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Wednesday July 15, 2026 10:00 AM thru 03:30 PM, intersection Wed, 08 Jul 2026 05:11:50 -0400 40.7204971313477 -74.0934066772461 US 9 southbound : roadwork NJDOT - STMC: Roadwork on US 9 Southbound between North of Garden State Parkway (Sayreville) and South of CR 673/Ernston Rd (Old Bridge Twp), Monday July 13, 2026 07:00 AM thru 03:00 PM, right shoulder closed Tue, 07 Jul 2026 14:26:58 -0400 40.4735565185547 -74.294189453125 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near Wilson Av (North Plainfield), Monday July 13, 2026 08:00 AM thru 03:00 PM, right shoulder closed Tue, 07 Jul 2026 14:27:02 -0400 40.624153137207 -74.442985534668 US 9 southbound : roadwork NJDOT - STMC: Roadwork on US 9 Southbound between North of Garden State Parkway (Sayreville) and South of CR 673/Ernston Rd (Old Bridge Twp), Tuesday July 14, 2026 07:00 AM thru 03:00 PM, right shoulder closed Tue, 07 Jul 2026 14:26:53 -0400 40.4735565185547 -74.294189453125 NJ 67 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 67 Southbound At Tom Hunter Rd (Fort Lee) Wednesday July 15, 2026 09:00 AM thru 03:30 PM, 1 right lane of 3 lanes, right shoulder closed Tue, 07 Jul 2026 12:18:38 -0400 40.8466911315918 -73.9710693359375 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound near East of CR 646 (Pilesgrove Twp), Continuous Monday July 13, 2026 07:00 AM thru Wednesday July 15, 2026 04:00 PM, right shoulder closed Tue, 07 Jul 2026 08:05:54 -0400 39.6711387634277 -75.3919296264648 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 577/Springfield Ave (Union Twp) and East of CR 626/West Chestnut St (Union Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, right lane closed, moving operation Tue, 07 Jul 2026 08:05:58 -0400 40.6883430480957 -74.3105697631836 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between CR 577/Springfield Ave (Springfield Twp) and East of CR 577/Springfield Ave (Union Twp), Continuous Monday July 13, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, right shoulder closed, moving operation Tue, 07 Jul 2026 08:06:02 -0400 40.6848907470703 -74.3288345336914 US 322 eastbound : roadwork NJDOT - TOC South: Roadwork on US 322 Eastbound near East of NJ 47 (Glassboro), Monday July 13, 2026 09:00 AM thru 03:00 PM, right shoulder closed Tue, 07 Jul 2026 06:51:25 -0400 39.701732635498 -75.1063919067383 US 322 eastbound : roadwork NJDOT - TOC South: Roadwork on US 322 Eastbound near East of NJ 47 (Glassboro), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, right shoulder closed Tue, 07 Jul 2026 06:51:15 -0400 39.701732635498 -75.1063919067383 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of Garden State Parkway (Union Twp), Monday July 13, 2026 10:00 PM thru Tuesday July 14, 2026 06:00 AM, right lane closed, moving operation Mon, 06 Jul 2026 20:05:49 -0400 40.69189453125 -74.2652740478516 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near West of Michigan Av (Union Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, right shoulder closed, moving operation Mon, 06 Jul 2026 20:05:50 -0400 40.688835144043 -74.3068161010742 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between West of Michigan Av (Union Twp) and East of CR 626/West Chestnut St (Union Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, right lane closed, moving operation Mon, 06 Jul 2026 20:06:00 -0400 40.689323425293 -74.3030624389648 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Tuesday July 14, 2026 10:00 AM thru 03:30 PM, intersection Mon, 06 Jul 2026 20:05:55 -0400 40.7204971313477 -74.0934066772461 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near CR 626/West Chestnut St (Union Twp), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, right shoulder closed, moving operation Mon, 06 Jul 2026 20:05:56 -0400 40.6912841796875 -74.2881698608398 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of Vaux Hall Rd (Union Twp), Monday July 13, 2026 10:00 PM thru Tuesday July 14, 2026 05:00 AM, right lane closed, moving operation Mon, 06 Jul 2026 20:05:59 -0400 40.6975326538086 -74.2500610351562 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Monday July 13, 2026 10:00 AM thru 03:30 PM, intersection Mon, 06 Jul 2026 18:29:51 -0400 40.7204971313477 -74.0934066772461 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Friday July 24, 2026 08:00 PM thru Saturday July 25, 2026 05:00 AM, right shoulder closed, moving operation Mon, 06 Jul 2026 10:15:43 -0400 41.0953254699707 -74.5298080444336 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Wednesday July 22, 2026 08:00 PM