Active Construction All Active Construction en-us Sat, 11 Apr 2026 08:35:17 -0400 Copyright 511nj.org 1 Commodore Barry Bridge eastbound : Construction DRPA: Construction, construction on Commodore Barry Bridge eastbound New Jersey Side (Logan Twp) All lanes closed ramp from US 322 east to US 130 Southbound closed Sat, 11 Apr 2026 08:22:18 -0400 39.8053651096506 -75.3496705109651 NY 133 both directions : Construction NYSDOT - Region 8: Construction, gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) alternating traffic until 2:00 P.M. 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist Sat, 11 Apr 2026 08:00:31 -0400 41.1669813418883 -73.8471258001685 I-690 eastbound : Construction NYSDOT - Region 3: Construction , street sweeping on I-690 eastbound Exit ramp Exit 8 - John Glenn Boulevard (Van Buren) both shoulder of 1 lane closed until 1:00 PM Sat, 11 Apr 2026 08:01:06 -0400 43.112909 -76.271199 I-690 eastbound : Construction NYSDOT - Region 3: Construction , roadwork on I-690 eastbound between Exit 11 - ROUTE 297; Solvay-Fairgrounds (Geddes) and Exit 13 - Hiawatha Boulevard (Syracuse) right shoulder of 3 lanes closed until 1:00 PM Sat, 11 Apr 2026 08:01:06 -0400 43.07652 -76.214468 MT READ BLVD both directions : Construction NYSDOT - Region 4: Construction , intersection improvements on MT READ BLVD both directions between LEXINGTON AVE (Rochester) and DRIVING PARK AVE (Rochester) All lanes of 3 lanes until 3:30 PM Alternating lane closures with intersection flagging as needed Sat, 11 Apr 2026 08:01:06 -0400 43.179097 -77.659238 I-690 westbound : Construction NYSDOT - Region 3: Construction , street sweeping on I-690 westbound Exit ramp Exit 8 - John Glenn Boulevard (Geddes) both shoulder of 1 lane closed until 1:00 PM Sat, 11 Apr 2026 08:01:06 -0400 43.111937 -76.26525 NY 31F both directions : Construction NYSDOT - Region 4: Construction , utility work on NY 31F both directions between Town of East Rochester and Town of Perinton Line (East Rochester) and Turk Hill Road; CR 50 (Perinton) All lanes of 2 lanes until 3:00 PM Alternating lane closures with flaggers as needed Sat, 11 Apr 2026 08:00:09 -0400 43.1043154558479 -77.486925951474 NJ 27 both directions : Construction NJ DOT - STMC: Emergency Construction on NJ 27 Both Directions South of NJ 35/St. Georges Av (Woodbridge Twp) Saturday April 11, 2026 06:03 AM thru Sunday April 12, 2026 06:33 AM, All lanes closed and detoured northbound; All lanes closed and detoured southbound Sat, 11 Apr 2026 07:51:07 -0400 40.5924987792969 -74.2932281494141 Meadowbrook State Parkway northbound : Roadwork NYSDOT - Region 10: Roadwork, roadwork on Meadowbrook State Parkway northbound ramp to Exit M6W - Southern State Parkway (Hempstead) All lanes closed until 2:00 P.M. Sat, 11 Apr 2026 07:32:25 -0400 40.6841994846507 -73.5724056014093 Taconic State Parkway both directions : Construction NYSDOT - Region 8: Construction, guard rail repairs on Taconic State Parkway both directions between Exit 20 - US 6 (Yorktown) and Exit 47B - NY 55 Westbound (La Grange) right lane closure until 1:30 P.M. Res 8-3 RW/32698309 - This work is weather permitting. Plan travel accordingly; delays may exist Sat, 11 Apr 2026 07:30:39 -0400 41.3372454407543 -73.8168775407566 I-684 northbound : Construction NYSDOT - Region 8: Construction, guard rail repairs on I-684 northbound between Exit 4 - NY 172 (Bedford) and Exit 6 - NY 35 (Bedford) left lane closure until 12:00 P.M. Res 8-8 RW/32705409 - Plan travel accordingly; delays may exist Sat, 11 Apr 2026 07:00:48 -0400 41.2814123614632 -73.6807991344548 I-81 southbound : Construction NYSDOT - Region 3: Construction , drainage improvements on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) All lanes of 2 lanes open until 3:00 PM ; Alternating left and right lane closures Sat, 11 Apr 2026 07:00:11 -0400 43.019965 -76.140542 NJ 7 both directions : Construction NJ DOT - STMC: Roadwork on NJ 7 Both Directions between CR 672/Mill St (Belleville Twp) and North of NJ 21 (Belleville Twp) Saturday April 11, 2026 07:00 AM thru 04:00 PM, right shoulder closed northbound; right shoulder closed southbound Sat, 11 Apr 2026 07:00:12 -0400 40.7827415466309 -74.1540374755859 I-481 northbound : Construction NYSDOT - Region 3: Construction , installation of sign structure on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) All lanes of 2 lanes open until 7:00 PM ; Alternating left and right lane closures Sat, 11 Apr 2026 07:00:12 -0400 43.007106707602 -76.1299400264631 Court Street both directions : Construction NYSDOT - Region 3: Construction , bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) All lanes closed until 3:30 PM ; follow detour Sat, 11 Apr 2026 07:00:12 -0400 43.0643790123933 -76.160457877142 NY 17 eastbound : Construction NYSDOT - Region 6: Construction , bridge painting on NY 17 eastbound (Ashland) 1 Left lane of 2 lanes closed until 5:00 PM left lane closed Sat, 11 Apr 2026 07:00:12 -0400 42.030153 -76.724316 US 9 northbound : Construction NJDOT - STMC: Roadwork on US 9 Northbound between North of Edison Bridge (Woodbridge Twp) and North of CR 616/New Brunswick Ave (Woodbridge Twp), Saturday April 11, 2026 07:00 AM thru 10:00 AM, right lane closed Sat, 11 Apr 2026 07:00:12 -0400 40.5136528015137 -74.3000259399414 I-490 eastbound : Construction NYSDOT - Region 4: Construction , roadwork on I-490 ramp eastbound Pittsford Palmyra Road; NY 31 (Perinton) to Exit 26 - NY 31 (Perinton) 1 Right lane of 3 lanes closed until 5:00 PM Exit 26 CLOSED Follow posted detour. Sat, 11 Apr 2026 07:00:12 -0400 43.0787513343138 -77.4853778140785 I-490 eastbound : Construction NYSDOT - Region 4: Construction , bridge replacement on I-490 eastbound from Pittsford Palmyra Road; NY 31 (Perinton) to Bushnells Basin (Perinton) All lanes of 2 lanes until 5:00 PM The I490 EB between Exit 26 to Exit 27. Both the EB lanes will be shifted to the right and/but staying in the EB travel direction beginning Monday March 30th. Lanes Shifts scheduled to be in place for the 2026 construction season. Sat, 11 Apr 2026 07:00:12 -0400 43.0793255286162 -77.4858025416461 NY 36 both directions : Construction NYSDOT - Region 6: Construction , roadwork on NY 36 both directions CR 66; Webbs Crossing (Hornellsville) to NY 21 at City of Hornell; Town of Hornellsville Line (Hornell) 1 Left lane of 2 lanes closed until 5:30 PM 2 lane down to 1 Left lane closed Sat, 11 Apr 2026 07:00:11 -0400 42.368081 -77.674563 US 11 both directions : Construction NYSDOT - Region 3: Construction , roadwork on US 11 both directions between Pendleton St (Cortland) and Pomeroy St (Cortlandville) All lanes closed until 12:00 PM ; follow detour Sat, 11 Apr 2026 07:00:12 -0400 42.5980413623419 -76.1718550142395 I-490 westbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on I-490 westbound at Bushnells Basin on ramp (Perinton) All lanes closed until 5:00 PM Exit 27 - I490 WB on ramp will be closed to all traffic beginning Monday March 30th. Detour will be posted Closure scheduled to be in place for the 2026 construction season. Sat, 11 Apr 2026 07:00:11 -0400 43.0576998898582 -77.47116 NY 414 both directions : Construction NYSDOT - Region 6: Construction , bridge rehabilitation on NY 414 both directions I-86 (Corning) to I-86 (Corning) All lanes of 1 lane open until 6:00 PM Lane closure Lane and shift NB and SB Sat, 11 Apr 2026 07:00:14 -0400 42.1553240598673 -77.0530685149668 US 9 northbound : Construction NJDOT - TOC South: Roadwork on US 9 Northbound between North of CR 601/Avalon Blvd (Middle Twp) and North of CR 550/Woodbine Ocean View Rd (Dennis Twp), Saturday April 11, 2026 07:00 AM thru 07:00 PM, right shoulder closed Sat, 11 Apr 2026 07:00:13 -0400 39.1314430236816 -74.7778549194336 I-481 southbound : Construction NYSDOT - Region 3: Construction , installation of sign structure on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) All lanes of 2 