All NJ Active Events All Active Events in New Jersey en-us Mon, 27 Jul 2026 04:02:44 -0400 Copyright 511nj.org 1 Garden State Parkway southbound : Disabled vehicle NJ Turnpike Auth.: Disabled vehicle on Garden State Parkway southbound North of Exit 135 - Central Ave (Clark Twp) 2 Left Lanes blocked Mon, 27 Jul 2026 04:00:03 -0400 40.6280601608 -74.3031714731 George Washington Bridge eastbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level eastbound Upper Trans Manhattan Expressway (Manhattan), Tuesday July 28th, 2026 thru Wednesday July 29th, 2026, 10:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed Mon, 27 Jul 2026 01:38:31 -0400 40.8483614711936 -73.9367448400211 George Washington Bridge eastbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level eastbound Upper Trans Manhattan Expressway (Manhattan), Friday July 31st, 2026 thru Saturday August 1st, 2026, 11:00 PM thru 08:00 AM 2 Right lanes of 3 lanes closed Mon, 27 Jul 2026 01:36:53 -0400 40.8486189415135 -73.937506942946 George Washington Bridge westbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level westbound Upper Trans Manhattan Expressway (Manhattan), Friday July 31st, 2026 thru Saturday August 1st, 2026, 10:00 PM thru 08:00 AM 2 Right lanes of 3 lanes closed Mon, 27 Jul 2026 01:35:31 -0400 40.8474688422153 -73.9342125346839 George Washington Bridge southbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level southbound ramp from Palisades Interstate Parkway (Fort Lee), Friday July 31st, 2026 thru Saturday August 1st, 2026, 11:00 PM thru 08:00 AM All lanes closed and detoured Mon, 27 Jul 2026 01:33:10 -0400 40.8548311502039 -73.9628698773404 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Friday July 31st, 2026 thru Saturday August 1st, 2026, 11:00 PM thru 08:00 AM 3 Right lanes of 4 lanes closed Mon, 27 Jul 2026 01:31:30 -0400 40.8531590585319 -73.9605805280265 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Upper Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Friday July 31st, 2026 thru Friday July 31st, 2026, 12:00 AM thru 05:00 AM 3 Right lanes of 4 lanes closed Mon, 27 Jul 2026 01:30:20 -0400 40.8503089014315 -73.945405386331 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday July 27th, 2026 thru Tuesday July 28th, 2026, 10:00 PM thru 05:00 AM All lanes closed and detoured Mon, 27 Jul 2026 01:28:44 -0400 40.8532041876287 -73.9610071741255 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday July 27th, 2026 thru Friday July 31st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed and detoured Mon, 27 Jul 2026 01:27:41 -0400 40.8503598707693 -73.9454055838454 George Washington Bridge eastbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level eastbound ramp to Exit 1A - Henry Hudson Parkway (New York), Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 10:30 AM thru 04:30 PM 1 Right lane of 2 lanes closed Mon, 27 Jul 2026 01:23:41 -0400 40.8497146040562 -73.9434788687321 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Wednesday August 5th, 2026 thru Friday August 7th, 2026, Wednesday/Friday, 10:30 AM thru 03:30 PM 1 Left lane of 3 lanes closed Mon, 27 Jul 2026 01:22:30 -0400 40.8530934823226 -73.9605117471303 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday July 27th, 2026 thru Thursday July 30th, 2026, Monday/Tuesday/Thursday, 10:30 AM thru 03:30 PM 1 Right lane of 3 lanes closed Mon, 27 Jul 2026 01:21:14 -0400 40.8530564640148 -73.9603359101685 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday July 27th, 2026 thru Saturday August 1st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed Mon, 27 Jul 2026 01:19:35 -0400 40.8531105127874 -73.96034993574 George Washington Bridge westbound : construction Port Authority NY/NJ: construction on George Washington Bridge Lower Level westbound Lower Trans Manhattan Expressway (Manhattan) to Exit 1A - Henry Hudson Parkway (New York), Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed Mon, 27 Jul 2026 01:17:33 -0400 40.8491609370791 -73.9389755485309 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday July 27th, 2026, 08:30 AM thru 02:30 PM 1 Left lane of 3 lanes closed Mon, 27 Jul 2026 01:16:19 -0400 40.8502597130403 -73.9449102970557 George Washington Bridge westbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Tuesday July 28th, 2026 thru Friday July 31st, 2026, Tuesday/Wednesday/Thursday/Friday, 05:00 AM thru 02:30 PM 1 Right lane of 3 lanes closed, Saturday August 1st, 2026, 05:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed Mon, 27 Jul 2026 01:15:27 -0400 40.8503842714717 -73.9455314401 Outerbridge Crossing both directions : bridge construction Port Authority NY/NJ: bridge construction on Outerbridge Crossing both directions New York Side (Staten Island) to New Jersey Side (Perth Amboy), Monday July 27th, 2026 thru Tuesday July 28th, 2026, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed Mon, 27 Jul 2026 01:12:52 -0400 40.5252041699198 -74.240290983924 Lincoln Tunnel eastbound : Construction Port Authority NY/NJ: Construction , construction on Lincoln Tunnel South Tube eastbound New Jersey Side (Weehawken Twp) to New York Side (Manhattan) All lanes closed and detoured until 5:00 AM Sun, 26 Jul 2026 23:57:09 -0400 40.765415 -74.016694 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound near South of Ridgewood Ave (Paramus), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 05:00 AM, at least one lane closed Sun, 26 Jul 2026 23:41:56 -0400 40.9603004455566 -74.0756072998047 NJ 33 westbound : roadwork NJDOT - TOC South: Roadwork on NJ 33 Westbound near East of NJ 18 (Neptune Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Sun, 26 Jul 2026 23:41:55 -0400 40.2061576843262 -74.0510864257812 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound near South of Ridgewood Ave (Paramus), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM) Sun, 26 Jul 2026 23:41:53 -0400 40.9603004455566 -74.0756072998047 NJ 7 northbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Northbound near Charlotte Circle (Jersey City), Wednesday July 29, 2026 10:00 AM thru 02:00 PM, right lane closed Sun, 26 Jul 2026 23:41:52 -0400 40.7391548156738 -74.0749893188477 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at I-280 (Newark) Monday August 3, 2026 07:00 AM thru 03:00 PM, ramp Sun, 26 Jul 2026 23:42:00 -0400 40.7473106384277 -74.1674423217773 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound near Broadway (Middletown Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, left lane closed Sun, 26 Jul 2026 23:41:59 -0400 40.4164505004883 -74.0695419311523 US 1&9 Truck Route southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Southbound near North of Hackensack River Drawbridge (Jersey City), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 05:00 AM, at least one lane closed Sun, 26 Jul 2026 23:41:58 -0400 40.7272720336914 -74.0985260009766 US 1&9 Truck Route southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Southbound near North of Hackensack River Drawbridge (Jersey City), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Sun, 26 Jul 2026 23:41:47 -0400 40.7272720336914 -74.0985260009766 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between East of CR 625/Hollywood Av (Fairfield Twp) and East of CR 615/Fairfield Av (Fairfield Twp), Monday August 3, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sun, 26 Jul 2026 23:41:51 -0400 40.8833312988281 -74.288688659668 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Monday August 3, 2026 12:00 AM thru 05:00 AM, right lane closed Sun, 26 Jul 2026 23:41:49 -0400 40.834114074707 -74.3345031738281 NJ 7 northbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Northbound near Charlotte Circle (Jersey City), Tuesday July 28, 2026 10:00 AM thru 02:00 PM, right lane closed Sun, 26 Jul 2026 23:41:48 -0400 40.7391548156738 -74.0749893188477 Holland Tunnel eastbound : Construction Port Authority NY/NJ: Construction , construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan) 1 Right lane of 2 lanes closed until 5:00 AM Sun, 26 Jul 2026 23:11:08 -0400 40.728735 -74.031713 Bayonne Bridge both directions : bridge construction Port Authority NY/NJ: bridge construction on Bayonne Bridge both directions New Jersey Side (Bayonne) to New York Side (Staten Island), Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed Sun, 26 Jul 2026 22:59:42 -0400 40.6464617537785 -74.1403412984886 Outerbridge Crossing eastbound : bridge construction Port Authority NY/NJ: bridge construction on Outerbridge Crossing eastbound New Jersey Side (Perth Amboy) to New York Side (Staten Island), Wednesday July 29th, 2026 thru Thursday July 30th, 2026, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed Sun, 26 Jul 2026 22:55:58 -0400 40.5243917942066 -74.2534659100746 Outerbridge Crossing westbound : bridge construction Port Authority NY/NJ: bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Wednesday July 29th, 2026 thru Thursday July 30th, 2026, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Friday July 31st, 2026 thru Saturday August 1st, 2026, 11:59 PM thru 08:00 AM 1 Right lane of 2 lanes closed Sun, 26 Jul 2026 22:53:42 -0400 40.5252011712731 -74.2403442099033 Lincoln Tunnel westbound : construction Port Authority NY/NJ: construction on Lincoln Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Weehawken Twp), Monday July 27th, 2026 thru Tuesday July 28th, 2026, 11:00 PM thru 05:00 AM All lanes closed and detoured Sun, 26 Jul 2026 22:48:50 -0400 40.760328801729 -74.0028420043226 Lincoln Tunnel both directions : construction Port Authority NY/NJ: construction on Lincoln Tunnel Center Tube both directions New York Side (New York) to New Jersey Side - Toll Plaza (Weehawken Twp), Tuesday July 28th, 2026 thru Thursday July 30th, 2026, Tuesday/Wednesday, 11:00 PM thru 05:00 AM All lanes closed and detoured Sun, 26 Jul 2026 22:47:40 -0400 40.7601015095972 -74.0029496230334 Lincoln Tunnel eastbound : construction Port Authority NY/NJ: construction on Lincoln Tunnel South Tube eastbound New Jersey Side (Weehawken Twp) to New York Side (Manhattan), Monday July 27th, 2026 thru Monday July 27th, 2026, 12:00 AM thru 05:00 AM All lanes closed and detoured, Thursday July 30th, 2026 thru Friday July 31st, 2026, 11:00 PM thru 05:00 AM All lanes closed and detoured Sun, 26 Jul 2026 23:56:43 -0400 40.7654151886385 -74.0166940635846 Holland Tunnel westbound : construction Port Authority NY/NJ: construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Sunday July 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 11:30 PM thru 05:30 AM 1 Right lane of 2 lanes closed Sun, 26 Jul 2026 22:44:08 -0400 40.7262067069949 -74.0110569489644 Holland Tunnel eastbound : construction Port Authority NY/NJ: construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Sunday July 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed Sun, 26 Jul 2026 22:43:10 -0400 40.7287350396515 -74.0317133885844 Holland Tunnel eastbound : construction Port Authority NY/NJ: construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Sunday July 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed Sun, 26 Jul 2026 22:42:13 -0400 40.7287377748434 -74.0317401934657 Holland Tunnel westbound : construction Port Authority NY/NJ: construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Sunday July 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 11:30 PM thru 05:30 AM 1 Left lane of 2 lanes closed Sun, 26 Jul 2026 23:24:58 -0400 40.7262539937755 -74.0113679564286 NJ 57 eastbound : Construction NJ DOT - STMC: Roadwork on NJ 57 Eastbound East of CR 637/Liberty Rd (Greenwich Twp) Sunday July 26, 2026 07:00 PM thru Monday July 27, 2026 06:00 AM, right shoulder closed Sun, 26 Jul 2026 19:00:12 -0400 40.7045402526855 -75.1162261962891 NJ 57 eastbound : Construction NJ DOT - STMC: Roadwork on NJ 57 Eastbound from CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Sunday July 26, 2026 07:00 PM thru Monday July 27, 2026 06:00 AM, All lanes open Sun, 26 Jul 2026 19:00:12 -0400 40.7022018432617 -75.1369171142578 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Saturday August 1, 2026 07:00 AM thru Sunday August 2, 2026 12:00 AM, right lane closed Sun, 26 Jul 2026 14:32:53 -0400 40.834114074707 -74.3345031738281 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound between North of I-287 (Edison Twp) and South of CR 531/Main St (Edison Twp), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 05:00 AM, left lane closed Sun, 26 Jul 2026 14:32:54 -0400 40.5337295532227 -74.3469924926758 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound between North of I-287 (Edison Twp) and South of CR 531/Main St (Edison Twp), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 05:00 AM, left lane closed Sun, 26 Jul 2026 14:32:49 -0400 40.5337295532227 -74.3469924926758 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Saturday August 1, 2026 10:00 PM thru Sunday August 2, 2026 09:00 AM, right lane closed Sun, 26 Jul 2026 14:32:51 -0400 40.8557586669922 -74.3595123291016 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound between North of I-287 (Edison Twp) and South of CR 531/Main St (Edison Twp), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 05:00 AM, left lane closed Sun, 26 Jul 2026 14:32:52 -0400 40.5337295532227 -74.3469924926758 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Sunday August 2, 2026 12:00 AM thru 12:15 AM, right lane closed Sun, 26 Jul 2026 14:32:48 -0400 40.834114074707 -74.3345031738281 Pan Am Road eastbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Pan Am Road eastbound between Lot 8 (Employee Lot) (New York) and 130th place (New York), Tuesday July 28th, 2026 thru Wednesday July 29th, 2026, Tuesday/Wednesday, 07:00 AM thru 03:00 PM All lanes closed Sun, 26 Jul 2026 03:42:44 -0400 40.6612118456209 -73.8218764782289 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Wednesday July 29, 2026 06:00 PM thru Thursday July 30, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound Sun, 26 Jul 2026 02:57:34 -0400 41.2077941894531 -74.6071701049805 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Friday July 31, 2026 06:00 PM thru Saturday August 1, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound Sun, 26 Jul 2026 02:57:48 -0400 41.2077941894531 -74.6071701049805 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Thursday July 30, 2026 06:00 PM thru Friday July 31, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound Sun, 26 Jul 2026 02:57:41 -0400 41.2077941894531 -74.6071701049805 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Tuesday July 28, 2026 06:00 PM thru Wednesday July 29, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound Sun, 26 Jul 2026 02:57:28 -0400 41.2077941894531 -74.6071701049805 NJ 284 both directions : roadwork NJ DOT - STMC: Roadwork on NJ 284 Both Directions between NJ 23 (Sussex) and New York State Line (Wantage Twp) Monday July 27, 2026 06:00 PM thru Tuesday July 28, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound Sun, 26 Jul 2026 02:57:23 -0400 41.2077941894531 -74.6071701049805 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound North of CR 604/Green St (Woodbridge Twp) Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 01:00 AM, right shoulder closed Sun, 26 Jul 2026 02:52:05 -0400 40.5760917663574 -74.3172836303711 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at I-280 (Newark) Tuesday July 28, 2026 07:00 AM thru 03:00 PM, ramp Sat, 25 Jul 2026 07:29:50 -0400 40.7473106384277 -74.1674423217773 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at I-280 (Newark) Wednesday July 29, 2026 07:00 AM thru 03:00 PM, ramp Sat, 25 Jul 2026 07:29:55 -0400 40.7473106384277 -74.1674423217773 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at I-280 (Newark) Friday July 31, 2026 07:00 AM thru 03:00 PM, ramp Sat, 25 Jul 2026 07:29:54 -0400 40.7473106384277 -74.1674423217773 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at I-280 (Newark) Thursday July 30, 2026 07:00 AM thru 03:00 PM, ramp Sat, 25 Jul 2026 07:29:53 -0400 40.7473106384277 -74.1674423217773 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at I-280 (Newark) Monday July 27, 2026 07:00 AM thru 03:00 PM, ramp Sat, 25 Jul 2026 07:29:51 -0400 40.7473106384277 -74.1674423217773 NJ 181 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 181 Southbound North of Prospect Point Rd (Sparta Twp) Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 05:00 AM, 1 right lane of 3 lanes closed Sat, 25 Jul 2026 06:55:11 -0400 40.9948806762695 -74.6169662475586 NJ 181 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 181 Southbound North of Prospect Point Rd (Sparta Twp) Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, 1 right lane of 3 lanes closed Sat, 25 Jul 2026 06:55:03 -0400 40.9948806762695 -74.6169662475586 NJ 181 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 181 Northbound North of Espanong Rd (Jefferson Twp) Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 05:00 AM, 1 right lane of 2 lanes closed Sat, 25 Jul 2026 06:52:09 -0400 40.9716911315918 -74.6033477783203 NJ 181 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 181 Northbound North of Espanong Rd (Jefferson Twp) Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, 1 right lane of 2 lanes closed Sat, 25 Jul 2026 06:51:58 -0400 40.9716911315918 -74.6033477783203 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near South of NJ 70 (Collingswood), Wednesday July 29, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:20:16 -0400 39.9179840087891 -75.0894317626953 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:20:15 -0400 40.663402557373 -74.4206008911133 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of NJ 49 (Millville) and South of Orange St (Millville), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, closed, moving operation Sat, 25 Jul 2026 00:20:14 -0400 39.3843841552734 -75.0309295654297 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Saturday August 1, 2026 09:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:20:21 -0400 40.8538780212402 -74.9309310913086 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Friday July 31, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:20:20 -0400 40.6438446044922 -74.6615905761719 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of CR 646/Deptford Av (Deptford Twp) and North of CR 665/Cattell Rd (Deptford Twp), Thursday July 30, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:20:19 -0400 39.8360900878906 -75.1249542236328 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near West of CR 537/Federal St (Camden), Thursday July 30, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:20:18 -0400 39.9452209472656 -75.1086196899414 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of I-80 (Denville Twp) and West of CR 621/Hook Mountain Rd (Montville Twp), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 08:00 AM, Sat, 25 Jul 2026 00:20:22 -0400 40.8972053527832 -74.4902877807617 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between North of US 130 (Pennsauken Twp) and North of CR 543/Carmen Rd (Palmyra), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 03:00 AM, right lane closed Sat, 25 Jul 2026 00:20:24 -0400 39.984188079834 -75.0182266235352 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Thursday July 30, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:20:13 -0400 39.9204940795898 -75.0875701904297 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:20:12 -0400 39.7551803588867 -75.0467071533203 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of NJ 49 (Millville) and South of Orange St (Millville), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, closed, moving operation Sat, 25 Jul 2026 00:19:53 -0400 39.3843841552734 -75.0309295654297 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 7 - CR 526 (Robbinsville) and East of Exit 2 - CR 524 (Hamilton Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, right shoulder closed Sat, 25 Jul 2026 00:19:57 -0400 40.1932334899902 -74.5990676879883 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 10 - CR 527/Easton Ave (Franklin Twp) and South of Exit 8 - Possumtown Rd (Piscataway Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 04:00 AM, left lane closed Sat, 25 Jul 2026 00:19:56 -0400 40.5408897399902 -74.5264358520508 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), left shoulder Sat, 25 Jul 2026 00:19:55 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between East of Exit 18 - US 22 (Clinton Twp) and West of Exit 20 - CR 639 (Lebanon Twp), Thursday July 30, 2026 09:00 AM thru 02:00 PM, right shoulder closed Sat, 25 Jul 2026 00:19:54 -0400 40.6463279724121 -74.8529357910156 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 10 - CR 527/Easton Ave (Franklin Twp) and South of Exit 8 - Possumtown Rd (Piscataway Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 04:00 AM, left lane closed Sat, 25 Jul 2026 00:20:01 -0400 40.5408897399902 -74.5264358520508 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near North of CR 665/Cattell Rd (Deptford Twp), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 06:00 AM, right shoulder closed Sat, 25 Jul 2026 00:19:59 -0400 39.8189506530762 -75.1246643066406 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Friday July 31, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:19:58 -0400 39.9204940795898 -75.0875701904297 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 16 - CR 537/Great Adventure (Millstone Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, left lane closed Sat, 25 Jul 2026 00:20:05 -0400 40.1765480041504 -74.5273284912109 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 12 - CR 623 (Franklin Twp), left shoulder Sat, 25 Jul 2026 00:20:04 -0400 40.5447540283203 -74.5344467163086 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 12 - CR 623 (Franklin Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 04:00 AM, right shoulder closed Sat, 25 Jul 2026 00:20:03 -0400 40.5447540283203 -74.5344467163086 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of CR 646/Deptford Av (Deptford Twp) and North of CR 665/Cattell Rd (Deptford Twp), Wednesday July 29, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:20:02 -0400 39.8360900878906 -75.1249542236328 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between South of Orange St (Millville) and South of NJ 49 (Millville), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, closed, moving operation Sat, 25 Jul 2026 00:20:09 -0400 39.3671836853027 -75.0211639404297 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and Watson Dr (Washington Twp), Friday July 31, 2026 12:00 AM thru 06:00 AM, right lane closed Sat, 25 Jul 2026 00:20:08 -0400 39.7623252868652 -75.0479965209961 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 8 - Possumtown Rd (Piscataway Twp) and North of Exit 10 - CR 527/Easton Ave (Franklin Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 04:00 AM, left lane closed Sat, 25 Jul 2026 00:20:07 -0400 40.5560989379883 -74.4762420654297 NJ 139 Upper eastbound : roadwork NJDOT - STMC: Roadwork on NJ 139 Upper Eastbound near Central Ave (Jersey City), Friday July 31, 2026 10:00 PM thru Saturday August 1, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:20:06 -0400 40.7354507446289 -74.0568618774414 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near South of NJ 70 (Collingswood), Thursday July 30, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:20:11 -0400 39.9152717590332 -75.0903549194336 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Friday July 31, 2026 09:00 PM thru Saturday August 1, 2026 10:00 AM, at least one lane closed Sat, 25 Jul 2026 00:20:10 -0400 40.867805480957 -74.4501113891602 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and Watson Dr (Washington Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:19:37 -0400 39.7623252868652 -75.0479965209961 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Friday July 31, 2026 09:00 PM thru Saturday August 1, 2026 10:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 09:00 AM) Sat, 25 Jul 2026 00:19:36 -0400 40.867805480957 -74.4501113891602 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between East of CR 633/Rifle Camp Rd (Little Falls Twp) and West of NJ 23/Old Turnpike Rd (Wayne Twp), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:30 PM to 05:00 AM) Sat, 25 Jul 2026 00:19:35 -0400 40.8739700317383 -74.1972885131836 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound near North of CR 651/Greentree Rd (Washington Twp), Thursday July 30, 2026 07:00 AM thru 04:00 PM, right shoulder closed Sat, 25 Jul 2026 00:19:34 -0400 39.7623252868652 -75.0479965209961 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between South of CR 655/Fries Mill Rd (Franklin Twp) and North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, alternating traffic closed, moving operation Sat, 25 Jul 2026 00:19:38 -0400 39.5992431640625 -75.065788269043 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near North of CR 639/Ganttown Rd (Washington Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 05:00 AM, right lane closed Sat, 25 Jul 2026 00:19:41 -0400 39.7551803588867 -75.0467071533203 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near CR 624/Polly Av (Washington Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:19:40 -0400 39.7393112182617 -75.1134643554688 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between East of Exit 18 - US 22 (Clinton Twp) and West of Exit 20 - CR 639 (Lebanon Twp), Wednesday July 29, 2026 09:00 AM thru 02:00 PM, right shoulder closed Sat, 25 Jul 2026 00:19:45 -0400 40.6463279724121 -74.8529357910156 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between North of CR 690/Lake Rd/Weymouth Rd (Vineland) and West Chestnut Av (Vineland), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, Sat, 25 Jul 2026 00:19:44 -0400 39.551082611084 -75.0508422851562 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between South of US 322 (Logan Twp) and North of CR 642/Porcupine Rd (Oldmans Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, left lane closed Sat, 25 Jul 2026 00:19:43 -0400 39.8020935058594 -75.3527145385742 NJ 28 westbound : roadwork NJDOT - STMC: Roadwork on NJ 28 Westbound between CR 529/Washington Ave (Dunellen) and East of CR 635/Vosseller Av (Bound Brook), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:19:42 -0400 40.591423034668 -74.4637145996094 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:19:49 -0400 40.663402557373 -74.4206008911133 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Friday July 31, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:19:48 -0400 39.9166641235352 -75.0873565673828 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of CR 663/California Ave (Absecon City) and US 30/White Horse Pike (Absecon City), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 05:00 AM, right shoulder closed Sat, 25 Jul 2026 00:19:47 -0400 39.4159317016602 -74.5116729736328 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Friday July 31, 2026 10:00 PM thru Saturday August 1, 2026 08:00 AM, right lane closed Sat, 25 Jul 2026 00:19:46 -0400 40.8557586669922 -74.3595123291016 NJ 55 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Northbound near South of Exit 27 - NJ 47 (Millville), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, left lane closed Sat, 25 Jul 2026 00:19:52 -0400 39.4279174804688 -75.0384902954102 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound at South of Exit 4 - Atlantic Ave (Camden) Friday July 31, 2026 11:00 PM thru Saturday August 1, 2026 05:00 AM, ramp Sat, 25 Jul 2026 00:19:51 -0400 39.9263801574707 -75.1161041259766 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 672/CR 557 (Buena) and East of CR 648 (Upper Pittsgrove Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, Sat, 25 Jul 2026 00:19:29 -0400 39.5369529724121 -74.9521255493164 US 1&9/Tonnelle Avenue northbound : roadwork NJDOT - STMC: Roadwork on US 1&9/Tonnelle Avenue near 83rd St (North Bergen Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, left lane closed Sat, 25 Jul 2026 00:19:33 -0400 40.8083686828613 -74.0152435302734 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 03:00 AM, at least one lane closed Sat, 25 Jul 2026 00:19:32 -0400 39.930305480957 -75.1140441894531 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between South of CR 655/Fries Mill Rd (Franklin Twp) and North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, alternating traffic closed, moving operation Sat, 25 Jul 2026 00:19:31 -0400 39.5992431640625 -75.065788269043 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between West Chestnut Av (Vineland) and North of CR 690/Lake Rd/Weymouth Rd (Vineland), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, closed, moving operation Sat, 25 Jul 2026 00:19:30 -0400 39.4798393249512 -75.0436096191406 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near CR 639/Pitman Av (Glassboro), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:19:14 -0400 39.7364845275879 -75.1140289306641 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between East of CR 648 (Upper Pittsgrove Twp) and CR 672/CR 557 (Buena), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, , moving operation Sat, 25 Jul 2026 00:19:12 -0400 39.5974540710449 -75.1650848388672 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), left shoulder Sat, 25 Jul 2026 00:19:17 -0400 40.6438446044922 -74.6615905761719 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Wednesday July 29, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:19:16 -0400 39.9204940795898 -75.0875701904297 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:19:15 -0400 40.6445121765137 -74.7184753417969 NJ 19 northbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Northbound near South of CR 509/Broad St (Clifton), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Sat, 25 Jul 2026 00:19:21 -0400 40.8878288269043 -74.1682434082031 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound near North of CR 651/Greentree Rd (Washington Twp), Friday July 31, 2026 07:00 AM thru 04:00 PM, right shoulder closed Sat, 25 Jul 2026 00:19:20 -0400 39.7623252868652 -75.0479965209961 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near North of CR 655/Fries Mill Rd (Washington Twp), Friday July 31, 2026 07:00 AM thru 04:00 PM, right shoulder closed Sat, 25 Jul 2026 00:19:19 -0400 39.748291015625 -75.0454025268555 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Friday July 31, 2026 10:00 PM thru Saturday August 1, 2026 07:00 AM, right lane closed Sat, 25 Jul 2026 00:19:18 -0400 40.834114074707 -74.3345031738281 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near West of CR 537/Federal St (Camden), Wednesday July 29, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:19:26 -0400 39.9452209472656 -75.1086196899414 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:19:25 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:19:23 -0400 40.6445121765137 -74.7184753417969 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of CR 642/Porcupine Rd (Oldmans Twp) and South of US 322 (Logan Twp), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:19:22 -0400 39.7755813598633 -75.4171752929688 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and Watson Dr (Washington Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:19:28 -0400 39.7623252868652 -75.0479965209961 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp), Thursday July 30, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:19:27 -0400 40.6438446044922 -74.6615905761719 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between North of CR 665/Cattell Rd (Deptford Twp) and South of CR 646/Deptford Av (Deptford Twp), Friday July 31, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:19:09 -0400 39.8146743774414 -75.1245803833008 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between South of Orange St (Millville) and South of NJ 49 (Millville), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, closed, moving operation Sat, 25 Jul 2026 00:19:08 -0400 39.3671836853027 -75.0211639404297 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near North of CR 639/Ganttown Rd (Washington Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 05:00 AM, right lane closed Sat, 25 Jul 2026 00:19:07 -0400 39.7551803588867 -75.0467071533203 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM) Sat, 25 Jul 2026 00:19:11 -0400 39.930305480957 -75.1140441894531 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near CR 551/Broadway Av (Westville), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Sat, 25 Jul 2026 00:19:10 -0400 39.8703422546387 -75.1255264282227 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near South of NJ 70 (Collingswood), Friday July 31, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:18:54 -0400 39.9152717590332 -75.0903549194336 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near North of CR 639/Ganttown Rd (Washington Twp), Friday July 31, 2026 12:00 AM thru 05:00 AM, right lane closed Sat, 25 Jul 2026 00:18:53 -0400 39.7551803588867 -75.0467071533203 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM) Sat, 25 Jul 2026 00:18:51 -0400 39.930305480957 -75.1140441894531 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:18:57 -0400 40.6445121765137 -74.7184753417969 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Friday July 31, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:18:56 -0400 40.6445121765137 -74.7184753417969 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Saturday August 1, 2026 09:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:19:02 -0400 40.8320922851562 -75.0009841918945 NJ 19 northbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Northbound near South of CR 509/Broad St (Clifton), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Sat, 25 Jul 2026 00:19:01 -0400 40.8878288269043 -74.1682434082031 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between North of CR 690/Lake Rd/Weymouth Rd (Vineland) and West Chestnut Av (Vineland), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, Sat, 25 Jul 2026 00:18:59 -0400 39.551082611084 -75.0508422851562 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between East of CR 648 (Upper Pittsgrove Twp) and CR 672/CR 557 (Buena), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, , moving operation Sat, 25 Jul 2026 00:18:58 -0400 39.5974540710449 -75.1650848388672 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near North of CR 655/Fries Mill Rd (Washington Twp), Thursday July 30, 2026 07:00 AM thru 04:00 PM, right shoulder closed Sat, 25 Jul 2026 00:19:06 -0400 39.748291015625 -75.0454025268555 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near South of NJ 70 (Collingswood), Thursday July 30, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:19:05 -0400 39.9179840087891 -75.0894317626953 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near South of NJ 70 (Collingswood), Wednesday July 29, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:19:04 -0400 39.9152717590332 -75.0903549194336 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of CR 642/Porcupine Rd (Oldmans Twp) and South of US 322 (Logan Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:19:03 -0400 39.7755813598633 -75.4171752929688 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:18:55 -0400 39.7551803588867 -75.0467071533203 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near West of CR 537/Federal St (Camden), Friday July 31, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:18:43 -0400 39.9452209472656 -75.1086196899414 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 03:00 AM, at least one lane closed Sat, 25 Jul 2026 00:18:41 -0400 39.930305480957 -75.1140441894531 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near North of CR 665/Cattell Rd (Deptford Twp), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 06:00 AM, closed Sat, 25 Jul 2026 00:18:36 -0400 39.8161010742188 -75.1246109008789 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 8 - Possumtown Rd (Piscataway Twp) and North of Exit 10 - CR 527/Easton Ave (Franklin Twp), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 04:00 AM, left lane closed Sat, 25 Jul 2026 00:18:34 -0400 40.5560989379883 -74.4762420654297 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 8 - Possumtown Rd (Piscataway Twp) and North of Exit 10 - CR 527/Easton Ave (Franklin Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 04:00 AM, left lane closed Sat, 25 Jul 2026 00:18:33 -0400 40.5560989379883 -74.4762420654297 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between West Chestnut Av (Vineland) and North of CR 690/Lake Rd/Weymouth Rd (Vineland), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, closed, moving operation Sat, 25 Jul 2026 00:18:16 -0400 39.4798393249512 -75.0436096191406 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Thursday July 30, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:18:15 -0400 39.9166641235352 -75.0873565673828 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 12 - CR 623 (Franklin Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 04:00 AM, right shoulder closed Sat, 25 Jul 2026 00:18:19 -0400 40.5447540283203 -74.5344467163086 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound near East of CR 575/Rangleboro Rd (Hamilton Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, right shoulder closed, moving operation Sat, 25 Jul 2026 00:18:45 -0400 39.4454689025879 -74.6290588378906 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Friday July 31, 2026 10:00 PM thru Saturday August 1, 2026 06:00 AM, right lane closed local lane Sat, 25 Jul 2026 00:18:49 -0400 40.8605499267578 -74.3977203369141 NJ 28 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 28 Eastbound between East of CR 635/Vosseller Av (Bound Brook) and CR 529/Washington Ave (Dunellen), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:18:48 -0400 40.567268371582 -74.5393676757812 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), left shoulder Sat, 25 Jul 2026 00:18:47 -0400 40.6438446044922 -74.6615905761719 NJ 28 westbound : roadwork NJDOT - STMC: Roadwork on NJ 28 Westbound between West of Mountain Ave (Middlesex) and East of CR 635/Vosseller Av (Bound Brook), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:18:46 -0400 40.5767822265625 -74.5074691772461 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound near South of Ridge Rd (South Brunswick Twp), Friday July 31, 2026 10:00 PM thru Saturday August 1, 2026 05:00 AM, left lane closed Sat, 25 Jul 2026 00:18:50 -0400 40.363525390625 -74.5990676879883 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between NJ 23/Pompton Av (Wayne Twp) and East of CR 633/Rifle Camp Rd (Little Falls Twp), Friday July 31, 2026 09:00 