thru Thursday July 23, 2026 05:00 AM, right shoulder closed, moving operation Mon, 06 Jul 2026 10:15:50 -0400 41.0953254699707 -74.5298080444336 NJ 45 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 45 between South of I-295 (Deptford Twp) and North of Delaware St/Cooper Av (Woodbury), Thursday July 23, 2026 06:30 AM thru 03:30 PM, right shoulder closed Mon, 06 Jul 2026 10:15:31 -0400 39.8518867492676 -75.1424865722656 US 206 northbound : roadwork NJDOT - TOC South: Roadwork on US 206 near North of CR 541/Stokes Rd (Shamong Twp), Wednesday July 15, 2026 09:00 AM thru 04:00 PM, right shoulder closed Mon, 06 Jul 2026 10:15:13 -0400 39.7804985046387 -74.7384033203125 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Thursday July 23, 2026 08:00 PM thru Friday July 24, 2026 05:00 AM, right shoulder closed, moving operation Mon, 06 Jul 2026 10:15:06 -0400 41.0953254699707 -74.5298080444336 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between East of Central Ave (South Hackensack Twp) and West of NJ 17 (Hasbrouck Heights), Wednesday July 22, 2026 08:00 PM thru Thursday July 23, 2026 06:00 AM, right shoulder closed Mon, 06 Jul 2026 10:15:18 -0400 40.8566703796387 -74.050048828125 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Rector St (Newark) Tuesday July 21, 2026 09:00 AM thru 03:00 PM, ramp Mon, 06 Jul 2026 10:15:14 -0400 40.7404556274414 -74.1655120849609 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Saturday July 25, 2026 08:00 PM thru Sunday July 26, 2026 05:00 AM, right shoulder closed, moving operation Mon, 06 Jul 2026 10:15:23 -0400 41.0953254699707 -74.5298080444336 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 17 (Hasbrouck Heights) and East of Central Ave (South Hackensack Twp), Wednesday July 22, 2026 08:00 PM thru Thursday July 23, 2026 06:00 AM, right shoulder closed Mon, 06 Jul 2026 10:15:28 -0400 40.8667144775391 -74.0635681152344 US 206 northbound : roadwork NJDOT - TOC South: Roadwork on US 206 near North of CR 541/Stokes Rd (Shamong Twp), Tuesday July 14, 2026 09:00 AM thru 04:00 PM, right shoulder closed Mon, 06 Jul 2026 10:15:00 -0400 39.7804985046387 -74.7384033203125 Outerbridge Crossing westbound : bridge construction Port Authority NY/NJ: bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Tuesday July 7th,2026 thru Thursday July 16th,2026, Monday thru Friday, 08:30 PM thru 05:00 AM 1 Right lane of 2 lanes closed westbound, , Friday July 17th,2026 thru Saturday July 18th,2026, Friday, 11:30 PM thru 08:00 AM 1 Right lane of 2 lanes closed westbound, Sat, 11 Jul 2026 08:00:02 -0400 40.525217087805 -74.2400616914618 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Inner Roadway northbound Entrance ramp Interchange 9 - NJ 18 (East Brunswick Twp) to Interchange 9 - NJ 18 (New Brunswick), Monday July 13th,2026 thru Tuesday July 14th,2026, Monday, 06:00 PM thru 05:00 AM All lanes closed northbound, Sat, 11 Jul 2026 06:00:25 -0400 40.4772931883193 -74.4028751087605 North Avenue eastbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on North Avenue eastbound between Earhart Drive (Elizabeth) and IKea Drive (Elizabeth), Wednesday July 1st, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 08:00 PM thru 04:00 AM 1 Left lane of 3 lanes closed Fri, 10 Jul 2026 18:02:36 -0400 40.6706860736086 -74.1806744877021 US 322 westbound : roadwork NJDOT - TOC South: Roadwork on US 322 Westbound near East of CR 641/High St (Glassboro), left shoulder Wed, 01 Jul 2026 08:36:14 -0400 39.701286315918 -75.1029357910156 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Monday July 20, 2026 08:00 PM thru Tuesday July 21, 2026 05:00 AM, right shoulder closed, moving operation Wed, 01 Jul 2026 08:36:11 -0400 41.0953254699707 -74.5298080444336 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound near East of New Jersey Turnpike/I-295 (Carneys Point Twp), Thursday July 16, 2026 09:00 AM thru 02:00 PM, left lane closed Wed, 01 Jul 2026 08:36:19 -0400 39.6784629821777 -75.4768981933594 US 322 westbound : roadwork NJDOT - TOC South: Roadwork on US 322 Westbound near East of CR 641/High St (Glassboro), left shoulder Wed, 01 Jul 2026 08:36:23 -0400 39.701286315918 -75.1029357910156 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Monday July 13, 2026 08:00 PM thru Tuesday July 14, 2026 05:00 AM, right shoulder closed, moving operation Wed, 01 Jul 2026 08:36:20 -0400 41.0953254699707 -74.5298080444336 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound near East of New Jersey Turnpike/I-295 (Carneys Point Twp), Wednesday July 15, 2026 09:00 AM thru 02:00 PM, left lane closed Wed, 01 Jul 2026 