Active Construction All Active Construction en-us Sun, 11 Oct 2026 13:45:42 -0400 Copyright 511nj.org 1 IRVING AVE both directions : Construction NYSDOT - Region 3: Construction , longterm construction on IRVING AVE both directions between E ADAMS ST (Syracuse) and E FAYETTE ST (Syracuse) All lanes of 1 lane open until 3:00 PM ; Alternating one-way traffic with flaggers Sun, 11 Oct 2026 09:00:12 -0400 43.0427520182119 -76.1378729532482 QUAKER BRIDGE RD both directions : Construction Westchester Co. DPW: Construction , bridge replacement on QUAKER BRIDGE RD both directions between RT-129 (Croton-On-Hudson) and RT-129 (Croton-On-Hudson) All lanes closed until 11:59 PM Sun, 11 Oct 2026 09:00:12 -0400 41.2150159254114 -73.8710122237658 NY 415 both directions : Construction NYSDOT - Region 6: Construction , installation of fiber optics on NY 415 both directions Town of Cohocton; Town of Avoca Line (Cohocton) to CR 121; Loon Lake Road; I-390 (Exit 2) connector to NY 415 (Cohocton) All lanes of 1 lane open until 3:00 PM 2 lanes reduced to 1 lane Sun, 11 Oct 2026 09:00:12 -0400 42.461462 -77.471995 NY 31F eastbound : Construction NYSDOT - Region 4: Construction , roadwork on NY 31F eastbound between 323 Fairport Rd (Pittsford) and 151 Fairport Rd (East Rochester) 1 Right lane of 2 lanes closed until 3:00 PM Sun, 11 Oct 2026 09:00:13 -0400 43.1071661093877 -77.4963522555244 NY 256 northbound : Construction NYSDOT - Region 4: Construction , utility work on NY 256 northbound from Stagecoach Road; NY 255 (Sparta) to Town of Conesus and Town of Sparta Line (Conesus) All lanes of 1 lane until 3:00 PM Sun, 11 Oct 2026 09:00:12 -0400 42.6344227898739 -77.6967468938822 NY 77 both directions : Construction NYSDOT - Region 4: Construction , utility work on NY 77 both directions area of WELCH RD (Java) All lanes of 1 lane until 3:30 PM Alternating Right/Left Lane/shoulder closures with flaggers as needed. Sun, 11 Oct 2026 08:30:09 -0400 42.6724970240218 -78.3899933420493 TUCKAHOE RD both directions : Construction Westchester Co. DPW: Construction , road rehabilitation on TUCKAHOE RD both directions between 6E (Yonkers) and CASSILIS AVE (Yonkers) All lanes of 2 lanes open until 3:30 PM • There will be lane and shoulder closures within the above limits. Sun, 11 Oct 2026 07:30:08 -0400 40.95534 -73.8606805293759 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) until 6:30 P.M. Motorists will encounter lane closures in both directions with flaggers and temporary signals in place Sun, 11 Oct 2026 07:03:04 -0400 43.4109404488897 -75.3414657623387 NY 415 both directions : Construction NYSDOT - Region 6: Construction , utility work on NY 415 both directions Babcock Hollow Road; I-86/NY 15/NY 17 (Exit 39) connector to NY 415 (Bath) to Liberty Street; NY 54 (Bath) All lanes of 1 lane open until 5:00 PM Right shoulder closure Sun, 11 Oct 2026 07:00:09 -0400 42.3294577202977 -77.3006689608021 i86 eastbound : Construction NYSDOT - Region 6: Construction , bridge rehabilitation on i86 eastbound (Chemung) All lanes of 2 lanes open until 5:30 PM 2 lane reduced to 1 Sun, 11 Oct 2026 07:00:09 -0400 42.0008032333726 -76.5997984845246 NY 19 both directions : Construction NYSDOT - Region 4: Construction , utility work on NY 19 both directions from W Bergen Rd (Le Roy) to Mill St (Le Roy) right shoulder of 1 lane closed intermittently until 4:00 PM Sun, 11 Oct 2026 07:00:10 -0400 42.9882101534995 -77.9904388665792 I-90 westbound : Construction NYSDOT TMC - Albany: Construction , overhead sign repair on I-90 westbound Off-ramp Exit 6; US 9 (Albany) 1 Right lane of 2 lanes closed until 3:00 PM Sun, 11 Oct 2026 07:00:10 -0400 42.67021 -73.743014 NY 66 eastbound : Construction NYSDOT TMC - Albany: Construction , roadwork on NY 66 eastbound between Algonquin Beach Road (Poestenkill) and Reichards Lake Road; NY 351 (Poestenkill) 1 Right lane of 3 lanes closed until 5:00 PM -Water District/pipe install Sun, 11 Oct 2026 07:00:10 -0400 42.6636228142334 -73.5792821739189 NY I86 westbound : Construction NYSDOT - Region 6: Construction , bridge rehabilitation on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 1 Right lane of 2 lanes closed until 5:30 PM 2 lanes reduced to 1 Sun, 11 Oct 2026 07:00:10 -0400 42.0003746347831 -76.5149372929721 NY 14 both directions : Construction NYSDOT - Region 6: Construction , bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) All lanes of 2 lanes open until 5:30 PM Lane Closure(Multilane HWY ) Sun, 11 Oct 2026 07:00:09 -0400 42.1544907272148 -76.8360934402304 NY 14A both directions : Construction NYSDOT - Region 6: Construction , repaving on NY 14A both directions Highland Drive (Starkey) to Highland Drive (Starkey) All lanes of 1 lane open until 5:30 PM 1 Lane, 2 Way, Flagger Control Sun, 11 Oct 2026 07:00:09 -0400 42.5117255789472 -76.9732864103478 NY 275 both directions : Construction NYSDOT - Region 6: Construction , drainage improvements on NY 275 both directions Town of Wirt; Town of Bolivar Line (Bolivar) to Town of Wirt; Town of Bolivar Line (Bolivar) All lanes of 1 lane open until 5:00 PM 1 Lane, 2 Way, temp signal or STOP sign Sun, 11 Oct 2026 07:00:09 -0400 42.0801636832683 -78.1607521373568 NY 253 eastbound : Construction NYSDOT - Region 4: Construction , bridge replacement on NY 253 eastbound at I-390 (Henrietta) 1 Right lane of 3 lanes closed until 4:00 PM BINS 1070071 & 1070072 Sun, 11 Oct 2026 07:00:10 -0400 43.0588311499697 -77.6417671013914 NY 66 westbound : Construction NYSDOT TMC - Albany: Construction , roadwork on NY 66 westbound Algonquin Beach Road (North Greenbush) to Reichards Lake Road; NY 351 (Poestenkill) 1 Right lane of 2 lanes closed until 5:00 PM Water District-pipe install Sun, 11 Oct 2026 07:00:11 -0400 42.6771014312854 -73.5980156458113 NY 414 southbound : Construction NYSDOT - Region 6: Construction , bridge work on NY 414 southbound I-86 (Corning) to I-86 (Corning) All lanes of 1 lane open until 6:00 PM 3 lanes reduced to 1, alternating lane closure. Sun, 11 Oct 2026 07:00:11 -0400 42.1552768827164 -77.0530614574759 NY 415 westbound : Construction NYSDOT - Region 6: Construction , utility work on NY 415 westbound Babcock Hollow Road; I-86/NY 15/NY 17 (Exit 39) connector to NY 415 (Bath) to Liberty Street; NY 54 (Bath) All lanes of 1 lane open until 3:30 PM 2 Lanes reduced to 1 Sun, 11 Oct 2026 07:00:08 -0400 42.32780770748 -77.2964630653755 NY 197 both directions : Construction NYSDOT TMC - Albany: Construction , culvert repairs on NY 197 both directions at Broadway; US 4; Cortland Street (Fort Edward) All lanes of 1 lane open until 5:00 PM Alternating Lane Closure Sun, 11 Oct 2026 07:00:08 -0400 43.2634666748609 -73.5749078779555 US 9 both directions : Construction NYSDOT TMC - Albany: Construction , roadwork on US 9 both directions between NY 254 (Queensbury) and NY 149 (Queensbury) 1 Right lane of 2 lanes closed until 5:00 PM Pavement corrective maintenance Sun, 11 Oct 2026 07:00:08 -0400 43.3305668181442 -73.6736743180556 NY 415 both directions : Construction NYSDOT - Region 6: Construction , utility work on NY 415 both directions Liberty Street; NY 54 (Bath) to Liberty Street; NY 54 (Bath) All lanes of 1 lane open until 3:30 PM 2 Lanes reduced to 1 Sun, 11 Oct 2026 07:00:09 -0400 42.3334017538179 -77.3157703378114 NY 378 westbound : Construction NYSDOT TMC - Albany: Construction , overhead sign repair on NY 378 westbound at I-787 SB (Menands) 1 Right lane of 2 lanes closed until 7:00 PM Sun, 11 Oct 2026 07:00:09 -0400 42.700107 -73.709754 Court Street both directions : Construction NYSDOT - Region 3: Construction , bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) All lanes closed until 3:30 PM ; follow detour Sun, 11 Oct 2026 07:00:09 -0400 43.0643790123933 -76.160457877142 US 9 both directions : Construction NYSDOT TMC - Albany: Construction , roadwork on US 9 both directions between Rte 149 (Lake George) to Rte 9 at Rte 9N (Lake George) (Queensbury) All lanes of 1 lane open until 3:00 PM pavement corrective maintenance Sun, 11 Oct 2026 07:00:08 -0400 43.3471506333821 -73.6884859500732 NY 415 both directions : Construction NYSDOT - Region 6: Construction , utility work on NY 415 both directions Babcock Hollow Road; I-86/NY 15/NY 17 (Exit 39) connector to NY 415 (Bath) to Liberty Street; NY 54 (Bath) All lanes of 1 lane open until 3:30 PM Lane shift Sun, 11 Oct 2026 07:00:09 -0400 42.3287178850805 -77.298675935319 I-90 both directions : Construction NYSDOT TMC - Albany: Construction , tree trimming on I-90 both directions between Exit 6A; I-787 (Albany) and NY State Thruway Interchange/I-87 (Schodack) All lanes of 4 lanes open until 5:00 PM + Litter Pick Up Sun, 11 Oct 2026 07:00:09 -0400 42.669678 -73.737609 NY 104 eastbound : Construction NYSDOT - Region 4: Construction , bridge work on NY 104 eastbound at Saint Paul Street bridge (Rochester) 2 Left lanes of 4 lanes closed until 3:30 PM Sun, 11 Oct 2026 07:00:08 -0400 43.191556 -77.618304 NY 245 both directions : Construction NYSDOT - Region 6: Construction , drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) All lanes of 1 lane open until 3:30 PM 2 lane reduced to 1 with flaggers Sun, 11 Oct 2026 07:00:08 -0400 42.6546338164214 -77.3288525966306 CR-13 both directions : Construction NYSDOT - Region 6: Construction , utility work on CR-13 both directions ALLEN ST (Bath) to NY 54 at Liberty Street; End NY 415 overlap (Bath) All lanes of 3 lanes open until 5:00 PM 2 Lanes Reduced to 1 Sun, 11 Oct 2026 07:00:08 -0400 42.3407347308116 -77.3175143846065 NY 228 both directions : Construction NYSDOT - Region 6: Construction , bridge work on NY 228 both directions START ROUTE NY 228; intersection NY 224 Odessa (Catharine) to START ROUTE NY 228; intersection NY 224 Odessa (Catharine) left shoulder of 1 lane closed until 5:30 PM Sun, 11 Oct 2026 07:00:11 -0400 42.3401576203155 -76.7792733319018 NY 8 both directions : Construction NYSDOT TMC - Albany: Construction , repaving on NY 8 both directions between Dixon Road (Horicon) and Route 9 (Chester) All lanes of 1 lane open until 7:00 PM alternating lanes Sun, 11 Oct 2026 07:00:12 -0400 43.6698558894832 -73.7732946833033 NY 14 both directions : Construction NYSDOT - Region 6: Construction , milling on NY 14 both directions City of Elmira; Town of Elmira Line (Elmira) to Chemung Street (Horseheads) All lanes of 1 lane open until 7:00 PM 2 Lanes Reduced to 1 Sun, 11 Oct 2026 07:00:12 -0400 42.1189048323873 -76.8229589890598 I-787 both directions : Construction NYSDOT TMC - Albany: Construction , tree trimming on I-787 both directions Exit 1 southbound ramp to I-87 Thruway Interchange 23 (Albany) to Exit 7E; NY 378 eastbound (Colonie) All lanes of 4 lanes open until 5:00 PM + Litter Pick Up Sun, 11 Oct 2026 07:00:08 -0400 42.632958 -73.768671 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) until 6:30 P.M. Motorists will encounter lane