Active Construction All Active Construction en-us Mon, 15 Dec 2025 03:36:24 -0500 Copyright 511nj.org 1 I-90 - NYS Thruway eastbound : Construction NYSTA - Statewide Ops.: road maintenance operations ,right lane closed on I-90 - NYS Thruway eastbound from After Exit 26 (I-90) - Schenectady (I-890 - Rte 5S) to After Exit 26 (I-90) - Schenectady (I-890 - Rte 5S) [CARS CAD-253490021] Mon, 15 Dec 2025 01:42:30 -0500 42.854479 -74.0314 NY 3 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) to Route 3 - Arsenal Street at North Meadow Street (Watertown) All lanes of 2 lanes open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 15 Dec 2025 00:01:02 -0500 43.97639096423 -75.9206566174228 NY 12F both directions : Construction NYSDOT - Region 7: Construction , bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) to NY 971H; Paddy Hill Road (Hounsfield) All lanes of 2 lanes open until 11:59 PM Motorists may experience minor disruptions near the Bridge St. intersection due to equipment and/or material movements Mon, 15 Dec 2025 00:01:01 -0500 43.9994230767768 -75.9830930786789 BRIDGE ST eastbound : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes of 2 lanes open until 11:59 PM All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays Mon, 15 Dec 2025 00:01:01 -0500 43.9743621931654 -75.6148611815249 French Road and Champlin Avenue; Whitesboro Street northbound : Construction NYSDOT - Region 2: Construction, water main work on French Road and Champlin Avenue; Whitesboro Street northbound between Utica College Driveway; St. Lukes Hospital Driveway (Utica) and Campbell Ave (Yorkville) until 6:00 P.M. Motorists will encounter a NB lane closure Mon, 15 Dec 2025 00:00:48 -0500 43.0976 -75.2745 NY 126 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 126 both directions (Wilna) All lanes of 3 lanes open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 15 Dec 2025 00:00:11 -0500 43.9778987922716 -75.6096251086944 NY 26 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) All lanes of 2 lanes open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 15 Dec 2025 00:00:08 -0500 43.7882979619324 -75.493499612246 NY 80 both directions : Construction NYSDOT - Region 3: Construction , tree trimming on NY 80 both directions between Kingsley Rd (Onondaga) and US 20 (Onondaga) All lanes of 1 lane open until 11:59 PM ; Alternating one-way traffic with flaggers Mon, 15 Dec 2025 00:00:02 -0500 42.8841651147922 -76.2198247122547 CT 15N_X68N-E_I91 unknown : Roadwork ConnDOT: RT 15 Northbound Exit 64B to I 91 Northbound CLOSED because of Road Work. Reported Sunday, December 14 at 11:46 pm. Sun, 14 Dec 2025 23:47:04 -0500 41.53304 -72.767144 CT 15N_X67_OFF unknown : Roadwork ConnDOT: RT 15 Northbound Exit 64A OFFRAMP CLOSED because of Road Work. Reported Sunday, December 14 at 11:46 pm. Sun, 14 Dec 2025 23:47:16 -0500 41.523725 -72.769295 Hutchinson River Parkway [Westchester] both directions : Construction NYSDOT - Region 8: Construction, drainage improvements on Hutchinson River Parkway [Westchester] both directions between Exit 4 - Boston Post Road - US 1 (Pelham) and Exit 13 - Mamaroneck Avenue (White Plains) various lane closures until 5:00 A.M. D265463/NIGHT/32455309 - This work is weather permitting. Plan travel accordingly; delays may exist Sun, 14 Dec 2025 23:00:17 -0500 40.8913342382476 -73.8157279735634 CT 9 southbound : Roadwork ConnDOT: RT 9 Southbound CLOSED between Exits 23B and 22 because of Road Work. Road Work in effect today until Monday, December 15 at 6:00 am. Reported Sunday, December 14 at 9:28 pm. Sun, 14 Dec 2025 21:28:44 -0500 41.560149 -72.64582 I-95 southbound : Roadwork ConnDOT: Road Work on I-95 Southbound between Exits 46 and 43 (1.7 miles) in effect today until Monday, December 15 at 6:00 am. The right lane is closed. Reported Sunday, December 14 at 9:10 pm. Sun, 14 Dec 2025 21:10:48 -0500 41.292078 -72.920791 NY 100A both directions : Construction NYSDOT - Region 8: Construction, road rehabilitation on NY 100A both directions between Dobbs Ferry Road - NY 100B (Greenburgh) and Grasslands Road - NY 100C/NY 100 (Mount Pleasant) alternating traffic until 6:00 A.M. D265312/NIGHT/32591309 - This work is weather permitting. Plan travel accordingly; delays may exist Sun, 14 Dec 2025 21:01:03 -0500 41.0366831581945 -73.8094342755831 NJ 23 northbound : Construction NJDOT - STMC: Roadwork on NJ 23 Northbound near CR 511/Boonton Av (Butler), Continuous Friday September 12, 2025 09:00 PM thru Friday December 19, 2025 03:00 PM, right lane closed Sun, 14 Dec 2025 21:00:02 -0500 40.9917144775391 -74.3463745117188 NJ 35 both directions : Construction NJ DOT - STMC: Roadwork on NJ 35 Both Directions between CR 514/Main St (Woodbridge Twp) and North of CR 604/Green St (Woodbridge Twp) Sunday December 14, 2025 08:00 PM thru Monday December 15, 2025 05:00 AM, 1 left lane of 2 lanes closed northbound; 1 left lane of 2 lanes closed southbound Sun, 14 Dec 2025 20:00:02 -0500 40.553108215332 -74.2822875976562 US 40 eastbound : Construction NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 585/Main St (Pleasantville) and East of CR 629/West End Av (Atlantic City), Sunday December 14, 2025 08:00 PM thru Monday December 15, 2025 06:00 AM, right lane closed Sun, 14 Dec 2025 20:00:02 -0500 39.3898162841797 -74.5236358642578 NJ 36 northbound : Construction NJDOT - TOC South: Roadwork on NJ 36 Northbound between South