08:35:47 -0400 39.6784629821777 -75.4768981933594 US 322 westbound : roadwork NJDOT - TOC South: Roadwork on US 322 Westbound near East of CR 641/High St (Glassboro), left shoulder Wed, 01 Jul 2026 08:35:53 -0400 39.701286315918 -75.1029357910156 NJ 45 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 45 between South of I-295 (Deptford Twp) and North of Delaware St/Cooper Av (Woodbury), Wednesday July 22, 2026 06:30 AM thru 03:30 PM, right shoulder closed Wed, 01 Jul 2026 08:35:51 -0400 39.8518867492676 -75.1424865722656 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Friday July 17, 2026 08:00 PM thru Saturday July 18, 2026 05:00 AM, right shoulder closed, moving operation Wed, 01 Jul 2026 08:35:49 -0400 41.0953254699707 -74.5298080444336 US 322 westbound : roadwork NJDOT - TOC South: Roadwork on US 322 Westbound near East of CR 641/High St (Glassboro), left shoulder Wed, 01 Jul 2026 08:36:00 -0400 39.701286315918 -75.1029357910156 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Tuesday July 21, 2026 08:00 PM thru Wednesday July 22, 2026 05:00 AM, right shoulder closed, moving operation Wed, 01 Jul 2026 08:36:08 -0400 41.0953254699707 -74.5298080444336 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Saturday July 18, 2026 08:00 PM thru Sunday July 19, 2026 05:00 AM, right shoulder closed, moving operation Wed, 01 Jul 2026 08:36:04 -0400 41.0953254699707 -74.5298080444336 NJ 45 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 45 between South of I-295 (Deptford Twp) and North of Delaware St/Cooper Av (Woodbury), Tuesday July 21, 2026 06:30 AM thru 03:30 PM, right shoulder closed Wed, 01 Jul 2026 08:36:03 -0400 39.8518867492676 -75.1424865722656 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Thursday July 16, 2026 08:00 PM thru Friday July 17, 2026 05:00 AM, right shoulder closed, moving operation Wed, 01 Jul 2026 08:35:56 -0400 41.0953254699707 -74.5298080444336 US 322 westbound : roadwork NJDOT - TOC South: Roadwork on US 322 Westbound near East of CR 641/High St (Glassboro), left shoulder Wed, 01 Jul 2026 08:35:55 -0400 39.701286315918 -75.1029357910156 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Wednesday July 15, 2026 08:00 PM thru Thursday July 16, 2026 05:00 AM, right shoulder closed, moving operation Wed, 01 Jul 2026 08:35:54 -0400 41.0953254699707 -74.5298080444336 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Tuesday July 14, 2026 08:00 PM thru Wednesday July 15, 2026 05:00 AM, right shoulder closed, moving operation Wed, 01 Jul 2026 08:35:59 -0400 41.0953254699707 -74.5298080444336 NJ 133 westbound : roadwork NJDOT - TOC South: Roadwork on NJ 133 Westbound near In the vicinity of NJ 33 (East Windsor Twp), Monday July 13, 2026 01:00 PM thru 02:00 PM, right shoulder closed Tue, 30 Jun 2026 11:57:11 -0400 40.2742691040039 -74.5042343139648 NJ 133 eastbound : roadwork NJDOT - TOC South: Roadwork on NJ 133 Eastbound near In the vicinity of NJ 33 (East Windsor Twp), Monday July 13, 2026 12:00 PM thru 01:00 PM, right shoulder closed Tue, 30 Jun 2026 11:57:31 -0400 40.2753829956055 -74.5077590942383 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound near East of New Jersey Turnpike/I-295 (Carneys Point Twp), Tuesday July 14, 2026 09:00 AM thru 03:00 PM, left lane closed Tue, 30 Jun 2026 11:57:23 -0400 39.6784629821777 -75.4768981933594 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound near East of Exit 6 - New Jersey Turnpike (Robbinsville), Monday July 13, 2026 10:00 AM thru 11:00 AM, right shoulder closed Tue, 30 Jun 2026 11:57:35 -0400 40.1943092346191 -74.6025772094727 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound near West of Exit 7 - CR 526 (Robbinsville), Monday July 13, 2026 10:00 AM thru 11:00 AM, right shoulder closed Tue, 30 Jun 2026 11:56:53 -0400 40.1932334899902 -74.5990676879883 American Dream Mall : other special event Meadowlands Complex: other special event on American Dream Mall at (East Rutherford) TikTok Match Day Market, Saturday July 18th, 2026 thru Saturday July 18th, 2026, 12:00 PM thru 04:00 PM, Sunday July 19th, 2026, 11:00 AM thru 08:00 PM Mon, 29 Jun 2026 09:42:21 -0400 40.8103304020617 -74.0684148072978 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall at (East Rutherford) AS IT IS, Saturday August 8th, 2026, 07:00 PM thru 10:00 PM Mon, 29 Jun 2026 09:28:13 -0400 40.8103304020617 -74.0684148072978 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall (East Rutherford) French Montana, Saturday August 15th, 2026, 09:00 PM thru 11:59 PM Mon, 29 Jun 2026 09:25:54 -0400 40.8103304020617 -74.0684148072978 