closures in both directions with flaggers and temporary signals in place Sun, 11 Oct 2026 06:52:36 -0400 43.4109404488897 -75.3414657623387 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) until 6:30 P.M. Motorists will encounter lane closures in both directions with flaggers and temporary signals in place Sun, 11 Oct 2026 06:44:36 -0400 43.4109404488897 -75.3414657623387 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) until 6:30 P.M. Motorists will encounter lane closures in both directions with flaggers and temporary signals in place Sun, 11 Oct 2026 06:34:21 -0400 43.4109404488897 -75.3414657623387 NY 825 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 825 both directions at Perimeter Road (Rome) until 5:00 P.M. Motorists will encounter lane closures in both directions with temporary signals in place with a new traffic pattern Sun, 11 Oct 2026 06:34:22 -0400 43.2258 -75.4253 NY 17 both directions : Construction NYSDOT - Region 6: Construction , bridge rehabilitation on NY 17 both directions (Chemung) All lanes of 2 lanes open until 5:00 PM alternating lane closures Sun, 11 Oct 2026 06:31:08 -0400 42.014832 -76.640056 NY 28N westbound : Construction NYSDOT TMC - Albany: Construction , culvert repairs on NY 28N westbound at COBBLE CREEK RD (Chester) All lanes of 1 lane open until 5:00 PM One Lane Closed for duration of project Sun, 11 Oct 2026 06:30:07 -0400 43.728585817353 -73.9677062739705 US 20 both directions : Construction NYSDOT - Region 2: Construction, utility work on US 20 both directions between Cedar Street ( Morrisville) and Willowvale Road (Madison) until 6:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Sun, 11 Oct 2026 06:25:19 -0400 42.9027641223643 -75.6669203643235 Golf Course Road both directions : Construction NYSDOT - Region 2: Construction, bridge work on Golf Course Road both directions between NY 46 ( Rome) and Fish Hatchery Road (Rome) all lanes closed until 6:00 P.M. Motorists will encounter a full road closure Sun, 11 Oct 2026 06:25:20 -0400 43.2730767460199 -75.4298817033503 NY 825 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 825 both directions at Perimeter Road (Rome) until 5:00 P.M. Motorists will encounter lane closures in both directions with temporary signals in place with a new traffic pattern Sun, 11 Oct 2026 06:14:16 -0400 43.2258 -75.4253 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) until 6:30 P.M. Motorists will encounter lane closures in both directions with flaggers and temporary signals in place Sun, 11 Oct 2026 06:02:17 -0400 43.4109404488897 -75.3414657623387 NY 14 both directions : Construction NYSDOT - Region 6: Construction , bridge work on NY 14 both directions Hickory Grove Road; CR 57 (Horseheads) to Town of Veteran; Town of Montour Line; Schuyler - Chemung County Line (Veteran) All lanes of 2 lanes open until 6:00 PM 1 Lane, 2 Way, Flagger Control Sun, 11 Oct 2026 06:00:10 -0400 42.194388320169 -76.8374191796174 US 20 both directions : Construction NYSDOT TMC - Albany: Construction , bridge work on US 20 both directions over I-88 (Duanesburg) right shoulder of 1 lane closed until 6:00 PM Sun, 11 Oct 2026 06:00:10 -0400 42.7602204225853 -74.1194821135196 NY 22 both directions : Construction NYSDOT TMC - Albany: Construction , repaving on NY 22 both directions Town of White Creek; Town of Hoosick Line; Rensselaer-Washington County Line (White Creek) to Gilbert Street; NY 313 (White Creek) All lanes of 1 lane open until 6:00 PM alternating lane closures Sun, 11 Oct 2026 06:00:10 -0400 42.9442644579471 -73.3683145565022 TOWN LINE RD both directions : Construction CT DOT-Newington-HWY-Oper Ctr: Construction , construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) All lanes of 1 lane open until 9:00 PM There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road Sun, 11 Oct 2026 06:00:10 -0400 41.6497127490642 -72.8818944527624 I-684 southbound : Construction NYSDOT - Region 8: Construction, culvert repairs on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) various lane closures until 5:00 A.M. D265186/NIGHT/B1077550/32842909 - This work is weather permitting, Plan travel accordingly; delays may exist Sat, 10 Oct 2026 19:01:29 -0400 41.3429294678028 -73.6551067795619 NEWKIRK AVE eastbound : Construction NYSDOT - Region 11: Construction, construction on NEWKIRK AVE eastbound at NEWKIRK PLZ (New York) All lanes closed until 6:00 P.M. on 10/11/26 Sat, 10 Oct 2026 01:23:47 -0400 40.6356789046129 -73.9629961046206 I-684 northbound : Construction NYSDOT - Region 8: Construction, culvert repairs on I-684 northbound between Exit 6A - NY 22 - NY 138 (Lewisboro) and Exit 7 - NY 116 (North Salem) various lane closures until 7:00 A.M. D265186/B1077550/NIGHT/32650809 - This work is weather permitting, Plan travel accordingly; delays may exist Fri, 09 Oct 2026 22:00:27 -0400 41.3032156533813 -73.6745794155338 I-690 westbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-690 westbound between Exit 17 - Midler Avenue (Syracuse) and Exit 16B - Townsend Street (Syracuse) 1 Right lane of 3 lanes closed until 3:00 PM on December 31,2026 Fri, 09 Oct 2026 14:16:07 -0400 43.058918 -76.09861 LODI ST both directions : Construction NYSDOT - Region 3: Construction , longterm construction on LODI ST both directions between RT-5 - ERIE BLVD E (Syracuse) and BURNET AVE (Syracuse) All lanes of 1 lane open until 4:00 PM on December 31,2026 ; Lane Shift Fri, 09 Oct 2026 14:12:08 -0400 43.0507990209759 -76.1306 N CROUSE AVE both directions : Construction NYSDOT - Region 3: Construction , longterm construction on N CROUSE AVE both directions between RT-5 - ERIE BLVD E (Syracuse) and BURNET AVE (Syracuse) All lanes of 1 lane open until 4:00 PM on December 31,2026 ; Lane Shift Fri, 09 Oct 2026 14:05:09 -0400 43.05088682812 -76.1364427466035 I-690 eastbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-690 eastbound between I-81 Northbound (Syracuse) and Exit 17 - Teall Avenue (Syracuse) 1 Left lane of 3 lanes closed until 3:00 PM on December 31,2026 Fri, 09 Oct 2026 13:23:07 -0400 43.051115 -76.146424 NY 5 both directions : Construction NYSDOT - Region 3: Construction , repaving on NY 5 both directions between Almond Street (Syracuse) and University Avenue (Syracuse) 1 Right lane of 2 lanes closed until 6:00 AM on November 30,2026 Thu, 08 Oct 2026 19:13:08 -0400 43.0507874320567 -76.1420047143248 Korean Veterans Memorial Parkway southbound : Construction NYSDOT - Region 11: Construction on Korean Veterans Memorial Parkway southbound between Albee Avenue (Staten Island) and Foster Road (Staten Island) 1 Left lane of 2 lanes closed Long-Term Closure until 3:00 P.M on 11/5/2026 Fri, 09 Oct 2026 05:32:48 -0400 40.5417003386549 -74.1853053339685 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound between West of CR 608/Baird Blvd (Camden) and East of I-676/Ben Franklin Bridge (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right lane closed Thu, 08 Oct 2026 15:08:08 -0400 39.9407043457031 -75.0997772216797 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound near West of US 130/Collingswood Circle (Collingswood), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 08:00 PM, right lane closed Thu, 08 Oct 2026 15:08:09 -0400 39.9204940795898 -75.0875701904297 US 322 westbound : Construction NJDOT - TOC South: Roadwork on US 322 Westbound near East of US 130 (Logan Twp), Continuous left shoulder Thu, 08 Oct 2026 15:07:09 -0400 39.7974128723145 -75.3466644287109 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound near West of US 130/Collingswood Circle (Collingswood), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 08:00 PM, right lane closed Thu, 08 Oct 2026 15:07:10 -0400 39.9204940795898 -75.0875701904297 US 322 eastbound : Construction NJDOT - TOC South: Roadwork on US 322 Eastbound near East of US 130 (Logan Twp), Continuous left shoulder Thu, 08 Oct 2026 15:07:09 -0400 39.8001823425293 -75.3477935791016 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound between West of CR 608/Baird Blvd (Camden) and East of I-676/Ben Franklin Bridge (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right lane closed Thu, 08 Oct 2026 15:07:10 -0400 39.9407043457031 -75.0997772216797 I-684 southbound : Construction NYSDOT - Region 8: Construction, culvert repairs on I-684 southbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) left lane and shoulder closed to traffic until 12:00 A.M. on October 17, 2026 D265186/B1077550/32651809 - 24/7 SHOULDER/LEFT LANE CLOSURE - Plan travel accordingly; delays may exist Thu, 08 Oct 2026 07:26:06 -0400 41.3032078231156 -73.6745859893158 NY 64 both directions : Construction NYSDOT - Region 4: Construction , culvert repairs on NY 64 both directions between CR-53 (Mendon) and Mendonshire Dr. (West Bloomfield) All lanes closed and detoured until 4:30 PM on November 20,2026 ROAD CLOSED, follow posted detour Thu, 08 Oct 2026 07:00:24 -0400 42.9645266399913 -77.5024223897425 NY 5 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 5 both directions between Groff Road (Palatine Bridge) and Failing Hill Road (Palatine Bridge) until 6:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Thu, 08 Oct 2026 06:01:51 -0400 42.9120574834915 -74.5777417890228 Bronx River Parkway southbound : Construction Westchester Co. DPW: Construction , bridge rehabilitation on Bronx River Parkway southbound between Exit 23 - Old Tarrytown Road; Cemetery Road (White Plains) and Exit 22 - NY 119 - Tarrytown Road; NY 100 - Central Avenue (White Plains) 1 Right lane of 2 lanes closed until 11:59 PM on October 18,2026 Tue, 06 Oct 2026 09:30:08 -0400 41.04617 -73.775153 NY 17 [Tioga] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Tioga] both directions at (Waverly) On 10/6/2026 hour of 0900-1100 Bridge Inspection of 1061481 and 82 bucket truck used on Fulton St. with single lane closure controlled by flaggers. No closure on NY 17 just Fulton street. Flaggers will be present. This work is not weather dependent. IR# 11603090 Tue, 06 Oct 2026 08:51:25 -0400 41.9987977323682 -76.5412255505249 GROVE ST both directions : Construction NJ DEP: Construction , construction on GROVE ST both directions between 18TH ST (Jersey City) and CR-636 (Hoboken) All lanes closed until 11:59 PM on April 06,2027 Tue, 06 Oct 2026 08:00:28 -0400 40.7345159275534 -74.0406675496072 NY 104 both directions : Construction NYSDOT - Region 4: Construction , culvert repairs on NY 104 both directions between Sweden Walker Road; NY 260 (Clarkson) and Lake Road North; NY 19 (Clarkson) All lanes closed and detoured until 5:00 PM on November 17,2026 Road CLOSED, follow posted detours Tue, 06 Oct 2026 07:00:13 -0400 43.2254005598851 -77.8904028150121 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Exit 13B (Dickinson) and Exit 21 1 lane may be closed For Epoxy Striping with alternating traffic, both northbound and