of Rose Ln (Union Beach) and Atlantic St (Keyport), Sunday December 14, 2025 08:00 PM thru Monday December 15, 2025 05:00 AM, right lane closed Sun, 14 Dec 2025 20:00:02 -0500 40.4385299682617 -74.1516418457031 NJ 27 both directions : Construction NJ DOT - STMC: Roadwork on NJ 27 Both Directions between Talmadge Rd (Edison Twp) and NJ 35/St. Georges Av (Rahway) Sunday December 14, 2025 08:00 PM thru Monday December 15, 2025 04:00 AM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound Sun, 14 Dec 2025 20:00:02 -0500 40.5254096984863 -74.3882827758789 I-90 eastbound : Construction NYSDOT TMC - Albany: Construction , bridge work on I-90 eastbound over North Pearl Street (Albany) 1 Right lane of 4 lanes closed until 6:00 AM Sun, 14 Dec 2025 20:00:02 -0500 42.670022 -73.741493 I-691 westbound : Roadwork ConnDOT: Road Work on I-691 Westbound between Exits 1C and 2A (0.7 miles) in effect today until Monday, December 15 at 6:00 am. The left lane is closed. Reported Sunday, December 14 at 7:48 pm. Sun, 14 Dec 2025 19:49:09 -0500 41.539474 -72.768403 CT 15 northbound : Roadwork ConnDOT: Road Work on RT 15 Northbound between Exits 61 and 65 (3.8 miles) in effect today until Monday, December 15 at 6:00 am. The right lane is closed. Reported Sunday, December 14 at 7:47 pm. Sun, 14 Dec 2025 19:48:58 -0500 41.49184 -72.808842 I-91 northbound : Roadwork ConnDOT: Road Work on I-91 Northbound between Exits 15 and 16 (3.0 miles) in effect today until Monday, December 15 at 6:00 am. The right lane is closed. Reported Sunday, December 14 at 7:47 pm. Sun, 14 Dec 2025 19:48:48 -0500 41.476452 -72.771068 Taconic State Parkway northbound : Construction NYSDOT - Region 8: Construction, bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) various lane closures until 6:00 A.M. D264582/NIGHT/B5502190/32562109 - This work is weather permitting. Plan travel accordingly; delays may exist Sun, 14 Dec 2025 19:00:40 -0500 41.214176255425 -73.8099295125967 I-481 southbound : Construction NYSDOT - Region 3: Construction , barrier repairs on I-481 southbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 4 - I-690 (De Witt) All lanes of 2 lanes open until 6:00 AM lane width restriction of 13 ft Sun, 14 Dec 2025 09:00:01 -0500 43.0835156751128 -76.0537152970186 NY 347 westbound : Roadwork NYSDOT - Region 10: Roadwork, roadwork on NY 347 westbound Nicolls Road; CR 97 (Brookhaven) to Hallock Road (Lake Grove) 1 Right lane of 3 lanes closed until further notice Thu, 11 Dec 2025 17:31:52 -0500 40.8831055 -73.1068105 I-81 southbound : Construction NYSDOT - Region 3: Construction , culvert repairs on I-81 southbound between Exit 50 - US11; NY 41; McGraw (Cortlandville) and Exit 39 - US 11; NY 221; Marathon (Marathon) left shoulder of 3 lanes closed until 3:30 PM on December 22,2025 Thu, 11 Dec 2025 07:00:06 -0500 42.586823 -76.127965 NY 100 both directions : Construction NYSDOT - Region 8: Construction, culvert repairs on NY 100 both directions between Moseman Avenue (Somers) and Amawalk Road - NY 35 (Somers) all lanes closed and detoured until 11:59 P.M. on February 01, 2026 D265424/32597209 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Wed, 10 Dec 2025 14:26:17 -0500 41.2499376709774 -73.7409249332072 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Whitney Point Rest Area (Lisle) and Cortland - Broome County Line (Lisle) 1 right lane and shoulder of 2 lanes blocked intermittently through duration of culvert rehabilitation from 12/10 through 3/1/26 during the hours of 7:00 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. The I-81 NB section will be completed prior to SB. Started Open Reach. IR# 9467090 D265389 Wed, 10 Dec 2025 13:14:33 -0500 42.4091987609863 -76.0146026611328 I-690 eastbound : Construction NYSDOT - Region 3: Construction , roadwork on I-690 eastbound ramp to Exit 9 - NY 298; Bear Street (Syracuse) left shoulder of 1 lane closed until 3:00 PM on December 19,2025 Tue, 09 Dec 2025 07:00:06 -0500 43.05721 -76.180154 I-81 northbound : Construction NYSDOT - Region 3: Construction , bridge work on I-81 northbound between Exit 54 (Old Exit 12) - US 11; NY 41; NY 281; Cortland/Homer (Cortlandville) and Exit 62 (Old Exit 13) - NY 281; Preble (Preble) 1 Left lane of 2 lanes closed until 3:30 PM on December 17,2025 Mon, 08 Dec 2025 09:00:10 -0500 42.617293000723 -76.1805773998554 I-81 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 southbound ramp to Exit 21 - Spencer Street; Catawba Street (Syracuse) All lanes closed until 11:59 PM on December 31,2025 ; New Exit Ramp opening at Clinton St Mon, 08 Dec 2025 07:00:16 -0500 43.062681 -76.158694 I-684 both directions : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) right shoulder closure until 11:59 A.M. on November 26, 2026 D265186/B1077550/32651809 - This work is weather permitting. Plan travel accordingly; delays may exist Mon, 08 Dec 2025 00:00:34 -0500 41.3032078231156 -73.6745859893158 NY 126 both directions : Construction NYSDOT - Region 7: Construction , construction on NY 126 both directions Town of New Bremen; Village of Croghan (New Bremen) to Town of New Bremen; Village of Croghan (New Bremen) All lanes of 1 lane open until 11:59 PM on April 30,2026 Route 126 now open to two way traffic. Fri, 05 Dec 2025 12:18:06 -0500 43.8894137234091 -75.4027849508917 NY 39 both directions : Construction NYSDOT - Region 4: Construction, bridge work on NY 39 both