PM thru Saturday August 1, 2026 07:00 AM, at least one lane closed Sat, 25 Jul 2026 00:18:27 -0400 40.8932075500488 -74.2535400390625 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Friday July 31, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:18:25 -0400 40.663402557373 -74.4206008911133 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near Union Hill Rd (Marlboro Twp), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 05:00 AM, left lane closed Sat, 25 Jul 2026 00:18:24 -0400 40.3388710021973 -74.3076782226562 US 1&9/Tonnelle Avenue northbound : roadwork NJDOT - STMC: Roadwork on US 1&9/Tonnelle Avenue between 83rd St (North Bergen Twp) and North of Fairview Av (Fairview), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 06:00 AM, left lane closed Sat, 25 Jul 2026 00:18:23 -0400 40.8083686828613 -74.0152435302734 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near South of NJ 70 (Collingswood), Friday July 31, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:18:32 -0400 39.9179840087891 -75.0894317626953 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between NJ 23/Old Turnpike Rd (Wayne Twp) and East of CR 633/Rifle Camp Rd (Little Falls Twp), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 06:00 AM, at least one lane closed Sat, 25 Jul 2026 00:18:31 -0400 40.894603729248 -74.2444305419922 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Thursday July 30, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:18:29 -0400 40.663402557373 -74.4206008911133 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between NJ 23/Old Turnpike Rd (Wayne Twp) and East of CR 633/Rifle Camp Rd (Little Falls Twp), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:30 PM to 05:00 AM) Sat, 25 Jul 2026 00:18:28 -0400 40.894603729248 -74.2444305419922 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 672/CR 557 (Buena) and East of CR 648 (Upper Pittsgrove Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, Sat, 25 Jul 2026 00:18:22 -0400 39.5369529724121 -74.9521255493164 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near US 1 (Trenton), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 05:00 AM, right lane closed Sat, 25 Jul 2026 00:18:21 -0400 40.2109413146973 -74.7665863037109 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp), Friday July 31, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:18:40 -0400 40.6438446044922 -74.6615905761719 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) and South of CR 655/Fries Mill Rd (Franklin Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, closed, moving operation Sat, 25 Jul 2026 00:18:39 -0400 39.6246070861816 -75.0827560424805 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between South of US 322 (Logan Twp) and North of CR 642/Porcupine Rd (Oldmans Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, left lane closed Sat, 25 Jul 2026 00:18:38 -0400 39.8020935058594 -75.3527145385742 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) and South of CR 655/Fries Mill Rd (Franklin Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, closed, moving operation Sat, 25 Jul 2026 00:18:37 -0400 39.6246070861816 -75.0827560424805 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 52 - Columbus Rd (Mansfield Twp) and north of Exit 67 - US 1 (Lawrence Twp), Wednesday July 29, 2026 10:00 AM thru 02:00 PM, right lane closed Sat, 25 Jul 2026 00:18:44 -0400 40.0924797058105 -74.7529907226562 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound at South of Exit 4 - Atlantic Ave (Camden) Friday July 31, 2026 11:00 PM thru Saturday August 1, 2026 05:00 AM, ramp Sat, 25 Jul 2026 00:18:13 -0400 39.9278182983398 -75.1158828735352 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:18:12 -0400 40.6445121765137 -74.7184753417969 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:18:18 -0400 40.6438446044922 -74.6615905761719 NJ 19 northbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Northbound between South of CR 509/Broad St (Clifton) and South of CR 621/Valley Rd (Clifton), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 05:00 AM, at least one lane closed Sat, 25 Jul 2026 00:18:17 -0400 40.8878288269043 -74.1682434082031 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of Bloy St (Hillside Twp), Thursday July 30, 2026 10:00 PM thru Friday July 31, 2026 02:00 AM, right lane closed Sat, 25 Jul 2026 00:18:01 -0400 40.6992149353027 -74.2369613647461 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 7 - CR 526 (Robbinsville) and East of Exit 2 - CR 524 (Hamilton Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 05:00 AM, right lane closed Sat, 25 Jul 2026 00:17:59 -0400 40.1932334899902 -74.5990676879883 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Wednesday July 29, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:17:58 -0400 39.9166641235352 -75.0873565673828 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Old Turnpike Rd (Wayne Twp) and East of CR 633/Rifle Camp Rd (Little Falls Twp), Friday July 31, 2026 09:00 PM thru Saturday August 1, 2026 07:00 AM, at least one lane closed, (2nd lane closed from 11:30 PM to 06:00 AM) Sat, 25 Jul 2026 00:17:57 -0400 40.8944778442383 -74.2463455200195 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 12 - CR 623 (Franklin Twp), left shoulder Sat, 25 Jul 2026 00:18:05 -0400 40.5447540283203 -74.5344467163086 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:18:04 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:18:03 -0400 40.6445121765137 -74.7184753417969 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between East of Exit 18 - US 22 (Clinton Twp) and West of Exit 20 - CR 639 (Lebanon Twp), Friday July 31, 2026 09:00 AM thru 02:00 PM, right shoulder closed Sat, 25 Jul 2026 00:18:02 -0400 40.6463279724121 -74.8529357910156 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of CR 642/Porcupine Rd (Oldmans Twp) and South of US 322 (Logan Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:18:08 -0400 39.7755813598633 -75.4171752929688 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between East of CR 633/Rifle Camp Rd (Little Falls Twp) and NJ 23/Pompton Av (Wayne Twp), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 06:00 AM, at least one lane closed Sat, 25 Jul 2026 00:18:07 -0400 40.8739700317383 -74.1972885131836 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of CR 646/Deptford Av (Deptford Twp) and North of CR 665/Cattell Rd (Deptford Twp), Friday July 31, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:18:11 -0400 39.8360900878906 -75.1249542236328 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between South of US 322 (Logan Twp) and North of CR 642/Porcupine Rd (Oldmans Twp), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 05:59 AM, left lane closed Sat, 25 Jul 2026 00:18:10 -0400 39.8020935058594 -75.3527145385742 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 621/Hook Mountain Rd (Montville Twp) and West of I-80 (Denville Twp), Friday July 31, 2026 09:00 PM thru Saturday August 1, 2026 08:00 AM, Sat, 25 Jul 2026 00:18:09 -0400 40.858585357666 -74.3399505615234 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of US 130 (Westville), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:17:52 -0400 39.8689231872559 -75.1252899169922 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound near North of I-80 (Wayne Twp), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 05:00 AM, left lane closed Sat, 25 Jul 2026 00:17:51 -0400 40.9016876220703 -74.255859375 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near South of Church Rd (Cinnaminson Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed Sat, 25 Jul 2026 00:17:49 -0400 39.9873657226562 -75.0110931396484 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:17:56 -0400 40.6438446044922 -74.6615905761719 NJ 19 northbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Northbound between South of CR 509/Broad St (Clifton) and South of CR 621/Valley Rd (Clifton), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 05:00 AM, at least one lane closed Sat, 25 Jul 2026 00:17:55 -0400 40.8878288269043 -74.1682434082031 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between North of CR 665/Cattell Rd (Deptford Twp) and South of CR 646/Deptford Av (Deptford Twp), Thursday July 30, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:17:53 -0400 39.8146743774414 -75.1245803833008 Pulaski Skyway eastbound : roadwork NJDOT - STMC: Roadwork on Pulaski Skyway between Tonnelle Circle (Jersey City) and South of US 1&9 Truck Route/Pulaski Skyway (Newark), Continuous Friday July 31, 2026 11:00 PM thru Sunday August 2, 2026 11:00 PM, closed Sat, 25 Jul 2026 00:08:50 -0400 40.7390899658203 -74.068000793457 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound at north of Exit 68 - CR 583/Princeton Pike (Lawrence Twp) Continuous Wednesday July 29, 2026 05:00 AM thru Saturday August 1, 2026 11:00 PM, ramp Sat, 25 Jul 2026 00:08:49 -0400 40.2859725952148 -74.71435546875 US 1&9 northbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Northbound between South of US 1&9 Truck Route/Pulaski Skyway (Newark) and Tonnelle Circle (Jersey City), Continuous Friday July 31, 2026 11:00 PM thru Sunday August 2, 2026 11:00 PM, closed local lane Sat, 25 Jul 2026 00:08:51 -0400 40.7318572998047 -74.1304168701172 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between East of CR 648 (Upper Pittsgrove Twp) and CR 672/CR 557 (Buena), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, , moving operation Sat, 25 Jul 2026 00:07:22 -0400 39.5974540710449 -75.1650848388672 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 8 - Possumtown Rd (Piscataway Twp) and North of Exit 10 - CR 527/Easton Ave (Franklin Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 04:00 AM, left lane closed Sat, 25 Jul 2026 00:07:21 -0400 40.5560989379883 -74.4762420654297 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:07:27 -0400 39.7551803588867 -75.0467071533203 NJ 18 southbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Southbound near Racetrack Rd (East Brunswick Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Sat, 25 Jul 2026 00:07:25 -0400 40.4285888671875 -74.3834686279297 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:07:24 -0400 40.6445121765137 -74.7184753417969 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near North of CR 571/Princeton-Hightstown Rd (East Windsor Twp), Tuesday July 28, 2026 08:00 AM thru 03:00 PM, right lane closed Sat, 25 Jul 2026 00:07:23 -0400 40.2766952514648 -74.5346145629883 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:07:28 -0400 40.6438446044922 -74.6615905761719 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 05:00 AM, right lane closed Sat, 25 Jul 2026 00:07:30 -0400 40.1918411254883 -74.7536239624023 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 10 - CR 527/Easton Ave (Franklin Twp) and South of Exit 8 - Possumtown Rd (Piscataway Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 04:00 AM, left lane closed Sat, 25 Jul 2026 00:07:29 -0400 40.5408897399902 -74.5264358520508 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:07:33 -0400 40.663402557373 -74.4206008911133 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and Watson Dr (Washington Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:07:34 -0400 39.7623252868652 -75.0479965209961 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between North of CR 665/Cattell Rd (Deptford Twp) and South of CR 646/Deptford Av (Deptford Twp), Tuesday July 28, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:07:32 -0400 39.8146743774414 -75.1245803833008 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of CR 642/Porcupine Rd (Oldmans Twp) and South of US 322 (Logan Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:07:31 -0400 39.7755813598633 -75.4171752929688 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:07:39 -0400 40.6445121765137 -74.7184753417969 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 672/CR 557 (Buena) and East of CR 648 (Upper Pittsgrove Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, Sat, 25 Jul 2026 00:07:37 -0400 39.5369529724121 -74.9521255493164 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:07:36 -0400 40.6438446044922 -74.6615905761719 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near South of Creek Rd (Willingboro Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, left lane closed Sat, 25 Jul 2026 00:07:35 -0400 40.028751373291 -74.9323654174805 NJ 29 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Tuesday July 28, 2026 09:00 AM thru 02:00 PM, right lane closed Sat, 25 Jul 2026 00:07:40 -0400 40.1987838745117 -74.7582550048828 US 1 northbound : roadwork NJDOT - TOC South: Roadwork on US 1 Northbound at Perry St (Trenton) Tuesday July 28, 2026 12:00 AM thru 05:00 AM, ramp Sat, 25 Jul 2026 00:06:59 -0400 40.2242012023926 -74.7588653564453 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near South of NJ 70 (Collingswood), Monday July 27, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:07:06 -0400 39.9152717590332 -75.0903549194336 NJ 18 southbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Southbound between New Jersey Turnpike (East Brunswick Twp) and South of CR 617/Rues Ln (East Brunswick Twp), Monday July 27, 2026 10:00 PM thru Tuesday July 28, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM) Sat, 25 Jul 2026 00:07:05 -0400 40.4728813171387 -74.4093704223633 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 12 - CR 623 (Franklin Twp), left shoulder Sat, 25 Jul 2026 00:07:04 -0400 40.5447540283203 -74.5344467163086 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near West of New Jersey Turnpike - Eastern Spur (Secaucus), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 03:00 AM) Sat, 25 Jul 2026 00:06:43 -0400 40.7902374267578 -74.0527801513672 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and East of Exit 5 - US 130 (Hamilton Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, right shoulder closed Sat, 25 Jul 2026 00:06:42 -0400 40.1777191162109 -74.546142578125 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 03:00 AM, at least one lane closed Sat, 25 Jul 2026 00:06:36 -0400 39.930305480957 -75.1140441894531 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between East of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 7 - CR 526 (Robbinsville), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right shoulder closed Sat, 25 Jul 2026 00:06:35 -0400 40.1769256591797 -74.508659362793 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:06:34 -0400 40.6438446044922 -74.6615905761719 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp), Tuesday July 28, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:33 -0400 40.6438446044922 -74.6615905761719 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound near North of CR 651/Greentree Rd (Washington Twp), Wednesday July 29, 2026 07:00 AM thru 04:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:19 -0400 39.7623252868652 -75.0479965209961 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), left shoulder Sat, 25 Jul 2026 00:07:20 -0400 40.6438446044922 -74.6615905761719 NJ 19 southbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Southbound between South of CR 621/Valley Rd (Clifton) and South of CR 509/Broad St (Clifton), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 05:00 AM, at least one lane closed Sat, 25 Jul 2026 00:07:19 -0400 40.8951072692871 -74.1689224243164 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound near South of US 130 (Westville), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:46 -0400 39.8689231872559 -75.1252899169922 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:06:44 -0400 40.6438446044922 -74.6615905761719 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound near North of CR 651/Greentree Rd (Washington Twp), Tuesday July 28, 2026 07:00 AM thru 04:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:50 -0400 39.7623252868652 -75.0479965209961 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 672/CR 557 (Buena) and East of CR 648 (Upper Pittsgrove Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, Sat, 25 Jul 2026 00:06:49 -0400 39.5369529724121 -74.9521255493164 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 03:00 AM, at least one lane closed Sat, 25 Jul 2026 00:06:48 -0400 39.930305480957 -75.1140441894531 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound at East of Berrys Creek Bridge (East Rutherford) left shoulder Sat, 25 Jul 2026 00:06:47 -0400 40.8108711242676 -74.086540222168 NJ 19 northbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Northbound near South of CR 509/Broad St (Clifton), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Sat, 25 Jul 2026 00:06:55 -0400 40.8878288269043 -74.1682434082031 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Tuesday July 28, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:54 -0400 40.663402557373 -74.4206008911133 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM) Sat, 25 Jul 2026 00:06:52 -0400 39.930305480957 -75.1140441894531 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near CR 551/Broadway Av (Westville), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed Sat, 25 Jul 2026 00:06:51 -0400 39.8703422546387 -75.1255264282227 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near North of CR 655/Fries Mill Rd (Washington Twp), Wednesday July 29, 2026 07:00 AM thru 04:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:58 -0400 39.748291015625 -75.0454025268555 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 12 - CR 623 (Franklin Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 04:00 AM, right shoulder closed Sat, 25 Jul 2026 00:06:57 -0400 40.5447540283203 -74.5344467163086 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near South of NJ 70 (Collingswood), Tuesday July 28, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:06:56 -0400 39.9179840087891 -75.0894317626953 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 8 - Possumtown Rd (Piscataway Twp) and North of Exit 10 - CR 527/Easton Ave (Franklin Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 04:00 AM, left lane closed Sat, 25 Jul 2026 00:07:03 -0400 40.5560989379883 -74.4762420654297 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near Union Hill Rd (Marlboro Twp), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 05:00 AM, left lane closed Sat, 25 Jul 2026 00:07:02 -0400 40.3388710021973 -74.3076782226562 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 635/Browertown Rd (Little Falls Twp) and NJ 23/Old Turnpike Rd (Wayne Twp), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:30 PM to 05:00 AM) Sat, 25 Jul 2026 00:07:00 -0400 40.8834228515625 -74.2116317749023 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between NJ 109 (Lower Twp) and South of Cresse Ln (Lower Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 04:00 AM, right shoulder closed, moving operation Sat, 25 Jul 2026 00:06:28 -0400 38.9662971496582 -74.9151611328125 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near South of Creek Rd (Willingboro Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, left lane closed Sat, 25 Jul 2026 00:06:26 -0400 40.028751373291 -74.9323654174805 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound near South of NJ 49 (Millville), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:25 -0400 39.3909759521484 -75.0347595214844 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between north of Exit 68 - CR 583/Princeton Pike (Lawrence Twp) and north of Exit 69 - US 206 (Lawrence Twp), Monday July 27, 2026 10:00 AM thru 03:00 PM, left lane closed Sat, 25 Jul 2026 00:06:24 -0400 40.2856025695801 -74.720085144043 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Monday July 27, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:06:31 -0400 39.9166641235352 -75.0873565673828 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp), Wednesday July 29, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:30 -0400 40.6438446044922 -74.6615905761719 US 206 southbound : roadwork NJDOT - TOC South: Roadwork on US 206 near North of Dunns Mill Rd (Bordentown Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, left lane closed Sat, 25 Jul 2026 00:06:29 -0400 40.1325454711914 -74.7047271728516 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between North of CR 665/Cattell Rd (Deptford Twp) and South of CR 646/Deptford Av (Deptford Twp), Wednesday July 29, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:06:23 -0400 39.8146743774414 -75.1245803833008 NJ 45 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 45 near South of CR 602/Auburn Rd (Woodstown), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, right shoulder closed Sat, 25 Jul 2026 00:06:20 -0400 39.656063079834 -75.3272705078125 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between South of US 322 (Logan Twp) and North of CR 642/Porcupine Rd (Oldmans Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, left lane closed Sat, 25 Jul 2026 00:06:22 -0400 39.8020935058594 -75.3527145385742 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp), left shoulder Sat, 25 Jul 2026 00:06:41 -0400 40.6438446044922 -74.6615905761719 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:06:39 -0400 40.6445121765137 -74.7184753417969 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near West of CR 537/Federal St (Camden), Tuesday July 28, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:06:38 -0400 39.9452209472656 -75.1086196899414 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of CR 615/Fairfield Av (Fairfield Twp) and West of CR 635/Browertown Rd (Little Falls Twp), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 06:00 AM, at least one lane closed Sat, 25 Jul 2026 00:06:37 -0400 40.8872985839844 -74.280647277832 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 12 - CR 623 (Franklin Twp), left shoulder Sat, 25 Jul 2026 00:07:10 -0400 40.5447540283203 -74.5344467163086 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound between South of Cresse Ln (Lower Twp) and NJ 109 (Lower Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 04:00 AM, right shoulder closed, moving operation Sat, 25 Jul 2026 00:07:09 -0400 38.9990081787109 -74.8935012817383 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near South of NJ 70 (Collingswood), Tuesday July 28, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:07:08 -0400 39.9152717590332 -75.0903549194336 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near North of CR 571/Princeton-Hightstown Rd (East Windsor Twp), Monday July 27, 2026 08:00 AM thru 03:00 PM, right lane closed Sat, 25 Jul 2026 00:07:07 -0400 40.2766952514648 -74.5346145629883 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of CR 646/Deptford Av (Deptford Twp) and North of CR 665/Cattell Rd (Deptford Twp), Tuesday July 28, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:07:14 -0400 39.8360900878906 -75.1249542236328 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near CR 668/Main St (Dennis Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:07:13 -0400 39.1708602905273 -74.7392730712891 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between East of CR 648 (Upper Pittsgrove Twp) and CR 672/CR 557 (Buena), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, , moving operation Sat, 25 Jul 2026 00:07:12 -0400 39.5974540710449 -75.1650848388672 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near North of CR 639/Ganttown Rd (Washington Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, right lane closed Sat, 25 Jul 2026 00:07:11 -0400 39.7551803588867 -75.0467071533203 NJ 18 southbound : roadwork NJDOT - STMC: Roadwork on NJ 18 Southbound between New Jersey Turnpike (East Brunswick Twp) and South of CR 617/Rues Ln (East Brunswick Twp), Monday July 27, 2026 10:00 PM thru Tuesday July 28, 2026 05:00 AM, at least one lane closed Sat, 25 Jul 2026 00:07:17 -0400 40.4728813171387 -74.4093704223633 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM) Sat, 25 Jul 2026 00:07:15 -0400 39.930305480957 -75.1140441894531 NJ 19 northbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Northbound between South of CR 509/Broad St (Clifton) and South of CR 621/Valley Rd (Clifton), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 05:00 AM, at least one lane closed Sat, 25 Jul 2026 00:07:18 -0400 40.8878288269043 -74.1682434082031 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between North of CR 642/Porcupine Rd (Oldmans Twp) and CR 642/Pennsgrove-Pedricktown Rd (Oldmans Twp), left shoulder Sat, 25 Jul 2026 00:06:10 -0400 39.7755813598633 -75.4171752929688 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between East of Exit 18 - US 22 (Clinton Twp) and West of Exit 20 - CR 639 (Lebanon Twp), Tuesday July 28, 2026 09:00 AM thru 02:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:09 -0400 40.6463279724121 -74.8529357910156 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 16 - CR 537/Great Adventure (Millstone Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, left lane closed Sat, 25 Jul 2026 00:05:56 -0400 40.1765480041504 -74.5273284912109 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between East of Exit 18 - US 22 (Clinton Twp) and West of Exit 20 - CR 639 (Lebanon Twp), Monday July 27, 2026 09:00 AM thru 02:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:03 -0400 40.6463279724121 -74.8529357910156 I-195 eastbound : roadwork NJDOT - TOC South: Roadwork on I-195 Eastbound between East of Exit 5 - US 130 (Hamilton Twp) and West of Exit 11 - CR 524 (Upper Freehold Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 04:00 AM, left lane closed Sat, 25 Jul 2026 00:06:02 -0400 40.202220916748 -74.6350021362305 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:06:01 -0400 40.663402557373 -74.4206008911133 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound near North of CR 4/Palmer Av (Hazlet Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, left lane closed Sat, 25 Jul 2026 00:05:59 -0400 40.4362335205078 -74.1368637084961 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Tuesday July 28, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:06:07 -0400 39.9204940795898 -75.0875701904297 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 10 - CR 527/Easton Ave (Franklin Twp) and South of Exit 8 - Possumtown Rd (Piscataway Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 04:00 AM, left lane closed Sat, 25 Jul 2026 00:06:06 -0400 40.5408897399902 -74.5264358520508 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 651/Greentree Rd (Washington Twp) and Watson Dr (Washington Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:06:05 -0400 39.7623252868652 -75.0479965209961 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between West of Exit 11 - CR 524 (Upper Freehold Twp) and East of Exit 5 - US 130 (Hamilton Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, right lane closed Sat, 25 Jul 2026 00:06:04 -0400 40.1777191162109 -74.546142578125 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 635/Browertown Rd (Little Falls Twp) and NJ 23/Old Turnpike Rd (Wayne Twp), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 06:00 AM, at least one lane closed Sat, 25 Jul 2026 00:06:08 -0400 40.8834228515625 -74.2116317749023 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound between West of New Jersey Turnpike - Eastern Spur (Secaucus) and West of Harmon Cove (Secaucus), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 03:00 AM, at least one lane closed Sat, 25 Jul 2026 00:05:58 -0400 40.7902374267578 -74.0527801513672 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound between South of Cresse Ln (Lower Twp) and NJ 109 (Lower Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 04:00 AM, right shoulder closed, moving operation Sat, 25 Jul 2026 00:06:15 -0400 38.9990081787109 -74.8935012817383 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near North of CR 655/Fries Mill Rd (Washington Twp), Tuesday July 28, 2026 07:00 AM thru 04:00 PM, right shoulder closed Sat, 25 Jul 2026 00:06:14 -0400 39.748291015625 -75.0454025268555 I-195 westbound : roadwork NJDOT - TOC South: Roadwork on I-195 Westbound between East of Exit 11 - CR 524 (Upper Freehold Twp) and West of Exit 7 - CR 526 (Robbinsville), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 05:00 AM, right lane closed Sat, 25 Jul 2026 00:06:13 -0400 40.1769256591797 -74.508659362793 NJ 29 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Monday July 27, 2026 09:00 AM thru 02:00 PM, right lane closed Sat, 25 Jul 2026 00:06:11 -0400 40.1987838745117 -74.7582550048828 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near Union Hill Rd (Marlboro Twp), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 05:00 AM, left lane closed Sat, 25 Jul 2026 00:06:18 -0400 40.3388710021973 -74.3076782226562 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of US 130/Collingswood Circle (Collingswood), Tuesday July 28, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:06:17 -0400 39.9166641235352 -75.0873565673828 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound between North of CR 639/Ganttown Rd (Washington Twp) and South of CR 655/Fries Mill Rd (Washington Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Sat, 25 Jul 2026 00:06:16 -0400 39.7551803588867 -75.0467071533203 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound near West of US 130/Collingswood Circle (Collingswood), Monday July 27, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:05:50 -0400 39.9204940795898 -75.0875701904297 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Wednesday July 29, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:05:49 -0400 40.663402557373 -74.4206008911133 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near South of NJ 70 (Collingswood), Monday July 27, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:05:48 -0400 39.9179840087891 -75.0894317626953 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between NJ 109 (Lower Twp) and South of Cresse Ln (Lower Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 04:00 AM, right shoulder closed, moving operation Sat, 25 Jul 2026 00:05:55 -0400 38.9662971496582 -74.9151611328125 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near North of CR 639/Ganttown Rd (Washington Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 05:00 AM, right lane closed Sat, 25 Jul 2026 00:05:54 -0400 39.7551803588867 -75.0467071533203 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound between West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:05:53 -0400 40.6445121765137 -74.7184753417969 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 12 - CR 623 (Franklin Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 04:00 AM, right shoulder closed Sat, 25 Jul 2026 00:05:51 -0400 40.5447540283203 -74.5344467163086 NJ 19 southbound : roadwork NJDOT - STMC: Roadwork on NJ 19 Southbound near South of CR 621/Valley Rd (Clifton), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM) Sat, 25 Jul 2026 00:05:57 -0400 40.8951072692871 -74.1689224243164 NJ 47 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Southbound between South of CR 646/Deptford Av (Deptford Twp) and North of CR 665/Cattell Rd (Deptford Twp), Monday July 27, 2026 07:00 AM thru 03:30 PM, right shoulder closed Sat, 25 Jul 2026 00:00:08 -0400 39.8360900878906 -75.1249542236328 NJ 17 southbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Southbound near North of NJ 3 (Rutherford), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:00:12 -0400 40.8093681335449 -74.1012268066406 NJ 42 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Southbound near North of CR 651/Greentree Rd (Washington Twp), Monday July 27, 2026 07:00 AM thru 04:00 PM, right shoulder closed Sat, 25 Jul 2026 00:00:09 -0400 39.7623252868652 -75.0479965209961 NJ 17 northbound : roadwork NJDOT - STMC: Roadwork on NJ 17 Northbound at Garland Way (Lyndhurst Twp) Monday July 27, 2026 07:00 AM thru 03:00 PM, ramp Sat, 25 Jul 2026 00:00:17 -0400 40.8087425231934 -74.1021194458008 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp), left shoulder Sat, 25 Jul 2026 00:00:15 -0400 40.6438446044922 -74.6615905761719 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near Harmon Meadow Blvd (Secaucus), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:00:14 -0400 40.7856216430664 -74.0482864379883 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound near West of NJ 17 (Rutherford), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:00:16 -0400 40.8125 -74.1048889160156 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound between North of Exit 10 - CR 527/Easton Ave (Franklin Twp) and South of Exit 8 - Possumtown Rd (Piscataway Twp), Sunday July 26, 2026 08:00 PM thru Monday July 27, 2026 04:00 AM, left lane closed Mon, 27 Jul 2026 04:00:02 -0400 40.5408897399902 -74.5264358520508 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), left shoulder Fri, 24 Jul 2026 23:59:56 -0400 40.663402557373 -74.4206008911133 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound near Paterson Plank Road (Secaucus), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 23:59:55 -0400 40.7842254638672 -74.0477600097656 NJ 3 westbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Westbound near West of New Jersey Turnpike - Western Spur (East Rutherford), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:00:00 -0400 40.810001373291 -74.0829010009766 NJ 47 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 47 Northbound between North of CR 665/Cattell Rd (Deptford Twp) and South of CR 646/Deptford Av (Deptford Twp), Monday July 27, 2026 07:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 23:59:59 -0400 39.8146743774414 -75.1245803833008 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 8 - Possumtown Rd (Piscataway Twp) and North of Exit 10 - CR 527/Easton Ave (Franklin Twp), Sunday July 26, 2026 08:00 PM thru Monday July 27, 2026 04:00 AM, left lane closed Mon, 27 Jul 2026 04:00:01 -0400 40.5560989379883 -74.4762420654297 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 12 - CR 623 (Franklin Twp), left shoulder Mon, 27 Jul 2026 04:00:02 -0400 40.5447540283203 -74.5344467163086 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 12 - CR 623 (Franklin Twp), Sunday July 26, 2026 08:00 PM thru Monday July 27, 2026 04:00 AM, right shoulder closed Mon, 27 Jul 2026 04:00:01 -0400 40.5447540283203 -74.5344467163086 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between East of Exit 41 - Dale Rd to Plainfield Ave (Berkeley Heights Twp) and West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Sat, 25 Jul 2026 00:00:01 -0400 40.663402557373 -74.4206008911133 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound between West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) and West of Exit 26 - CR 665/Rattlesnake Bridge Rd (Bedminster Twp), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 23:59:50 -0400 40.6438446044922 -74.6615905761719 NJ 42 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 42 Northbound near North of CR 655/Fries Mill Rd (Washington Twp), Monday July 27, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 23:59:49 -0400 39.748291015625 -75.0454025268555 NJ 88 westbound : roadwork NJ DOT - TOC South: Roadwork on NJ 88 Westbound Before CR 64/Jack Martin Blvd (Brick Twp) Monday July 27, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 18:52:45 -0400 40.0801544189453 -74.1407699584961 NJ 54 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 54 Both Directions between Atlantic City Expressway (Hammonton) and US 30/White Horse Pike (Hammonton) Friday July 31, 2026 07:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 24 Jul 2026 17:51:46 -0400 39.6141624450684 -74.8288116455078 NJ 54 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 54 Both Directions between Atlantic City Expressway (Hammonton) and US 30/White Horse Pike (Hammonton) Thursday July 30, 2026 07:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 24 Jul 2026 17:51:40 -0400 39.6141624450684 -74.8288116455078 NJ 54 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 54 Both Directions between Atlantic City Expressway (Hammonton) and US 30/White Horse Pike (Hammonton) Wednesday July 29, 2026 07:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 24 Jul 2026 17:51:34 -0400 39.6141624450684 -74.8288116455078 NJ 54 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 54 Both Directions between Atlantic City Expressway (Hammonton) and US 30/White Horse Pike (Hammonton) Tuesday July 28, 2026 07:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 24 Jul 2026 17:51:28 -0400 39.6141624450684 -74.8288116455078 NJ 54 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 54 Both Directions between Atlantic City Expressway (Hammonton) and US 30/White Horse Pike (Hammonton) Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound Fri, 24 Jul 2026 17:51:21 -0400 39.6141624450684 -74.8288116455078 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions At CR 670/East Commerce St (Bridgeton) Wednesday July 29, 2026 08:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound Fri, 24 Jul 2026 17:46:16 -0400 39.4269523620605 -75.2194747924805 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions At CR 670/East Commerce St (Bridgeton) Tuesday July 28, 2026 08:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound Fri, 24 Jul 2026 17:46:10 -0400 39.4269523620605 -75.2194747924805 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions At CR 670/East Commerce St (Bridgeton) Monday July 27, 2026 08:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound Fri, 24 Jul 2026 17:46:02 -0400 39.4269523620605 -75.2194747924805 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions At CR 670/East Commerce St (Bridgeton) Friday July 31, 2026 08:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound Fri, 24 Jul 2026 17:46:31 -0400 39.4269523620605 -75.2194747924805 NJ 49 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Both Directions At CR 670/East Commerce St (Bridgeton) Thursday July 30, 2026 08:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound Fri, 24 Jul 2026 17:46:21 -0400 39.4269523620605 -75.2194747924805 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Thursday July 30, 2026 10:00 PM thru Friday July 31, 2026 06:00 AM, right lane closed Fri, 24 Jul 2026 14:50:50 -0400 40.8557586669922 -74.3595123291016 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Wednesday July 29, 2026 10:00 PM thru Thursday July 30, 2026 06:00 AM, right lane closed Fri, 24 Jul 2026 14:50:51 -0400 40.8557586669922 -74.3595123291016 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound between North of I-287 (Edison Twp) and South