south bound lanes. From 10/5 to 10/12. This work is weather dependent. There will be no flaggers on scene. IR 11588091 D265682 Sat, 10 Oct 2026 19:21:57 -0400 42.1967472644897 -75.8985010088417 I-81 northbound : Roadwork NYSDOT - Region 9: Roadwork on I-81 northbound between Exit 4 - US 11, NY 7 - Kirkwood / Conklin (Kirkwood) and Exit 8A - I-86 East, NY 17 East - New York City (Kirkwood) alternate lanes blocked On 10/5/2026-10/14/2026 hours of 0700-1500 Alter nating lane closures on I81NB for bridge deck repair between exits 4&8A in Kirkwood over Ostrum Rd. This work is weather dependent. IR# 11586090 Mon, 05 Oct 2026 13:21:57 -0400 42.0817945103782 -75.8063831257639 New Jersey Turnpike both directions : Long term road construction NJ Turnpike Auth.: Long term road construction on New Jersey Turnpike both directions Interchange 1 - Delaware Memorial Bridge (Carneys Point Twp) one right lane in each direction of the high speed EZ Pass lanes are closed for repairs until October 29, 2026. Mon, 05 Oct 2026 13:26:20 -0400 39.6857547027 -75.4471838532 Bridge Street both directions : Roadwork NYSDOT - Region 9: Roadwork on Bridge Street both directions at Bridge Street (Andes) alternate lanes blocked Dates 10/5/2026-10/23/2026 hours of 0700-1530 Bolster installation on BIN 1053430 over East Branch Delaware River. No police present. Flaggers will be present. This work is not weather dependent.IR#11584090 Mon, 05 Oct 2026 12:13:34 -0400 42.1479412217477 -74.6473140493852 NY 51 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 51 both directions between Mt. Upton (New Lisbon) and Plainfield Center alternate lanes blocked Dates of 10/7/2026-10/16/2026 hours of 0700-1700 Cold-In-Place Recycle-Pavement Rehabilitation Phase 2 Overlay. Police will not be present. Flaggers will be present. This work is weather dependent. IR#11582090 Mon, 05 Oct 2026 12:12:52 -0400 42.6474911104529 -75.1721528046251 NY 97 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 97 both directions between Francis Drive (Tusten) and State Route 55 alternate lanes blocked On 10/5/2026-10/15/2026 hours of 0700-1530 Rail Repair between Francis Drive and SR 55 MM 1200-1121. Flaggers will be present. This work is weather dependent.IR#11581090 Thu, 08 Oct 2026 15:24:57 -0400 41.4804064504682 -74.9800786292029 NY 434 westbound : Roadwork NYSDOT - Region 9: Roadwork on NY 434 westbound between Walmart Entrance (Vestal) and Vestal Library right and left lanes closures On dates 10/5/26-10/9/26 from hours of 0700-1900 Contractor will be milling and paving 434 WB from Walmart Entrance to Vestal Library. Passing will be closed for two days and driving lanes will be closed the following two days, lane closures will be left up overnight. This will be an overnight closure. No flaggers or police will be present. This work is weather dependent. IR# 11578090 Thu, 08 Oct 2026 21:31:02 -0400 42.0922924565953 -76.0284001322201 US 22 eastbound : Construction NJDOT - STMC: Roadwork on US 22 Eastbound near West of NJ 57 (Lopatcong Twp), Continuous Friday October 2, 2026 08:00 PM thru Saturday October 17, 2026 06:00 AM, left lane closed Fri, 02 Oct 2026 20:00:18 -0400 40.6985931396484 -75.1682281494141 NY 481 northbound : Construction NYSDOT - Region 3: Construction , roadwork on NY 481 northbound between Exit 96 - I-481; NY-481 (Cicero) and I-81 SB Ramp to NY-481 (Cicero) 1 Right lane and shoulder of 2 lanes closed until 6:30 PM on November 30,2026 Fri, 02 Oct 2026 14:35:08 -0400 43.1405740782624 -76.1033838404624 NY 28 both directions : Construction NYSDOT - Region 2: Construction, culvert replacement on NY 28 both directions between Jordanville Road (Columbia) and Hammond Street; NY 168 (German Flatts) until 7:00 P.M. on October 30, 2026 Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 28,Route 168, Route 167 and Jordanville Road. Ward Road will remain open Fri, 02 Oct 2026 09:44:29 -0400 42.9944866942822 -75.008443551001 I-190 - Niagara Thruway both directions : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-190 - Niagara Thruway both directions from Before I-90 Exit 53 - Start of Niagara Thruway to Before I-90 Exit 53 - Start of Niagara Thruway starting 8:01 PM, 10/01/2026 [CARS CAD-262740362] Thu, 01 Oct 2026 20:01:00 -0400 42.874902 -78.788244 I-90 - NYS Thruway both directions : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-90 - NYS Thruway both directions from After Exit 31 (I-90) - Utica (Rte 8 - Rte 12) to Before Exit 32 (I-90) - Westmoreland (Rte 233) starting 7:47 PM, 10/01/2026 [CARS CAD-262740354] Thu, 01 Oct 2026 19:47:05 -0400 43.131961 -75.294987 I-90 - NYS Thruway both directions : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-90 - NYS Thruway both directions from Before Exit 44 (I-90) - Canandaigua (Rte 332) to After Exit 45 (I-90) - Rochester - Victor (I-490) starting 7:47 PM, 10/01/2026 [CARS CAD-262740358] Thu, 01 Oct 2026 19:47:28 -0400 42.995648 -77.364982 I-90 - NYS Thruway eastbound : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-90 - NYS Thruway eastbound from Before Exit 40 (I-90) - Weedsport (Rte 34) to After Exit 39 (I-90) - State Fair (I-690) starting 7:46 PM, 10/01/2026 [CARS CAD-262740350] Thu, 01 Oct 2026 19:46:11 -0400 43.078439 -76.473002 I-90 - NYS Thruway both directions : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-90 - NYS Thruway both directions from Before Exit 30 (I-90) - Herkimer (Rte 28) to After Exit 30 (I-90) - Herkimer (Rte 28) starting 7:46 PM, 10/01/2026 [CARS CAD-262740353] Thu, 01 Oct 2026 19:46:37 -0400 43.017981 -74.985817 I-90 - NYS Thruway eastbound : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-90 - NYS Thruway eastbound from Before Exit 25A (I-90) - Schenectady (I-88) to Before Exit 25A (I-90) - Schenectady (I-88) starting 7:45 PM, 10/01/2026 [CARS CAD-262740349] Thu, 01 Oct 2026 19:45:27 -0400 42.790278 -74.015733 I-90 - NYS Thruway both directions : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-90 - NYS Thruway both directions from Before Exit 28 (I-90) - Fultonville (Rte 30A) to Before Exit 28 (I-90) - Fultonville (Rte 30A) starting 7:45 PM, 10/01/2026 [CARS CAD-262740347] Thu, 01 Oct 2026 19:45:02 -0400 42.931389 -74.283438 I-87 - NYS Thruway both directions : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-87 - NYS Thruway both directions from After Exit 18 (I-87) - New Paltz (Rte 299) to After Exit 18 (I-87) - New Paltz (Rte 299) starting 7:43 PM, 10/01/2026 [CARS CAD-262740343] Thu, 01 Oct 2026 19:43:04 -0400 41.813617 -74.054748 I-287 - Cross Westchester Expwy westbound : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-287 - Cross Westchester Expwy westbound from After Exit 7 (I-287) - Central Westchester Parkway North to 0.0 starting 7:25 PM, 10/01/2026 [CARS CAD-262740341] Thu, 01 Oct 2026 19:25:21 -0400 41.04037 -73.761384 I-95 - New England Thruway northbound : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-95 - New England Thruway northbound from After Exit 15 (I-95) - New Rochelle (US 1) to Before Exit 16 (I-95) - New Rochelle - North Ave - Cedar St starting 7:24 PM, 10/01/2026 [CARS CAD-262740339] Thu, 01 Oct 2026 19:24:54 -0400 40.907415 -73.790025 I-87 - NYS Thruway southbound : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-87 - NYS Thruway southbound from After Exit 13 (I-87) - Palisades Interstate Parkway to After Exit 13 (I-87) - Palisades Interstate Parkway starting 7:22 PM, 10/01/2026 [CARS CAD-262740337] Thu, 01 Oct 2026 19:22:29 -0400 41.102684 -74.001677 I-95 - New England Thruway southbound : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-95 - New England Thruway southbound at Before Exit 16 (I-95) - New Rochelle - North Ave - Cedar St starting 7:22 PM, 10/01/2026 [CARS CAD-262740338] Thu, 01 Oct 2026 19:22:42 -0400 40.908989 -73.786871 I-87 - NYS Thruway both directions : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-87 - NYS Thruway both directions from Before Exit 15 (I-87) - I-287S - Rte 17S to Before Exit 15 (I-87) - I-287S - Rte 17S starting 7:25 PM, 10/01/2026 [CARS CAD-262740333] Thu, 01 Oct 2026 19:25:06 -0400 41.119775 -74.148007 I-87 - NYS Thruway northbound : Long term road construction NYSTA - Statewide Ops.: long term road construction on I-87 - NYS Thruway northbound from After Exit 13 (I-87) - Palisades Interstate Parkway to After Exit 13 (I-87) - Palisades Interstate Parkway starting 7:19 PM, 10/01/2026 [CARS CAD-262740334] Thu, 01 Oct 2026 19:19:57 -0400 41.102191 -73.995874 US 30 eastbound : Construction NJDOT - TOC South: Roadwork on US 30 Eastbound between East of I-676/Ben Franklin Bridge (Camden) and West of CR 608/Baird Blvd (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right shoulder closed Thu, 01 Oct 2026 12:51:11 -0400 39.9476280212402 -75.1173934936523 NY 304 both directions : Construction NYSDOT - Region 8: Construction, construction on NY 304 both directions ramps to/from NY 59 (Clarkstown) shoulder closure until 11:59 P.M. on October 31, 2026 D265821/32848009 - 24/7 SHOULDER CLOSURE - Plan travel accordingly; delays may exist Thu, 01 Oct 2026 00:01:18 -0400 41.0912256698468 -73.997171383719 NY 936E; I-81 NB Service Rd northbound : Construction NYSDOT - Region 3: Construction , longterm construction on NY 936E; I-81 NB Service Rd northbound ramp to Exit 24A - NY 370; Onondaga Lake Pkwy (Syracuse) All lanes closed until 11:59 PM on December 31,2026 ; follow detour Wed, 30 Sep 2026 14:54:08 -0400 43.076024 -76.173871 NY 17B eastbound : Roadwork NYSDOT - Region 9: Roadwork on NY 17B eastbound between Lux Rd (Callicoon) and State Route 52A alternate lanes blocked for repairing timber wall on 9/30/26 - 10/16/26 between 7am and 5pm. Expect overnight closure. This work is weather dependent. Wed, 30 Sep 2026 06:45:32 -0400 41.7311988272379 -75.0019205836177 I-88 westbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 westbound area of Exit 5 ( Martin Hill) (Colesville) left lane blocked For pothole repair. 