lanes open until 7:00 PM ; Alternating left and right lane closures Sat, 11 Apr 2026 07:00:13 -0400 43.037636 -76.056181 NY 17 eastbound : Construction NYSDOT - Region 6: Construction , drainage improvements on NY 17 eastbound (Elmira) All lanes of 2 lanes open until 5:30 PM Lanes shift Sat, 11 Apr 2026 07:00:13 -0400 42.0751083516399 -76.7718782927699 NY 14 both directions : Construction NYSDOT - Region 6: Construction , bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) All lanes of 2 lanes open until 5:30 PM Lane Closure(Multilane HWY ) Sat, 11 Apr 2026 07:00:13 -0400 42.1544907272148 -76.8360934402304 i86 eastbound : Construction NYSDOT - Region 6: Construction , roadwork on i86 eastbound (Elmira) All lanes of 2 lanes open until 5:30 PM 2 lanes reduced to 1 Sat, 11 Apr 2026 07:00:13 -0400 42.1075313230433 -76.7954297039629 New Jersey Turnpike northbound : Roadwork NJ Turnpike Auth.: Roadwork, roadwork on New Jersey Turnpike Outer Roadway northbound South of Interchange 14 - I-78/US 1&9 (Newark) to New Jersey Turnpike - Western Spur at North of Interchange 15W - I-280 (Kearny) 1 Left lane of 4 lanes closed for repairs -Until Monday 6:00 AM *HICC Sat, 11 Apr 2026 06:52:21 -0400 40.6991617975507 -74.1553651973602 NY 5 westbound : Construction NYSDOT TMC - Albany: Construction , roadwork on NY 5 westbound at N Ten Broeck St (Scotia) 1 Right lane and shoulder of 2 lanes closed until 4:00 PM Sat, 11 Apr 2026 06:31:07 -0400 42.8265677607644 -73.9641641334118 RT-914V both directions : Construction NYSDOT TMC - Albany: Construction , roadwork on RT-914V both directions Hetchletown Road (Glenville) All lanes of 1 lane open until 10:00 AM alternating lanes (Champlain Hudson Power Express) Sat, 11 Apr 2026 06:31:07 -0400 42.8671477635338 -73.9032895868452 I-481 northbound : Construction NYSDOT - Region 3: Construction , construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) All lanes of 3 lanes open until 6:00 PM ; Alternating lane closures Sat, 11 Apr 2026 06:30:19 -0400 43.0789 -76.053379 I-81 southbound : Construction NYSDOT - Region 3: Construction , construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) All lanes of 3 lanes open until 6:00 PM Sat, 11 Apr 2026 06:30:09 -0400 43.172473 -76.114817 Bronx River Parkway southbound : Construction NYSDOT - Region 11: Construction, construction on Bronx River Parkway southbound between Exit 6 - Boston Post Road (New York) and Cross Bronx Expressway; East 177th Street (New York) 1 Right lane of 3 lanes closed until 3:00 P.M. Sat, 11 Apr 2026 06:22:07 -0400 40.8519732913435 -73.8715415336166 Hutchinson River Parkway [Westchester] northbound : Construction NYSDOT - Region 8: Construction, road maintenance operations on Hutchinson River Parkway [Westchester] northbound between Exit 5 - Wolfs Lane (Pelham) and Exit 6A - East Lincoln Avenue (Pelham) shoulder closure until 2:00 P.M. Res 8-9 RW/327 - This work is weather permitting. Plan travel accordingly; delays may exist Sat, 11 Apr 2026 06:01:02 -0400 40.9035076783543 -73.8143923376803 TOWN LINE RD both directions : Construction CT DOT-Newington-HWY-Oper Ctr: Construction , construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) All lanes of 1 lane open until 9:00 PM There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road Sat, 11 Apr 2026 06:00:17 -0400 41.6497127490642 -72.8818944527624 I-481 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) All lanes of 2 lanes open until 6:00 PM ; Alternating lane closures Sat, 11 Apr 2026 06:00:15 -0400 43.140329 -76.103447 New Jersey Turnpike - Western Spur northbound : Roadwork NJ Turnpike Auth.: Roadwork, roadwork on New Jersey Turnpike - Western Spur northbound North of Interchange 18W - I-80/US 46/George Washington Bridge (Carlstadt) to South of Northern Mixing Bowl (Ridgefield) right lane closed for repairs until Monday 6:00:AM *HICC Sat, 11 Apr 2026 05:41:55 -0400 40.8131818839 -74.0567524445 Verrazano-Narrows Bridge eastbound : Roadwork MTA Bridges & Tunnels: Roadwork, roadwork on Verrazano-Narrows Bridge Lower Level eastbound Staten Island Approach (New York) to Brooklyn Side (New York) 1 Right lane of 3 lanes closed Sat, 11 Apr 2026 05:34:19 -0400 40.6030796140018 -74.0551035872742 I-590 southbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on I-590 southbound Elmwood Avenue; CR 87 (Brighton) to EXIT 2A to NY 31; Monroe Ave (Brighton) 1 Right lane of 3 lanes diverted until 12:00 PM on November 30,2026 RIGHT LANE IS EXIT ONLY AT EXIT 2A Sat, 11 Apr 2026 05:00:21 -0400 43.126751 -77.553513 I-590 southbound : Construction NYSDOT - Region 4: Construction , bridge replacement on I-590 southbound between Elmwood Avenue; CR 87 (Brighton) and Exit 2e - NY 31 (Brighton) 2 Left lanes of 3 lanes closed until 12:00 PM Sat, 11 Apr 2026 05:00:20 -0400 43.1267157595264 -77.5535144876416 NY 31 westbound : Construction NYSDOT - Region 4: Construction , bridge replacement on NY 31 ramp westbound Entrance ramp I-590 SB (Brighton) All lanes closed and detoured until 12:00 PM on November 30,2026 RAMP CLOSED Sat, 11 Apr 2026 05:00:21 -0400 43.117 -77.553968 I-590 southbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on I-590 ramp southbound Exit ramp Exit 2B to NY 31; Monroe Ave. (Brighton) All lanes closed and detoured until 12:00 PM on November 30,2026 RAMP CLOSED Sat, 11 Apr 2026 05:00:21 -0400 43.114341 -77.552248 I-490 westbound : Construction NYSDOT - Region 4: Construction , street sweeping on I-490 westbound from Golf Ave (Pittsford) to I-590 (Brighton) All lanes of 2 lanes until 4:00 PM Scraping and Sweeping Operation in Center Median Sat, 11 Apr 2026 04:00:09 -0400 43.0967177635358 -77.5012322559041 John F. Kennedy International Airport westbound : Construction Port Authority NY/NJ: Construction, construction on John F. Kennedy International Airport westbound Terminal 4 Parking (Blue) (New York) All lanes closed and detoured exit to the Van Wyck Expressway Closed - All arrivals level traffic will be detoured through Terminal 5 Sat, 11 Apr 2026 01:33:56 -0400 40.6466538408355 -73.7789619953907 NY 65 both directions : Construction NYSDOT - Region 4: Construction , utility work on NY 65 both directions between 212 NY 65 (Mendon) and MONROE ST (Mendon) All lanes of 1 lane open until 3:00 PM alternating lane/shoulder closures w/flaggers when needed Sat, 11 Apr 2026 00:00:07 -0400 42.9564457899169 -77.5888949358389 Lincoln Tunnel eastbound : Construction Port Authority NY/NJ: Construction, construction on Lincoln Tunnel South Tube eastbound New Jersey Side (Weehawken Twp) to New York Side (Manhattan) All lanes closed Fri, 10 Apr 2026 22:59:04 -0400 40.7658432251789 -74.0176791481339 New Jersey Turnpike - Hudson County Extension eastbound : Roadwork NJ Turnpike Auth.: Roadwork on New Jersey Turnpike - Hudson County Extension Eastbound between West of Newark Bay Bridge (Newark) and West of Interchange 14C - Toll Plaza (Jersey City) 1 right lane closed until 9:00 A.M. Sat, 11 Apr 2026 07:21:36 -0400 40.6976281573 -74.1262458112 US 202 southbound : Construction NJDOT - STMC: Roadwork on US 202 Southbound between CR 646/W. County Dr (Branchburg Twp) and South of Whiton Rd (Branchburg Twp), Friday April 10, 2026 09:00 PM thru Saturday April 11, 2026 09:00 AM, left lane closed Fri, 10 Apr 2026 21:00:18 -0400 40.5581207275391 -74.7104339599609 US 202 southbound : Construction NJDOT - STMC: Roadwork on US 202 Southbound between CR 646/W. County Dr (Branchburg Twp) and South of Whiton Rd (Branchburg Twp), Friday April 10, 2026 09:00 PM thru Saturday April 11, 2026 09:00 AM, right lane closed Fri, 10 Apr 2026 21:00:17 -0400 40.5581207275391 -74.7104339599609 I-80 eastbound : Construction NJDOT - STMC: Roadwork on I-80 Eastbound near West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp), Continuous Friday April 10, 2026 09:00 PM thru Saturday September 26, 2026 05:00 AM, right shoulder closed Fri, 10 Apr 2026 21:00:16 -0400 40.8679008483887 -74.452018737793 I-287 - Cross Westchester Expwy westbound : Construction NYSTA - Statewide Ops.: road maintenance operations ,right lane closed on I-287 - Cross Westchester Expwy westbound from Before Exit 2 (I-287) - Saw Mill River Rd (Rte 9A) to After Exit 1 (I-287) - Saw Mill River Parkway - Rte 119 [CARS CAD-261000421] Sat, 11 Apr 2026 00:54:58 -0400 41.058619 -73.820013 I-80 westbound : Construction NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 38 - US 46 (Denville Twp), Continuous Friday April 10, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Fri, 10 Apr 2026 20:00:08 -0400 40.9053802490234 -74.4967422485352 US 202 northbound : Construction NJDOT - STMC: Roadwork on US 202 Northbound between North of Whiton Rd (Branchburg Twp) and CR 646/W. County Dr (Branchburg Twp), Friday April 10, 2026 08:00 PM thru Saturday April 11, 2026 09:00 AM, left lane closed Fri, 10 Apr 2026 20:00:08 -0400 40.5520172119141 -74.7275238037109 US 202 northbound : Construction NJDOT - STMC: Roadwork on US 202 Northbound between South of Whiton Rd (Branchburg Twp) and CR 646/W. County Dr (Branchburg Twp), Friday April 10, 2026 08:00 PM thru Saturday April 11, 2026 09:00 AM, right lane closed Fri, 10 Apr 2026 20:00:08 -0400 40.5459136962891 -74.7446136474609 I-481 southbound : Construction NYSDOT - Region 3: Construction , bridge replacement on I-481 southbound between Exit 89B - Kirkville Rd (De Witt) and Exit 88 - I-690 (De Witt) 1 Right lane of 2 lanes closed until 9:00 AM Fri, 10 Apr 2026 19:00:07 -0400 43.077594 -76.05367 NY 230 both directions : Construction NYSDOT - Region 6: Construction , culvert repairs on NY 230 both directions Town of Tyrone; Town of Barrington Line (Tyrone) to Town of Tyrone; Town of Barrington Line (Tyrone) All lanes of 1 lane open until 11:59 PM 2 lanes reduced to 1 with signals Fri, 10 Apr 2026 18:33:06 -0400 42.4940850354644 -77.0567725962961 I-87 Northway both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on I-87 Northway both directions E. Schroon River Rd just north of Exit 23 (Bolton) 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound until 11:59 PM on September 30,2026 11' lane width restriction Fri, 10 Apr 2026 14:41:05 -0400 43.4997297094236 -73.7468358468454 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound near West of US 130/Collingswood Circle (Collingswood), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 08:00 PM, right lane closed Fri, 10 Apr 2026 13:17:07 -0400 39.9204940795898 -75.0875701904297 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound between West of CR 608/Baird Blvd (Camden) and East of I-676/Ben Franklin Bridge (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right lane closed Fri, 10 Apr 2026 13:17:08 -0400 39.9407043457031 -75.0997772216797 NJ 66 westbound : Construction NJDOT - TOC South: Roadwork on NJ 66 Westbound near East of Green Grove Rd (Neptune Twp), Continuous Monday March 30, 2026 07:00 AM thru Monday April 13, 2026 04:00 PM, right shoulder closed Fri, 10 Apr 2026 13:17:08 -0400 40.2270545959473 -74.0717086791992 US 30 eastbound : Construction NJDOT - TOC South: Roadwork on US 30 Eastbound between East of I-676/Ben Franklin Bridge (Camden) and West of CR 608/Baird Blvd (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right shoulder closed Fri, 10 Apr 2026 13:14:09 -0400 39.9476280212402 -75.1173934936523 I-590 both directions : Construction NYSDOT - Region 4: Construction , bridge replacement on I-590 both directions between Edgewood Ave (Brighton) and Elmwood Avenue; CR 87 (Brighton) 1 Left lane of 3 lanes closed until 5:00 PM on September 30,2026 Fri, 10 Apr 2026 11:34:07 -0400 43.1084545195575 -77.5609362742396 Earhart Drive both directions : Construction Port Authority NY/NJ: Construction on Earhart Drive both directions Basoline Road (Elizabeth) to South Bridge Road All lanes closed until June 30th, 2028 Fri, 10 Apr 2026 05:49:51 -0400 40.6854533201585 -74.1888271599343 I-80 westbound : Construction NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Continuous Thursday April 9, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed local lane Thu, 09 Apr 2026 20:00:08 -0400 40.8605499267578 -74.3977203369141 US 11 both directions : Construction NYSDOT - Region 3: Construction , bridge replacement on US 11 both directions between Bennett St (Cicero) and River Rd (Hastings) All lanes of 1 lane open until 3:30 PM on December 31,2026 ; Alternating one-way traffic with temporary signals Thu, 09 Apr 2026 13:21:06 -0400 43.2394080545219 -76.1406134324658 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) until 5:30 P.M. on April 18, 2026 Thu, 09 Apr 2026 13:20:13 -0400 43.4109404488897 -75.3414657623387 NY 12 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 12 both directions before Prentice St (Norwich) For bridge deck & joint repairs on BIN# 1009350 on NY 12 near Prentice Rd. from 4/6/26 to 5/7/26 between 7am & 4pm. A lane shift will be in place during the project. This works is not weather dependent and no flaggers present. IR:9988090 D265379 Thu, 09 Apr 2026 14:34:26 -0400 42.5193007082438 -75.5228054795152 I-84 westbound : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on I-84 westbound between Exit 46 - US 9 (Fishkill) and Exit 44 - NY 52 (Fishkill) right lane closure until 3:00 P.M. DOT BM/B1032491/32587109 - This work is weather permitting. Plan travel accordingly; delays may exist Thu, 09 Apr 2026 09:49:38 -0400 41.5234097686063 -73.9080945865774 NY 28 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 28 both directions between Linden Ave (Cooperstown) and Walnut St. (Otsego) 1 alternate lanes of 2 lanes blocked For safety improvements and testing utility pipes SR-28 between Linden Ave & Walnut St. from 4/9/26 to 4/15/26 between 7am & 3:30pm. This work is not weather dependent and flag personnel will be present IR:9985090 D265567 Fri, 10 Apr 2026 15:57:27 -0400 42.6900085786143 -74.9360745522221 NY 28 both directions : Construction NYSDOT - Region 2: Construction, tree trimming on NY 28 both directions between ONeil Flowage (Indian Lake) and Durant Road (Indian Lake) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Thu, 09 Apr 2026 07:01:11 -0400 43.8203436936601 -74.346154646509 I-690 westbound : Construction NYSDOT - Region 3: Construction , utility work on I-690 westbound ramp to Exit 12B - Solvay/Fairgrounds (Geddes) 1 Left lane of 2 lanes closed until 5:00 PM on June 27,2026 Thu, 09 Apr 2026 07:00:11 -0400 43.071771 -76.205473 I-80 westbound : Construction NJDOT - STMC: Roadwork on I-80 Westbound near East of Exit 47A - I-280 (Fairfield Twp), Continuous Wednesday April 8, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Wed, 08 Apr 2026 20:00:08 -0400 40.8682289123535 -74.3308258056641 Korean Veterans Memorial Parkway southbound : Construction NYSDOT - Region 11: Construction, construction on Korean Veterans Memorial Parkway southbound between Anadale Road (Staten Island) and Arden Avenue (Staten Island) 1 Right lane of 2 lanes closed until further notice Wed, 08 Apr 2026 19:09:51 -0400 40.5555864727681 -74.1758393546696 NY 54A northbound : Construction NYSDOT - Region 6: Construction , safety improvements on NY 54A northbound Town of Pulteney; Town of Urbana Line (Pulteney) to Town of Pulteney; Town of Urbana Line (Pulteney) All lanes closed until 11:59 PM on May 29,2026 2 lanes reduced to 1 Wed, 08 Apr 2026 13:55:06 -0400 42.4753782378973 -77.1720962528018 I-481 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) All lanes closed until 6:00 PM on September 11,2026 ; follow detour Wed, 08 Apr 2026 09:00:14 -0400 43.0768629491718 -76.0559744237577 RIVERVIEW RD both directions : Construction NYSDOT TMC - Albany: Construction , bridge rehabilitation on RIVERVIEW RD both directions over I-87 (Halfmoon) All lanes of 3 lanes until 11:59 PM on December 31,2026 alternating lanes closed Wed, 08 Apr 