directions Littleville Rd (Avon) all lanes open eastbound ; right shoulder of 1 lane closed westbound until 5:00 PM on December 31,2025 Alternating lane closures with flaggers as needed Thu, 11 Dec 2025 17:00:07 -0500 42.8977578580981 -77.7638164280657 NY 3 both directions : Construction NYSDOT - Region 7: Construction , drainage improvements on NY 3 both directions (Piercefield) All lanes of 1 lane open until 11:59 PM No active work at this time. All lanes and shoulders open to traffic Fri, 05 Dec 2025 11:40:05 -0500 44.24 -74.5938098640825 NY 7 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 7 both directions between Old Conklin Road (Conklin) and Shirley Avenue (Conklin) 1 southbound one lane of 2 lanes blocked for bridge repair to occur from 12/4/25 through 1/3/26 with one lane alternating controlled via temporary signal. This closure will remain in place for duration of work including overnights. This work is weather dependent. Started Open Reach. IR#9430090 Thu, 04 Dec 2025 14:55:45 -0500 42.0414865753413 -75.8068251752388 NY 204 both directions : Construction NYSDOT - Region 4: Construction , road rehabilitation on NY 204 both directions between Deep Rock Rd (Gates) and Buell Road; Airport Road (Gates) All lanes closed and detoured until 5:00 PM on January 15,2026 Road Closed, follow posted detour, Free Taxi service for pedestrian detour, info at detour location Wed, 03 Dec 2025 09:37:09 -0500 43.1306812536769 -77.6793410477718 NJ 71 both directions : Construction NJ DOT - TOC South: Roadwork on NJ 71 Both Directions At South of Shark River Bridge (Belmar) Tuesday December 2, 2025 06:00 AM thru Friday March 13, 2026 04:00 PM, All lanes closed and detoured northbound; All lanes closed and detoured southbound Tue, 02 Dec 2025 06:01:05 -0500 40.1846885681152 -74.0237121582031 NY 34 both directions : Construction NYSDOT - Region 3: Construction , bridge replacement on NY 34 both directions between Trombley Rd (Brutus) and Emerson Rd (Cato) All lanes closed until 6:59 PM on November 01,2026 Mon, 01 Dec 2025 10:41:04 -0500 43.0647078625052 -76.5591497036743 CR-636 northbound : Construction NJ DOT - TOC North: Construction on CR-636 northbound between 56A (Woodland Park) and CR-636 (Woodland Park) All lanes closed until 11:59 PM on June 01,2026 Southbound traffic operate in the Northbound lane. Northbound traffic is detoured. Mon, 01 Dec 2025 09:31:58 -0500 40.9029870144273 -74.1925535114569 I-690 westbound : Construction NYSDOT - Region 3: Construction , noise wall construction on I-690 westbound ramp from Teall Avenue (Syracuse) 1 Right lane of 2 lanes closed until 6:00 AM on December 24,2025 Mon, 01 Dec 2025 09:01:04 -0500 43.053729 -76.122041 TEALL AVE northbound : Construction NYSDOT - Region 3: Construction , noise wall construction on TEALL AVE northbound between I-690 EB off/on-ramp (Syracuse) and I-690 WB on/off-ramp (Syracuse) 1 Left lane of 2 lanes closed until 6:00 AM on December 24,2025 Mon, 01 Dec 2025 09:00:17 -0500 43.0531919495223 -76.121896618949 Korean Veterans Memorial Parkway westbound : Construction NYSDOT - Region 11: Construction on Korean Veterans Memorial Parkway westbound between NY 440 (Staten Island) and Exit 1 - Arthur KIll Road (Staten Island) 1 Center lane of 3 lanes closed until further notice Long Term - Construction Fri, 28 Nov 2025 15:40:25 -0500 40.5259558409132 -74.2284325090049 NY 207 both directions : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on NY 207 both directions between Hatfield Lane (Goshen) and Matthews Street (Goshen) right lane closed to traffic until 11:59 P.M. on December 19, 2025 D265186/B1003160/32532809 - 24/7 LANE CLOSURE - This work is weather permitting. Plan travel accordingly; delays may exist Wed, 26 Nov 2025 12:22:54 -0500 41.3952664103638 -74.333429384128 I-678 southbound : Construction Port Authority NY/NJ: Construction on I-678 southbound ramp to 150th Avenue (New York) All lanes closed and detoured thru January 2026. Wed, 26 Nov 2025 06:51:06 -0500 40.6629029167993 -73.80411937679 I-690 eastbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-690 eastbound ramp from McBride Street (Syracuse) All lanes closed until 11:59 PM on December 31,2025 Permanent ramp closure (there will be a new on-ramp from N. Crouse Ave. to I-690 EB) Tue, 25 Nov 2025 12:00:06 -0500 43.051118 -76.14367 CANAL ST both directions : Construction NYSDOT - Region 3: Construction , longterm construction on CANAL ST both directions at N CROUSE AVE (Syracuse) All lanes closed until 11:59 PM on December 31,2025 Permanent closure (no outlet to N. Crouse Ave.; to facilitate new on-ramp from N. Crouse Ave. to I-690 EB) Tue, 25 Nov 2025 07:00:11 -0500 43.0511772877604 -76.1362801487608 CR-636 northbound : Construction NJ DOT - TOC North: Construction on CR-636 northbound between JACKSON AVE (Woodland Park) and CR-636 (Woodland Park) All lanes closed until 11:59 PM on July 01,2026 Mon, 24 Nov 2025 10:58:52 -0500 40.9025862339041 -74.1922361851741 I-80 eastbound : Construction NJ DOT - TOC North: Construction on I-80 eastbound Exit ramp Exit 56 - Squirrelwood Rd (Woodland Park) All lanes closed until 3:00 PM on June 01,2026 This is the Exit 56B ramp only.