of CR 531/Main St (Edison Twp), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 05:00 AM, left lane closed Fri, 24 Jul 2026 14:47:50 -0400 40.5337295532227 -74.3469924926758 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Tuesday July 28, 2026 10:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Fri, 24 Jul 2026 14:47:49 -0400 40.8557586669922 -74.3595123291016 I-280 westbound : roadwork NJDOT - STMC: Roadwork on I-280 Westbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Monday July 27, 2026 10:00 PM thru Tuesday July 28, 2026 06:00 AM, right lane closed Fri, 24 Jul 2026 14:47:53 -0400 40.8557586669922 -74.3595123291016 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound at East of I-78/NJ 173 (Clinton Twp) Wednesday July 29, 2026 01:00 AM thru 05:00 AM, ramp Fri, 24 Jul 2026 14:47:51 -0400 40.6411895751953 -74.8742599487305 NJ 31 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 31 Northbound near I-295 (Hopewell Twp), Tuesday July 28, 2026 09:00 PM thru 09:15 PM, right lane closed, moving operation Fri, 24 Jul 2026 14:44:52 -0400 40.2914848327637 -74.7839889526367 New Jersey Turnpike southbound : paving operations NJ Turnpike Auth.: paving operations on New Jersey Turnpike Inner Roadway southbound South of Interchange 8A - NJ 32 (Cranbury Twp) to South of Interchange 8 - NJ 33 (East Windsor Twp), Friday July 31st, 2026 thru Saturday August 1st, 2026, 09:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed Fri, 24 Jul 2026 14:34:16 -0400 40.3216220525398 -74.4862446148701 New Jersey Turnpike southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike southbound South of Interchange 6 - Pennsylvania Turnpike (Mansfield Twp) to North of Interchange 5 - CR 541 (Springfield Twp), Thursday July 30th, 2026 thru Saturday August 1st, 2026, Thursday/Friday, 08:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Thursday July 30th, 2026 thru Saturday August 1st, 2026, Thursday/Friday, 10:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed Fri, 24 Jul 2026 14:33:13 -0400 40.0687160341045 -74.7633597520061 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near West of Gray St (North Plainfield), Wednesday July 29, 2026 10:00 PM thru Thursday July 30, 2026 01:00 AM, left lane closed, moving operation Fri, 24 Jul 2026 14:32:52 -0400 40.6391716003418 -74.4198455810547 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of Old Hwy 28 (Readington Twp) and East of Ridge Rd (Readington Twp), Monday July 27, 2026 09:00 PM thru 11:00 PM, left lane closed, moving operation Fri, 24 Jul 2026 14:32:50 -0400 40.6208000183105 -74.7623291015625 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound between East of Ridge Rd (Readington Twp) and East of Old Hwy 28 (Readington Twp), Monday July 27, 2026 09:00 PM thru 11:00 PM, left lane closed, moving operation Fri, 24 Jul 2026 14:32:49 -0400 40.6123428344727 -74.7244033813477 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of Ridge Rd (Readington Twp) and West of CR 679/Station Rd (Branchburg Twp), Tuesday July 28, 2026 02:00 AM thru 05:00 AM, left lane closed, moving operation Fri, 24 Jul 2026 14:32:53 -0400 40.6123428344727 -74.7244033813477 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound between West of CR 679/Station Rd (Branchburg Twp) and East of Ridge Rd (Readington Twp), Monday July 27, 2026 11:00 PM thru Tuesday July 28, 2026 02:00 AM, left lane closed, moving operation Fri, 24 Jul 2026 14:32:59 -0400 40.5992012023926 -74.6824493408203 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of Rock Av (North Plainfield), Tuesday July 28, 2026 08:00 PM thru 10:00 PM, right shoulder closed, moving operation Fri, 24 Jul 2026 14:32:54 -0400 40.6107482910156 -74.4628677368164 New Jersey Turnpike southbound : milling NJ Turnpike Auth.: milling and paving operations on New Jersey Turnpike Outer Roadway southbound North of Interchange 9 - NJ 18 (East Brunswick Twp) to South of Interchange 9 - NJ 18 (East Brunswick Twp), Thursday July 30th, 2026 thru Friday July 31st, 2026, 07:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Thursday July 30th, 2026 thru Friday July 31st, 2026, 09:00 PM thru 05:45 AM 1 Center lane of 3 lanes closed Fri, 24 Jul 2026 14:31:38 -0400 40.4789516369886 -74.4050704455689 US 1 northbound : roadwork NJDOT - STMC: Roadwork on US 1 Northbound near North of College Rd (South Brunswick Twp), Wednesday July 29, 2026 10:00 PM thru Thursday July 30, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 14:29:51 -0400 40.3614082336426 -74.6016387939453 New Jersey Turnpike northbound : paving operations NJ Turnpike Auth.: paving operations on New Jersey Turnpike Inner Roadway northbound South of Interchange 8 - NJ 33 (East Windsor Twp) to South of Molly Pitcher Service Area (Cranbury Twp), Thursday July 30th, 2026 thru Friday July 31st, 2026, 09:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed Fri, 24 Jul 2026 14:30:05 -0400 40.2389950333236 -74.5319003431718 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near Reaville Av (Raritan Twp), Monday July 27, 2026 08:00 PM thru 09:00 PM, left lane closed, moving operation Fri, 24 Jul 2026 14:29:53 -0400 40.4992065429688 -74.8558654785156 NJ 440 southbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Southbound at North of New Jersey Turnpike/I-287 (Edison Twp) Tuesday July 28, 2026 02:00 AM thru 05:00 AM, ramp, right partial lane Fri, 24 Jul 2026 14:29:52 -0400 40.5275917053223 -74.3336868286133 US 1 southbound : roadwork NJDOT - STMC: Roadwork on US 1 Southbound near South of Ridge Rd (South Brunswick Twp), Thursday July 30, 2026 10:00 PM thru Friday July 31, 2026 05:00 AM, left lane closed Fri, 24 Jul 2026 14:29:50 -0400 40.363525390625 -74.5990676879883 New Jersey Turnpike - Western Spur northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike - Western Spur northbound South of Interchange 15E - US 1&9 (Newark) to South of Interchange 15W - I-280 (Newark), Wednesday July 29th, 2026 thru Friday July 31st, 2026, Wednesday/Thursday, 08:00 PM thru 05:00 AM 1 Left lane of 5 lanes closed, Wednesday July 29th, 2026 thru Friday July 31st, 2026, Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Center lane of 5 lanes closed Fri, 24 Jul 2026 14:28:59 -0400 40.7245573935571 -74.133165522574 New Jersey Turnpike northbound : paving operations NJ Turnpike Auth.: paving operations on New Jersey Turnpike Inner Roadway northbound South of Interchange 8 - NJ 33 (East Windsor Twp) to South of Molly Pitcher Service Area (Cranbury Twp), Wednesday July 29th, 2026 thru Thursday July 30th, 2026, 09:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed Fri, 24 Jul 2026 14:27:25 -0400 40.2346916634073 -74.5394948845362 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp) and East of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp), Friday July 31, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 14:26:51 -0400 40.9309997558594 -74.9850921630859 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp) and East of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp), Tuesday July 28, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 14:26:50 -0400 40.9309997558594 -74.9850921630859 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp) and East of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp), Wednesday July 29, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 14:26:49 -0400 40.9309997558594 -74.9850921630859 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 21 - I-78 (Bridgewater Twp), left shoulder express lane Fri, 24 Jul 2026 14:27:03 -0400 40.6345100402832 -74.6439819335938 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Thursday July 30, 2026 10:00 PM thru Friday July 31, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 14:27:02 -0400 40.834114074707 -74.3345031738281 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Monday July 27, 2026 10:00 PM thru Tuesday July 28, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 14:27:00 -0400 40.834114074707 -74.3345031738281 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Tuesday July 28, 2026 10:00 PM thru Wednesday July 29, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 14:26:59 -0400 40.834114074707 -74.3345031738281 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Wednesday July 29, 2026 10:00 PM thru Thursday July 30, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 14:26:57 -0400 40.834114074707 -74.3345031738281 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp) and East of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 14:26:53 -0400 40.9309997558594 -74.9850921630859 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp) and East of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp), Thursday July 30, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 14:26:52 -0400 40.9309997558594 -74.9850921630859 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike northbound North of Interchange 4 - NJ 73 (Mount Laurel Twp), Wednesday July 29th, 2026 thru Thursday July 30th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 3 lanes closed, Wednesday July 29th, 2026 thru Thursday July 30th, 2026, 10:00 PM thru 03:00 AM 1 Center lane of 3 lanes closed Fri, 24 Jul 2026 14:25:53 -0400 39.965719598974 -74.9092495314301 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Inner Roadway northbound Entrance ramp Interchange 7A - I-195 (Robbinsville Twp), Thursday July 30th, 2026 thru Friday July 31st, 2026, 08:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 14:24:27 -0400 40.1956483265714 -74.5957775731673 New Jersey Turnpike eastbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike eastbound Exit ramp To NJ 440 from Interchange 10 (Edison Twp), Wednesday July 29th, 2026 thru Thursday July 30th, 2026, 10:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 14:23:24 -0400 40.5250251812643 -74.3318242428601 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Inner Roadway northbound Entrance ramp Interchange 9 - NJ 18 (East Brunswick Twp) to Interchange 9 - NJ 18 (New Brunswick), Wednesday July 29th, 2026 thru Saturday August 1st, 2026, Wednesday/Friday, 07:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 14:22:19 -0400 40.477325147167 -74.4028608555756 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Inner Roadway northbound Entrance ramp Interchange 8 - NJ 33 (East Windsor Twp), Wednesday July 29th, 2026 thru Thursday July 30th, 2026, 08:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 14:21:13 -0400 40.2635464541664 -74.5100163962118 New Jersey Turnpike - Eastern Spur southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike - Eastern Spur southbound Northern Mixing Bowl (Ridgefield) to South of Interchange 15E - US 1&9 (Newark), Wednesday July 29th, 2026 thru Friday July 31st, 2026, Wednesday/Thursday, 09:00 PM thru 04:00 AM All lanes closed Fri, 24 Jul 2026 14:19:27 -0400 40.8316274297349 -74.022705545025 New Jersey Turnpike southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Inner Roadway southbound North of Interchange 14 - I-78/US 1&9 (Newark) to Interchange 6 - Pennsylvania Turnpike (Mansfield Twp), Tuesday July 28th, 2026 thru Saturday August 1st, 2026, Tuesday/Friday, 09:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 14:18:33 -0400 40.7123303721567 -74.1442484155906 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Inner Roadway northbound Inner and Outer Roadway Merge (Mansfield Twp) to North of Interchange 14 - I-78/US 1&9 (Newark), Tuesday July 28th, 2026 thru Saturday August 1st, 2026, Tuesday/Thursday/Friday, 08:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 14:17:17 -0400 40.0797044170661 -74.7484351830285 New Jersey Turnpike southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Inner Roadway southbound Entrance ramp Interchange 13A - Newark Liberty International Airport/US 1&9 (Elizabeth), Tuesday July 28th, 2026 thru Wednesday July 29th, 2026, 08:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 14:16:00 -0400 40.6670659735988 -74.1835148564674 New Jersey Turnpike eastbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike eastbound Exit ramp To NJ 440 from Interchange 10 (Edison Twp), Tuesday July 28th, 2026 thru Wednesday July 29th, 2026, 07:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 14:14:47 -0400 40.525032971955 -74.3317648388433 New Jersey Turnpike southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Inner Roadway southbound Entrance ramp Interchange 10 - NJ 440/I-287 (Edison Twp), Tuesday July 28th, 2026 thru Wednesday July 29th, 2026, 07:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 14:13:38 -0400 40.5279483537113 -74.342119667329 New Jersey Turnpike southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Inner Roadway southbound Entrance ramp Interchange 9 - NJ 18 (East Brunswick Twp), Tuesday July 28th, 2026 thru Wednesday July 29th, 2026, 08:00 PM thru 06:00 AM All lanes closed Fri, 24 Jul 2026 14:12:34 -0400 40.4777953882856 -74.4065935435999 New Jersey Turnpike southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Inner Roadway southbound Entrance ramp Interchange 8A - NJ 32 (Monroe Twp) to Interchange 8A - NJ 32 (South Brunswick Twp), Tuesday July 28th, 2026 thru Wednesday July 29th, 2026, 08:00 PM thru 06:45 AM All lanes closed Fri, 24 Jul 2026 14:11:29 -0400 40.3467295452215 -74.4754124126412 New Jersey Turnpike - Western Spur southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike - Western Spur southbound North of Interchange 15W - I-280 (Kearny) to North of Interchange 15E - US 1&9 (Newark), Tuesday July 28th, 2026 thru Saturday August 1st, 2026, Tuesday/Friday, 07:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Tuesday July 28th, 2026 thru Saturday August 1st, 2026, Tuesday/Friday, 09:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed Fri, 24 Jul 2026 14:10:18 -0400 40.7670922561759 -74.1094033176762 New Jersey Turnpike southbound : paving operations NJ Turnpike Auth.: paving operations on New Jersey Turnpike Inner Roadway southbound South of Interchange 8A - NJ 32 (Monroe Twp) to North of Interchange 8 - NJ 33 (East Windsor Twp), Tuesday July 28th, 2026 thru Wednesday July 29th, 2026, 09:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed Fri, 24 Jul 2026 14:08:29 -0400 40.343607323769 -74.4767169920235 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Outer Roadway northbound Entrance ramp Interchange 10 - NJ 440/I-287 (Edison Twp), Monday July 27th, 2026 thru Tuesday July 28th, 2026, 07:00 PM thru 06:00 AM All lanes closed Fri, 24 Jul 2026 14:05:46 -0400 40.5242851399754 -74.3408816797045 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Outer Roadway northbound Entrance ramp Interchange 9 - NJ 18 (East Brunswick Twp), Monday July 27th, 2026 thru Tuesday July 28th, 2026, 08:00 PM thru 06:00 AM All lanes closed Fri, 24 Jul 2026 14:04:20 -0400 40.4773201784066 -74.4029069899372 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Outer Roadway northbound Entrance ramp Interchange 8 - NJ 33 (East Windsor Twp), Monday July 27th, 2026 thru Wednesday July 29th, 2026, Monday/Tuesday, 07:00 PM thru 06:45 AM All lanes closed Fri, 24 Jul 2026 14:03:21 -0400 40.2636148532228 -74.5100349091379 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Outer Roadway northbound Entrance ramp Interchange 7A - I-195 (Robbinsville Twp), Monday July 27th, 2026 thru Wednesday July 29th, 2026, Monday/Tuesday, 07:00 PM thru 06:45 AM All lanes closed Fri, 24 Jul 2026 14:02:09 -0400 40.1959685965655 -74.5955335849979 New Jersey Turnpike - Eastern Spur northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike - Eastern Spur northbound North of Southern Mixing Bowl (Newark) to South of Northern Mixing Bowl (Ridgefield), Monday July 27th, 2026 thru Tuesday July 28th, 2026, 09:00 PM thru 04:00 AM All lanes closed Fri, 24 Jul 2026 14:00:45 -0400 40.7153532504806 -74.1378574993731 New Jersey Turnpike northbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike Outer Roadway northbound Inner and Outer Roadway Merge (Mansfield Twp) to North of Interchange 14 - I-78/US 1&9 (Newark), Monday July 27th, 2026 thru Tuesday July 28th, 2026, 08:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 13:59:42 -0400 40.079602373513 -74.7483958281558 New Jersey Turnpike - Western Spur southbound : construction NJ Turnpike Auth.: construction on New Jersey Turnpike - Western Spur southbound North of Interchange 15W - I-280 (Kearny) to North of Interchange 15E - US 1&9 (Newark), Monday July 27th, 2026 thru Tuesday July 28th, 2026, 07:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Monday July 27th, 2026 thru Tuesday July 28th, 2026, 09:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed Fri, 24 Jul 2026 13:58:23 -0400 40.7670922561759 -74.1094033176762 New Jersey Turnpike northbound : paving operations NJ Turnpike Auth.: paving operations on New Jersey Turnpike Outer Roadway northbound South of Interchange 8 - NJ 33 (East Windsor Twp) to South of Molly Pitcher Service Area (Cranbury Twp), Monday July 27th, 2026 thru Tuesday July 28th, 2026, 09:00 PM thru 05:45 AM 2 Left lanes of 3 lanes closed Fri, 24 Jul 2026 13:56:51 -0400 40.2379314528869 -74.5334150591992 NJ 28 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 28 Eastbound between East of CR 635/Vosseller Av (Bound Brook) and CR 529/Washington Ave (Dunellen), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, right lane closed Fri, 24 Jul 2026 13:44:49 -0400 40.567268371582 -74.5393676757812 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Tuesday July 28, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:27:05 -0400 40.5087089538574 -74.6357803344727 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 517 (Andover Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 24 Jul 2026 13:27:04 -0400 40.9041709899902 -74.722282409668 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Wednesday July 29, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:27:03 -0400 40.5383033752441 -74.6155776977539 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 near CR 518/Washington St (Montgomery Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, right shoulder closed Fri, 24 Jul 2026 13:27:02 -0400 40.4031524658203 -74.649543762207 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Monday July 27, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:27:08 -0400 40.5087089538574 -74.6357803344727 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 607/Lackawanna Dr (Byram Twp) and I-80 (Mount Olive Twp), Friday July 31, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:27:07 -0400 40.9528503417969 -74.7354049682617 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Tuesday July 28, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:27:06 -0400 40.5383033752441 -74.6155776977539 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 near CR 518/Washington St (Montgomery Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right shoulder closed Fri, 24 Jul 2026 13:27:12 -0400 40.4031524658203 -74.649543762207 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 near South of CR 518/Washington St (Montgomery Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:27:11 -0400 40.3990707397461 -74.6514129638672 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 near South of CR 518/Washington St (Montgomery Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right shoulder closed Fri, 24 Jul 2026 13:27:10 -0400 40.3990707397461 -74.6514129638672 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Wednesday