9/30 from 7:30am to 2pm. Weather dependent, no flagger present. Wed, 30 Sep 2026 05:06:12 -0400 42.1870994567871 -75.7083990573883 I-88 westbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 westbound between Exit 15 - NY 23 (Oneonta) alternate lanes blocked for bridge joint and pothole repair on 9/29/26-10/23/26 between 7:30am-3pm. This work is weather dependent. Overnight closure expected. IR 11521090 BIN 1095239 Wed, 07 Oct 2026 11:38:27 -0400 42.4485015869141 -75.0565032958984 NY 145 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 145 both directions between Thorington Rd (Broome) and Gates Hill Rd alternate lanes blocked for cross culvert replacement on 9/29/26-10/14/26 between 7am and 6:30pm.. This work is weather dependent. Flaggers will be present. IR11519090 D265668 Wed, 07 Oct 2026 14:47:02 -0400 42.5244809231752 -74.3040217748087 River Road; CR-61 both directions : Construction NYSDOT - Region 3: Construction , bridge work on River Road; CR-61 both directions between Jordan Road; CR-16 (Elbridge) and Jordan Road; CR-16 at Jorolemon Road; CR-135A (Cato) All lanes closed until 11:59 PM on December 31,2026 ; follow detour Mon, 28 Sep 2026 18:45:08 -0400 43.0999087260943 -76.4979923762626 NY 9J both directions : Construction NYSDOT - Region 8: Construction, emergency repairs on NY 9J both directions between Gibbons Road (Stuyvesant) and Ridge Rd (Stuyvesant) all lanes closed and detoured until 12:00 A.M. on December 31, 2026 EMERGENCY STORM DAMAGE/32850409 - ROAD CLOSED - LONG TERM CONSTRUCTION - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Mon, 28 Sep 2026 09:50:50 -0400 42.4141911473037 -73.7708695240322 NY 218 both directions : Construction NYSDOT - Region 8: Construction, emergency repairs on NY 218 both directions between Mountain House Lane (Cornwall) and Grant Road (Cornwall) all lanes closed and detoured until 12:00 A.M. on December 28, 2026 EMERGENCY STORM DAMAGE/32850409 - ROAD CLOSED - LONG TERM CONSTRUCTION - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Mon, 28 Sep 2026 09:39:23 -0400 41.4373650998789 -73.9918820024601 I-90 - NYS Thruway westbound : Construction NYSTA - Statewide Ops.: road maintenance operations ,left shoulder closed on I-90 - NYS Thruway westbound from After Exit 27 (I-90) - Amsterdam (Rte 30) to After Exit 27 (I-90) - Amsterdam (Rte 30) until 5:30 PM, 10/17/2026 [CARS CAD-262710073] Mon, 28 Sep 2026 14:10:11 -0400 42.925569 -74.208134 NY 33 both directions : Construction NYSDOT - Region 4: Construction , culvert repairs on NY 33 both directions between Prole Rd (Stafford) and Horseshoe Lake Rd (Batavia) All lanes closed and detoured until 7:00 AM on October 28,2026 Mon, 28 Sep 2026 07:00:14 -0400 43.0140909267678 -78.1160216526196 NY 17 [Sullivan] eastbound : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Sullivan] eastbound between Exit 96 (Rockland) and Exit 94 (Sullivan) alternate lanes blocked Deck repair BIN(1063382) and pothole repair in both lanes, crack seal. 9/28 to 10/16 from 6am to 2:30pm. Weather dependent, no flagger present. Fri, 09 Oct 2026 14:16:41 -0400 41.9261831373958 -74.8866367435468 NY 224 both directions : Construction NYSDOT - Region 6: Construction , bridge work on NY 224 both directions North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) to North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) All lanes of 1 lane open until 5:30 PM Fri, 25 Sep 2026 07:00:10 -0400 42.3431782823837 -76.8272232786557 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Exit 13B (Dickinson) and Exit 16 alternate lanes of 4 lanes Grooved in Epoxy Striping Northbound and Southbound directions of travel Starting 09/24/2026-09/26/2026 between the hours 1800-0600. This work is weather dependent. Thu, 24 Sep 2026 17:42:55 -0400 42.1410301169314 -75.9016694266989 NY 27A eastbound : Roadwork NYSDOT - Region 10: Roadwork, roadwork on NY 27A eastbound at Ocean Avenue (Babylon) 1 Right lane of 3 lanes closed until further notice Thu, 24 Sep 2026 15:29:52 -0400 40.6704674358016 -73.4146064441122 NY 17 [Sullivan] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Sullivan] both directions between Morsston Rd (Rockland) and Roscoe Rd (Sullivan) 09/24/2026 - 09/25-2026 07:00am - 3:30pm Rail and Chevron Repair on the median from Morsston to Roscoe. Overnight Closure. Work is weather dependent. No flaggers will be on scene. IR # 11478091 Thu, 24 Sep 2026 07:40:36 -0400 41.9386728594064 -74.9279995843085 New Jersey Turnpike : Roadwork NJ Turnpike Auth.: Long term road construction and Roadwork, roadwork on New Jersey Turnpike entering at Interchange 14 - I-78/US 1&9 (Newark) the ramp from Port St. to Interchange 14 will be closed to traffic until further notice. Fri, 09 Oct 2026 09:31:34 -0400 40.704651270117 -74.1534074881665 CR-64 both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on CR-64 both directions over I-87 (Saratoga Springs) All lanes of 1 lane open until 11:59 PM on January 01,2027 single lane open controlled by traffic signal Tue, 22 Sep 2026 14:04:08 -0400 43.0455008853457 -73.7731203354431 I-87 Northway both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on I-87 Northway both directions north of Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie) All lanes of 3 lanes open until 11:59 PM on October 30,2026 Riverview Rd bridge replacement, lane shift in place Tue, 22 Sep 2026 14:03:08 -0400 42.800509 -73.765113 NY 22 both directions : Construction NYSDOT - Region 8: Construction, roadwork on NY 22 both directions between Nash Road (North Salem) alternating traffic until 11:59 P.M. on October 30, 2026 D265424/ - Plan travel accordingly; delays may Tue, 22 Sep 2026 10:53:58 -0400 41.302727198212 -73.6710087691086 NY 252 both directions : Construction NYSDOT - Region 4: Construction , culvert repairs on NY 252 both directions between Chili Scottsville Road; NY 386 (Chili) and Chili Avenue; NY 33A; START ROUTE; NY 252 (Chili) All lanes closed and detoured until 11:59 PM on July 31,2027 Tue, 22 Sep 2026 06:30:08 -0400 43.095334379935 -77.7589355674256 CR-3; Schlegel Rd. both directions : Construction NYSDOT - Region 4: Construction , culvert repairs on CR-3; Schlegel Rd. both directions between PIPE LINE WAY (Webster) and CR-3 at Basket Rd. (Webster) All lanes closed and detoured until 4:00 PM on November 20,2026 ROAD CLOSED, follow posted detour Mon, 21 Sep 2026 07:00:08 -0400 43.241085856755 -77.3931248594697 NY 89 both directions : Construction NYSDOT - Region 3: Construction , bridge rehabilitation on NY 89 both directions between Demont Road (Seneca Falls) and Hyatt Road (Seneca Falls) All lanes of 1 lane open until 3:30 PM on November 13,2026 ; Alternating one-way traffic with temporary signals Mon, 21 Sep 2026 07:00:11 -0400 42.9384001373074 -76.7604343585713 NY 2 both directions : Construction NYSDOT TMC - Albany: Construction , bridge work on NY 2 both directions between 2nd Avenue; NY 32 (Watervliet) and Front Street/River Street (Watervliet) All lanes of 2 lanes open until 11:30 PM alternating lanes Fri, 18 Sep 2026 07:00:13 -0400 42.7300601072802 -73.7014566771545 NY 30 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 30 both directions between Belldons Road (Amsterdam) and Prospect Street (Amsterdam) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Thu, 17 Sep 2026 07:01:38 -0400 42.9365934383445 -74.1915925677521 NY 5 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 5 both directions between McKinley Road ( Palatine) and County House Road until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Thu, 17 Sep 2026 07:01:40 -0400 42.896333118975 -74.5094789697832 NY 26 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 26 both directions between Tuffy Road (Ava) and Houser Road (Ava) until 5:00 P.M. Motorists will encounter shoulder closures in both directions with most work performed off the roadway Thu, 17 Sep 2026 07:01:23 -0400 43.3813663578418 -75.4869694086789 NY 29 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 29 both directions between W State Street (Dolgeville) and Green Street (Dolgeville) until 5:00 P.M. Motorists will encounter a full road closure for with local traffic only Thu, 17 Sep 2026 07:01:27 -0400 43.1087022218668 -74.7714281621239 NY 26 both directions : Construction NYSDOT - Region 2: Construction, utility work on NY 26 both directions between NY 31 (Vernon) and NY 5 (Vernon) until 3:30 P.M. Work will be off the roadway with no impact to traffic Thu, 17 Sep 2026 07:01:31 -0400 43.0733510996448 -75.5071064520996 NY 412 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) until 6:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place. Thu, 17 Sep 2026 06:00:40 -0400 43.0485000610352 -75.3960037231445 NY 167 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 167 both directions between NY 5 (Little Falls) and Bronner Road (Little Falls) until 6:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Thu, 17 Sep 2026 06:00:49 -0400 43.0475499143776 -74.8014434426747 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Potter Road (Rome) and North James Street (Rome) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Thu, 17 Sep 2026 06:00:34 -0400 43.2422898583393 -75.4383946412655 US 20 both directions : Construction NYSDOT - Region 2: Construction, construction on US 20 both directions between NY 12 Junction Sangerfield (Sangerfield) and South Street; NY 8 Junction Bridgewater (Bridgewater) until 6:00 P.M. Motorists will encounter lane and shoulder closures in both directions Thu, 17 Sep 2026 06:00:46 -0400 42.9137992858887 -75.3787994384766 NY 5 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 5 both directions between Groff Road (Palatine Bridge) and Failing Hill Road (Palatine Bridge) until 6:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Thu, 17 Sep 2026 06:00:52 -0400 42.9120574834915 -74.5777417890228 NY 825 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 825 both directions at Perimeter Road (Rome) until 4:30 P.M. Motorists will encounter lane closures in both directions with temporary signals in place with a new traffic pattern Wed, 16 Sep 2026 18:30:22 -0400 43.2258 -75.4253 NJ 36 northbound : Construction NJDOT - TOC South: Roadwork on NJ 36 Northbound near South of Florence Av (Long Branch), Continuous Monday September 14, 2026 06:00 AM thru Friday May 21, 2027 06:00 AM, right shoulder closed Wed, 16 Sep 2026 15:10:10 -0400 40.3120536804199 -73.9877777099609 NJ 36 southbound : Construction NJDOT - TOC South: Roadwork on NJ 36 Southbound near Long Branch Av (Long Branch), Continuous Monday September 14, 2026 06:00 AM thru Friday May 21, 2027 06:00 AM, right shoulder closed Wed, 16 Sep 2026 15:10:11 -0400 40.3132629394531 -73.9845886230469 Loop Parkway both directions : Roadwork NYSDOT - Region 10: Roadwork, roadwork on Loop Parkway both directions area of START ROUTE Loop Parkway at Lido Boulevard (Hempstead) 1 Left lane of 2 lanes closed until further notice work is over the Reynolds Channel Bridge just north of Lido Blvd Wed, 16 Sep 2026 02:58:49 -0400 40.5921004670348 -73.5870042628198 Meadowbrook State Parkway southbound : Roadwork NYSDOT - Region 10: Roadwork, roadwork on Meadowbrook State Parkway southbound between Exit M9E - Merrick Road (Hempstead) and Exit M10 - Loop Parkway (Hempstead) 1 Right lane of 3 lanes closed until further notice work is over the Fundy Channel Bridge Wed, 16 Sep 2026 02:55:51 -0400 40.6512702358579 -73.5663530066404 NY 8 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 8 both directions from State Highway 23 (South New Berlin) to Brooker Road eastbound all lanes blocked Pothole repair mile marker 1160-1174. 