(Eastbound to Northbound) Mon, 01 Dec 2025 09:23:18 -0500 40.904047 -74.193291 NY 8 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 8 both directions area of NY 206 (Masonville) 1 alternate lanes of 2 lanes blocked For culvert repairs/replacement 1/2mi north of the intersection of SR-206 on SR-8 from 11/24 to 12/12 between 7am & 4:30pm. This work is weather dependent and flag personnel will be present. IR:9388090 D:265120 Mon, 24 Nov 2025 06:51:55 -0500 42.2420997619629 -75.3775024414063 BEVINS RD both directions : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on BEVINS RD both directions FRENCH CREEK RD (Clayton) to FRENCH CREEK RD (Clayton) All lanes closed until 5:00 PM Bevins Road Bridge over French Creek is closed to all traffic. Wed, 19 Nov 2025 16:50:04 -0500 44.188614536652 -76.1348379877102 NY 304 southbound : Construction NYSDOT - Region 8: Construction, bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) right lane closure until 12:00 A.M. on December 17, 2025 D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist Mon, 17 Nov 2025 11:29:20 -0500 41.1022529085572 -73.9975370056921 NY 304 northbound : Construction NYSDOT - Region 8: Construction, bridge rehabilitation on NY 304 northbound between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) left lane closed to traffic until 12:00 A.M. on December 17, 2025 D265160/NIGHT/B1045400/32646509 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist Mon, 17 Nov 2025 11:21:43 -0500 41.1022131869693 -73.9974208532324 NY 9D northbound : Construction NYSDOT - Region 8: Construction, tunnel repairs on NY 9D northbound between Fair Street (Cold Spring) and Hartsook Lane (Cold Spring) alternating traffic until 3:00 P.M. on December 31, 2025 D265238-202508112949/32312109 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist Wed, 12 Nov 2025 09:20:29 -0500 41.4412377311786 -73.9755173946684 NY 310 both directions : Construction NYSDOT - Region 7: Construction , culvert repairs on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) All lanes of 1 lane closed and detoured until 11:59 PM on January 16,2026 Rte. 310 over tributary to Nettle Creek is closed while the culvert is replaced. Thru traffic should follow the signed detour. Mon, 10 Nov 2025 14:21:05 -0500 44.6589531722522 -75.1495084569147 NY 5 both directions : Construction NYSDOT - Region 3: Construction , installation of traffic management systems on NY 5 both directions between Almond Street (Syracuse) and University Ave (Syracuse) 1 Left lane of 2 lanes closed until 11:59 PM on April 01,2026 Mon, 10 Nov 2025 11:22:05 -0500 43.0507848486549 -76.1418987948504 NY 5S westbound : Construction NYSDOT - Region 2: Construction, bridge work on NY 5S westbound ramp to/from Culver Ave (Utica) ramp closed until 4:00 P.M. on November 28, 2025 The west bound ramps to and from Culver Ave will be fully closed to traffic with a signed detour in place. The detour will utilize Turner Street, Pitcher Street, Dwyer Ave and Culver Ave. Mon, 10 Nov 2025 07:01:12 -0500 43.0961 -75.1927 NY 10 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 10 both directions between Stoner Lake Road (Arietta) and Powley Road (Arietta) until 4:30 P.M. Motorists will encounter lane closures in both directions with a temporary signal in place Fri, 07 Nov 2025 06:30:48 -0500 43.3574684957089 -74.5415301891675 NY 8 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 8 both directions between Church St (Masonville) and Butts Rd. (Masonville) all lanes blocked for culvert replacement and apron work near ref. marker 1131 SR-8 between Church St & Butts Rd. from 11/4/25 to 12/15/25 between 7am & 5:30pm with an overnight closure. This work is weather dependent, and a signed detour will be in place for the duration of the project. IR:9226090 D265120 Tue, 02 Dec 2025 17:38:41 -0500 42.2453760511146 -75.3837094846362 Taconic State Parkway southbound : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on Taconic State Parkway southbound between Exit 2 - Sprain Brook State Parkway (Mount Pleasant) and W Stevens Avenue (North Castle) left lane closed to traffic until 11:59 P.M. on December 19, 2025 D265281/B5502029/32521709 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist Mon, 03 Nov 2025 14:18:09 -0500 41.0970831784949 -73.7942163756719 I-81 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-81 southbound ramp to Exit 29S - I-481 South; Dewitt (North Syracuse) All lanes closed until 11:59 PM on December 31,2025 Permanent ramp closure Mon, 03 Nov 2025 08:00:05 -0500 43.13957 -76.115336 I-81 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 southbound ramp to Exit 96 - SB I-481; Dewitt (Cicero) All lanes of 2 lanes open until 11:59 PM on December 31,2025 Opening of new ramp Mon, 03 Nov 2025 08:00:06 -0500 43.144072 -76.110703 Commodore Barry Bridge westbound : Construction DRPA: Construction on Commodore Barry Bridge westbound New Jersey Side (Logan Twp) to Pennsylvania Side (Chester) 2 Right lanes of 3 lanes closed expect delays, speed at 25 MPH. Through December 31, 2025 Sun, 16 Nov 2025 09:54:38 -0500 39.8201848064883 -75.3629345009876 NY 5S both directions : Construction NYSDOT - Region 2: Construction, utility work on NY 5S both directions between Orchard Street (Fort Plain) and Old Fort Plain Road (Fort Plain) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Fri, 24 Oct 2025 07:00:39 -0400 42.9319912640869 -74.6236872942795 I-87 Northway northbound : Construction NYSDOT - Region 7: Construction , reconstruction on I-87 Northway northbound (Champlain) 2 lanes of 3 lanes closed until 11:59 PM on May 01,2026 delays due to construction