July 29, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:27:09 -0400 40.5087089538574 -74.6357803344727 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and North of CR 607/Lackawanna Dr (Byram Twp), Friday July 31, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:27:17 -0400 40.9041709899902 -74.722282409668 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 607/Lackawanna Dr (Byram Twp) and I-80 (Mount Olive Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:27:15 -0400 40.9528503417969 -74.7354049682617 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Thursday July 30, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:27:13 -0400 40.5087089538574 -74.6357803344727 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Friday July 31, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:27:20 -0400 40.5087089538574 -74.6357803344727 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and North of CR 607/Lackawanna Dr (Byram Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:27:18 -0400 40.9041709899902 -74.722282409668 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and North of CR 607/Lackawanna Dr (Byram Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:27:19 -0400 40.9041709899902 -74.722282409668 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 near South of CR 518/Washington St (Montgomery Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, right shoulder closed Fri, 24 Jul 2026 13:27:16 -0400 40.3990707397461 -74.6514129638672 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 near CR 518/Washington St (Montgomery Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, right shoulder closed Fri, 24 Jul 2026 13:27:21 -0400 40.4031524658203 -74.649543762207 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 607/Lackawanna Dr (Byram Twp) and I-80 (Mount Olive Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 24 Jul 2026 13:26:53 -0400 40.9528503417969 -74.7354049682617 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 607/Lackawanna Dr (Byram Twp) and I-80 (Mount Olive Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:26:52 -0400 40.9528503417969 -74.7354049682617 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 near South of CR 518/Washington St (Montgomery Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, right shoulder closed Fri, 24 Jul 2026 13:26:55 -0400 40.3990707397461 -74.6514129638672 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Monday July 27, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:26:56 -0400 40.5383033752441 -74.6155776977539 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between North of CR 607/Lackawanna Dr (Byram Twp) and I-80 (Mount Olive Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 24 Jul 2026 13:26:54 -0400 40.9528503417969 -74.7354049682617 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 near CR 518/Washington St (Montgomery Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:27:01 -0400 40.4031524658203 -74.649543762207 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 517 (Andover Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 24 Jul 2026 13:26:59 -0400 40.9041709899902 -74.722282409668 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Thursday July 30, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:26:58 -0400 40.5383033752441 -74.6155776977539 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Friday July 31, 2026 06:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 13:26:57 -0400 40.5383033752441 -74.6155776977539 US 130 southbound : roadwork NJDOT - STMC: Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:23:57 -0400 40.3272666931152 -74.5065383911133 US 130 southbound : roadwork NJDOT - STMC: Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:23:55 -0400 40.3272666931152 -74.5065383911133 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Friday July 31, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:23:54 -0400 40.2637748718262 -74.5466690063477 US 1&9/Tonnelle Avenue northbound : roadwork NJDOT - STMC: Roadwork on US 1&9/Tonnelle Avenue between 83rd St (North Bergen Twp) and North of Fairview Av (Fairview), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, left lane closed Fri, 24 Jul 2026 13:23:53 -0400 40.8083686828613 -74.0152435302734 US 130 southbound : roadwork NJDOT - STMC: Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:23:51 -0400 40.3272666931152 -74.5065383911133 US 130 southbound : roadwork NJDOT - STMC: Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Friday July 31, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:23:50 -0400 40.3272666931152 -74.5065383911133 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:23:49 -0400 40.2637748718262 -74.5466690063477 US 1&9/Tonnelle Avenue northbound : roadwork NJDOT - STMC: Roadwork on US 1&9/Tonnelle Avenue between 83rd St (North Bergen Twp) and North of Fairview Av (Fairview), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, left lane closed Fri, 24 Jul 2026 13:23:58 -0400 40.8083686828613 -74.0152435302734 NJ 28 westbound : roadwork NJDOT - STMC: Roadwork on NJ 28 Westbound between CR 529/Washington Ave (Dunellen) and East of CR 635/Vosseller Av (Bound Brook), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, right lane closed Fri, 24 Jul 2026 13:24:02 -0400 40.591423034668 -74.4637145996094 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:24:01 -0400 40.2637748718262 -74.5466690063477 US 130 southbound : roadwork NJDOT - STMC: Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:24:00 -0400 40.3272666931152 -74.5065383911133 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:23:59 -0400 40.2637748718262 -74.5466690063477 US 1&9/Tonnelle Avenue northbound : roadwork NJDOT - STMC: Roadwork on US 1&9/Tonnelle Avenue between 83rd St (North Bergen Twp) and North of Fairview Av (Fairview), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, left lane closed Fri, 24 Jul 2026 13:24:05 -0400 40.8083686828613 -74.0152435302734 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 13:24:04 -0400 40.2637748718262 -74.5466690063477 NJ 70 both directions : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Both Directions between East of Four Mile Circle (Pemberton Twp) and West of CR 530/Lakehurst Rd (Pemberton Twp) Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, 1 left lane of 2 lanes closed eastbound; 1 left lane of 2 lanes closed westbound Fri, 24 Jul 2026 12:58:44 -0400 39.9070014953613 -74.5700607299805 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and South of Paterson Hamburg Tpke (Kinnelon), Friday July 31, 2026 07:00 AM thru 05:00 PM, right lane closed Fri, 24 Jul 2026 12:53:56 -0400 40.9582290649414 -74.2821197509766 I-287 southbound : roadwork NJDOT - STMC: Roadwork on I-287 Southbound near South of Exit 37 - NJ 24 (Hanover Twp), Monday July 27, 2026 06:00 AM thru 02:00 PM, right shoulder closed Fri, 24 Jul 2026 12:53:53 -0400 40.8074913024902 -74.4528350830078 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and South of Paterson Hamburg Tpke (Kinnelon), Tuesday July 28, 2026 07:00 AM thru 05:00 PM, right lane closed Fri, 24 Jul 2026 12:53:52 -0400 40.9582290649414 -74.2821197509766 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and South of Paterson Hamburg Tpke (Kinnelon), Thursday July 30, 2026 07:00 AM thru 05:00 PM, right lane closed Fri, 24 Jul 2026 12:53:51 -0400 40.9582290649414 -74.2821197509766 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and South of Paterson Hamburg Tpke (Kinnelon), Monday July 27, 2026 07:00 AM thru 05:00 PM, right lane closed Fri, 24 Jul 2026 12:53:50 -0400 40.9582290649414 -74.2821197509766 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Alexander Av (Pequannock Twp) and South of Paterson Hamburg Tpke (Kinnelon), Wednesday July 29, 2026 07:00 AM thru 05:00 PM, right lane closed Fri, 24 Jul 2026 12:53:54 -0400 40.9582290649414 -74.2821197509766 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Monday July 27, 2026 06:00 AM thru 02:00 PM, right shoulder closed Fri, 24 Jul 2026 12:53:49 -0400 40.8037414550781 -74.4586410522461 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near Everitt Rd (Raritan Twp), Wednesday July 29, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 12:47:53 -0400 40.4592895507812 -74.8594207763672 US 1 northbound : roadwork NJDOT - STMC: Roadwork on US 1 Northbound near North of College Rd (South Brunswick Twp), Tuesday July 28, 2026 10:00 PM thru Wednesday July 29, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 12:47:51 -0400 40.3614082336426 -74.6016387939453 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near North of Toad Ln (Raritan Twp), Thursday July 30, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 12:47:50 -0400 40.4478530883789 -74.8585510253906 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near North of Toad Ln (Raritan Twp), Wednesday July 29, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 12:47:55 -0400 40.4478530883789 -74.8585510253906 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near North of Toad Ln (Raritan Twp), Tuesday July 28, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 12:47:54 -0400 40.4478530883789 -74.8585510253906 US 1 northbound : roadwork NJDOT - STMC: Roadwork on US 1 Northbound near North of College Rd (South Brunswick Twp), Monday July 27, 2026 10:00 PM thru Tuesday July 28, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 12:47:56 -0400 40.3614082336426 -74.6016387939453 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near North of Toad Ln (Raritan Twp), Friday July 31, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 12:48:00 -0400 40.4478530883789 -74.8585510253906 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near North of Toad Ln (Raritan Twp), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 12:47:58 -0400 40.4478530883789 -74.8585510253906 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near Everitt Rd (Raritan Twp), Tuesday July 28, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 12:47:57 -0400 40.4592895507812 -74.8594207763672 US 1&9 Truck Route northbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Northbound near Passaic River Drawbridge (Newark), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 12:45:00 -0400 40.7330894470215 -74.1207122802734 US 1&9 Truck Route northbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Northbound near Passaic River Drawbridge (Newark), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 05:00 AM, left lane closed Fri, 24 Jul 2026 12:44:58 -0400 40.7330894470215 -74.1207122802734 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of Paterson Hamburg Tpke (Kinnelon) and South of CR 680/Jackson Av (Pequannock Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 12:44:57 -0400 41.0110969543457 -74.3694152832031 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of Paterson Hamburg Tpke (Kinnelon) and South of CR 680/Jackson Av (Pequannock Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 12:44:52 -0400 41.0110969543457 -74.3694152832031 US 1&9 Truck Route northbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Northbound near Passaic River Drawbridge (Newark), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 05:00 AM, left lane closed Fri, 24 Jul 2026 12:44:51 -0400 40.7330894470215 -74.1207122802734 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of Paterson Hamburg Tpke (Kinnelon) and South of CR 680/Jackson Av (Pequannock Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 12:44:48 -0400 41.0110969543457 -74.3694152832031 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of Paterson Hamburg Tpke (Kinnelon) and South of CR 680/Jackson Av (Pequannock Twp), Friday July 31, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 12:44:56 -0400 41.0110969543457 -74.3694152832031 US 1&9 Truck Route northbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Northbound near Passaic River Drawbridge (Newark), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 12:44:54 -0400 40.7330894470215 -74.1207122802734 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of Paterson Hamburg Tpke (Kinnelon) and South of CR 680/Jackson Av (Pequannock Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 12:44:53 -0400 41.0110969543457 -74.3694152832031 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway southbound South of Exit 154 - US 46 (Clifton) to South of Exit 153A - NJ 3 (Bloomfield), Monday July 27th, 2026 thru Tuesday July 28th, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Tuesday July 28th, 2026 thru Tuesday July 28th, 2026, 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed Fri, 24 Jul 2026 12:26:39 -0400 40.8659694009323 -74.170718083283 Garden State Parkway southbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway southbound North of Exit 136 - Stiles St (Cranford Twp) to Garden State Parkway Local Lanes at North of Exit 124 - Main St (Sayreville), Friday July 31st, 2026 thru Saturday August 1st, 2026, 11:00 PM thru 07:00 AM 5 Right lanes of 6 lanes closed Fri, 24 Jul 2026 12:16:15 -0400 40.6458349593639 -74.2876938595884 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway southbound South of Essex Toll Plaza (Bloomfield) to North of Exit 144 - CR 510 (Newark), Saturday August 1st, 2026 thru Saturday August 1st, 2026, 12:00 AM thru 06:00 AM 2 Left lanes of 4 lanes closed Fri, 24 Jul 2026 12:14:45 -0400 40.8042960759312 -74.1849695958095 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway northbound South of Exit 144 - CR 510 (Irvington Twp) to South of Exit 145 - I-280 (East Orange), Friday July 31st, 2026 thru Saturday August 1st, 2026, 11:00 PM thru 06:00 AM 2 Left lanes of 4 lanes closed Fri, 24 Jul 2026 12:13:41 -0400 40.7358623661339 -74.2188571996454 Garden State Parkway southbound : construction NJ Turnpike Auth.: construction on Garden State Parkway southbound South of Exit 138 - CR 509 (Kenilworth) to South of Exit 137 - NJ 28 (Cranford Twp), Wednesday July 29th, 2026 thru Friday July 31st, 2026, Wednesday/Thursday, 08:00 PM thru 06:00 AM 1 Right lane of 5 lanes closed, Wednesday July 29th, 2026 thru Friday July 31st, 2026, Wednesday/Thursday, 09:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed, Thursday July 30th, 2026 thru Friday July 31st, 2026, 11:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed Fri, 24 Jul 2026 12:12:28 -0400 40.6777675230463 -74.278763899048 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 621/Hook Mountain Rd (Montville Twp) and West of I-80 (Denville Twp), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 06:00 AM, Fri, 24 Jul 2026 12:11:52 -0400 40.858585357666 -74.3399505615234 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 621/Hook Mountain Rd (Montville Twp) and West of I-80 (Denville Twp), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 06:00 AM, Fri, 24 Jul 2026 12:11:51 -0400 40.858585357666 -74.3399505615234 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 621/Hook Mountain Rd (Montville Twp) and West of I-80 (Denville Twp), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 06:00 AM, Fri, 24 Jul 2026 12:11:50 -0400 40.858585357666 -74.3399505615234 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of CR 621/Hook Mountain Rd (Montville Twp) and West of I-80 (Denville Twp), Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 06:00 AM, Fri, 24 Jul 2026 12:11:48 -0400 40.858585357666 -74.3399505615234 Garden State Parkway northbound : traffic shift NJ Turnpike Auth.: traffic shift on Garden State Parkway northbound South of Exit 144 - CR 510 (Irvington Twp) to South of Exit 145 - I-280 (East Orange), Wednesday July 29th, 2026 thru Thursday July 30th, 2026, 08:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Wednesday July 29th, 2026 thru Thursday July 30th, 2026, 10:00 PM thru 01:00 AM 1 Center lane of 4 lanes closed Fri, 24 Jul 2026 12:10:05 -0400 40.7358623661339 -74.2188571996454 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound near East of Exit 6 - Laurel Ave (West Orange Twp), Friday July 31, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 12:08:56 -0400 40.8030548095703 -74.2815933227539 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound near East of Exit 12 - Garden State Parkway (East Orange), Friday July 31, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 12:08:52 -0400 40.755729675293 -74.1999130249023 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound near East of Exit 12 - Garden State Parkway (East Orange), Monday July 27, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 12:08:50 -0400 40.755729675293 -74.1999130249023 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of I-80 (Denville Twp) and West of CR 621/Hook Mountain Rd (Montville Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, Fri, 24 Jul 2026 12:08:49 -0400 40.8972053527832 -74.4902877807617 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound near East of Exit 12 - Garden State Parkway (East Orange), Tuesday July 28, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 12:09:04 -0400 40.755729675293 -74.1999130249023 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound near East of Exit 12 - Garden State Parkway (East Orange), Thursday July 30, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 12:09:08 -0400 40.755729675293 -74.1999130249023 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound near East of Exit 6 - Laurel Ave (West Orange Twp), Thursday July 30, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 12:09:06 -0400 40.8030548095703 -74.2815933227539 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of I-80 (Denville Twp) and West of CR 621/Hook Mountain Rd (Montville Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, Fri, 24 Jul 2026 12:09:02 -0400 40.8972053527832 -74.4902877807617 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound near East of Exit 6 - Laurel Ave (West Orange Twp), Monday July 27, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 12:09:11 -0400 40.8030548095703 -74.2815933227539 Pulaski Skyway northbound : roadwork NJDOT - STMC: Roadwork on Pulaski Skyway at South Kearny (South Kearny) Wednesday July 29, 2026 09:00 AM thru 03:00 PM, ramp Fri, 24 Jul 2026 12:09:09 -0400 40.7344398498535 -74.1040878295898 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of I-80 (Denville Twp) and West of CR 621/Hook Mountain Rd (Montville Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, Fri, 24 Jul 2026 12:09:17 -0400 40.8972053527832 -74.4902877807617 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound near East of Exit 12 - Garden State Parkway (East Orange), Wednesday July 29, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 12:09:16 -0400 40.755729675293 -74.1999130249023 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound near East of Exit 6 - Laurel Ave (West Orange Twp), Tuesday July 28, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 12:09:15 -0400 40.8030548095703 -74.2815933227539 US 1&9 northbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Northbound between I-78 (Newark) and South of US 1&9 Truck Route/Pulaski Skyway (Newark), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed express lane , moving operation Fri, 24 Jul 2026 12:09:13 -0400 40.7085342407227 -74.1771850585938 Pulaski Skyway northbound : roadwork NJDOT - STMC: Roadwork on Pulaski Skyway at South Kearny (South Kearny) Thursday July 30, 2026 09:00 AM thru 03:00 PM, ramp Fri, 24 Jul 2026 12:09:21 -0400 