9/15 to 10/16 from 7am-3pm. Not weather dependent, controlled by temp signal. Fri, 09 Oct 2026 18:02:23 -0400 42.541542542273 -75.375910578259 I-88 eastbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 eastbound over Ives Hill Rd (Afton) 09/14/2026 - 10/31/2026 07:00am - 04:00pm. Fascia replacement - right and left side facia will be replaced. Closure will be a Right Lane closure with Barrier then concrete barrier will be switched to a LT lane Closure once the right is complete. This is an overnight closure. Work is not weather dependent. No Flaggers will be on scene. BIN# 1094932 D265379 IR# 11403090 Mon, 14 Sep 2026 10:12:13 -0400 42.2057557447462 -75.5209489124527 I-690 westbound : Construction NYSDOT - Region 3: Construction , noise wall construction on I-690 westbound between Exit 18 - Midler Avenue (Syracuse) and Exit 17 - Teall Avenue (Syracuse) 1 Right lane and shoulder of 3 lanes closed until 3:00 PM on December 31,2026 Mon, 14 Sep 2026 09:00:28 -0400 43.058848 -76.09898 NY 17 [Sullivan] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Sullivan] both directions between Exit 97 (Thompson) and Exit 94 (Sullivan) alternate lanes blocked Rail repair Morsston to Roscoe in median. 9/14 to 9/17 from 7am-3:30pm. Weather dependent, no flagger present. Wed, 16 Sep 2026 19:59:41 -0400 41.911097970751 -74.8294328208929 I-481 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) All lanes closed until 6:00 PM on December 31,2026 ; follow detour Fri, 11 Sep 2026 22:33:08 -0400 43.0768629491718 -76.0559744237577 NY 224 both directions : Construction NYSDOT - Region 6: Construction , bridge work on NY 224 both directions North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) to North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) All lanes of 1 lane open until 11:59 PM Fri, 11 Sep 2026 09:47:08 -0400 42.3431782823837 -76.8272232786557 US 9W both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on US 9W both directions between Hickory Circle and Pictuay Rd (Bethlehem) All lanes of 2 lanes open until 5:00 PM on October 30,2026 one lane open in both directions, NB lane shift in place Tue, 08 Sep 2026 11:53:08 -0400 42.5340517856205 -73.8058262254228 NY 298 both directions : Construction NYSDOT - Region 3: Construction, construction on NY 298 both directions Spencer St (Syracuse) and Solar St (Syracuse)1 1 Right lane of 2 lanes closed until 3:00 PM on October 31,2026 Wed, 30 Sep 2026 07:00:26 -0400 43.0577593038197 -76.1747223510516 Burrstone Road both directions : Construction NYSDOT - Region 2: Construction, bridge painting on Burrstone Road both directions area of Access Ramp to NY 5/8/12 Southbound (North-South Arterial) (Utica) ramp closed until 6:00 P.M. on October 15, 2026 Motorists will encounter a full ramp closure with a detour utilizing French Road in place Tue, 08 Sep 2026 06:01:35 -0400 43.0924 -75.2685 NY 26 both directions : Construction NYSDOT - Region 2: Construction, culvert replacement on NY 26 both directions between Wells Gifford Road (Augusta) and Simmons Road (Augusta) all lanes closed until 5:30 P.M. on October 31, 2026 Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 26, College Hill Road, Route 233 and Route 12B Tue, 08 Sep 2026 06:01:34 -0400 43.0017672304133 -75.503243693148 NY 17 [Tioga] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Tioga] both directions between Exit 61 - NY 199 (Barton) and Exit 62 - NY 282 (Nichols) alternate lanes blocked prepare crossovers and complete steel repairs BIN( 1061511, 1061512) 9/8 to 10/31 from 7am to 4pm. Not weather dependent, no flagger present. Tue, 08 Sep 2026 08:19:57 -0400 42.0000566190317 -76.5214630230164 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions over Brooker Hollow Road (Worcester) alternate lanes blocked For bridge deck repairs BIN (1070711, 1070712) Work will be in WB lane for 2-3 weeks then commence to EB lane same duration. 9/8 to 10/16 from 6am to 6:30pm. Not weather dependent, no flagger present. ir 11350091 D265377 BIN 1070711/12 Tue, 08 Sep 2026 08:40:41 -0400 42.628737965283 -74.6606188247573 NY 52 both directions : Construction NYSDOT - Region 8: Construction, drainage improvements on NY 52 both directions between Old Plank Road (Wawarsing) and Roxanne Lane (Wawarsing) alternating traffic until 12:00 A.M. on November 01, 2026 D265730/32779709 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist Tue, 08 Sep 2026 00:00:59 -0400 41.699697498563 -74.3892719812654 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions between Exit 14 - Main Street (Oneonta) and Exit 18 - Route 7 Schenevus (Maryland) 1 right lane and shoulder of 4 lanes blocked for exit sign replacement & post foundation work on I-88E/W between Exits 14-18 in the right lane & shoulder from 7/7 to 11/25 between 6am & 5pm. this work is weather dependent, and no flag personnel are present. D265707 IR: 10769090 Wed, 19 Aug 2026 10:46:49 -0400 42.4444007873535 -75.0671005249023 NY 9A northbound : Construction NYSDOT - Region 11: Construction on NY 9A northbound ramp to Exit 12 - West 125th Street (New York) All lanes closed Long-Term Closure Wed, 30 Sep 2026 06:11:20 -0400 40.8171132938785 -73.9618032843138 NY 224 both directions : Construction NYSDOT - Region 6: Construction , bridge work on NY 224 both directions North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) to North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) All lanes of 1 lane open until 11:59 PM Mon, 31 Aug 2026 07:36:01 -0400 42.3431782823837 -76.8272232786557 Betsy Ross Bridge both directions : Construction DRPA: Construction on Betsy Ross Bridge both directions Mid-Span (Philadelphia) to Mid-Span (Pennsauken Twp) All lanes open 2 LANES GETTING BY BOTH DIRECTIONS, SPEED 35 Sun, 11 Oct 2026 06:50:49 -0400 39.9862408626055 -75.0695656336147 WATER ST southbound : Construction NYSDOT TMC - Albany: Construction , bridge work on WATER ST southbound between COLONIE ST (Albany) and COLUMBIA ST (Albany) 1 Left lane of 2 lanes closed until 11:59 PM Fri, 28 Aug 2026 00:00:09 -0400 42.656269 -73.743836 WATER ST northbound : Construction NYSDOT TMC - Albany: Construction , bridge work on WATER ST northbound between North Ferry Street (Albany) and COLONIE ST (Albany) 1 Right lane of 2 lanes closed until 11:59 PM Fri, 28 Aug 2026 00:00:09 -0400 42.657789 -73.741738 NY 53 northbound : Construction NYSDOT - Region 6: Construction , repaving on NY 53 northbound I-86 (Bath) to Ontario and Steuben County Line (Prattsburg) All lanes and both shoulder of 1 lane open until 6:30 PM one lane 2 way flagger Thu, 27 Aug 2026 07:52:08 -0400 42.3793574189077 -77.3618466131827 FEURA BUSH RD eastbound : Construction NYSDOT TMC - Albany: Construction , utility work on FEURA BUSH RD eastbound between Murray Drive (Glenmont Plaza) (Bethlehem) and HENDERSON RD (Bethlehem) All lanes of 1 lane open until 11:00 AM alternating lanes Wed, 26 Aug 2026 19:00:22 -0400 42.5999006486044 -73.8228519280238 I-84 eastbound : Construction NYSDOT - Region 8: Construction, construction on I-84 eastbound between Exit 65 - NY 312 - Carmel (Southeast) and Exit 68 - I-684 - Pawling - White Plains (Southeast) shoulder closure until 11:59 P.M. on December 31, 2026 D265693/32777209 - 24/7 SHOULDER CLOSURE - Plan travel accordingly; delays may exist Wed, 26 Aug 2026 13:18:01 -0400 41.4192363021109 -73.6225099062784 NY 7 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 7 both directions at Maple St (Oneonta) alternate lanes 08/24/2026 - 12/01/2026 07:00 to 5:00pm Sidewalk replacement work and landscaping at various locations on RT. 7, Rt. 23, and Maple St. Maple and pine STs will be closed at various times. Work is weather dependent. Flaggers will be present. D# D265369 IR# 11234090 Mon, 24 Aug 2026 08:16:15 -0400 42.4568956734297 -75.0579097724693 I-88 eastbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 eastbound between Exit 18 - Route 7 Schenevus (Maryland) and Schoharie Cnty Line (Rotterdam) right shoulder of 4 lanes 08/24/26 - 10/16/26 07:30am - 2:30pm Drum Mulching on I-88 on right schoulder from Exit 18 to the Schoharie County Line. Work is weather dependent. No Flaggers will be present. IR# 11230090 Fri, 09 Oct 2026 14:35:24 -0400 42.5492238203261 -74.8055726558996 Water Street northbound : Construction NYSDOT TMC - Albany: Construction , bridge work on Water Street northbound at Quay Street (Albany) 1 Left lane of 2 lanes closed until 11:59 PM Mon, 24 Aug 2026 00:00:08 -0400 42.656173 -73.743866 NY 363 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 363 both directions between Susquehana Street (Binghamton) and North Shore Drive (Binghamton) alternate lanes blocked for Median and pavement reconstruction and drainage crossings from washington street to exchange street. For EB and WB, two lanes will be reduced to one with left lanes closed. Additionaly, NY 363 SB left lane will be closed between the Susquahana Street exit and North Shore Drive for single lane traffic to tie into the N. Shore Dr traffic. Work will begin 8/21/26-11/19/26. Expect overnight closures. This work is weather dependent. IR 11213091 d265753 Fri, 21 Aug 2026 09:14:49 -0400 42.093890093354 -75.9115931135752 JFK Expressway northbound : Construction Port Authority NY/NJ: Construction on JFK Expressway northbound ramp to T7/T8 Flyover (New York) All lanes closed and detoured until further notice. Sun, 04 Oct 2026 05:46:06 -0400 40.649207668644 -73.7854049853353 US 20 eastbound : Construction NYSDOT TMC - Albany: Construction , bridge painting on US 20 eastbound between Seminole Ave and Tampa Ave (Albany) 1 Right lane of 2 lanes closed until 11:59 PM on September 10,2026 Thu, 20 Aug 2026 13:28:07 -0400 42.671736498654 -73.8082939124045 I-87 Northway northbound : Construction NYSDOT TMC - Albany: Construction , roadwork on I-87 Northway northbound at END ROUTE I-87; US-Canadian Line (Champlain) All lanes of 2 lanes open until 11:59 PM until 12/2028, border crossing will be restricted to trailers over 16'4" in height, 8'5" in width and over 53' in length. Mon, 17 Aug 2026 09:04:08 -0400 45.008807 -73.452067 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions from Exit 3 (Various) to Exit 23 1 lane may be of 4 lanes closed Replacing existing exit panels on advance exit signs with new exit numbers. Replace existing gore exit signing with new exit numbering, overlay existing specific service and supplement exit signs with new exit numbering. Shoulder closures to start then there will be right lane closures in multiple areas of I88. 