2026 08:53:07 -0400 42.800434629655 -73.7649153438428 South Ave southbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on South Ave southbound ramp to I-490 Eastbound (Rochester) All lanes closed and detoured until 11:59 PM on December 31,2026 RAMP CLOSED Wed, 08 Apr 2026 08:39:08 -0400 43.1524435297133 -77.6073289140658 I-80 westbound : Construction NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Tuesday April 7, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Tue, 07 Apr 2026 20:00:06 -0400 40.8945350646973 -74.263801574707 US 11 both directions : Construction NYSDOT - Region 7: Construction , construction on US 11 both directions Brewster Street (Malone) to Pearl Street (Malone) 1 Left lane of 2 lanes closed northbound; 1 Right lane of 2 lanes closed southbound until 5:00 PM on May 29,2026 2 way traffic maintained on narrow travel lanes - one travel lane per direction for Building Demolition Work Tue, 07 Apr 2026 19:58:06 -0400 44.8488 -74.295645991916 NY 201 northbound : Construction NYSDOT - Region 9: Construction on NY 201 northbound at North of Vestal Pkwy (NY 434) (Binghamton) 2 alternate lanes of 4 lanes closed NIGHTTIME OPERATIONS: NY-201 NB, north of Vestal Pkwy (NY-434) Single Left Lane Closed, Single Right Lane Closed w/ On/Off Ramps Merged. This work will be conducted during the dates of 04/06/2026-04/13/2026 and times of 8pm-3am. No police or flagged personal will be present. This work is weather dependent. SIN#s 91091, 91092 D#041201 Started Open Reach IR# 9971090 Wed, 08 Apr 2026 21:59:13 -0400 42.0870178072019 -76.0495774902395 991H both directions : Roadwork NYSDOT - Region 9: Roadwork on 991H both directions at START ROUTE 991H; I-88 (Exit 10) connector to NY 7 (Sidney) 2 all lanes of 2 lanes blocked for emergency joint & deck repairs on BIN 1094300 on NY 991H, I-88EB Exit 10 on & off ramp will be blocked while work is in progress. This work will occur between 4/7 to 4/17 between 7am to 3pm, this work is not weather dependent and detour will be in place. IR:9975090 Tue, 07 Apr 2026 14:22:28 -0400 42.3134002685547 -75.3218994140625 NY 3 both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 3 both directions NY 178 (Henderson) to NY 178 (Henderson) All lanes and both shoulder of 1 lane closed westbound; All lanes of 1 lane closed eastbound until 11:59 PM on November 15,2026 NYS Rte. 3 closed in both directions at the bridge over Stoney Creek. Traffic is directed to follow the signed detour Tue, 07 Apr 2026 12:09:06 -0400 43.8410857915649 -76.1991277724751 NY 310 both directions : Construction NYSDOT - Region 7: Construction , culvert repairs on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) All lanes of 1 lane open until 11:59 PM on May 29,2026 Rte. 310 over tributary to Nettle Creek is now open to alternating one-way traffic. Traffic is being controlled by a temporary signal. Additional work at the site will be completed once the weather is more favorable. Tue, 07 Apr 2026 12:00:11 -0400 44.6590178874974 -75.1495181801412 I-80 eastbound : Construction NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Monday April 6, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Mon, 06 Apr 2026 20:00:07 -0400 40.8987617492676 -74.2436065673828 NY 310 both directions : Construction NYSDOT - Region 7: Construction , culvert repairs on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) All lanes of 1 lane open until 11:59 PM Rte. 310 over tributary to Nettle Creek is now open to alternating one-way traffic. Traffic is being controlled by a temporary signal. Additional work at the site will be completed once the weather is more favorable. Mon, 06 Apr 2026 15:37:07 -0400 44.6590178874974 -75.1495181801412 NY 12F both directions : Construction NYSDOT - Region 7: Construction , bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) to NY 971H; Paddy Hill Road (Hounsfield) All lanes of 2 lanes open until 11:59 PM Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements Mon, 06 Apr 2026 15:24:07 -0400 43.9994230767768 -75.9830930786789 Wantagh State Parkway northbound : Roadwork NYSDOT - Region 10: Roadwork, roadwork on Wantagh State Parkway northbound from START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead) to Exit W6 - Merrick Road (Hempstead) right shoulder closed Until further notice Mon, 06 Apr 2026 14:41:58 -0400 40.596869 -73.5077375 NY 33 both directions : Construction NYSDOT - Region 4: Construction , culvert repairs on NY 33 both directions between CR 161; Bromley Rd (Riga) and Percy Rd. (Riga) All lanes closed and detoured until 5:00 PM on May 23,2026 Mon, 06 Apr 2026 11:25:06 -0400 43.1102849315708 -77.8649528460773 NY 79 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 79 both directions area of Skellett Rd. (Colesville) 1 alternate lanes of 2 lanes blocked for culvert repairs on SR-79 near Skellett Rd. from 4/6/26 to 4/20/26 during 7am to 4pm. This work is weather dependent, and flaggers will be present. IR:9966090 D264778 Mon, 06 Apr 2026 07:13:15 -0400 42.2210472856767 -75.6644313248176 NY 165 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 165 both directions between Beaver St (Rosebloom) and John Deere Rd. 1 alternate lanes of 2 lanes blocked for bridge painting of BIN 1038850 over Cherry Valley Creek from 4/6/26 to 5/6/26 between 7am & 7pm. This work is weather dependent, and flaggers will be present. IR: 9967090 D265640 Mon, 06 Apr 2026 07:23:28 -0400 42.7399744326334 -74.7736178945843 NY 168 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 168 both directions between END ROUTE; NY 80; Hamlet of Stark (Stark) and CR 206; Lighthall Road all lanes closed until 6:00 P.M. on June 27, 2026 Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 80 and Lighthall Road. Mon, 06 Apr 2026 07:00:26 -0400 42.9264591263652 -74.7934481566887 922A both directions : Construction NYSDOT - Region 2: Construction, bridge work on 922A both directions between Main Street; Village of Whitesboro (Whitesboro) and Cavanaugh Road; CR 30; END ROUTE; NY 49 (Marcy) until 4:00 P.M. on May 08, 2026 Mon, 06 Apr 2026 07:00:27 -0400 43.1222 -75.2912 NY 7 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 7 both directions between Shirley Ave (Conklin) and Millburn Dr. (Conklin) 1 alternate lanes of 2 lanes blocked for bridge repairs on SR-7(Conklin Rd.) between Shirley Rd & Milburn Dr. from 4/6/26 to 5/7/26 between 7am & 4pm. this work is weather dependent and a temp signal is in place. IR:9965090 D265376 Mon, 06 Apr 2026 06:48:50 -0400 42.0415056113478 -75.8068179838773 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions between Town of Worcester; Town of Richmondville Line (Richmondville) and Exit 20 - NY 7; NY 10; Richmondville (Richmondville) 2 alternate lanes of 4 lanes blocked For pavement resurfacing, joint repairs & guiderail installation on I-88 E/W between Otsego County line & Exit 20. From 4/6/26 to 11/2/26 between 6am &6pm. this work is not weather dependent and no flag personnel are present. IR: 9963090 D265446 Mon, 06 Apr 2026 06:24:08 -0400 42.6492004394531 -74.6349029541016 I-88 westbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 westbound between Exit 16 - CR 47; Emmons Route 7 (Oneonta) and Exit 17 - NY 28; Gersoni Road Route 7 (Milford) 1 right lane of 2 lanes blocked for slope repair on embankment of driving lane on I-88WB at ref. marker 3024 between Exits 16 & 17 from 4/6/26 to 4/17/26 between 6:30am & 4:30pm with overnight lane closure. This work is weather dependent and no flag personnel are present. IR:9964090 D264777 Mon, 06 Apr 2026 07:51:30 -0400 42.4580001831055 -75.0147018432617 NY 3 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) to Route 3 - Arsenal Street at North Meadow Street (Watertown) All lanes open to traffic until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 06 Apr 2026 00:00:06 -0400 43.97639096423 -75.9206566174228 NY 26 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) All