40.7344398498535 -74.1040878295898 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of I-80 (Denville Twp) and West of CR 621/Hook Mountain Rd (Montville Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, Fri, 24 Jul 2026 12:09:20 -0400 40.8972053527832 -74.4902877807617 Pulaski Skyway northbound : roadwork NJDOT - STMC: Roadwork on Pulaski Skyway at South Kearny (South Kearny) Friday July 31, 2026 09:00 AM thru 03:00 PM, ramp Fri, 24 Jul 2026 12:09:18 -0400 40.7344398498535 -74.1040878295898 I-280 eastbound : roadwork NJDOT - STMC: Roadwork on I-280 Eastbound near East of Exit 6 - Laurel Ave (West Orange Twp), Wednesday July 29, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 12:09:12 -0400 40.8030548095703 -74.2815933227539 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, right shoulder closed Fri, 24 Jul 2026 12:05:48 -0400 40.862434387207 -73.9752578735352 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between East of Exit 65 - Green St (Teterboro) and East of Exit 67 - River Rd (Bogota), Monday July 27, 2026 01:00 PM thru 03:00 PM, right shoulder closed local lane Fri, 24 Jul 2026 12:05:52 -0400 40.8679504394531 -74.0534286499023 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound near South of CR 602/Danforth Av (Jersey City), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation Fri, 24 Jul 2026 12:05:50 -0400 40.703685760498 -74.1011581420898 NJ 440 southbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Southbound between North of NJ 185 (Jersey City) and North of 30th St (Bayonne), Friday July 31, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation Fri, 24 Jul 2026 12:05:49 -0400 40.6853790283203 -74.0930099487305 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane Fri, 24 Jul 2026 12:05:57 -0400 40.9222297668457 -74.0780715942383 NJ 440 southbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Southbound between North of NJ 185 (Jersey City) and North of 30th St (Bayonne), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation Fri, 24 Jul 2026 12:05:56 -0400 40.6853790283203 -74.0930099487305 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 12:05:55 -0400 40.862434387207 -73.9752578735352 NJ 440 southbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Southbound between North of NJ 185 (Jersey City) and North of 30th St (Bayonne), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation Fri, 24 Jul 2026 12:05:53 -0400 40.6853790283203 -74.0930099487305 NJ 440 southbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Southbound between North of NJ 185 (Jersey City) and North of 30th St (Bayonne), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation Fri, 24 Jul 2026 12:06:00 -0400 40.6853790283203 -74.0930099487305 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound between West of Exit 58 - Madison Ave (Paterson) and West of Exit 61 - CR 507/River Rd (Paterson), Monday July 27, 2026 09:00 AM thru 12:00 PM, right shoulder closed Fri, 24 Jul 2026 12:05:59 -0400 40.9070587158203 -74.1665191650391 NJ 4 westbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right shoulder closed Fri, 24 Jul 2026 12:05:58 -0400 40.862434387207 -73.9752578735352 Garden State Parkway : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway Express Lanes Exit 105 - NJ 36 (Tinton Falls) to North of Exit 105 - NJ 36 (Tinton Falls), Tuesday July 28th, 2026 thru Wednesday July 29th, 2026, 10:30 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 12:02:44 -0400 40.2845051636037 -74.0844722545945 Garden State Parkway southbound : traffic shift NJ Turnpike Auth.: traffic shift on Garden State Parkway southbound South of Essex Toll Plaza (Bloomfield) to North of Exit 144 - CR 510 (Newark), Tuesday July 28th, 2026 thru Friday July 31st, 2026, Tuesday/Thursday, 08:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed, Wednesday July 29th, 2026 thru Friday July 31st, 2026, Wednesday/Friday, 12:00 AM thru 05:00 AM 1 Center lane of 4 lanes closed Fri, 24 Jul 2026 12:01:10 -0400 40.8042960759312 -74.1849695958095 Garden State Parkway northbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway Local Lanes northbound South of Garden State Parkway - Jon Bon Jovi Service Area (Old Bridge Twp) to Garden State Parkway at North of Driscoll Bridge (Woodbridge Twp), Monday July 27th, 2026 thru Friday July 31st, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed Fri, 24 Jul 2026 11:59:09 -0400 40.4511618240693 -74.2706675775517 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway Local Lanes northbound Entrance ramp Exit 124 - Main St (Sayreville), Monday July 27th, 2026 thru Friday July 31st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 11:57:11 -0400 40.4762540315915 -74.29733 Garden State Parkway northbound : construction NJ Turnpike Auth.: construction on Garden State Parkway northbound Exit ramp Exit 125 - NJ 35 (Sayreville), Monday July 27th, 2026 thru Friday July 31st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed Fri, 24 Jul 2026 11:47:21 -0400 40.4918681315264 -74.3007990583044 Garden State Parkway southbound : milling NJ Turnpike Auth.: milling and paving operations on Garden State Parkway southbound North of Exit 136 - Stiles St (Cranford Twp) to North of Exit 132 - NJ 27 (Woodbridge Twp), Monday July 27th, 2026 thru Thursday July 30th, 2026, Monday/Tuesday/Wednesday, 08:00 PM thru 06:00 AM 1 Right lane of 5 lanes closed, Monday July 27th, 2026 thru Thursday July 30th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed, Monday July 27th, 2026 thru Thursday July 30th, 2026, Monday/Tuesday/Wednesday, 10:00 PM thru 06:00 AM 1 Center lane of 5 lanes closed Fri, 24 Jul 2026 11:45:28 -0400 40.6458349593639 -74.2876938595884 Garden State Parkway northbound : traffic shift NJ Turnpike Auth.: traffic shift on Garden State Parkway northbound South of Exit 144 - CR 510 (Irvington Twp) to South of Exit 145 - I-280 (East Orange), Monday July 27th, 2026 thru Thursday July 30th, 2026, Monday/Wednesday, 08:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed, Monday July 27th, 2026 thru Thursday July 30th, 2026, Monday/Wednesday, 10:00 PM thru 06:00 AM 1 Center lane of 4 lanes closed Fri, 24 Jul 2026 11:43:40 -0400 40.7358623661339 -74.2188571996454 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Wednesday July 29, 2026 10:00 PM thru Thursday July 30, 2026 06:00 AM, right lane closed local lane Fri, 24 Jul 2026 11:27:09 -0400 40.8605499267578 -74.3977203369141 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound near North of I-80 (Wayne Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 05:00 AM, left lane closed Fri, 24 Jul 2026 11:27:07 -0400 40.9016876220703 -74.255859375 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Friday July 31, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 11:27:06 -0400 40.8899612426758 -74.1311798095703 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound near North of I-80 (Wayne Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, left lane closed Fri, 24 Jul 2026 11:27:00 -0400 40.9016876220703 -74.255859375 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 11:26:59 -0400 40.8899612426758 -74.1311798095703 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 11:26:58 -0400 40.6294021606445 -74.4338760375977 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 11:27:05 -0400 40.8899612426758 -74.1311798095703 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 11:27:04 -0400 40.8899612426758 -74.1311798095703 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 11:27:03 -0400 40.6294021606445 -74.4338760375977 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Thursday July 30, 2026 10:00 PM thru Friday July 31, 2026 06:00 AM, right lane closed local lane Fri, 24 Jul 2026 11:27:01 -0400 40.8605499267578 -74.3977203369141 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 11:27:13 -0400 40.6294021606445 -74.4338760375977 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound near North of I-80 (Wayne Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 05:00 AM, left lane closed Fri, 24 Jul 2026 11:27:11 -0400 40.9016876220703 -74.255859375 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 11:27:10 -0400 40.8899612426758 -74.1311798095703 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Friday July 31, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 11:26:57 -0400 40.8931846618652 -74.2573089599609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 11:26:56 -0400 40.8931846618652 -74.2573089599609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 11:26:54 -0400 40.8931846618652 -74.2573089599609 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound near North of I-80 (Wayne Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 05:00 AM, left lane closed Fri, 24 Jul 2026 11:26:53 -0400 40.9016876220703 -74.255859375 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 11:26:51 -0400 40.6294021606445 -74.4338760375977 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 11:26:50 -0400 40.8931846618652 -74.2573089599609 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 11:26:49 -0400 40.8931846618652 -74.2573089599609 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Gray St (North Plainfield), Friday July 31, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 11:26:48 -0400 40.6294021606445 -74.4338760375977 NJ 208 southbound : roadwork NJDOT - STMC: Roadwork on NJ 208 Southbound near North of Maple Ave (Glen Rock), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 06:00 AM, right lane closed Fri, 24 Jul 2026 11:20:58 -0400 40.9513740539551 -74.1383666992188 NJ 208 southbound : roadwork NJDOT - STMC: Roadwork on NJ 208 Southbound near North of Maple Ave (Glen Rock), Wednesday July 29, 2026 09:00 PM thru Thursday July 30, 2026 06:00 AM, right lane closed Fri, 24 Jul 2026 11:20:57 -0400 40.9513740539551 -74.1383666992188 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound at Exit 54 - Minnisink Rd (Totowa) Thursday July 30, 2026 11:00 PM thru Friday July 31, 2026 05:00 AM, ramp Fri, 24 Jul 2026 11:20:56 -0400 40.8995971679688 -74.23388671875 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound at Exit 54 - Minnisink Rd (Totowa) Wednesday July 29, 2026 11:00 PM thru Thursday July 30, 2026 05:00 AM, ramp Fri, 24 Jul 2026 11:20:55 -0400 40.8995971679688 -74.23388671875 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound at Exit 54 - Minnisink Rd (Totowa) Monday July 27, 2026 11:00 PM thru Tuesday July 28, 2026 05:00 AM, ramp Fri, 24 Jul 2026 11:20:59 -0400 40.8995971679688 -74.23388671875 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near West of Exit 53 - NJ 23/US 46 (Wayne Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 11:20:48 -0400 40.8958282470703 -74.2563858032227 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound at Exit 54 - Minnisink Rd (Totowa) Tuesday July 28, 2026 11:00 PM thru Wednesday July 29, 2026 05:00 AM, ramp Fri, 24 Jul 2026 11:20:53 -0400 40.8995971679688 -74.23388671875 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound at Exit 37 - CR 513/Hibernia Ave (Rockaway Twp) Monday July 27, 2026 11:00 PM thru Tuesday July 28, 2026 05:00 AM, ramp Fri, 24 Jul 2026 11:20:52 -0400 40.9101753234863 -74.5060501098633 NJ 208 northbound : roadwork NJDOT - STMC: Roadwork on NJ 208 Northbound near South of Maple Ave (Fair Lawn), Monday July 27, 2026 10:00 PM thru Tuesday July 28, 2026 06:00 AM, left lane closed Fri, 24 Jul 2026 11:20:51 -0400 40.9489860534668 -74.1359634399414 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near West of Exit 53 - NJ 23/US 46 (Wayne Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 11:20:50 -0400 40.8958282470703 -74.2563858032227 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near West of Exit 53 - NJ 23/US 46 (Wayne Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 05:00 AM, right lane closed Fri, 24 Jul 2026 11:21:00 -0400 40.8958282470703 -74.2563858032227 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Monday July 27, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 09:56:52 -0400 40.8320922851562 -75.0009841918945 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Tuesday July 28, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 09:56:50 -0400 40.8320922851562 -75.0009841918945 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Friday July 31, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 09:56:49 -0400 40.8320922851562 -75.0009841918945 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound at West of Exit 2 - CR 510/Columbia Turnpike (Hanover Twp) Friday July 31, 2026 09:00 AM thru 05:00 PM, ramp Fri, 24 Jul 2026 09:56:48 -0400 40.7921600341797 -74.427490234375 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Wednesday July 29, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 09:56:54 -0400 40.8320922851562 -75.0009841918945 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound near US 46 (White Twp), Thursday July 30, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 09:56:53 -0400 40.8320922851562 -75.0009841918945 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Monday July 27, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 09:41:51 -0400 40.8538780212402 -74.9309310913086 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Wednesday July 29, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 09:41:53 -0400 40.8538780212402 -74.9309310913086 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near South of CR 567/First Av (Raritan Boro), Wednesday July 29, 2026 07:00 AM thru 05:00 PM, right shoulder closed Fri, 24 Jul 2026 09:41:54 -0400 40.574390411377 -74.6470718383789 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Friday July 31, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 09:41:55 -0400 40.8538780212402 -74.9309310913086 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near South of CR 567/First Av (Raritan Boro), Monday July 27, 2026 07:00 AM thru 05:00 PM, right shoulder closed Fri, 24 Jul 2026 09:41:48 -0400 40.574390411377 -74.6470718383789 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Tuesday July 28, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 09:41:49 -0400 40.8538780212402 -74.9309310913086 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near West of CR 611/Hope Rd (Liberty Twp), Thursday July 30, 2026 09:00 AM thru 03:30 PM, right shoulder closed Fri, 24 Jul 2026 09:41:50 -0400 40.8538780212402 -74.9309310913086 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near South of CR 567/First Av (Raritan Boro), Thursday July 30, 2026 07:00 AM thru 05:00 PM, right shoulder closed Fri, 24 Jul 2026 09:41:57 -0400 40.574390411377 -74.6470718383789 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near South of CR 567/First Av (Raritan Boro), Friday July 31, 2026 07:00 AM thru 05:00 PM, right shoulder closed Fri, 24 Jul 2026 09:41:58 -0400 40.574390411377 -74.6470718383789 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near South of CR 567/First Av (Raritan Boro), Tuesday July 28, 2026 07:00 AM thru 05:00 PM, right shoulder closed Fri, 24 Jul 2026 09:41:47 -0400 40.574390411377 -74.6470718383789 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound near West of Exit 33 - CR 525/Liberty Corner Rd/Martinsville (Bernards Twp), Monday July 27, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 24 Jul 2026 09:38:52 -0400 40.6462593078613 -74.5865859985352 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound near West of Exit 33 - CR 525/Liberty Corner Rd/Martinsville (Bernards Twp), Tuesday July 28, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 24 Jul 2026 09:38:51 -0400 40.6462593078613 -74.5865859985352 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound near South of Exit 35 - NJ 124 (Morristown), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM) Fri, 24 Jul 2026 09:38:50 -0400 40.7833290100098 -74.4714508056641 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound at West of Exit 2 - CR 510/Columbia Turnpike (Hanover Twp) Thursday July 30, 2026 09:00 AM thru 05:00 PM, ramp Fri, 24 Jul 2026 09:38:49 -0400 40.7921600341797 -74.427490234375 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound near West of Exit 33 - CR 525/Liberty Corner Rd/Martinsville (Bernards Twp), Friday July 31, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 24 Jul 2026 09:38:57 -0400 40.6462593078613 -74.5865859985352 I-287 northbound : roadwork NJDOT - STMC: Roadwork on I-287 Northbound between South of Exit 35 - NJ 124 (Morristown) and North of Exit 35 - NJ 124 (Morristown), Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 05:00 AM, at least one lane closed Fri, 24 Jul 2026 09:38:56 -0400 40.7833290100098 -74.4714508056641 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound near West of Exit 33 - CR 525/Liberty Corner Rd/Martinsville (Bernards Twp), Wednesday July 29, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 24 Jul 2026 09:38:54 -0400 40.6462593078613 -74.5865859985352 I-78 westbound : roadwork NJDOT - STMC: Roadwork on I-78 Westbound near West of Exit 33 - CR 525/Liberty Corner Rd/Martinsville (Bernards Twp), Thursday July 30, 2026 09:00 AM thru 02:00 PM, left lane closed Fri, 24 Jul 2026 09:38:48 -0400 40.6462593078613 -74.5865859985352 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Tuesday July 28, 2026 07:00 AM thru 05:00 PM, right shoulder closed Fri, 24 Jul 2026 08:44:48 -0400 40.5741958618164 -74.6357498168945 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Friday July 31, 2026 07:00 AM thru 05:00 PM, right shoulder closed Fri, 24 Jul 2026 08:44:47 -0400 40.5741958618164 -74.6357498168945 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Monday July 27, 2026 07:00 AM thru 05:00 PM, right shoulder closed Fri, 24 Jul 2026 08:44:52 -0400 40.5741958618164 -74.6357498168945 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Wednesday July 29, 2026 07:00 AM thru 05:00 PM, right shoulder closed Fri, 24 Jul 2026 08:44:51 -0400 40.5741958618164 -74.6357498168945 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Thursday July 30, 2026 07:00 AM thru 05:00 PM, right shoulder closed Fri, 24 Jul 2026 08:44:49 -0400 40.5741958618164 -74.6357498168945 NJ 55 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Southbound near South of Exit 35 - CR 674/Garden Rd (Vineland), Friday July 31, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:20 -0400 39.5052223205566 -75.0695037841797 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound between West of Atlantic City Expressway/Indiana Av (Atlantic City) and West of Casino Parking (Atlantic City), Friday July 31, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 08:21:23 -0400 39.3766403198242 -74.4499664306641 NJ 55 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 55 Northbound near North of Exit 32 - NJ 56 (Vineland), Friday July 31, 2026 09:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:22 -0400 39.502326965332 -75.0696868896484 NJ 36 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Southbound near Long Branch Av (Long Branch), Tuesday July 28, 2026 09:30 PM thru Wednesday July 29, 2026 05:30 AM, right shoulder closed Fri, 24 Jul 2026 08:20:50 -0400 40.3132629394531 -73.9845886230469 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Tuesday July 28, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:20:58 -0400 40.0001487731934 -74.8623733520508 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound near East of New Jersey Turnpike/I-295 (Carneys