Mon, 20 Oct 2025 11:45:04 -0400 45.008726 -73.45112 NY 7, NY 23 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 7, NY 23 both directions at NY 7, NY 23, Maple Street (Oneonta) 1 alternate lanes of 2 lanes blocked Top course paving to begin at night on RTE. 7, Rte. 23, and Maple St. Intersection Reconstruction/Roundabout project in the City of Oneonta. Closures on Route 7 from RM 7/9403/2018 to 2019 and Route 23 from RM 23/9402/2014 to 23/9402/2106. Access will be available from Route 23 NB to Route 7 EB and from Route 7 EB to Route 23 SB with Maple Street and Pine Street closed at night. The intersection will be re-opened to the Phase II traffic pattern during the day. Striping work to be completed at night also. extended to 12/17 Flag personal will be present. Mon, 17 Nov 2025 13:04:52 -0500 42.4568666871791 -75.0581728034225 US 9W northbound : Construction NYSDOT - Region 8: Construction, longterm construction on US 9W northbound between Central Drive (Haverstraw) and E Main Street (Haverstraw) lane closed and detoured until 11:59 P.M. 202308107656/202508112934/B1007140/32545409 - NORTHBOUND LANE DETOURED - SOUTHBOUND LANE REMAINS OPEN - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Thu, 16 Oct 2025 15:39:37 -0400 41.2265391811409 -73.9870995756282 NY 41 northbound : Roadwork NYSDOT - Region 9: Roadwork on NY 41 northbound between Thorn Hill rd. (Sanford) and Huggins Rd. (Sanford) northbound one lane blocked for replacement of Culvert C910140 on SR-41NB between Thorn Hill rd. & Huggins Rd. from 10/8/25 to 3/20/26. This work is not weather dependent, with overnight closure and temporary signal for traffic control. IR: 8961090 Wed, 08 Oct 2025 09:46:11 -0400 42.1290572229095 -75.5151753113017 I-690 eastbound : Construction NYSDOT - Region 3: Construction , bridge work on I-690 eastbound between I-81 Northbound Interchange (Syracuse) and Exit 14 - Teall Avenue (Syracuse) 1 Right lane of 3 lanes closed until 6:00 PM on March 01,2026 Tue, 07 Oct 2025 11:43:05 -0400 43.0511107200294 -76.1464889115476 Southern State Parkway westbound : Roadwork NYSDOT - Region 10: Roadwork, roadwork on Southern State Parkway westbound Exit ramp Exit 15 - North Corona Avenue (Hempstead) 1 Left lane of 2 lanes closed until further notice left lane of the exit ramp remains closed and the right lane is open Tue, 07 Oct 2025 07:06:01 -0400 40.6820463646154 -73.6920524736871 I-87 Northway northbound : Construction NYSDOT - Region 7: Construction , reconstruction on I-87 Northway northbound END ROUTE I-87; US-Canadian Line (Champlain) to END ROUTE I-87; US-Canadian Line (Champlain) 5 lanes of 8 lanes closed until 11:59 PM on February 28,2027 8 car lanes NB reduced to 3 (max) lanes Mon, 06 Oct 2025 14:11:05 -0400 45.0087514673341 -73.452063085427 I-481 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) All lanes closed until 6:00 PM on April 01,2026 ; follow detour Wed, 01 Oct 2025 09:00:17 -0400 43.077039 -76.05659 Taconic State Parkway northbound : Construction NYSDOT - Region 8: Construction, emergency repairs on Taconic State Parkway northbound between W Stevens Avenue (Mount Pleasant) and Exit 2 - Broadway - NY 141 (Mount Pleasant) left lane closed to traffic until 11:59 P.M. on December 19, 2025 D265281/B5502029/32531909 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist Tue, 30 Sep 2025 11:14:01 -0400 41.0972101764976 -73.7941801232275 Garden State Parkway Connector southbound : Construction NYSTA - Statewide Ops.: road maintenance operations on Garden State Parkway Connector southbound at After New Jersey State Line (Garden State Parkway) [CARS CAD-252650194] Mon, 22 Sep 2025 13:40:13 -0400 41.066052 -74.056783 MARIN BLVD both directions : Construction TRANSCOM, Jersey City: Construction on MARIN BLVD both directions 18TH ST (Jersey City) to CR-636 / Observer Hwy (Hoboken) All lanes closed Sun, 26 Oct 2025 14:17:15 -0400 40.7343287713577 -74.0390152047737 NY 173 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 173 both directions between Cheese Factory Road (Chittenango) and Palmer Road (Chittenango) until 5:00 P.M. on October 30, 2025 Motorists will encounter a full road closure with a signed detour in place. The detour will be Palmer Road to Salt Springs Road to Route 5 to Route 173 Fri, 19 Sep 2025 07:50:23 -0400 43.0280315428162 -75.9076901720581 I-81 northbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) All lanes of 2 lanes open until 3:30 PM on December 31,2025 NB lane shift to SB side for I-81 project Wed, 17 Sep 2025 00:00:04 -0400 43.0199887207626 -76.1403830073767 NY 69 both directions : Construction NYSDOT - Region 2: Construction, bridge construction on NY 69 both directions under I-90 (Whitestown) until 6:00 P.M. on September 30, 2025 Motorists will encounter long term lane shift in both directions under the bridge Fri, 29 Aug 2025 07:39:56 -0400 43.1299127509732 -75.3008088140435 NY 28 both directions : Construction NYSDOT - Region 2: Construction, bridge replacement on NY 28 both directions between Exit - Mohawk Street; I-90; Steele Street (Herkimer) and Marginal Road (Herkimer) until 6:00 P.M. Motorists will encounter possible lane closures/ lane shifts with flaggers in place for the I-90 bridge replacement Fri, 29 Aug 2025 06:00:09 -0400 43.0176476218537 -74.9935529126271 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound Upper Trans Manhattan Expressway (Manhattan) 1 Right lane