8/17 to 10/30 from 7:00am to 5:00pm. Weather dependent, no flagger present. Mon, 17 Aug 2026 07:32:43 -0400 42.4995732227404 -74.9179105110033 George Washington Bridge eastbound : Construction Port Authority NY/NJ: Construction , scheduled roadwork on George Washington Bridge Upper Level eastbound ramp from Center Avenue (Fort Lee) All lanes closed until 11:59 PM on November 01,2026 Fri, 14 Aug 2026 23:02:25 -0400 40.8551704664066 -73.9703917125381 NY 90 both directions : Construction NYSDOT - Region 3: Construction , culvert repairs on NY 90 both directions between Levanna Rd (Ledyard) and GULLY RD (Ledyard) All lanes of 1 lane open until 6:00 PM on October 30,2026 ; Alternating one-way traffic with temporary signals Fri, 14 Aug 2026 13:07:07 -0400 42.7845277184666 -76.7137733952039 NY 458 both directions : Construction NYSDOT - Region 7: Construction , bridge work on NY 458 both directions Town of Duane; Town of Santa Clara Line (Santa Clara) to Town of Duane; Town of Santa Clara Line (Santa Clara) All lanes of 1 lane open until 11:59 PM on November 30,2026 NY Rte. 458 over Clear Brook reduced to one 12 ft lane with alternating one-way traffic controlled by a temporary signal. Mon, 03 Aug 2026 12:18:07 -0400 44.5938501282153 -74.3462085538256 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp to Center Avenue (Fort Lee) All lanes closed Cars/Buses use Exit 73 for Local Streets. Trucks follow posted detours until further notice. Wed, 05 Aug 2026 11:34:18 -0400 40.8554548155036 -73.9699934310644 US 44 / NY 55 both directions : Construction NYSDOT - Region 8: Construction, construction on US 44 / NY 55 both directions between Chapel Hill Road (Highland) and Grotto Lane (Highland) all lanes closed and detoured until 12:00 A.M. on November 07, 2026 D265440/32720209 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Mon, 03 Aug 2026 00:00:53 -0400 41.6954068879768 -73.9850212497792 NY 7 westbound : Roadwork NYSDOT - Region 9: Roadwork on NY 7 westbound area of NY 79 (Colesville) 1 lane may be of 2 lanes closed Long term shoulder closure, Overnight Closure From 7/31 to 10/16 , Alternating be way traffic Work is not weather dependent, Flaggers will be on scene controlling traffic. D265389 IR11037091 Sat, 01 Aug 2026 21:55:34 -0400 42.189376729614 -75.6424582274305 I-81 northbound : Roadwork NYSDOT - Region 9: Roadwork on I-81 northbound between Exit 16 (Binghamton) and Exit 21 alternate lanes blocked 07/27/2026 - 10/13/2026 06:00am - 8:00pm Mainline milling and and paving on I-81 between Exit 16 and Exit 21. Work is an Overnight Closure. This work weather dependent. No flaggers will be present at scene. D# D265682 IR#10991090 Tue, 06 Oct 2026 13:33:42 -0400 42.1523865876567 -75.8973116827099 NY 52 westbound : Roadwork NYSDOT - Region 9: Roadwork on NY 52 westbound at Route 52A (Delaware) 1 westbound one lane of 2 lanes blocked 07/27/2026 - 11/30/2026 07:00am until 05:30pm Closing WB lane on NY-52 at the intersection of NY-52a. Traffic will be alternated through the open eastbound lane via Temp traffic signals while replacement of existing retaining walls is performed. Lanes will be delineated with temporary concrete barrier and traffic barrels. A width restriction is in place disallowing vehicles over 10 feet wide. Work is weather dependent. No flaggers will be on scene. D# D265674 IR# 10990090 Thu, 30 Jul 2026 05:55:51 -0400 41.7475583288646 -74.9538373947144 NY 19 both directions : Construction NYSDOT - Region 6: Construction , drainage improvements on NY 19 both directions Old Route 408 Transit Bridge CR 16 (Belfast) to Old Route 408 Transit Bridge CR 16 (Belfast) All lanes of 1 lane open until 11:59 PM on December 31,2026 1 Lane, 2 Way, temp signal or STOP sign Mon, 27 Jul 2026 00:00:08 -0400 42.3031086621618 -78.0888117743423 I-81 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 southbound between Exit 73 - US 20 (La Fayette) and LaFayette Weigh Station (La Fayette) right shoulder of 3 lanes closed until 3:00 PM on December 31,2026 Fri, 24 Jul 2026 07:16:07 -0400 42.892885 -76.110214 TAYLOR RD both directions : Construction NYSDOT - Region 4: Construction , bridge replacement on TAYLOR RD both directions between CHAMBERLAIN RD (Mendon) and CR-66; West Bloomfield Rd. (Mendon) All lanes closed until 5:00 PM on November 01,2026 ROAD CLOSED, follow posted detour Thu, 23 Jul 2026 09:00:15 -0400 42.984165478122 -77.5432664954427 Port Street westbound : Construction Port Authority NY/NJ: Construction on Port Street westbound Outer Port Street (Newark) to Brewster Road (Newark) 1 Left lane of 3 lanes closed Wed, 12 Aug 2026 13:15:37 -0400 40.7036788855868 -74.1478919353638 NY 17 [Broome] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Broome] both directions between Exit 67N - NY 26; Ramp (Vestal) and Exit 69 - NY 17C; Ramp (Union) 2 alternate lanes of 4 lanes closed for bridge approach repairs from 8/7/26 to 11/20/26 over Vestal Rd. Susquehanna River NY 17EB with traffic in a single lane in each direction (head-to-head) starting 8/6/26 on NY-17WB. Very slow-moving traffic is expected during high volume times. Exit 68 EB off ramp and NY 26 North ramps to SR-17EB are blocked. NY-26 SB ramp to NY 17 EB have reopened as of 9/9, This work is not weather dependent. Police will be present. IR# 10939091 D#265797 Wed, 09 Sep 2026 14:14:30 -0400 42.1103084311484 -76.0080914459544 NY 206 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 206 both directions area of 9303 1219 (Walton) 07-20-2026 - 11-25-2026 06:00 -17:00 Sign removal / replacement and post foundation work will occur on NY-206. Overhead sign panel replacement work will occur. Shoulder and Driving lane closures are needed at sign locations. Work is weather dependent. No flaggers will be present. IR# 10915090 Mon, 20 Jul 2026 10:39:01 -0400 42.1336041046187 -75.0803233356835 NY 17 [Delaware] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Delaware] both directions area of RM 9308 1036 (Deposit) 1 alternate lanes of 4 lanes closed 07-20-2026 - 11-25-2026 06:00 -17:00 Sign removal / replacement and post foundation work will occur. Overhead sign panel replacement work will occur. Shoulder and Driving lane closures are needed at sign locations. Work is weather dependent. No flaggers will be present. IR# 10914090 Mon, 20 Jul 2026 10:23:21 -0400 42.0328097270277 -75.4087783640761 960J northbound : Roadwork NYSDOT - Region 9: Roadwork on 960J northbound approaching NY 17c (Owego) 1 northbound one lane of 2 lanes closed 07-20-2026 - 11-25-2026 06:00 - 17:00 Sign removal and replacement on NY-960J . Soulder and Driving lane closures are needed at sign locations. This work is weather dependent. No flaggers will be on scene. D# D265707 IR# 10909090 Mon, 20 Jul 2026 08:27:53 -0400 42.0891816775426 -76.2150288608581 NY 17 [Sullivan] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Sullivan] both directions between Livingston Manor Rest area (Livingston Manor) and MM 114 (Sullivan) 1 alternate lanes of 4 lanes closed 07/20/2026 - 11/25/2026 06:00 - 17:00 Sign Replacement and Post Foundation work will occur. Overhead sign panel replacement work will occur. Shoulder and driving lane closures are needed at sign locations. Work is weather dependent. No flaggers will be present on scene. D# D265707 IR# 10908090 Mon, 20 Jul 2026 07:52:21 -0400 41.9257919155817 -74.8439221931346 I-481 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-481 southbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and Exit 88 - I-690 West (De Witt) All lanes of 2 lanes open until 6:00 AM on December 31,2026 ; Lane shifts to accomodate new traffic pattern Fri, 17 Jul 2026 18:23:07 -0400 43.082821 -76.05371 I-481 northbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-481 northbound between Exit 88 - I-690 West (De Witt) and Exit 89B - Kirkville Road West; CR 53 (De Witt) All lanes of 2 lanes open until 6:00 AM on December 31,2026 Lane shifts to accomodate new traffic pattern Fri, 17 Jul 2026 18:19:08 -0400 43.051702 -76.049883 S James Street both directions : Construction NYSDOT - Region 2: Construction, bridge work on S James Street both directions between Martin Street ( Rome) and Muck Road (Rome) all lanes closed until 8:00 P.M. on August 31, 2026 Motorists will encounter a closure of the bridge over the Canal with a signed detour in place Fri, 17 Jul 2026 11:00:03 -0400 43.2018747133583 -75.4670296358344 NY 7 both directions : Construction NYSDOT TMC - Albany: Construction , bridge rehabilitation on NY 7 both directions over I-90 (Rotterdam) both shoulder of 2 lanes closed until 11:59 PM 11ft width restriction with no shoulder Thu, 16 Jul 2026 00:00:09 -0400 42.7866680025647 -74.0137539948707 George Washington Bridge eastbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) 1 Left lane of 2 lanes closed motorists will not be able to make the left turn onto Center Avenue until further notice. Wed, 05 Aug 2026 11:32:17 -0400 40.8554885303696 -73.9716333729092 CHESTNUT RIDGE RD both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on CHESTNUT RIDGE RD both directions RT-3 (Hounsfield) to RIDGE RD (Hounsfield) All lanes closed until 11:59 PM on November 01,2026 Chestnut Ridge Rd. closed in both directions to thru traffic due to bridge construction on NY Rte. 3 Fri, 10 Jul 2026 15:43:08 -0400 43.9098027720436 -76.1192033677385 NY 12 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 12 both directions before Bates-Wilson Rd. (North Norwich) 1 alternate lanes of 2 lanes closed 07/08/2026 - 10/08/2026 07:00 - 15:30 Signalized alternating sing lane closures on NY - 12 just before Bates-Willson Rd. for staged culvert replacement. This work requires overnight closures. Work is weather dependent. No Flaggers will be on scene. Long term closure IR# 10789090 Wed, 08 Jul 2026 08:56:07 -0400 42.5885221015755 -75.5315032711615 NY 371 both directions : Construction NYSDOT - Region 6: Construction , bridge replacement on NY 371 both directions CR-35 (Cohocton) to Naples Street; NY 21; END ROUTE (Cohocton) All lanes closed northbound; All lanes of 1 lane open southbound until 5:30 PM on October 05,2026 On site detour temporary bridge. Tue, 07 Jul 2026 07:00:12 -0400 42.5267585462035 -77.4687919748397 NY 3 both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 3 both directions CR 75 South (Hounsfield) to Town of Hounsfield; Town of Henderson Line (Henderson) All lanes closed and detoured westbound; All lanes of 2 lanes closed and detoured eastbound until 11:59 PM on November 01,2026 Rte. 3 closed from CR 75 (Smithville Rd.) to Ridge Rd. due to bridge replacement. Motorists are directed to follow the signed detour route that uses CR 75 and Ridge Rd. Tue, 07 Jul 2026 00:00:08 -0400 43.9269495778451 -76.1079629093125 I-84 both directions : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on I-84 both directions ramps to Exit 68 - I-684 - White Plains (Southeast) shoulder closure until 11:59 P.M. on July 01, 2027 Mon, 06 Jul 2026 00:00:12 -0400 41.3890451248678 -73.5944622044725 US 11 northbound : Construction NYSDOT - Region 7: Construction , bridge replacement on US 11 northbound ACC I81; Kellogg Hill (Adams) to NY 232 (Watertown) All lanes of 2 lanes closed and detoured until 11:59 PM on November 30,2026 Rte. 11 is closed in both directions between Old US 11 and Rte. 232. Motorists are directed to follow the official signed detour route that uses Rte. 232, I81 and Kellogg Rd.. Thu, 