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall at (East Rutherford) MAGIC!, Saturday October 24th, 2026, 07:00 PM thru 10:00 PM Mon, 29 Jun 2026 09:24:15 -0400 40.8103304020617 -74.0684148072978 NJ 88 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 88 Eastbound East of CR 633/Arnold Av (Point Pleasant) Thursday July 16, 2026 07:00 PM thru Friday July 17, 2026 06:00 AM, All lanes closed and detoured Tue, 16 Jun 2026 14:14:44 -0400 40.0839500427246 -74.0624618530273 NJ 88 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 88 Eastbound East of CR 633/Arnold Av (Point Pleasant) Tuesday July 14, 2026 07:00 PM thru Wednesday July 15, 2026 06:00 AM, All lanes closed and detoured Tue, 16 Jun 2026 14:14:33 -0400 40.0839500427246 -74.0624618530273 NJ 88 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 88 Eastbound East of CR 633/Arnold Av (Point Pleasant) Wednesday July 15, 2026 07:00 PM thru Thursday July 16, 2026 06:00 AM, All lanes closed and detoured Tue, 16 Jun 2026 14:14:38 -0400 40.0839500427246 -74.0624618530273 NJ 88 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 88 Eastbound East of CR 633/Arnold Av (Point Pleasant) Monday July 13, 2026 07:00 PM thru Tuesday July 14, 2026 06:00 AM, All lanes closed and detoured Tue, 16 Jun 2026 14:14:28 -0400 40.0839500427246 -74.0624618530273 Prudential Center - ROCK : concert Prudential Center: concert on Prudential Center - ROCK at (Newark) IVE IVE WORLD TOUR SHOW WHAT I AM>, Saturday July 25th, 2026, 08:00 PM thru 11:00 PM Tue, 16 Jun 2026 10:39:19 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : concert Prudential Center: concert on Prudential Center - ROCK at (Newark) HOT 97 Summer Jam French Montana, Mariah the Scientist, Ice Spice, Fetty Wap & More, Friday July 24th, 2026, 07:00 PM thru 11:00 PM Tue, 16 Jun 2026 10:36:23 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : concert Prudential Center: concert on Prudential Center - ROCK at (Newark) Shinedown Dance, Kid, Dance Act I, Tuesday July 21st, 2026, 07:00 PM thru 10:00 PM Tue, 16 Jun 2026 10:33:16 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : special event Prudential Center: special event on Prudential Center - ROCK at (Newark) The Global Game Summit The Future of Soccer, Tech & Media, Wednesday July 15th, 2026, 08:00 AM thru 08:00 PM Tue, 16 Jun 2026 10:29:33 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : concert Prudential Center: concert on Prudential Center - ROCK at (Newark) Shakira Las Mujeres Ya No Lloran - World Tour, Tuesday July 14th, 2026, 08:30 PM thru 11:30 PM Tue, 16 Jun 2026 10:26:48 -0400 40.7335901472838 -74.1711848974228 Prudential Center - ROCK : concert Prudential Center: concert on Prudential Center - ROCK at (Newark) Benson Boone Wanted Man Tour, Monday July 13th, 2026, 08:00 PM thru 11:00 PM Tue, 16 Jun 2026 10:24:14 -0400 40.7335901472838 -74.1711848974228 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York) Not currently Scheduled Sun, 21 Jun 2026 08:00:01 -0400 40.8532203381601 -73.9610771597614 New Jersey Turnpike - Eastern Spur : Roadwork NJ Turnpike Auth.: Long term road construction and Roadwork, roadwork on New Jersey Turnpike - Eastern Spur Interchange 15X - Secaucus Train Station (Secaucus) The right lane from Interchange 15X to the Secaucus Train Station is closed until July 22, 2026. Tue, 23 Jun 2026 05:41:48 -0400 40.75214 -74.07102 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall at (East Rutherford) Scotty McCreery, Sunday October 18th, 2026, 07:00 PM thru 10:00 PM Fri, 12 Jun 2026 07:26:21 -0400 40.8103304020617 -74.0684148072978 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Logic & G-Eazy: The Endless Summer Tour Part II, Saturday October 3rd, 2026, 07:00 PM thru 10:00 PM Wed, 10 Jun 2026 14:17:05 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Dan + Shay: The Young Tour, Thursday September 24th, 2026, 07:00 PM thru 10:00 PM Tue, 09 Jun 2026 17:48:04 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Roxette 40th Anniversary Tour 2026, Friday September 18th, 2026, 06:30 PM thru 09:00 PM Tue, 09 Jun 2026 17:46:21 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) O.A.R Three Decades Tour, Thursday September 24th, 2026, 06:30 PM thru 09:00 PM Tue, 09 Jun 2026 17:43:40 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) TLC & Salt-N-Pepa with En Vogue - IT'S ICONIC, Saturday September 12th, 2026, 07:30 PM thru 10:30 PM Tue, 09 Jun 2026 17:41:29 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Wu-Tang Forever: The Final Chamber, Friday September 11th, 2026, 07:30 PM thru 10:30 PM Tue, 09 Jun 2026 17:37:30 