of 3 lanes closed through December 2025. Mon, 01 Dec 2025 06:45:17 -0500 40.8486898874025 -73.9372566112686 NY 80 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 80 both directions between Smith Road (Springfield) and Public Landing Road; CR 29A (Springfield) 2 all lanes of 2 lanes blocked for culvert replacement between Smith Rd. & CR-29A (Public Landing Rd.) between 8/21/25 to 12/19/25 between 6:30am to 5:30pm. This work is weather dependent, and flag personnel will be present. This is a long-term closure to replace the culvert over Hayden Creek. Detour is NY-80 (Cooperstown)to NY-28 to US-20(Richfield Springs) back to NY-80. On 10/18 SR-80 will reopen to traffic with an alternate lane closure controlled by flaggers until completion. IR:8589090 D:265086 Fri, 21 Nov 2025 14:28:41 -0500 42.8279991149902 -74.8798980712891 NY 7 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 7 both directions between Butternut Road (Unadilla) and SR 991J (Otego) 1 alternate lanes of 2 lanes blocked for chip sealing to occur from 8/22 to 8/25 during the hours of 6:00 AM to 6:00 PM. This work is weather dependent with flagger personnel present. Started Open Reach. IR# 8599090 Mon, 25 Aug 2025 08:59:08 -0400 42.3289985656738 -75.3029022216797 US 9W both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on US 9W both directions between Hickory Circle and Pictuay Rd (Bethlehem) All lanes of 2 lanes open until 5:00 PM on July 03,2026 one lane open in both directions, NB lane shift in place Wed, 06 Aug 2025 09:46:05 -0400 42.5340517856205 -73.8058262254228 I-690 westbound : Construction NYSDOT - Region 3: Construction , installation of sign structure on I-690 westbound between Exit 15 - Midler Avenue (Syracuse) and Exit 14 - Teall Avenue (Syracuse) 1 Right lane and shoulder of 3 lanes closed until 3:00 PM on February 02,2026 Mon, 28 Jul 2025 10:39:06 -0400 43.058837 -76.099037 Corbin Street both directions : Construction Port Authority NY/NJ: Construction on Corbin Street both directions Kellogg Street (Newark) to Outer Port Street 1 Right lane of 3 lanes closed January 31st, 2026 Tue, 18 Nov 2025 07:55:58 -0500 40.7029624496184 -74.1514398425719 I-81 northbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 northbound at Exit 29N - NY 481; North Syracuse; Oswego (Cicero) right shoulder of 3 lanes closed until 6:00 PM ; Alternating shoulder closures Mon, 28 Jul 2025 07:00:05 -0400 43.1420079390913 -76.1119110803027 NY 8 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 8 both directions between Alder Brook Road ( Morehouse) and Morehouse Lake Road (Hamilton) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Fri, 25 Jul 2025 07:01:14 -0400 43.379863109796 -74.6637756340183 I-81 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) All lanes of 4 lanes open until 11:59 PM on October 31,2026 ; Alternating lane closures Fri, 11 Jul 2025 00:00:06 -0400 43.047668293587 -76.1426372866984 I-690 westbound : Construction NYSDOT - Region 3: Construction , roadwork on I-690 westbound between Exit 14 - Teall Avenue (Syracuse) and Exit 13 - Townsend Street (Syracuse) 1 Left lane of 3 lanes closed until 3:00 PM on February 01,2026 Thu, 10 Jul 2025 15:00:23 -0400 43.052292 -76.125858 I-481 southbound : Construction NYSDOT - Region 3: Construction , bridge work on I-481 southbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 4 - I-690 (De Witt) All lanes of 3 lanes open until 7:00 PM on December 31,2025 ; Alternating left and right lane and shoulder closures Sun, 06 Jul 2025 14:58:05 -0400 43.0788953577289 -76.0536879910796 I-81 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-81 southbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 16 - US 11; Nedrow; Onondaga Nation (Onondaga) All lanes of 3 lanes open until 3:00 PM on December 31,2025 ; Alternating lane closures Sun, 06 Jul 2025 14:53:06 -0400 43.0199654196533 -76.1405422028076 I-81 southbound : Construction NYSDOT - Region 3: Construction , bridge demolition on I-81 southbound between Exit 29S - I-481 South; Dewitt (Cicero) and East Taft Road; CR 19 (North Syracuse) 1 Left lane of 2 lanes closed until 6:00 PM Sun, 06 Jul 2025 06:00:05 -0400 43.140206 -76.114204 NY 8 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 8 both directions between Griffen Road ( Wells) and Teachout Road (Wells) until 6:00 P.M. Fri, 27 Jun 2025 06:00:40 -0400 43.4603615850682 -74.2278188257434 NY 80 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 80 both directions between Smith Road (Springfield) and Public Landing Road; CR 29A (Springfield) 1 alternate lanes of 2 lanes blocked For drilling & installing piles for lag wall, temp. driveways, prepping water diversion on SR-80 between Smith Rd. & Public landing Rd. from 6/16 to 12/19 during 6:30am to 5pm. This work is weather dependent and flag personnel are present. IR:7972090 D:265086 Fri, 05 Dec 2025 15:53:44 -0500 42.8279991149902 -74.8798980712891 NY 23 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 23 both directions between NY 8 South New Berlin (New Berlin) and CR 18 (Morris) 1 alternate lanes of 2 lanes blocked for bridge replacement SR-23 over the Unadilla River starting 6/17/25 to 1/2/26 from 6am to 5pm. A one-lane on-site detour will be activated for SR-23 East & West bound traffic for both directions between SR-8 & CR-18. Traffic will be controlled utilizing Temporary Traffic Signals. This work is weather