lanes of 1 lane open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 06 Apr 2026 00:00:06 -0400 43.7882979619324 -75.493499612246 I-490 westbound : Construction NYSDOT - Region 4: Construction , longterm construction on I-490 westbound between Exit 27 - NY 96 (Perinton) and Exit 26 - NY 31 (Pittsford) All lanes shift until 5:00 PM on December 18,2026 Sat, 04 Apr 2026 07:01:07 -0400 43.0570952593101 -77.4711561917241 NY 21 both directions : Construction NYSDOT - Region 6: Construction , installation of fiber optics on NY 21 both directions Cohocton Street; NY 371 (Cohocton) to PARKS RD (Cohocton) All lanes of 1 lane open until 3:00 PM Shoulder closure 2 lane to 1 lane with flagger Thu, 02 Apr 2026 14:26:09 -0400 42.5656179918977 -77.4851325701242 NY 481 southbound : Construction NYSDOT - Region 3: Construction , culvert repairs on NY 481 southbound between Henry Clay Boulevard; CR 121 (Clay) and Exit 1C (Old Exit 10) Southbound - US 11 (Cicero) right shoulder of 2 lanes closed until 3:30 PM on April 24,2026 Wed, 01 Apr 2026 09:27:07 -0400 43.1712503274935 -76.1977171444928 NY 481 northbound : Construction NYSDOT - Region 3: Construction , culvert repairs on NY 481 northbound between Exit 2 (Old Exit 11) - Maple Road; Caughdenoy Road (Clay) and Henry Clay Boulevard; CR 121 (Clay) right shoulder of 2 lanes closed until 3:30 PM on April 24,2026 Wed, 01 Apr 2026 09:23:08 -0400 43.1585189471621 -76.1573575256348 NY 90 both directions : Construction NYSDOT - Region 3: Construction , emergency repairs on NY 90 both directions between Gully Rd (Ledyard) and Levanna Rd (Ledyard) All lanes of 1 lane open northbound; All lanes closed southbound until 3:30 PM on April 30,2026 ; Alternating one-way traffic with temporary signals Tue, 31 Mar 2026 18:16:08 -0400 42.7722457361218 -76.7103010606765 WATER ST southbound : Construction NYSDOT TMC - Albany: Construction , bridge rehabilitation on WATER ST southbound between COLONIE ST (Albany) and ORANGE ST (Albany) 1 Left lane of 2 lanes closed until 11:59 PM on December 31,2026 left lane closure with temporary concrete barrier Tue, 31 Mar 2026 00:00:07 -0400 42.6560526568251 -73.7441176875787 NY 310 both directions : Construction NYSDOT - Region 7: Construction , culvert repairs on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) All lanes of 1 lane open until 11:59 PM Rte. 310 over tributary to Nettle Creek is now open to alternating one-way traffic. Traffic is being controlled by a temporary signal. Additional work at the site will be completed once the weather is more favorable. Mon, 30 Mar 2026 08:36:08 -0400 44.6590178874974 -75.1495181801412 NY 12F both directions : Construction NYSDOT - Region 7: Construction , bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) to NY 971H; Paddy Hill Road (Hounsfield) All lanes of 2 lanes open until 11:59 PM Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements Mon, 30 Mar 2026 08:11:09 -0400 43.9994230767768 -75.9830930786789 I-690 westbound : Construction NYSDOT - Region 3: Construction , ramp widening on I-690 westbound ramp from NY-298; Bear St (Syracuse) All lanes closed until 3:00 PM on April 30,2026 ; follow detour Mon, 30 Mar 2026 07:00:14 -0400 43.057607 -76.17505 NY 46 both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 46 both directions over I-90 (Oneida) until 6:00 P.M. Motorists will encounter lane closures in both directions Mon, 30 Mar 2026 06:01:16 -0400 43.1102981567383 -75.6647033691406 NY 5 both directions : Construction NYSDOT - Region 3: Construction , roadwork on NY 5 both directions between Almond Street (Syracuse) and University Ave (Syracuse) 1 Left lane of 2 lanes closed until 3:30 PM on July 01,2026 Fri, 27 Mar 2026 13:44:06 -0400 43.0507859952873 -76.141945806778 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Exit 2E - Connector from US 11 to I-81 (Exit 2) & NY 17 (Exit 75) (Kirkwood) and Exit 3 - Broad Avenue West (Binghamton) 1 alternate lanes of 4 lanes blocked for Bridge Painting, BINS 1013111 (I-81 SB), 1013112 (I-81 NB) over Loughlin Road between New exits 9 and 10, RM 81 91011096. Left or Right Lane Closure on Southbound I-81 Bridge. Left Lane Closure on Northbound I-81 Bridge. Closure to be removed on Fridays. A single lane closure managed by a temp. signal will be in place on Loughlin Rd. under the bridges during the project. From 3/26/26 - 5/22/26 between 7am and 7pm. This work is weather dependent. Open Reach Started. IR 9913090 D235640 Mon, 30 Mar 2026 07:27:42 -0400 42.0956001281738 -75.8136978149414 NY 17 [Delaware] westbound : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Delaware] westbound between Exit 90 - CR 17; NY 30 (Hancock) and Exit 89 - Old State Highway; Ramp (Hancock) 1 right lane of 2 lanes blocked for bridge painting on BIN 1013431 on SR-17WB between Exits 90 & 89 with overnight lane closure from 3/23/26 to 6/20/26 between 7am &7pm. This work is weather dependent and no flag personnel are present. IR: 9902090 D265640 Mon, 23 Mar 2026 07:01:34 -0400 41.9929008483887 -75.1376037597656 NY 369 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 369 both directions between CR-124 (Fenton) and END ROUTE; NY 79 (Fenton) 1 alternate lanes of 2 lanes blocked For bridge painting on BIN# 1046830 SR-369 between CR-124 & SR-79 with alternating lane closure controlled by flaggers from 3/23/26 to 4/24/26 between 7am & 7pm. this work is weather dependent with no overnight closures. IR:9899090 D:265640 Mon, 23 Mar 2026 06:26:46 -0400 42.2398199286891 -75.7954578070246 I-88 westbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 westbound before Exit 21 - Mickle Road; I-88 ramps (Exit 21) to NY 7/NY 10; Warnersville (Richmondville) 1 alternate lanes of 2 lanes blocked For bridge deck & joint repair on I-88WB 1 mile before Exit 21 with overnight lane closure beginning 3/23 to 4/24 during 6:30Am to 4:30pm. This work is weather dependent with no flag personnel present. IR:9898090 D:265377 Mon, 23 Mar 2026 06:11:40 -0400 42.652099609375 -74.5148010253906 NY 69 both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 69 both directions between NY 291 (Whitestown) and NY 922A; Clinton Street; CR 30 (Whitestown) until 6:00 P.M. on November 21, 2026 Motorists will encounter lane closures in both directions for work on the I-90 bridge Mon, 23 Mar 2026 06:00:43 -0400 43.1389007568359 -75.3051986694336 NY 6N both directions : Construction NYSDOT - Region 8: Construction, culvert repairs on NY 6N both directions between Pine Tree Lane (Carmel) and Green Lane (Carmel) all lanes closed and detoured until 12:00 A.M. on May 23, 2026 D265424/32701609 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Mon, 23 Mar 2026 00:00:42 -0400 41.3437838818538 -73.7862493043648 NY 52 westbound : Construction NYSDOT - Region 8: Construction, bridge rehabilitation on NY 52 westbound between Brookside Farms Road (Newburgh) and 5th Avenue (Newburgh) right lane closed to traffic until 12:00 A.M. on April 25, 2026 D265160/B1026780/32112309 - 24/7 RIGHT LANE CLOSURE - Plan travel accordingly; delays may exist Mon, 23 Mar 2026 00:00:40 -0400 41.5130253486982 -74.0492785615146 I-490 westbound : Construction NYSDOT - Region 4: Construction , drainage improvements on I-490 westbound Exit ramp Exit 27 - NY 96 (Perinton) right shoulder of 1 lane closed until 5:00 PM on March 27,2026 Sat, 21 Mar 2026 08:00:12 -0400 43.054883 -77.470495 I-678 southbound : Construction Port Authority NY/NJ: Construction on I-678 southbound ramp to Exit C (New York) All lanes closed and detoured to Exit B Wed, 08 Apr 2026 17:20:46 -0400 40.6609323419368 -73.8057896891484 US 9W both directions : Construction NYSDOT - Region 8: Construction, drainage improvements on US 9W both directions between NY 218 (Highlands) and Mountain Road (Cornwall) right lane closed to traffic until 12:00 A.M. on September 04, 2026 D265262/32427409 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist Mon, 16 Mar 2026 09:44:16 -0400 41.3771406249868 -73.9836180210114 I-481 southbound : Construction NYSDOT - Region 3: Construction , bridge work on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 88 (Old Exit 4) - I-690 (De Witt) All lanes of 2 lanes open until 6:00 PM on September 11,2026 ; Lane Shift Mon, 16 Mar 2026 09:00:10 -0400 43.0830976069085 -76.0537121137582 I-481 southbound : Construction NYSDOT - Region 3: Construction , bridge work on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 88 (Old Exit 4) - I-690 (De Witt) All lanes of 2 lanes open until 6:00 PM on September 11,2026 ; Lane Shift Mon, 16 Mar 2026 08:59:07 -0400 43.0830976069085 -76.0537121137582 Sprain Brook State Pkwy southbound : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on Sprain Brook State Pkwy southbound ramp from W/B I-287 (Greenburgh) until further notice D265281/32709309 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Tue, 17 Mar 2026 08:43:45 -0400 41.0566264173802 -73.8090318177941 NY 5S both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 5S both directions between CR 122; Auriesville Road (Glen) and CR 27; Main Street; Hamlet of Fort Hunter (Montgomery) until 6:00 P.M. on November 21, 2026 Mon, 16 Mar 2026 06:00:52 -0400 42.9299 -74.315 NY 284 both directions : Construction NYSDOT - Region 8: Construction, culvert repairs on NY 284 both directions between Langlitz Road (Minisink) and Farms Road (Minisink) all lanes closed and detoured until 12:00 A.M. on June 20, 2026 D265386/32597309 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Mon, 16 Mar 2026 00:00:30 -0400 41.3285156373355 -74.5527167373649 Palisades Interstate Parkway southbound : Construction NYSDOT - Region 8: Construction, bridge rehabilitation on Palisades Interstate Parkway southbound ramp to Exit 9W - I-87 - I-287 (Clarkstown) ramp closed and detoured until 12:00 A.M. on November 16, 2026 D265160/32254709 - EXIT RAMP CLOSED TO TRAFFIC - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Thu, 12 Mar 2026 12:29:42 -0400 41.1040791130742 -73.995487617742 NY 80 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 80 both directions between Moyer Road (Stark) and East Smith Road (Stark) until 6:00 P.M. on April 30, 2026 Thu, 12 Mar 2026 11:26:36 -0400 42.9235885841741 -74.7588332822937 I-81 northbound : Roadwork NYSDOT - Region 9: Roadwork on I-81 northbound between Exit 8 - NY 26; Ramp (Barker) and Exit 7 - US 11 (Chenango) 1 northbound one lane of 4 lanes closed blocked intermittently through duration of culvert rehabilitation on I-81NB between Exits 19 & 21 (old 7 & 8) from 3/11/26 through 6/1/26 during the hours of 7:00 AM to 6:00 PM. This work is weather dependent with no flagger personnel present. Police presence requested. IR9853090 D265389 Thu, 12 Mar 2026 07:21:03 -0400 42.3191986083984 -75.9664993286133 NY 9A northbound : Construction NYSDOT - Region 11: Construction on NY 9A northbound ramp to W 125th Street (New York) All lanes closed until further notice Long Term - Construction Fri, 20 Mar 2026 15:15:27 -0400 40.8184470717359 -73.9610529282641 Korean Veterans Memorial Parkway westbound : Construction NYSDOT - Region 11: Construction on Korean Veterans Memorial Parkway westbound NY 440 (Staten Island) All lanes and left shoulder closed until further notice Long Term - Construction Fri, 20 Mar 2026 15:16:08 -0400 40.5262261288054 -74.2253870983623 I-86 both directions : Construction NITTEC: Construction , bridge work on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Strunk Road (Ellicott) 1 Right lane of 2 lanes closed until 11:59 PM Tue, 10 Mar 2026 07:05:07 -0400 42.157516 -79.475119 I-86 both directions : Construction NITTEC: Construction , bridge work on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Strunk Road (Ellicott) 1 Right lane of 2 lanes closed until 11:59 PM Fri, 06 Mar 2026 12:56:08 -0500 42.157516 -79.475119 TEALL AVE northbound : Construction NYSDOT - Region 3: Construction , noise wall construction on TEALL AVE northbound between CANAL ST (Syracuse) and BURNET AVE (Syracuse) 1 Left lane of 3 lanes closed until 3:00 PM on May 01,2026 Mon, 02 Mar 2026 08:23:06 -0500 43.052470642511 -76.1218321132766 I-690 westbound : Construction NYSDOT - Region 3: Construction , noise wall construction on I-690 westbound ramp from Teall Avenue (Syracuse) 1 Right lane of 2 lanes closed until 3:00 PM on May 01,2026 Mon, 02 Mar 2026 08:16:06 -0500 43.053253 -76.123076 I-690 eastbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-690 eastbound between I-81 Northbound (Syracuse) and Exit 14 - Teall Avenue (Syracuse) 1 Left lane of 3 lanes closed until 3:00 PM on May 01,2026 Mon, 02 Mar 2026 08:15:08 -0500 43.051162 -76.145696 NY 298 both directions : Construction NYSDOT - Region 3: Construction , drainage improvements on NY 298 both directions between Pulaski St (Syracuse) and Solar St (Syracuse) 1 Right lane of 2 lanes closed until 3:00 PM on April 30,2026 Mon, 02 Mar 2026 07:00:09 -0500 43.0594633923897 -76.1725510930969 South Bay Rd westbound : Construction NYSDOT - Region 3: Construction , bridge work on South Bay Rd westbound between PINE GROVE RD E (Cicero) and CIRCLE DR E (Cicero) All lanes closed until 6:00 PM on May 15,2026 Sun, 01 Mar 2026 06:01:07 -0500 43.1536555008945 -76.1057043575117 NY 310 both directions : Construction NYSDOT - Region 7: Construction , culvert repairs on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) All lanes of 1 lane open until 11:59 PM Rte. 310 over tributary to Nettle Creek is now open to alternating one-way traffic. Traffic is being controlled by a temporary signal. Additional work at the site will be completed once the weather is more favorable. Fri, 20 Feb 2026 08:37:08 -0500 44.6590178874974 -75.1495181801412 NY 126 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 126 both directions (Wilna) All lanes of 3 lanes open to traffic until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 16 Feb 2026 00:00:08 -0500 43.9778987922716 -75.6096251086944 NY 26 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) All lanes of 1 lane open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 16 Feb 2026 00:00:08 -0500 43.7882979619324 -75.493499612246 NY 3 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) to Route 3 - Arsenal Street at North Meadow Street (Watertown) All lanes open to traffic until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 16 Feb 2026 00:00:07 -0500 43.97639096423 -75.9206566174228 BRIDGE ST eastbound : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes of 1 lane open until 11:59 PM All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays Mon, 16 Feb 2026 00:00:07 -0500 43.9743621931654 -75.6148611815249 NY 3 both directions : Construction NYSDOT - Region 7: Construction , drainage improvements on NY 3 both directions (Piercefield) All lanes of 1 lane open until 11:59 PM No active work at this time. All lanes and shoulders open to traffic Mon, 16 Feb 2026 00:00:07 -0500 44.24 -74.5938098640825 NY 17 [Tioga] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Tioga] both directions between Exit 66 - NY 434 (Owego) and Exit 63 - CR 54; Stunton Hill Road (Nichols) 1 right lane of 2 lanes blocked for pothole repair to occur today (2/4) during the hours of 8:000 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Started Open Reach. IR# 9700090 Wed, 04 Feb 2026 09:09:16 -0500 42.0626983642578 -76.143798828125 I-690 westbound : Construction NYSDOT - Region 3: Construction , bridge work on I-690 westbound between Exit 14 - Teall Avenue (Syracuse) and Exit 13 - Townsend Street (Syracuse) 1 Left lane of 3 lanes closed until 3:00 PM on June 01,2026 Tue, 03 Feb 2026 09:58:07 -0500 43.054456 -76.117594 I-690 westbound : Construction NYSDOT - Region 3: Construction , installation of sign structure on I-690 westbound between Exit 15 - Midler Avenue (Syracuse) and Exit 14 - Teall