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Breaking Benjamin, Sunday September 6th, 2026, 06:00 PM thru 09:00 PM Tue, 09 Jun 2026 17:35:49 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Pitbull - I'm Back with special guest Lil Jon, Thursday September 3rd, 2026, 08:00 PM thru 11:00 PM Tue, 09 Jun 2026 17:27:28 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Empire of the Sun - Ask That God: Afterlife North American Tour, Wednesday September 2nd, 2026, 07:30 PM thru 10:00 PM Tue, 09 Jun 2026 17:25:49 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Jerry Garcia Symphonic Celebration, Saturday August 29th, 2026, 08:00 PM thru 11:59 PM Wed, 10 Jun 2026 14:19:35 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Rob Zombie & Marilyn Manson with The Hu & Orgy, Wednesday August 26th, 2026, 06:30 PM thru 09:30 PM Tue, 09 Jun 2026 17:22:23 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Howard Jones: Things Can Only Get Better Tour, Friday August 21st, 2026, 06:30 PM thru 09:00 PM Tue, 09 Jun 2026 17:20:35 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Ninja Kidz Live: Infinite Possibilities, Sunday August 23rd, 2026, 06:00 PM thru 08:00 PM Tue, 09 Jun 2026 17:20:16 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Kesha: The Freedom Tour, Wednesday August 19th, 2026, 07:00 PM thru 09:30 PM Tue, 09 Jun 2026 17:16:58 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Beatstock With Deborah Cox, Treach & More, Saturday August 15th, 2026, 05:30 PM thru 09:00 PM Tue, 09 Jun 2026 17:13:18 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Five Finger Death Punch, Wednesday August 5th, 2026, 06:45 PM thru 09:00 PM Tue, 09 Jun 2026 17:14:53 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Margaritaville Presents Jimmy Buffett's Coral Reefer Band, Tuesday August 4th, 2026 thru Tuesday August 4th, 2026, 12:00 AM thru 11:59 PM Tue, 09 Jun 2026 17:06:19 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) The Return Of The Carnival Of Sins: M�tley Cr�e, Friday July 31st, 2026, 06:30 PM thru 11:59 PM Wed, 10 Jun 2026 14:30:23 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Lynyrd Skynyrd x Foreigner: Double Trouble Double Vision Tour, Sunday July 26th, 2026, 06:30 PM thru 09:30 PM Tue, 09 Jun 2026 16:56:35 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) John Mellencamp Dancing Words Tour The Greatest Hits, Saturday July 25th, 2026, 08:00 PM thru 10:30 PM Tue, 09 Jun 2026 16:54:35 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert TRANSCOM, Jersey City: concert on PNC Arts Center (Holmdel Twp) TRAIN - Drops of Jupiter: 25 Years in the Atmosphere, Friday July 24th, 2026, 06:45 PM thru 09:30 PM Tue, 09 Jun 2026 16:52:09 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Dirty Heads and 311: So Glad You Made It Tour, Thursday July 23rd, 2026, 05:30 PM thru 08:30 PM Tue, 09 Jun 2026 16:49:04 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Muse - The Wow! Signal Tour, Wednesday July 22nd, 2026, 07:00 PM thru 10:00 PM Tue, 09 Jun 2026 16:47:16 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) NE-YO & AKON: Nights Like This Tour 2026, Sunday July 19th, 2026, 08:00 PM thru 11:00 PM Tue, 09 Jun 2026 16:44:52 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) TOTO + Christopher Cross + The Romantics, Saturday July 18th, 2026, 06:45 PM thru 11:00 PM Tue, 09 Jun 2026 16:41:43 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Jason Aldean: Songs About Us Tour 2026, Friday July 17th, 2026, 07:30 PM thru 10:30 PM Tue, 09 Jun 2026 16:38:03 -0400 40.3929811131815 -74.177076101696 NJ 24 westbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Westbound near West of Exit 7 - NJ 124/JFK Parkway (Chatham), Continuous Monday June 22, 2026 07:00 AM thru Monday November 30, 2026 04:00 PM, right shoulder closed Mon, 08 Jun 2026 08:20:51 -0400 40.753776550293 -74.379768371582 Broadway both directions : emergency repairs Port Authority NY/NJ: emergency repairs on Broadway both directions between 178th Street (New York) and 179th Street (New York) Under the Port Authority GWB Bus Terminal. Not currently Scheduled Fri, 05 Jun 2026 05:00:01 -0400 40.8489390784605 -73.9370795597705 Van Wyck Expressway southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Van Wyck Expressway southbound ramp from Federal Circle (New York) Not currently Scheduled Sat, 06 Jun 2026 04:00:01 -0400 40.6569554668775 -73.8078060230612 American Dream Mall : sports event Meadowlands Complex: sports event on American Dream Mall at (East Rutherford) Red Bull New York Youth Soccer Clinics, Thursday July 16th,2026 05:30 PM thru 08:30 PM Sun, 12 Jul 2026 12:00:10 -0400 40.8103304020617 -74.0684148072978 NJ 7 northbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Northbound near CR 672/Mill St (Belleville Twp), Continuous Monday May 18, 2026 12:00 AM thru Friday August 28, 2026 12:00 PM, right shoulder closed Fri, 22 May 2026 09:55:32 -0400 40.7827377319336 -74.1540374755859 NJ 7 southbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Southbound near North of NJ 21 (Belleville Twp), Continuous Friday May 22, 2026 12:00 AM thru Friday August 28, 2026 12:00 PM, right shoulder closed Fri, 22 May 2026 09:55:34 -0400 40.7841758728027 -74.153694152832 NJ 7 southbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Southbound near North of NJ 21 (Belleville Twp), Continuous Monday May 18, 2026 12:00 AM thru Friday August 28, 2026 12:00 PM, right lane closed Fri, 15 May 2026 13:56:53 -0400 40.7841758728027 -74.153694152832 NJ 7 northbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Northbound near CR 672/Mill St (Belleville Twp), Continuous Monday May 18, 2026 12:00 AM thru Friday August 28, 2026 11:00 PM, right lane closed Fri, 15 May 2026 13:56:46 -0400 40.7827377319336 -74.1540374755859 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound near East of Exit 44 - CR 527/Glenside Ave (Berkeley Heights Twp), Continuous Monday May 18, 2026 11:00 PM thru Tuesday July 28, 2026 11:00 PM, right shoulder closed Fri, 15 May 2026 00:59:42 -0400 40.684009552002 -74.3889694213867 Trump National Golf Course : golf tournament TRANSCOM, Jersey City: golf tournament on Trump National Golf Course at (Bedminster Twp) LIV Golf New York , Thursday August 6th, 2026 thru Sunday August 9th, 2026, Sunday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM Mon, 11 May 2026 10:47:06 -0400 40.6535101692702 -74.6971463449697 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall at (East Rutherford) ARRIVAL From Sweden: The Music of ABBA, Thursday August 20th, 2026, 07:00 PM thru 10:00 PM Mon, 11 May 2026 09:49:45 -0400 40.8103304020617 -74.0684148072978 American Dream Mall : sports event Meadowlands Complex: sports event on American Dream Mall at (East Rutherford) Victory Fighting League, Saturday July 25th, 2026, 04:00 PM thru 07:00 PM Mon, 11 May 2026 09:46:22 -0400 40.8103304020617 -74.0684148072978 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Continuous Friday May 15, 2026 07:00 AM thru Saturday February 27, 2027 07:00 PM, Sun, 03 May 2026 07:45:52 -0400 40.5741958618164 -74.6357498168945 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Karol G Viajando Por El Mundo Tropitour , Thursday September 17th, 2026, 07:00 PM thru 11:00 PM Thu, 23 Apr 2026 10:38:36 -0400 40.8134600702536 -74.0742874145508 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Chris Brown & Usher , Friday August 7th, 2026 thru Saturday August 8th, 2026, Friday/Saturday, 07:00 PM thru 11:00 PM Thu, 23 Apr 2026 10:36:33 -0400 40.8134600702536 -74.0742874145508 9th Avenue southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st,2026 thru Thursday August 27th,2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed , , Monday July 13th,2026 thru Tuesday July 14th,2026, Monday, 11:00 PM thru 05:00 AM All lanes closed , Tue, 30 Jun 2026 05:00:06 -0400 40.7549062841009 -73.9952685512616 Dyer Avenue (Lincoln Tunnel Expressway) both directions : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st,2026 thru Thursday August 27th,2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed westbound, eastbound, Monday July 13th,2026 thru Tuesday July 14th,2026, Monday, 11:00 PM thru 05:00 AM All lanes closed westbound, eastbound Tue, 30 Jun 2026 05:00:05 -0400 40.7518868422388 -73.9995678946567 Earhart Drive both directions : Construction Port Authority NY/NJ: Construction on Earhart Drive both directions Basilone Road (Elizabeth) to South Bridge Road All lanes closed until June 30th, 2028 Mon, 04 May 2026 20:12:29 -0400 40.6854533201585 -74.1888271599343 Sports Illustrated Stadium : soccer game New York Red Bulls: soccer game on Sports Illustrated Stadium at (Harrison) Leeds United vs. Sunderland AFC, Thursday July 30th, 2026, 07:30 PM thru 10:30 PM Thu, 09 Apr 2026 07:39:22 -0400 40.7366914609768 -74.1502866405472 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 38 - US 46 (Denville Twp), Continuous Friday April 10, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Sun, 05 Apr 2026 04:13:49 -0400 40.9053802490234 -74.4967422485352 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Continuous Thursday April 9, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed local lane Fri, 03 Apr 2026 07:14:08 -0400 40.8605499267578 -74.3977203369141 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near East of Exit 47A - I-280 (Fairfield Twp), Continuous Wednesday April 8, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Fri, 03 Apr 2026 07:14:03 -0400 40.8682289123535 -74.3308258056641 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Tuesday April 7, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Thu, 02 Apr 2026 08:49:28 -0400 40.8945350646973 -74.263801574707 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Monday April 6, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Thu, 02 Apr 2026 08:49:41 -0400 40.8987617492676 -74.2436065673828 MetLife Stadium : concert TRANSCOM, Jersey City: concert on MetLife Stadium at (East Rutherford) AC/DC AC/DC "Power Up Tour 2026" , Friday September 25th, 2026, 07:00 PM thru 11:00 PM Thu, 02 Apr 2026 08:27:14 -0400 40.8134600702536 -74.0742874145508 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Guns N' Roses Guns N' Roses World Tour , Wednesday August 12th, 2026, 06:25 PM thru 11:00 PM Thu, 02 Apr 2026 08:24:03 -0400 40.8134600702536 -74.0742874145508 MetLife Stadium : soccer game Meadowlands Complex: soccer game on MetLife Stadium at (East Rutherford) FIFA World Cup 2026� Final , Sunday July 19th, 2026, 03:00 PM thru 06:00 PM Thu, 02 Apr 2026 08:21:11 -0400 40.8134600702536 -74.0742874145508 North Beach : concert TRANSCOM, Jersey City: concert on North Beach at (Asbury Park) Sea. Hear. Now, Saturday September 19th, 2026 thru Sunday September 20th, 2026, Saturday/ Sunday, 11:00 AM thru 11:00 PM Thu, 26 Mar 2026 14:21:17 -0400 40.2239673811411 -73.9979217444968 George Washington Bridge eastbound : Truck restrictions Port Authority NY/NJ: Truck restrictions on George Washington Bridge Lower Level eastbound (Fort Lee) All lanes open . All commercial vehicles exiting at Exit 73 from US Route 46, Route 4, and the I-95 Local Lanes, please stay to the left and use Exit 73 to exit from the I-95 Express Lanes. Tue, 30 Jun 2026 13:44:34 -0400 40.8567846997699 -73.9734259635123 George Washington Bridge southbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level southbound ramp from Palisades Interstate Parkway (Fort Lee) to Palisades Interstate Parkway (Fort Lee) Not currently Scheduled Sun, 22 Mar 2026 08:00:01 -0400 40.8545430432684 -73.9629827826926 Sports Illustrated Stadium : lacrosse TRANSCOM, Jersey City: lacrosse on Sports Illustrated Stadium at (Harrison) PLL Championship, Sunday September 20th, 2026 thru Sunday September 20th, 2026, 12:30 PM thru 06:00 PM Thu, 05 Feb 2026 16:28:47 -0500 40.7366914609768 -74.1502866405472 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Bruno Mars "The Romantic Tour", Friday August 21st, 2026 thru Wednesday August 26th, 2026, Tuesday/Wednesday/Friday/Saturday, 07:00 PM thru 11:00 PM Fri, 16 Jan 2026 11:59:59 -0500 40.8134600702536 -74.0742874145508 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) BTS WORLD TOUR , Saturday August 1st, 2026 thru Sunday August 2nd, 2026, Saturday/ Sunday, 08:00 PM thru 11:00 PM Fri, 16 Jan 2026 11:57:36 -0500 40.8134600702536 -74.0742874145508 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp to Center Avenue (Fort Lee) All lanes closed will be closed through July. Cars/Buses use Exit 73 for Local Streets. Trucks follow posted detours Sun, 18 Jan 2026 05:35:06 -0500 40.8552310825741 -73.9694127322947 Bruce Reynolds Boulevard westbound : Construction Port Authority NY/NJ: Construction on Bruce Reynolds Boulevard westbound Lemoine Avenue (Fort Lee) to Center Avenue All lanes closed will be closed through September 2026 Sun, 18 Jan 2026 05:35:45 -0500 40.8541588400011 -73.9683181500042 George Washington Bridge eastbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed Tue, 13 Jan 2026 05:45:44 -0500 40.8550757297774 -73.9711807961208 Bruce Reynolds Blvd westbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Bruce Reynolds Blvd westbound between Lemoine Avenue (Fort Lee) and Center Avenue (Fort Lee) will be closed through September., Continuous Monday January 12th, 2026 10:00 PM thru Wednesday September 30th, 2026 11:59 PM All lanes closed Tue, 13 Jan 2026 05:43:29 -0500 40.8536749463068 -73.9685448747159 George Washington Bridge westbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on George Washington Bridge Upper Level westbound ramp to Center Avenue (Fort Lee) will be closed through July. Cars/Buses use Exit 73 for Local Streets. Trucks follow posted detours, Continuous Monday January 12th, 2026 10:00 PM thru Friday July 31st, 2026 11:59 PM All lanes closed Tue, 13 Jan 2026 05:42:46 -0500 40.8552310825741 -73.9694127322947 NJ 495 : operational activity Port Authority NY/NJ: operational activity and special event on NJ 495 XBL East of New Jersey Turnpike (North Bergen Twp) to West of Boulevard East (Weehawken Twp), Friday January 2nd, 2026 thru Friday January 1st, 2027, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes open Mon, 13 Jul 2026 05:56:15 -0400 40.7801663207199 -74.052560637231 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Ed Sheeran "The Loop Tour" , Friday September 4th, 2026 thru Saturday September 5th, 2026, Friday/Saturday, 05:30 PM thru 11:00 PM Fri, 31 Oct 2025 13:30:08 -0400 40.8134600702536 -74.0742874145508 Sports Illustrated Stadium : concert New York Red Bulls: concert on Sports Illustrated Stadium at (Harrison) IRON MAIDEN RUN FOR YOUR LIVES WORLD TOUR with Megadeath & Anthrax, Saturday September 5th, 2026 thru Sunday September 6th, 2026, Saturday/ Sunday, 06:00 PM thru 11:00 PM Fri, 02 Jan 2026 15:58:33 -0500 40.7366914609768 -74.1502866405472 Corbin Street both directions : Construction Port Authority NY/NJ: Construction on Corbin Street both directions Kellogg Street (Newark) to Outer Port Street 1 Right lane of 3 lanes closed July 14th, 2026 Mon, 06 Jul 2026 07:35:36 -0400 40.7029624496184 -74.1514398425719 NJ 71 southbound : roadwork NJ DOT - TOC South: Roadwork on NJ 71 Southbound At South of Shark River Bridge (Belmar) Thursday June 12, 2025 09:30 PM thru Friday June 13, 2025 05:00 AM, 2 left lanes of 3 lanes closed Fri, 13 Jun 2025 05:00:03 -0400 40.1846885681152 -74.0237121582031 NJ 18 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 18 Northbound between South of Exit 19 - NJ 34 (Colts Neck Twp) and South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp), Thursday June 12, 2025 07:00 AM thru 03:00 PM, right shoulder closed Thu, 12 Jun 2025 15:00:12 -0400 40.2814140319824 -74.1344451904297 NJ 18 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 18 Southbound between South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp) and South of Exit 19 - NJ 34 (Colts Neck Twp), left shoulder Thu, 12 Jun 2025 15:00:12 -0400 40.3417434692383 -74.2804183959961 US 9 northbound : roadwork NJ DOT - TOC South: Roadwork on US 9 Northbound between North of CR 571/Indian Head Rd (Toms River Twp) and CR 620/Church Rd (Toms River Twp) Monday June 9, 2025 09:00 PM thru Saturday June 14, 2025 05:00 AM, All lanes closed and detoured Sat, 14 Jun 2025 05:00:01 -0400 39.9955101013184 -74.2116622924805 NJ 38 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 38 Eastbound At Cherry Hill Mall (Cherry Hill Twp) Friday June 6, 2025 09:00 AM thru 03:00 PM, 1 left lane of 3 lanes closed Fri, 06 Jun 2025 15:00:18 -0400 39.9390411376953 -75.0226669311523 NJ 70 westbound : construction NJ DOT - TOC South: Construction on NJ 70 Westbound between East of CR 674/Greentree Rd (Cherry Hill Twp) and East of New Jersey Turnpike (Cherry Hill Twp) Wednesday June 4, 2025 07:00 AM thru 03:30 PM, 1 right lane of 4 lanes closed Wed, 04 Jun 2025 15:30:01 -0400 39.9045906066895 -74.9711456298828 American Dream Mall : soccer game Meadowlands Complex: soccer game on American Dream Mall at (East Rutherford) Cup of Dreams, Sunday July 26th, 2026, 09:00 AM thru 10:00 PM Fri, 30 May 2025 09:39:57 -0400 40.8103304020617 -74.0684148072978 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp from West 179th Street (New York) All lanes open until further notice. Trucks wider than 10 ft or longer than 110 ft are prohibited. Tue, 16 Jun 2026 11:09:17 -0400 40.8493802929073 -73.9396241842173 Meadowlands Racetrack : racing Meadowlands Complex: racing on Meadowlands Racetrack at (East Rutherford), Friday July 10th,2026 thru Friday July 31st,2026, Friday/Saturday, 06:35 PM thru 11:00 PM Thu, 09 Jul 2026 23:00:10 -0400 40.8202318285764 -74.0717875957489 Inner Port Street both directions : Construction Port Authority NY/NJ: Construction on Inner Port Street both directions between Corbin Street (Newark) and Port Street (Newark) All lanes closed December 31st, 2026 Mon, 30 Mar 2026 07:21:56 -0400 40.7040488538158 -74.1505620476053 Port Street eastbound : Construction Port Authority NY/NJ: Construction on Port Street eastbound ramp to Corbin Street (Newark) All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until July 14th 2026 Tue, 07 Jul 2026 05:36:14 -0400 40.7047103800473 -74.1514923040378 NJ 47 both directions : bridge replacement NJ DOT - TOC South: bridge replacement on NJ 47 both directions CR 551/Broadway Av (Westville) to US 130 (Westville) Not currently Scheduled Wed, 31 Dec 2025 23:59:00 -0500 39.8703414582983 -75.1255272596073