dependent, and no flag personnel are present. IR:7969090 D:265265 Tue, 17 Jun 2025 06:27:57 -0400 42.529598236084 -75.3850021362305 NY 23/7 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 23/7 both directions area of Main Street; NY 7; Maple Street (Oneonta) all lanes closure for the reconstruction of intersection and roundabout installation to occur from 6/2 through 9/5 during the hours of 7:00 AM to 6:00 PM. SR 23 NB traffic to SR 7 EB and SR 7 EB to SR 23 SB remain open with all other traffic detoured. From 11/4 to 11/8 pavement marking will occur between 7am & 5pm on NY7/23, & Maple St. This closure remains in place for entirety of work including off hours and overnight. This work is weather dependent with no flagger personnel present. Started Open Reach. IR# 7903090 D265569 Tue, 04 Nov 2025 06:22:09 -0500 42.456901550293 -75.0584030151367 FINEVIEW PL both directions : Construction NYSDOT - Region 3: Construction , roadwork on FINEVIEW PL both directions between RENWICK AVE (Syracuse) and STANDART ST (Syracuse) All lanes closed until 11:59 PM on July 31,2028 Permanent Road Closure Wed, 11 Jun 2025 00:00:07 -0400 43.0371160398121 -76.1415755230853 VAN WYCK EXPY southbound : Construction NYSDOT - Region 11: Construction on VAN WYCK EXPY service road southbound between 105TH AVE (New York) and 107TH AVE (New York) 1 Left lane of 3 lanes closed until further notice Long Term - Construction Wed, 13 Aug 2025 16:57:11 -0400 40.6907881837233 -73.8103679556409 RENWICK AVE both directions : Construction NYSDOT - Region 3: Construction , roadwork on RENWICK AVE both directions between VAN BUREN ST (Syracuse) and E CASTLE ST at S McBride St (Syracuse) All lanes closed until 11:59 PM on July 31,2028 Permanent road closure Wed, 04 Jun 2025 08:43:05 -0400 43.0375081304917 -76.14151 E RAYNOR AVE both directions : Construction NYSDOT - Region 3: Construction , roadwork on E RAYNOR AVE both directions between FINEVIEW PL (Syracuse) and HENRY ST (Syracuse) All lanes closed until 11:59 PM on July 31,2028 Permanent road closure Wed, 04 Jun 2025 08:03:07 -0400 43.0357909089078 -76.1416191112315 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp from West 179th Street (New York) All lanes open until 11:59 PM on January 31, 2026 Trucks wider than 10 ft or longer than 110 ft are prohibited. Tue, 02 Dec 2025 11:33:32 -0500 40.8493802929073 -73.9396241842173 US 11 both directions : Roadwork NYSDOT - Region 9: Roadwork on US 11 both directions between Main Street (Whitney Point) and Keibel Road (Whitney Point) 1 alternate lanes of 2 lanes blocked at various times for bridge reconstruction, curbing, drainage work to occur from 4/21 through 7/31/2026. Two lane, two way traffic will be maintained between Main Street and Keibel Road 24 hours/day. This work is weather dependent with flaggger personnel present. Started Open Reach. IR# 7461090 D264920 Tue, 05 Aug 2025 07:27:41 -0400 42.3359817350312 -75.9737122414941 I-87 Northway northbound : Construction NYSDOT TMC - Albany: Construction , roadwork on I-87 Northway northbound at END ROUTE I-87; US-Canadian Line (Champlain) All lanes of 2 lanes open until 11:59 PM Starting on 4/21/25, border crossing will be restricted to trailers over 16'4" in height, 8'5" in width and over 53' in length. Mon, 21 Apr 2025 00:00:07 -0400 45.008807 -73.452067 I-86 eastbound : Construction NITTEC: Construction , culvert repairs on I-86 eastbound Exit 26 - NY 16 Connector (Olean) to Exit 27 - NY 16 (Hinsdale) 1 Left lane of 2 lanes closed until 11:59 PM on May 30,2025 Tue, 15 Apr 2025 15:23:04 -0400 42.100083 -78.431821 I-490 eastbound : Construction NYSDOT - Region 4: Construction , bridge replacement on I-490 eastbound between Exit 26 - NY 31 (Perinton) and Exit 28 - I-490; Ramp (Perinton) 1 Left lane of 2 lanes closed until 5:00 PM on October 31,2025 Traffic will cross over to the WB side after exit 26 and will cross back over to the EB side after exit 27. There is no access to the EXIT 27 off-ramp. Mon, 07 Apr 2025 07:00:11 -0400 43.07748 -77.48448 NY 201 northbound : Roadwork NYSDOT - Region 9: Roadwork on NY 201 northbound area of Town of Union; Town of Vestal Line (Union) 1 1 lane may be of 2 lanes blocked Soundwall removal and replacement on 201 NB at Riverside Drive Exit from 4/1/25 to 12/15/25. Day work is from 7am to 5pm with no lane closures, night work begins 7/24 to 9/18, between 9pm & 8am with the right lane blocked during these hours. Shoulder will be closed with a pedestrian detour in place. work is weather dependent. No flaggers will be present, D#265353 Open Reach Started IR# 7341090 Wed, 03 Dec 2025 14:16:48 -0500 42.103401184082 -75.9692001342773 I-490 westbound : Construction NYSDOT - Region 4: Construction , bridge replacement on I-490 westbound between Exit 28 - I-490; Ramp (Perinton) and Exit 26 - NY 31 (Perinton) 1 Left lane of 2 lanes closed until 5:00 PM on October 31,2025 Tue, 01 Apr 2025 07:00:10 -0400 43.0455238653937 -77.4629282921857 NY 96 Bushnell Basin : Construction NYSDOT - Region 4: Construction , longterm construction on NY 96 Bushnell Basin ramp ramp to I-490 WB (Perinton) to I-490 WB (Perinton) All lanes closed until 5:00 PM on October 31,2025 Mon, 31 Mar 2025 07:00:04 -0400 43.058212 -77.473265 NY 52 both directions : Construction NYSDOT - Region 8: Construction, bridge rehabilitation on NY 52 both directions between Brookside Farms Road (Newburgh) and 5th Avenue (Newburgh) lane shift until 11:59 P.M. on December 19, 2025 D265160/B1026780/32112309 Mon, 10 Mar 2025 05:59:11 -0400 41.5130253486982 -74.0492785615146 US 9W southbound : Construction NYSDOT - Region 8: Construction, utility work on US 9W southbound between Short Clove Road (Haverstraw) and NY 304 (Haverstraw) shoulder closed until 4:00 P.M. on December 19, 2025 202308107656/32258309 - Plan travel accordingly; delays may exist Wed, 28 May 2025 18:44:49 -0400 41.1821711751389 -73.9549292922414 Bridge Street Interstate bridge # 7 westbound : Roadwork NYSDOT - Region 9: Roadwork on Bridge Street Interstate bridge # 7 westbound (Callicoon) 1 westbound one lane of 2 lanes blocked for bridge rehabilitation to occur from 3/24/25 through 11/30/26 during the hours of 6:00 AM to 5:30 PM. This work is weather dependent with no flagger personnel present. Traffic will be controlled by temporary signal. Started Open Reach. IR# 6256091 D265033 Mon, 01 Dec 2025 16:45:55 -0500 41.7650010366706 -75.0609952667757 I-81 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-81 southbound at Exit 16A - ramp to I-481 NB (Syracuse) All lanes closed until 3:00 PM on December 31,2025 ; follow detour Thu, 21 Dec 2023 07:33:04 -0500 43.0093816184579 -76.1359687860938 936E; I-81 NB Service Road northbound : Construction NYSDOT - Region 3: Construction , roadwork on 936E; I-81 NB Service Road northbound ramp to Exit 23 - NY 370 East; Park Street (Syracuse) All lanes closed until 11:59 PM on December 31,2025 closed until further notice Tue, 14 Jan 2025 08:58:06 -0500 43.069102 -76.167311 GARDEN RD both directions : Construction NYSDOT - Region 7: Construction , bridge work on GARDEN RD both directions RT-26 (Philadelphia) to Sophia Street (Philadelphia) All lanes closed until 11:59 PM on December 31,2025 Garden Rd over Indian River Bridge #P021Closed to Traffic until further notice Wed, 09 Oct 2024 15:42:05 -0400 44.1589685052784 -75.7085867284068 I-81 southbound : Construction NYSDOT - Region 3: Construction , bridge demolition on I-81 southbound under South Bay Road; CR 208 (Cicero) All lanes of 3 lanes open until 6:00 AM on March 28,2026 ; Alternating lane closures Fri, 28 Feb 2025 14:54:05 -0500 43.149574 -76.110251 US 11 both directions : Construction NYSDOT - Region 7: Construction , construction on US 11 both directions in the vicinity of HALLAHAN RD (Lawrence) All lanes of 1 lane open until 11:59 PM on December 31,2027 Narrow Bridge Sun, 15 Dec 2024 21:00:05 -0500 44.7720819404316 -74.713616527616 NY 17 [Tioga] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Tioga] both directions between Exit 65 - NY 434; Ramp (Owego) and Town of Owego; Town of Vestal Line (Owego) 1 alternate lanes of 2 lanes blocked for preparations for upcoming construction to occur from 03/20 through 11/01 during the hours of 7:00AM and 5:00PM. New striping will be placed on NY 17 EB allowing traffic to only use the right lane. Starting 3/22 a temporary concrete barrier will be placed in EB following the new striping patterns. On 4/01 head to head traffic will be in place with a single lane for WB and EB all on the EB side of the highway and the contractor will CLOSE Exit 66 WB off ramp to traffic. A signed detour will be in place taking WB traffic to Exit 65 and getting them onto NY 17 EB and back to Exit 66. The ramp to get on NY 17 WB from Exit 66 will remain open. There will be no flag personnel present and this work is weather dependent. Started Open Reach. IR#4948091 D265091 Tue, 25 Jun 2024 13:19:54 -0400 42.0886001586914 -76.2288970947265 NY 240 both directions : Construction NITTEC: Construction, construction on NY 240 both directions Westbrook Drive (Cheektowaga) to Maryvale Drive (Cheektowaga) 1 Left lane of 2 lanes closed Tue, 12 Nov 2024 18:46:02 -0500 42.9336719270712 -78.7841518738921 Inner Port Street both directions : Construction Port Authority NY/NJ: Construction on Inner Port Street both directions between Corbin Street (Newark) and Port Street (Newark) All lanes closed January 31st 2026 Tue, 18 Nov 2025 07:58:05 -0500 40.7040488538158 -74.1505620476053 I-86 eastbound : Construction NITTEC: Construction , bridge work on I-86 eastbound Exit ramp to Exit 9 closed. Use Exit 10. (Ellery) All lanes closed until 11:59 PM on December 31,2026 Wed, 03 Apr 2024 10:13:04 -0400 42.152016 -79.382971 I-481 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-481 southbound ramp to I-81 soutbound (Syracuse) All lanes closed until 3:00 PM on December 31,2025 ; follow detour Mon, 25 Sep 2023 09:00:08 -0400 43.007882 -76.1307105 NY 33A westbound : Construction NYSDOT - Region 4: Construction , bridge work on NY 33A westbound over Erie Canal (Rochester) 1 Right lane of 2 lanes closed until 11:59 PM on December 31,2025 Tue, 31 Dec 2024 06:18:04 -0500 43.1402832232763 -77.6657956524986 RIVERVIEW RD both directions : Construction NYSDOT TMC - Albany: Construction on RIVERVIEW RD both directions CLAM STEAM RD and BOYACK RD (Halfmoon) All lanes open until 11:59 PM on December 19,2025 alternating lanes closed controlled by traffic signals Wed, 05 Mar 2025 09:34:27 -0500 42.8004478849381 -73.7648774716053 Port Street eastbound : Construction Port Authority NY/NJ: Construction on Port Street eastbound ramp to Corbin Street (Newark) All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until January 31st 2026 Tue, 18 Nov 2025 08:04:50 -0500 40.7047103800473 -74.1514923040378