Avenue (Syracuse) 1 Right lane and shoulder of 2 lanes closed until 3:00 PM on June 01,2026 Tue, 03 Feb 2026 09:46:08 -0500 43.058933 -76.098536 NY 221 both directions : Construction NYSDOT - Region 3: Construction , bridge replacement on NY 221 both directions between Jennings Creek Rd (Lapeer) and Cooper Hill Rd (Lapeer) All lanes closed until 4:00 PM on September 21,2026 ; follow detour Mon, 02 Feb 2026 07:02:08 -0500 42.4255071124658 -76.0834941522333 NY 31 : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on NY 31 ramp to I-490 Eastbound (Rochester) All lanes closed and detoured until 11:59 PM RAMP CLOSED Wed, 21 Jan 2026 11:21:04 -0500 43.1511861395552 -77.6072980233321 NY 27A eastbound : Roadwork NYSDOT - Region 10: Roadwork on NY 27A eastbound at Ocean Avenue (Islip) 1 Center lane of 3 lanes closed until further notice Tue, 13 Jan 2026 16:25:45 -0500 40.7279778365612 -73.2247004818139 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp to Center Avenue (Fort Lee) All lanes closed will be closed through July. Cars/Buses use Exit 73 for Local Streets. Trucks follow posted detours Sun, 18 Jan 2026 05:35:06 -0500 40.8552310825741 -73.9694127322947 Bruce Reynolds Boulevard westbound : Construction Port Authority NY/NJ: Construction on Bruce Reynolds Boulevard westbound Lemoine Avenue (Fort Lee) to Center Avenue All lanes closed will be closed through September 2026 Sun, 18 Jan 2026 05:35:45 -0500 40.8541588400011 -73.9683181500042 George Washington Bridge eastbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) 1 Left lane of 2 lanes closed motorists will not be able to make the left turn onto Center Avenue through July 2026. Sun, 18 Jan 2026 05:35:56 -0500 40.8550757297774 -73.9711807961208 NY 3 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) to Route 3 - Arsenal Street at North Meadow Street (Watertown) All lanes of 2 lanes open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 05 Jan 2026 00:01:04 -0500 43.97639096423 -75.9206566174228 NY 26 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) All lanes of 2 lanes open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 05 Jan 2026 00:00:07 -0500 43.7882979619324 -75.493499612246 NY 126 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 126 both directions (Wilna) All lanes of 3 lanes open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 05 Jan 2026 00:00:07 -0500 43.9778987922716 -75.6096251086944 NY 12F both directions : Construction NYSDOT - Region 7: Construction , bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) to NY 971H; Paddy Hill Road (Hounsfield) All lanes of 2 lanes open until 11:59 PM Motorists may experience minor disruptions near the Bridge St. intersection due to equipment and/or material movements Mon, 05 Jan 2026 00:00:04 -0500 43.9994230767768 -75.9830930786789 NY 28 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 28 both directions area of South Inlet Raquette Lake (Raquette Lake) until 6:00 P.M. on September 30, 2026 Motorists will encounter laneclosures in both directions with the use of temporary signals Fri, 02 Jan 2026 07:47:21 -0500 43.8071129362516 -74.609983699413 I-81 northbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) All lanes of 4 lanes open until 3:30 PM on May 31,2026 NB lane shift to SB side for 81 project Thu, 01 Jan 2026 09:00:13 -0500 43.019989 -76.140383 NY 34 both directions : Construction NYSDOT - Region 3: Construction , bridge replacement on NY 34 both directions between Trombley Rd (Brutus) and Emerson Rd (Cato) All lanes closed until 6:00 AM on November 01,2026 ; follow detour Thu, 01 Jan 2026 07:00:05 -0500 43.0647604598753 -76.5591280459337 I-81 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 southbound ramp to Exit 1A (Old Exit 16A) - I-481 (Syracuse) All lanes closed until 3:00 PM on September 04,2026 ; follow detour Thu, 01 Jan 2026 00:00:03 -0500 43.008641 -76.135376 NY 3 both directions : Construction NYSDOT - Region 7: Construction , drainage improvements on NY 3 both directions (Piercefield) All lanes of 1 lane open until 11:59 PM No active work at this time. All lanes and shoulders open to traffic Mon, 29 Dec 2025 08:59:03 -0500 44.24 -74.5938098640825 NY 30 both directions : Construction NYSDOT - Region 2: Construction, guard rail repairs on NY 30 both directions between Hamilton County; Franklin County Line (Tupper Lake) and NY 28N; Long Lake (Long Lake) until 4:00 P.M. Motorists will encounter lane closures in both dierctions with flaggers in place Fri, 19 Dec 2025 07:00:47 -0500 44.0996017456055 -74.5289993286133 NY 347 westbound : Roadwork NYSDOT - Region 10: Roadwork on NY 347 westbound Nicolls Road; CR 97 (Brookhaven) to Hallock Road (Lake Grove) 1 Right lane of 3 lanes closed until further notice Thu, 26 Mar 2026 15:19:14 -0400 40.8831055 -73.1068105 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Whitney Point Rest Area (Lisle) and Cortland - Broome County Line (Lisle) 1 right lane and shoulder of 2 lanes blocked intermittently through duration of culvert rehabilitation from 12/10/25 through 6/1/26 during the hours of 7:00 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. The I-81 NB section will be completed prior to SB. Started Open Reach. IR# 9467090 D265389 Wed, 11 Mar 2026 14:34:12 -0400 42.4091987609863 -76.0146026611328 I-684 both directions : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) right shoulder closure until 11:59 A.M. on November 26, 2026 D265186/B1077550/32651809 - This work is weather permitting. Plan travel accordingly; delays may exist Mon, 08 Dec 2025 00:00:34 -0500 41.3032078231156 -73.6745859893158 NY 126 both directions : Construction NYSDOT - Region 7: Construction , construction on NY 126 both directions Town of New Bremen; Village of Croghan (New Bremen) to Town of New Bremen; Village of Croghan (New Bremen) All lanes of 1 lane open until 11:59 PM on April 30,2026 Route 126 now open to two way traffic. Fri, 05 Dec 2025 12:18:06 -0500 43.8894137234091 -75.4027849508917 NY 3 both directions : Construction NYSDOT - Region 7: Construction on NY 3 both directions (Piercefield) All lanes open 2 way traffic No active work at this time. All lanes and shoulders open to traffic Mon, 29 Dec 2025 08:19:08 -0500 44.24 -74.5938098640825 CR-636 northbound : Construction NJ DOT - TOC North: Construction on CR-636 northbound between 56A (Woodland Park) and CR-636 (Woodland Park) All lanes closed until 11:59 PM on June 01,2026 Southbound traffic operate in the Northbound lane. Northbound traffic is detoured. Mon, 01 Dec 2025 09:31:58 -0500 40.9029870144273 -74.1925535114569 CR-636 northbound : Construction NJ DOT - TOC North: Construction on CR-636 northbound between JACKSON AVE (Woodland Park) and CR-636 (Woodland Park) All lanes closed until 11:59 PM on July 01,2026 Mon, 24 Nov 2025 10:58:52 -0500 40.9025862339041 -74.1922361851741 I-80 eastbound : Construction NJ DOT - TOC North: Construction on I-80 eastbound Exit ramp Exit 56 - Squirrelwood Rd (Woodland Park) All lanes closed until 3:00 PM on June 01,2026 This is the Exit 56B ramp only.