02 Jul 2026 10:20:08 -0400 43.8865456650903 -75.990238714057 US 11 both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on US 11 both directions NY 420Town of Stockholm; Town of Lawrence (Stockholm) to NY 11C; CR 55 (Lawrence) All lanes of 1 lane closed and detoured until 11:59 PM on December 31,2026 Rte. 11 is closed from State Rte. 420 to Cotey's Corners (Rte. 11, 11C, CR 55 intersection). Truck traffic shall follow 11C from Stockholm Center to Cotey's Corners due to an R posted bridge on State Rte. 420. Motorists are advised to follow the official signed detour Tue, 30 Jun 2026 14:22:08 -0400 44.7759781236906 -74.7777285259369 NY 12E both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 12E both directions CR 57 (Lyme) to BAYVIEW DR (Lyme) All lanes closed until 11:59 PM on November 15,2026 Rte. 12 E over Shaver Creek closed to all traffic. Motorists are directed to follow the signed vehicle detour around the site. Mon, 22 Jun 2026 15:17:08 -0400 44.0805021379549 -76.2097844528848 I-481 northbound : Construction NYSDOT - Region 3: Construction , construction on I-481 northbound between Exit 95 - Northern Boulevard (Cicero) and I-81 at South Bay Road; CR 208 (Cicero) right shoulder of 2 lanes closed until 6:00 PM on September 30,2026 Mon, 15 Jun 2026 12:45:07 -0400 43.1348689702658 -76.0764728909745 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place.Beginning May 27th motorists will encounter a 3-color temp signal Fri, 12 Jun 2026 07:01:19 -0400 43.2622451883243 -75.4374746118408 I-690 westbound : Construction NYSDOT - Region 3: Construction , bridge work on I-690 westbound between Exit 17 - Teall Avenue (Syracuse) and Exit 16B - Townsend Street (Syracuse) 1 Left lane of 3 lanes closed until 3:00 PM on October 30,2026 Tue, 09 Jun 2026 13:57:06 -0400 43.054418 -76.117756 NY 17 [Sullivan] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Sullivan] both directions between Exit 97 - CR 178 (Rockland) and Exit 101 - CR 71; Ramp (Liberty) 2 alternate lanes of 4 lanes blocked for pavement resurfacing between Exits 98 to 101, ref. markers 1108-1165, on NY 17 E/W from 6/8 to 11/30 between 7am & 5pm with overnight closure. This work is weather dependent, and no flag personnel are present. D: 265735 IR:10475090 Mon, 08 Jun 2026 06:34:51 -0400 41.877498626709 -74.7983016967773 NY 12E both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 12E both directions NY 180 (Brownville) to NY 180 (Brownville) All lanes of 2 lanes closed until 11:59 PM on November 15,2026 NY Rte. 12E closed to ALL traffic at bridge crossing Perch River in Limerick. Traffic shall follow signed detour Tue, 26 May 2026 14:34:08 -0400 44.0290416425228 -76.0471677133942 I-88 westbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 westbound between Exit 16 - CR 47; Emmons Route 7 (Oneonta) and Exit 17 - NY 28; Gersoni Road Route 7 (Milford) for concrete joint repairs w/ paving & guiderail replacement between Ref Marker 3054 to 3009 in both driving & passing lanes from 5/26 to 11/6 between 6am & 6pm with overnight closure. This work is weather dependent and no flag personnel are present. D: 265744 IR:10329090 Tue, 26 May 2026 06:53:01 -0400 42.4580001831055 -75.0147018432617 RIVERVIEW RD both directions : Construction NYSDOT TMC - Albany: Construction , bridge rehabilitation on RIVERVIEW RD both directions over I-87 (Halfmoon) All lanes closed until 11:59 PM on March 31,2027 Mon, 18 May 2026 16:07:09 -0400 42.800434629655 -73.7649153438428 Fish Hatchery Road both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on Fish Hatchery Road both directions between NY 46 ( Rome) and Williams Road (Rome) all lanes closed until 5:00 P.M. on December 15, 2026 Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 46, Potter Road, Turin Road, Williams Road Mon, 18 May 2026 07:00:44 -0400 43.2613987330372 -75.4387860794468 CENTRAL PARK AVE both directions : Construction Westchester Co. DPW: Construction on CENTRAL PARK AVE both directions between PARKWAY N (Yonkers) and NY 100 at Palmer Road (Yonkers) All lanes open until 11:59 PM on April 19,2027 There will be single lane closures within the above limits Sun, 11 Oct 2026 01:30:02 -0400 40.905978 -73.87786 Bronx River Parkway both directions : Construction Westchester Co. DPW: Construction on Bronx River Parkway both directions City of Yonkers; City of New York Line (Yonkers) to Palmer Avenue (Yonkers) All lanes open until 11:59 PM on April 19,2027 There will be single lane closures within the above limits Sun, 11 Oct 2026 01:53:54 -0400 40.900908 -73.860711 NY 116 both directions : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on NY 116 both directions between Hunts Lane (North Salem) and Peach Lake Road - NY 121 (North Salem) alternating traffic until 12:00 A.M. on December 31, 2026 D265445/32700709 - 24/7 LANE CLOSURE - his work is weather permitting, Plan travel accordingly; delays may exist Thu, 07 May 2026 08:40:35 -0400 41.3305667588838 -73.5493376489188 WILER RD both directions : Construction NYSDOT - Region 4: Construction , bridge replacement on WILER RD both directions between CR-203; Brick Schoolhouse Rd (Hamlin) and CR-207; Hamlin Center Rd. (Hamlin) All lanes closed and detoured until 5:00 PM on November 01,2026 Road closed, follow posted detour. Thu, 30 Apr 2026 09:00:20 -0400 43.3127737164957 -77.891045545342 US 11 both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on US 11 both directions Delancy Avenue (Moira) to Delancy Avenue (Moira) All lanes of 1 lane diverted until 11:59 PM on November 30,2026 The bridge on Rte. 11 over Little Salmon River is reduced to one lane alternating traffic under control of a temporary signal Fri, 24 Apr 2026 14:35:03 -0400 44.8307384652527 -74.5097295546029 ALMOND ST both directions : Construction NYSDOT - Region 3: Construction , longterm construction on ALMOND ST both directions between E TAYLOR ST (Syracuse) and VAN BUREN ST (Syracuse) All lanes of 3 lanes open until 5:00 PM on October 15,2026 ; Alternating one-way traffic with flaggers Thu, 23 Apr 2026 18:51:01 -0400 43.0393993117124 -76.1422048967569 VAN BUREN ST both directions : Construction NYSDOT - Region 3: Construction , utility work on VAN BUREN ST both directions between ALMOND ST (Syracuse) and HENRY ST (Syracuse) All lanes closed until 5:00 PM on October 15,2026 ; follow detour Thu, 23 Apr 2026 18:47:01 -0400 43.0384656070661 -76.142081355163 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Exit 6 S-N- US 11; Ramp (Chenango) and Exit 7 - US 11 (Chenango) 2 alternate lanes of 4 lanes blocked for pavement repairs & resurfacing in the lanes of I-81NB & SB with alternate lane closures between Exits 16(old Exit 6) to 21(old Exit 7) and overnight lane closures from 4/20/26 to 9/30/26 between 7am & 7pm. This work is weather dependent & no flag personnel are present. IR:10068090 D265682 Wed, 27 May 2026 07:36:31 -0400 42.1501998901367 -75.8964996337891 NY 434 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 434 both directions between Main St. (Vestal) and Front St. (Vestal) 2 alternate lanes of 4 lanes blocked for bridge replacement of BIN# 1063329 over Choconut Creek on SR-434WB. WB traffic will be shifted to 1 eastbound lane, and EB traffic will be reduced to 1 lane between Main ST & Front St. Detour for Town Hall Rd. will be Front St. his work will occur between 4/20/26 to 10/31/26 from 7am to 4pm. This work is not weather dependent, and no flag personnel will be present. IR:10066090 D265629 Mon, 20 Apr 2026 07:11:42 -0400 42.0840671613892 -76.0636093469569 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions area of Exit 14 - Main Street (Oneonta) 1 right lane and shoulder of 4 lanes blocked for culvert rehabilitation at Ref. Marker 2024 around Exit 14 on I-88E/W with a long-term shoulder closure using concrete barriers. Between 4/16/26 to 12/1/26 during 7am to 6pm. This work is weather dependent, and no flaggers will be present. IR: 10041090 D265389 Thu, 16 Apr 2026 07:00:24 -0400 42.4444007873535 -75.0671005249023 NY 34 southbound : Roadwork NYSDOT - Region 9: Roadwork on NY 34 southbound between Hulbert Hollow Rd. (Spencer) and Michigan Hollow Rd. (Spencer) 1 southbound one lane of 2 lanes blocked for bridge replacement on SR-34 between Hulbert Hollow Rd. & Michigan Hollow Rd. from 5/18/26 to 10/12/26 during 7am to 5pm. This work is weather dependent, and no flag personnel will be present. Temporary signal in place for traffic control. IR:10012090 D265517 Mon, 18 May 2026 07:22:44 -0400 42.2570719026262 -76.5074547182689 I-490 eastbound : Construction NYSDOT - Region 4: Construction , bridge replacement on I-490 eastbound from Pittsford Palmyra Road; NY 31 (Perinton) to Bushnells Basin (Perinton) All lanes of 2 lanes until 5:00 PM The I490 EB between Exit 26 to Exit 27. Both the EB lanes will be shifted to the right and/but staying in the EB travel direction beginning Monday March 30th. Lanes Shifts scheduled to be in place for the 2026 construction season. Mon, 13 Apr 2026 07:00:10 -0400 43.0793255286162 -77.4858025416461 I-490 westbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on I-490 westbound at Bushnells Basin on ramp (Perinton) All lanes closed until 5:00 PM Exit 27 - I490 WB on ramp will be closed to all traffic beginning Monday March 30th. Detour will be posted Closure scheduled to be in place for the 2026 construction season. Mon, 13 Apr 2026 07:00:10 -0400 43.0576998898582 -77.47116 NY 28 both directions : Construction NYSDOT - Region 2: Construction, bridge replacement on NY 28 both directions between Exit - Mohawk Street; I-90; Steele Street (Herkimer) and Marginal Road (Herkimer) until 6:00 P.M. on November 30, 2026 Motorists may encounter flagging operations under the I-90 bridge Mon, 13 Apr 2026 06:01:19 -0400 43.0176476218537 -74.9935529126271 I-590 southbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on I-590 southbound Elmwood Avenue; CR 87 (Brighton) to EXIT 2A to NY 31; Monroe Ave (Brighton) 1 Right lane of 3 lanes diverted until 12:00 PM on November 30,2026 RIGHT LANE IS EXIT ONLY AT EXIT 2A Sat, 11 Apr 2026 05:00:21 -0400 43.126751 -77.553513 NY 31 westbound : Construction NYSDOT - Region 4: Construction , bridge replacement on NY 31 ramp westbound Entrance ramp I-590 SB (Brighton) All lanes closed and detoured until 12:00 PM on November 30,2026 RAMP CLOSED Sat, 11 Apr 2026 05:00:21 -0400 43.117 -77.553968 I-590 southbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on I-590 ramp southbound Exit ramp Exit 2B to NY 31; Monroe Ave. (Brighton) All lanes closed and detoured until 12:00 PM on November 30,2026 RAMP CLOSED Sat, 11 Apr 2026 05:00:21 -0400 43.114341 -77.552248 I-87 Northway both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on I-87 Northway both directions E. Schroon River Rd just north of Exit 23 (Bolton) 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound until 