(Eastbound to Northbound) Mon, 01 Dec 2025 09:23:18 -0500 40.904047 -74.193291 BEVINS RD both directions : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on BEVINS RD both directions FRENCH CREEK RD (Clayton) to FRENCH CREEK RD (Clayton) All lanes closed until 5:00 PM Bevins Road Bridge over French Creek is closed to all traffic. Wed, 19 Nov 2025 16:50:04 -0500 44.188614536652 -76.1348379877102 I-87 Northway northbound : Construction NYSDOT - Region 7: Construction , reconstruction on I-87 Northway northbound (Champlain) 2 lanes of 3 lanes closed until 11:59 PM on May 01,2026 delays due to construction Mon, 20 Oct 2025 11:45:04 -0400 45.008726 -73.45112 I-87 Northway northbound : Construction NYSDOT - Region 7: Construction , reconstruction on I-87 Northway northbound END ROUTE I-87; US-Canadian Line (Champlain) to END ROUTE I-87; US-Canadian Line (Champlain) 5 lanes of 8 lanes closed until 11:59 PM on February 28,2027 8 car lanes NB reduced to 3 (max) lanes Mon, 06 Oct 2025 14:11:05 -0400 45.0087514673341 -73.452063085427 MARIN BLVD both directions : Construction TRANSCOM, Jersey City: Construction on MARIN BLVD both directions 18TH ST (Jersey City) to CR-636 / Observer Hwy (Hoboken) All lanes closed Sun, 05 Apr 2026 07:28:33 -0400 40.7343287713577 -74.0390152047737 US 9W both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on US 9W both directions between Hickory Circle and Pictuay Rd (Bethlehem) All lanes of 2 lanes open until 5:00 PM on July 03,2026 one lane open in both directions, NB lane shift in place Wed, 06 Aug 2025 09:46:05 -0400 42.5340517856205 -73.8058262254228 Corbin Street both directions : Construction Port Authority NY/NJ: Construction on Corbin Street both directions Kellogg Street (Newark) to Outer Port Street 1 Right lane of 3 lanes closed June 1st, 2026 Mon, 30 Mar 2026 07:25:50 -0400 40.7029624496184 -74.1514398425719 I-81 northbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 northbound at Exit 29N - NY 481; North Syracuse; Oswego (Cicero) right shoulder of 3 lanes closed until 6:00 PM ; Alternating shoulder closures Mon, 28 Jul 2025 07:00:05 -0400 43.1420079390913 -76.1119110803027 NY 8 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 8 both directions between Griffen Road ( Wells) and Teachout Road (Wells) until 6:00 P.M. Fri, 27 Jun 2025 06:00:40 -0400 43.4603615850682 -74.2278188257434 NY 23 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 23 both directions between NY 8 South New Berlin (New Berlin) and CR 18 (Morris) 1 alternate lanes of 2 lanes blocked for bridge replacement SR-23 over the Unadilla River starting 6/17/25 to 8/31/26 from 6am to 5pm. A one-lane on-site detour will be activated for SR-23 East & West bound traffic for both directions between SR-8 & CR-18. Traffic will be controlled utilizing Temporary Traffic Signals. This work is weather dependent, and no flag personnel are present. IR:7969090 D:265265 Wed, 07 Jan 2026 12:27:44 -0500 42.529598236084 -75.3850021362305 NY 23/7 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 23/7 both directions area of Main Street; NY 7; Maple Street (Oneonta) all lanes closure for the reconstruction of intersection and roundabout installation to occur from 6/2 through 2/17 during the hours of 7:00 AM to 6:00 PM. SR 23 NB traffic to SR 7 EB and SR 7 EB to SR 23 SB remain open with all other traffic detoured. From 2/2/26 to 4/30/26, Rapid flashing beacon installation work to be completed at crosswalks on Rte. 7, Rte. 23, and Maple St. Intersection Reconstruction/Roundabout project in the City of Oneonta. Closures will occur daily on Route 7 from RM 7/9403/2018 to 2019 and Route 23 from RM 23/9402/2104 to 23/9402/2106at various times. Pine Street will also be closed at various times. The intersection will be re-opened when work is completed each day. This work is weather dependent with no flagger personnel present. Started Open Reach. IR# 7903090 D265569 Tue, 17 Mar 2026 21:24:17 -0400 42.456901550293 -75.0584030151367 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp from West 179th Street (New York) All lanes open until June 30th, 2026 Trucks wider than 10 ft or longer than 110 ft are prohibited. Tue, 31 Mar 2026 09:57:22 -0400 40.8493802929073 -73.9396241842173 US 11 both directions : Roadwork NYSDOT - Region 9: Roadwork on US 11 both directions between Main Street (Whitney Point) and Keibel Road (Whitney Point) 1 alternate lanes of 2 lanes blocked at various times for bridge reconstruction, curbing, drainage work to occur from 4/21 through 7/31/2026. Two lane, two way traffic will be maintained between Main Street and Keibel Road 24 hours/day. This work is weather dependent with flaggger personnel present. Started Open Reach. IR# 7461090 D264920 Tue, 05 Aug 2025 07:27:41 -0400 42.3359817350312 -75.9737122414941 I-87 Northway northbound : Construction NYSDOT TMC - Albany: Construction , roadwork on I-87 Northway northbound at END ROUTE I-87; US-Canadian Line (Champlain) All lanes of 2 lanes open until 11:59 PM Starting on 4/21/25, border crossing will be restricted to trailers over 16'4" in height, 8'5" in width and over 53' in length. Mon, 21 Apr 2025 00:00:07 -0400 45.008807 -73.452067 I-86 eastbound : Construction NITTEC: Construction , culvert repairs on I-86 eastbound Exit 26 - NY 16 Connector (Olean) to Exit 27 - NY 16 (Hinsdale) 1 Left lane of 2 lanes closed until 11:59 PM on May 30,2025 Tue, 15 Apr 2025 15:23:04 -0400 42.100083 -78.431821 GARDEN RD both directions : Construction NYSDOT - Region 7: Construction, bridge work on GARDEN RD both directions RT-26 (Philadelphia) to Sophia Street (Philadelphia)2 All lanes of 2 lanes closed westbound All lanes of 2 lanes closed eastbound until 11:59 PM Garden Rd over Indian River Bridge #P021Closed to Traffic until further notice Fri, 02 Jan 2026 16:29:05 -0500 44.1589685052784 -75.7085867284068 Bridge Street Interstate bridge # 7 westbound : Roadwork NYSDOT - Region 9: Roadwork on Bridge Street Interstate bridge # 7 westbound (Callicoon) 1 westbound one lane of 2 lanes blocked for bridge rehabilitation to occur from 3/24/25 through 11/30/26 during the hours of 6:00 AM to 5:30 PM. This work is weather dependent with no flagger personnel present. Traffic will be controlled by temporary signal. Started Open Reach. IR# 6256091 D265033 Mon, 01 Dec 2025 16:45:55 -0500 41.7650010366706 -75.0609952667757 NY 17 [Tioga] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Tioga] both directions between Exit 65 - NY 434; Ramp (Owego) and Town of Owego; Town of Vestal Line (Owego) 1 alternate lanes of 2 lanes blocked for preparations for upcoming construction to occur from 03/20 through 11/01 during the hours of 7:00AM and 5:00PM. New striping will be placed on NY 17 EB allowing traffic to only use the right lane. Starting 3/22 a temporary concrete barrier will be placed in EB following the new striping patterns. On 4/01 head to head traffic will be in place with a single lane for WB and EB all on the EB side of the highway and the contractor will CLOSE Exit 66 WB off ramp to traffic. A signed detour will be in place taking WB traffic to Exit 65 and getting them onto NY 17 EB and back to Exit 66. The ramp to get on NY 17 WB from Exit 66 will remain open. There will be no flag personnel present and this work is weather dependent. Started Open Reach. IR#4948091 D265091 Tue, 25 Jun 2024 13:19:54 -0400 42.0886001586914 -76.2288970947265 Inner Port Street both directions : Construction Port Authority NY/NJ: Construction on Inner Port Street both directions between Corbin Street (Newark) and Port Street (Newark) All lanes closed December 31st, 2026 Mon, 30 Mar 2026 07:21:56 -0400 40.7040488538158 -74.1505620476053 I-86 eastbound : Construction NITTEC: Construction , bridge work on I-86 eastbound Exit ramp to Exit 9 closed. Use Exit 10. (Ellery) All lanes closed until 11:59 PM on December 31,2026 Wed, 03 Apr 2024 10:13:04 -0400 42.152016 -79.382971 US 11 both directions : Construction NYSDOT - Region 7: Construction , construction on US 11 both directions in the vicinity of HALLAHAN RD (Lawrence) All lanes of 1 lane open until 11:59 PM on December 31,2027 Narrow Bridge Sun, 15 Dec 2024 21:00:05 -0500 44.7720819404316 -74.713616527616 NY 240 both directions : Construction NITTEC: Construction, construction on NY 240 both directions Westbrook Drive (Cheektowaga) to Maryvale Drive (Cheektowaga) 1 Left lane of 2 lanes closed Tue, 12 Nov 2024 18:46:02 -0500 42.9336719270712 -78.7841518738921 Port Street eastbound : Construction Port Authority NY/NJ: Construction on Port Street eastbound ramp to Corbin Street (Newark) All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until June 1st 2026 Mon, 30 Mar 2026 07:26:43 -0400 40.7047103800473 -74.1514923040378