11:59 PM on September 30,2026 11' lane width restriction Fri, 10 Apr 2026 14:41:05 -0400 43.4997297094236 -73.7468358468454 Earhart Drive both directions : Construction Port Authority NY/NJ: Construction on Earhart Drive both directions Basilone Road (Elizabeth) to South Bridge Road All lanes closed until June 30th, 2028 Mon, 04 May 2026 20:12:29 -0400 40.6854533201585 -74.1888271599343 US 11 both directions : Construction NYSDOT - Region 3: Construction , bridge replacement on US 11 both directions between Bennett St (Cicero) and River Rd (Hastings) All lanes of 1 lane open until 3:30 PM on December 31,2026 ; Alternating one-way traffic with temporary signals Thu, 09 Apr 2026 13:21:06 -0400 43.2394080545219 -76.1406134324658 NY 28 both directions : Construction NYSDOT - Region 2: Construction, tree trimming on NY 28 both directions between ONeil Flowage (Indian Lake) and Durant Road (Indian Lake) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Thu, 09 Apr 2026 07:01:11 -0400 43.8203436936601 -74.346154646509 NY 54A northbound : Construction NYSDOT - Region 6: Construction , safety improvements on NY 54A northbound Town of Pulteney; Town of Urbana Line (Pulteney) to Town of Pulteney; Town of Urbana Line (Pulteney) All lanes closed until 11:59 PM on May 29,2026 2 lanes reduced to 1 Wed, 08 Apr 2026 13:55:06 -0400 42.4753782378973 -77.1720962528018 South Ave southbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on South Ave southbound ramp to I-490 Eastbound (Rochester) All lanes closed and detoured until 11:59 PM on December 31,2026 RAMP CLOSED Wed, 08 Apr 2026 08:39:08 -0400 43.1524435297133 -77.6073289140658 NY 3 both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 3 both directions NY 178 (Henderson) to NY 178 (Henderson) All lanes and both shoulder of 1 lane closed westbound; All lanes of 1 lane closed eastbound until 11:59 PM on November 15,2026 NYS Rte. 3 closed in both directions at the bridge over Stoney Creek. Traffic is directed to follow the signed detour Tue, 07 Apr 2026 12:09:06 -0400 43.8410857915649 -76.1991277724751 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions between Town of Worcester; Town of Richmondville Line (Richmondville) and Exit 20 - NY 7; NY 10; Richmondville (Richmondville) 2 alternate lanes of 4 lanes blocked For pavement resurfacing, joint repairs & guiderail installation on I-88 E/W between Otsego County line & Exit 20. From 4/6/26 to 11/2/26 between 6am &6pm. this work is not weather dependent and no flag personnel are present. IR: 9963090 D265446 Mon, 06 Apr 2026 06:24:08 -0400 42.6492004394531 -74.6349029541016 I-490 westbound : Construction NYSDOT - Region 4: Construction , longterm construction on I-490 westbound between Exit 27 - NY 96 (Perinton) and Exit 26 - NY 31 (Pittsford) All lanes shift until 5:00 PM on December 18,2026 Sat, 04 Apr 2026 07:01:07 -0400 43.0570952593101 -77.4711561917241 WATER ST southbound : Construction NYSDOT TMC - Albany: Construction , bridge rehabilitation on WATER ST southbound between COLONIE ST (Albany) and ORANGE ST (Albany) 1 Left lane of 2 lanes closed until 11:59 PM on December 31,2026 left lane closure with temporary concrete barrier Tue, 31 Mar 2026 00:00:07 -0400 42.6560526568251 -73.7441176875787 NY 46 both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 46 both directions over I-90 (Oneida) until 6:00 P.M. Motorists will encounter lane closures in both directions Mon, 30 Mar 2026 06:01:16 -0400 43.1102981567383 -75.6647033691406 NY 69 both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 69 both directions between NY 291 (Whitestown) and NY 922A; Clinton Street; CR 30 (Whitestown) until 6:00 P.M. on November 21, 2026 Motorists will encounter lane closures in both directions for work on the I-90 bridge Mon, 23 Mar 2026 06:00:43 -0400 43.1389007568359 -75.3051986694336 NY 5S both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 5S both directions between CR 122; Auriesville Road (Glen) and CR 27; Main Street; Hamlet of Fort Hunter (Montgomery) until 6:00 P.M. on November 21, 2026 Mon, 16 Mar 2026 06:00:52 -0400 42.9299 -74.315 Palisades Interstate Parkway southbound : Construction NYSDOT - Region 8: Construction, bridge rehabilitation on Palisades Interstate Parkway southbound ramp to Exit 9W - I-87 - I-287 (Clarkstown) ramp closed and detoured until 12:00 A.M. on November 16, 2026 D265160/32254709 - EXIT RAMP CLOSED TO TRAFFIC - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Thu, 12 Mar 2026 12:29:42 -0400 41.1040791130742 -73.995487617742 I-86 both directions : Construction NITTEC: Construction , bridge work on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Strunk Road (Ellicott) 1 Right lane of 2 lanes closed until 11:59 PM Tue, 10 Mar 2026 07:05:07 -0400 42.157516 -79.475119 I-86 both directions : Construction NITTEC: Construction , bridge work on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Strunk Road (Ellicott) 1 Right lane of 2 lanes closed until 11:59 PM Fri, 06 Mar 2026 12:56:08 -0500 42.157516 -79.475119 NY 31 : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on NY 31 ramp to I-490 Eastbound (Rochester) All lanes closed and detoured until 11:59 PM RAMP CLOSED Wed, 21 Jan 2026 11:21:04 -0500 43.1511861395552 -77.6072980233321 Bruce Reynolds Boulevard westbound : Construction Port Authority NY/NJ: Construction on Bruce Reynolds Boulevard westbound Lemoine Avenue (Fort Lee) to Center Avenue All lanes closed until further notice Wed, 30 Sep 2026 15:15:00 -0400 40.8541588400011 -73.9683181500042 NY 34 both directions : Construction NYSDOT - Region 3: Construction , bridge replacement on NY 34 both directions between Trombley Rd (Brutus) and Emerson Rd (Cato) All lanes closed until 6:00 AM on November 01,2026 ; follow detour Thu, 01 Jan 2026 07:00:05 -0500 43.0647604598753 -76.5591280459337 NY 347 westbound : Roadwork NYSDOT - Region 10: Roadwork on NY 347 westbound between Nicolls Road; CR 97 (Brookhaven) and Hallock Road (Lake Grove) 1 Right lane of 3 lanes closed until further notice Thu, 18 Jun 2026 08:07:18 -0400 40.8831055 -73.1068105 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Whitney Point Rest Area (Lisle) and Cortland - Broome County Line (Lisle) 1 right lane and shoulder of 2 lanes blocked intermittently through duration of culvert rehabilitation from 12/10/25 through 1/31/27 during the hours of 7:00 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. The I-81 NB section will be completed prior to SB. Started Open Reach. IR# 9467090 D265389 Thu, 01 Oct 2026 14:23:59 -0400 42.4091987609863 -76.0146026611328 BEVINS RD both directions : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on BEVINS RD both directions FRENCH CREEK RD (Clayton) to FRENCH CREEK RD (Clayton) All lanes closed until 5:00 PM Bevins Road Bridge over French Creek is closed to all traffic. Wed, 19 Nov 2025 16:50:04 -0500 44.188614536652 -76.1348379877102 Corbin Street both directions : Construction Port Authority NY/NJ: Construction on Corbin Street both directions Kellogg Street (Newark) to Outer Port Street All lanes closed and detoured northbound; All lanes open southbound until further notice Mon, 03 Aug 2026 05:26:02 -0400 40.7029624496184 -74.1514398425719 NY 23 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 23 both directions between NY 8 South New Berlin (New Berlin) and CR 18 (Morris) 1 alternate lanes of 2 lanes blocked for bridge replacement SR-23 over the Unadilla River starting 6/17/25 to 11/30/26 from 6am to 5pm. A one-lane on-site detour will be activated for SR-23 East & West bound traffic for both directions between SR-8 & CR-18. Traffic will be controlled utilizing Temporary Traffic Signals. This work is weather dependent, and no flag personnel are present. IR:7969090 D:265265 Wed, 02 Sep 2026 11:26:24 -0400 42.529598236084 -75.3850021362305 US 11 both directions : Roadwork NYSDOT - Region 9: Roadwork on US 11 both directions between Main Street (Whitney Point) and Keibel Road (Whitney Point) 1 alternate lanes of 2 lanes blocked at various times for bridge reconstruction, curbing, drainage work to occur from 4/21 through 11/20/2026. Two lane, two way traffic will be maintained between Main Street and Keibel Road 24 hours/day. This work is weather dependent with flaggger personnel present. Started Open Reach. IR# 7461090 D264920 Mon, 03 Aug 2026 08:57:22 -0400 42.3359817350312 -75.9737122414941 GARDEN RD both directions : Construction NYSDOT - Region 7: Construction, bridge work on GARDEN RD both directions RT-26 (Philadelphia) to Sophia Street (Philadelphia)2 All lanes of 2 lanes closed westbound All lanes of 2 lanes closed eastbound until 11:59 PM Garden Rd over Indian River Bridge #P021Closed to Traffic until further notice Fri, 02 Jan 2026 16:29:05 -0500 44.1589685052784 -75.7085867284068 Bridge Street Interstate bridge # 7 westbound : Roadwork NYSDOT - Region 9: Roadwork on Bridge Street Interstate bridge # 7 westbound (Callicoon) 1 westbound one lane of 2 lanes blocked for bridge rehabilitation to occur from 3/24/25 through 11/30/26 during the hours of 6:00 AM to 5:30 PM. This work is weather dependent with no flagger personnel present. Traffic will be controlled by temporary signal. Started Open Reach. IR# 6256091 D265033 Mon, 01 Dec 2025 16:45:55 -0500 41.7650010366706 -75.0609952667757 NY 17 [Tioga] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Tioga] both directions between Exit 65 - NY 434; Ramp (Owego) and Town of Owego; Town of Vestal Line (Owego) 1 alternate lanes of 2 lanes blocked for preparations for upcoming construction to occur from 03/20 through 11/01 during the hours of 7:00AM and 5:00PM. New striping will be placed on NY 17 EB allowing traffic to only use the right lane. Starting 3/22 a temporary concrete barrier will be placed in EB following the new striping patterns. On 4/01 head to head traffic will be in place with a single lane for WB and EB all on the EB side of the highway and the contractor will CLOSE Exit 66 WB off ramp to traffic. A signed detour will be in place taking WB traffic to Exit 65 and getting them onto NY 17 EB and back to Exit 66. The ramp to get on NY 17 WB from Exit 66 will remain open. There will be no flag personnel present and this work is weather dependent. Started Open Reach. IR#4948091 D265091 Tue, 25 Jun 2024 13:19:54 -0400 42.0886001586914 -76.2288970947265 Inner Port Street both directions : Construction Port Authority NY/NJ: Construction on Inner Port Street both directions between Corbin Street (Newark) and Port Street (Newark) All lanes closed December 31st, 2026 Mon, 30 Mar 2026 07:21:56 -0400 40.7040488538158 -74.1505620476053 I-86 eastbound : Construction NITTEC: Construction , bridge work on I-86 eastbound Exit ramp to Exit 9 closed. Use Exit 10. (Ellery) All lanes closed until 11:59 PM on December 31,2026 Wed, 03 Apr 2024 10:13:04 -0400 42.152016 -79.382971