Point Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 08:20:56 -0400 39.6816558837891 -75.4626007080078 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:20:57 -0400 40.0001487731934 -74.8623733520508 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound near East of New Jersey Turnpike/I-295 (Carneys Point Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 08:20:55 -0400 39.6816558837891 -75.4626007080078 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Thursday July 30, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:20:48 -0400 39.9504470825195 -74.9297866821289 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound near South of Florence Av (Long Branch), Monday July 27, 2026 09:30 PM thru Tuesday July 28, 2026 05:30 AM, right shoulder closed Fri, 24 Jul 2026 08:21:00 -0400 40.3120536804199 -73.9877777099609 NJ 36 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Northbound near South of Florence Av (Long Branch), Tuesday July 28, 2026 09:30 PM thru Wednesday July 29, 2026 05:30 AM, right shoulder closed Fri, 24 Jul 2026 08:20:49 -0400 40.3120536804199 -73.9877777099609 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Wednesday July 29, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:20:53 -0400 40.0001487731934 -74.8623733520508 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 10 - Center Square Rd (Logan Twp) and South of Exit 16 - CR 653/Swedesboro Rd (Greenwich Twp), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:20:51 -0400 39.768913269043 -75.3515243530273 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Friday July 31, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:02 -0400 39.9504470825195 -74.9297866821289 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Wednesday July 29, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:01 -0400 39.9504470825195 -74.9297866821289 NJ 36 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 36 Southbound near Long Branch Av (Long Branch), Monday July 27, 2026 09:30 PM thru Tuesday July 28, 2026 05:30 AM, right shoulder closed Fri, 24 Jul 2026 08:21:06 -0400 40.3132629394531 -73.9845886230469 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 10 - Center Square Rd (Logan Twp) and South of Exit 16 - CR 653/Swedesboro Rd (Greenwich Twp), Wednesday July 29, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:04 -0400 39.768913269043 -75.3515243530273 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of CR 663/California Ave (Absecon City) and US 30/White Horse Pike (Absecon City), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 05:00 AM, right shoulder closed Fri, 24 Jul 2026 08:21:10 -0400 39.4159317016602 -74.5116729736328 I-676 northbound : roadwork NJDOT - TOC South: Roadwork on I-676 Northbound at South of Exit 4 - Atlantic Ave (Camden) Thursday July 30, 2026 11:00 PM thru Friday July 31, 2026 05:00 AM, ramp Fri, 24 Jul 2026 08:21:09 -0400 39.9263801574707 -75.1161041259766 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Tuesday July 28, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:08 -0400 39.9504470825195 -74.9297866821289 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Monday July 27, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:14 -0400 39.9504470825195 -74.9297866821289 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Friday July 31, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:13 -0400 40.0001487731934 -74.8623733520508 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 10 - Center Square Rd (Logan Twp) and South of Exit 16 - CR 653/Swedesboro Rd (Greenwich Twp), Tuesday July 28, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:12 -0400 39.768913269043 -75.3515243530273 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 10 - Center Square Rd (Logan Twp) and South of Exit 16 - CR 653/Swedesboro Rd (Greenwich Twp), Thursday July 30, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:11 -0400 39.768913269043 -75.3515243530273 I-676 southbound : roadwork NJDOT - TOC South: Roadwork on I-676 Southbound at South of Exit 4 - Atlantic Ave (Camden) Thursday July 30, 2026 11:00 PM thru Friday July 31, 2026 05:00 AM, ramp Fri, 24 Jul 2026 08:21:18 -0400 39.9278182983398 -75.1158828735352 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Thursday July 30, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:17 -0400 40.0001487731934 -74.8623733520508 I-295 northbound : roadwork NJDOT - TOC South: Roadwork on I-295 Northbound between North of Exit 10 - Center Square Rd (Logan Twp) and South of Exit 16 - CR 653/Swedesboro Rd (Greenwich Twp), Friday July 31, 2026 07:00 AM thru 03:00 PM, right shoulder closed Fri, 24 Jul 2026 08:21:16 -0400 39.768913269043 -75.3515243530273 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between South of CR 528/Herbert St (Mantoloking) and North of Kittiwake Av (Toms River Twp), Friday July 31, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation Fri, 24 Jul 2026 08:21:15 -0400 40.0332946777344 -74.0519180297852 NJ 94 northbound : roadwork NJDOT - STMC: Roadwork on NJ 94 Northbound near South of CR 610/Stillwater Rd (Fredon Twp), Monday July 27, 2026 08:00 AM thru 02:00 PM, right shoulder closed Fri, 24 Jul 2026 07:53:51 -0400 41.0213050842285 -74.8310623168945 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 521/Montague River Rd (Montague Twp) and I-80 (Mount Olive Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 07:53:50 -0400 41.3001518249512 -74.7946395874023 US 206 southbound : roadwork NJDOT - STMC: Roadwork on US 206 near North of South Bridge St (Somerville), Friday July 31, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 07:53:49 -0400 40.5615310668945 -74.6198654174805 US 1&9 northbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Northbound at CR 624/North Ave (Elizabeth) Thursday July 30, 2026 11:00 PM thru Friday July 31, 2026 05:00 AM, ramp, right partial lane local lane Fri, 24 Jul 2026 07:53:48 -0400 40.6766662597656 -74.1978302001953 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Friday July 31, 2026 08:00 AM thru 03:30 PM, ramp Fri, 24 Jul 2026 07:53:47 -0400 40.4643707275391 -74.2710800170898 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 521/Montague River Rd (Montague Twp) and I-80 (Mount Olive Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 07:53:56 -0400 41.3001518249512 -74.7946395874023 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 521/Montague River Rd (Montague Twp) and I-80 (Mount Olive Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 07:53:55 -0400 41.3001518249512 -74.7946395874023 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 521/Montague River Rd (Montague Twp) and I-80 (Mount Olive Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 07:53:54 -0400 41.3001518249512 -74.7946395874023 US 1&9 southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Southbound near North of CR 624/North Ave (Elizabeth), Thursday July 30, 2026 07:00 PM thru 11:00 PM, right shoulder closed express lane Fri, 24 Jul 2026 07:53:53 -0400 40.6779518127441 -74.1964263916016 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound near West of New Jersey Turnpike - Eastern Spur (Secaucus), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, left lane closed Fri, 24 Jul 2026 07:53:59 -0400 40.7892379760742 -74.051399230957 US 206 northbound : roadwork NJDOT - STMC: Roadwork on US 206 between South of CR 521/Montague River Rd (Montague Twp) and I-80 (Mount Olive Twp), Friday July 31, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 07:53:58 -0400 41.3001518249512 -74.7946395874023 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound near West of New Jersey Turnpike - Eastern Spur (Secaucus), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Fri, 24 Jul 2026 07:53:57 -0400 40.7892379760742 -74.051399230957 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Wednesday July 29, 2026 05:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 07:51:02 -0400 40.8061561584473 -74.4446868896484 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Tuesday July 28, 2026 05:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 07:50:59 -0400 40.8061561584473 -74.4446868896484 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, at least one lane closed Fri, 24 Jul 2026 07:51:00 -0400 40.867805480957 -74.4501113891602 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Thursday July 30, 2026 05:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 07:50:58 -0400 40.8061561584473 -74.4446868896484 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Monday July 27, 2026 05:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 07:50:57 -0400 40.8061561584473 -74.4446868896484 NJ 24 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Eastbound between East of I-287 (Morris Twp) and I-78 (Springfield Twp), Friday July 31, 2026 05:00 AM thru 03:00 PM, right lane closed Fri, 24 Jul 2026 07:50:53 -0400 40.8061561584473 -74.4446868896484 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 08:00 PM to 06:00 AM) Fri, 24 Jul 2026 07:50:47 -0400 40.867805480957 -74.4501113891602 Sports Illustrated Stadium : soccer game TRANSCOM, Jersey City: soccer game on Sports Illustrated Stadium at (Harrison) Gotham FC vs. Portland Thorns FC, Friday August 28th, 2026, 08:00 PM thru 11:00 PM Fri, 24 Jul 2026 09:44:13 -0400 40.7366914609768 -74.1502866405472 Sports Illustrated Stadium : soccer game TRANSCOM, Jersey City: soccer game on Sports Illustrated Stadium at (Harrison) Gotham FC vs. Kansas City Current, Friday August 14th, 2026, 08:00 PM thru 11:00 PM Fri, 24 Jul 2026 07:35:38 -0400 40.7366914609768 -74.1502866405472 Sports Illustrated Stadium : soccer game TRANSCOM, Jersey City: soccer game on Sports Illustrated Stadium at (Harrison) Gotham FC vs. San Diego Wave FC, Friday August 7th, 2026, 08:00 PM thru 11:00 PM Fri, 24 Jul 2026 07:34:06 -0400 40.7366914609768 -74.1502866405472 US 130 northbound : roadwork NJ DOT - TOC South: Roadwork on US 130 Northbound North of CR 616/Cove Rd (Pennsauken Twp) Monday July 27, 2026 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 23 Jul 2026 19:03:56 -0400 39.9667892456055 -75.0469131469727 US 130 northbound : roadwork NJ DOT - TOC South: Roadwork on US 130 Northbound North of CR 616/Cove Rd (Pennsauken Twp) Tuesday July 28, 2026 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 23 Jul 2026 19:03:50 -0400 39.9667892456055 -75.0469131469727 US 130 northbound : roadwork NJ DOT - TOC South: Roadwork on US 130 Northbound North of CR 616/Cove Rd (Pennsauken Twp) Wednesday July 29, 2026 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed Thu, 23 Jul 2026 19:03:46 -0400 39.9667892456055 -75.0469131469727 NJ 49 northbound : roadwork NJ DOT - TOC South: Roadwork on NJ 49 Northbound East of NJ 45 (Salem) Wednesday July 29, 2026 10:00 AM thru 04:00 PM, 1 right lane of 2 lanes closed Thu, 23 Jul 2026 19:03:03 -0400 39.5703201293945 -75.4647369384766 NJ 208 southbound : roadwork NJDOT - STMC: Roadwork on NJ 208 Southbound near North of Fair Lawn Av (Fair Lawn), Monday July 27, 2026 05:00 AM thru 06:00 AM, left lane closed Thu, 23 Jul 2026 15:23:52 -0400 40.9420280456543 -74.1289825439453 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Wednesday July 29, 2026 08:00 AM thru 03:30 PM, ramp Thu, 23 Jul 2026 14:02:54 -0400 40.4643707275391 -74.2710800170898 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Thursday July 30, 2026 08:00 AM thru 03:30 PM, ramp Thu, 23 Jul 2026 14:02:59 -0400 40.4643707275391 -74.2710800170898 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Monday July 27, 2026 08:00 AM thru 03:30 PM, ramp Thu, 23 Jul 2026 14:02:55 -0400 40.4643707275391 -74.2710800170898 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Tuesday July 28, 2026 08:00 AM thru 03:30 PM, ramp Thu, 23 Jul 2026 14:02:52 -0400 40.4643707275391 -74.2710800170898 NJ 35 northbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Northbound near Morgan Drawbridge (Sayreville), Monday July 27, 2026 08:00 AM thru 03:30 PM, right lane closed Thu, 23 Jul 2026 13:44:53 -0400 40.4634284973145 -74.2602920532227 NJ 35 northbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Northbound near Morgan Drawbridge (Sayreville), Tuesday July 28, 2026 08:00 AM thru 03:30 PM, right lane closed Thu, 23 Jul 2026 13:44:51 -0400 40.4634284973145 -74.2602920532227 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound between South of CR 628/Jackson Valley Rd (Washington Twp) and North of NJ 57/Washington Ave (Washington Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right shoulder closed Thu, 23 Jul 2026 13:44:50 -0400 40.7733879089355 -74.9783706665039 NJ 35 northbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Northbound near Morgan Drawbridge (Sayreville), Thursday July 30, 2026 08:00 AM thru 03:30 PM, right lane closed Thu, 23 Jul 2026 13:44:49 -0400 40.4634284973145 -74.2602920532227 NJ 35 northbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Northbound near Morgan Drawbridge (Sayreville), Wednesday July 29, 2026 08:00 AM thru 03:30 PM, right lane closed Thu, 23 Jul 2026 13:44:55 -0400 40.4634284973145 -74.2602920532227 NJ 31 southbound : roadwork NJDOT - STMC: Roadwork on NJ 31 Southbound between South of CR 628/Jackson Valley Rd (Washington Twp) and North of NJ 57/Washington Ave (Washington Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right shoulder closed Thu, 23 Jul 2026 13:44:54 -0400 40.7733879089355 -74.9783706665039 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, at least one lane closed Thu, 23 Jul 2026 13:41:48 -0400 40.867805480957 -74.4501113891602 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 08:00 PM to 06:00 AM) Thu, 23 Jul 2026 13:41:56 -0400 40.867805480957 -74.4501113891602 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, at least one lane closed Thu, 23 Jul 2026 13:41:57 -0400 40.867805480957 -74.4501113891602 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 08:00 PM to 06:00 AM) Thu, 23 Jul 2026 13:42:03 -0400 40.867805480957 -74.4501113891602 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, at least one lane closed Thu, 23 Jul 2026 13:42:00 -0400 40.867805480957 -74.4501113891602 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 30 - Howard Blvd (Roxbury Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 08:00 PM to 06:00 AM) Thu, 23 Jul 2026 13:42:05 -0400 40.867805480957 -74.4501113891602 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound near West of US 130/Collingswood Circle (Collingswood), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 08:00 PM, right lane closed Thu, 23 Jul 2026 12:36:10 -0400 39.9204940795898 -75.0875701904297 US 30 eastbound : Construction NJDOT - TOC South: Roadwork on US 30 Eastbound between East of I-676/Ben Franklin Bridge (Camden) and West of CR 608/Baird Blvd (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:36:10 -0400 39.9476280212402 -75.1173934936523 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound between West of CR 608/Baird Blvd (Camden) and East of I-676/Ben Franklin Bridge (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right lane closed Thu, 23 Jul 2026 12:36:10 -0400 39.9407043457031 -75.0997772216797 I-295 southbound : Construction NJDOT - TOC South: Roadwork on I-295 Southbound at north of Exit 69 - US 206 (Lawrence Twp) Continuous Friday June 5, 2026 03:00 AM thru Monday August 31, 2026 03:00 PM, ramp Thu, 23 Jul 2026 12:36:10 -0400 40.2858772277832 -74.7353897094727 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound East of CR 637/Liberty Rd (Greenwich Twp) Wednesday July 29, 2026 07:00 PM thru Thursday July 30, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:17:35 -0400 40.7045402526855 -75.1162261962891 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound East of CR 637/Liberty Rd (Greenwich Twp) Friday July 31, 2026 07:00 PM thru Saturday August 1, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:17:44 -0400 40.7045402526855 -75.1162261962891 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound East of CR 637/Liberty Rd (Greenwich Twp) Thursday July 30, 2026 07:00 PM thru Friday July 31, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:17:40 -0400 40.7045402526855 -75.1162261962891 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound East of CR 637/Liberty Rd (Greenwich Twp) Tuesday July 28, 2026 07:00 PM thru Wednesday July 29, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:17:30 -0400 40.7045402526855 -75.1162261962891 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound East of CR 637/Liberty Rd (Greenwich Twp) Monday July 27, 2026 07:00 PM thru Tuesday July 28, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:17:25 -0400 40.7045402526855 -75.1162261962891 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound East of CR 637/Liberty Rd (Greenwich Twp) Sunday July 26, 2026 07:00 PM thru Monday July 27, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:17:06 -0400 40.7045402526855 -75.1162261962891 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Wednesday July 29, 2026 07:00 PM thru Thursday July 30, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:11:39 -0400 40.7022018432617 -75.1369171142578 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Tuesday July 28, 2026 07:00 PM thru Wednesday July 29, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:11:34 -0400 40.7022018432617 -75.1369171142578 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Friday July 31, 2026 07:00 PM thru Saturday August 1, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:11:49 -0400 40.7022018432617 -75.1369171142578 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Thursday July 30, 2026 07:00 PM thru Friday July 31, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:11:44 -0400 40.7022018432617 -75.1369171142578 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Monday July 27, 2026 07:00 PM thru Tuesday July 28, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:11:29 -0400 40.7022018432617 -75.1369171142578 NJ 57 eastbound : roadwork NJ DOT - STMC: Roadwork on NJ 57 Eastbound from CR 519/Uniontown Rd (Lopatcong Twp) to CR 637/Liberty Rd (Greenwich Twp) Sunday July 26, 2026 07:00 PM thru Monday July 27, 2026 06:00 AM, All lanes open Thu, 23 Jul 2026 12:14:53 -0400 40.7022018432617 -75.1369171142578 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound near South of CR 689/Lawrence Pkwy (Old Bridge Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 23 Jul 2026 11:23:59 -0400 40.4540786743164 -74.2433776855469 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound near South of CR 689/Lawrence Pkwy (Old Bridge Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 23 Jul 2026 11:23:51 -0400 40.4540786743164 -74.2433776855469 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound at West of Exit 58 - US 1&9/E. Port St (Newark) Monday July 27, 2026 09:00 AM thru 02:00 PM, ramp, right partial lane local lane Thu, 23 Jul 2026 11:23:57 -0400 40.710880279541 -74.168830871582 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound near South of CR 689/Lawrence Pkwy (Old Bridge Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 23 Jul 2026 11:23:55 -0400 40.4540786743164 -74.2433776855469 NJ 35 southbound : roadwork NJDOT - STMC: Roadwork on NJ 35 Southbound near South of CR 689/Lawrence Pkwy (Old Bridge Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed Thu, 23 Jul 2026 11:23:48 -0400 40.4540786743164 -74.2433776855469 Freedom Mortgage Pavilion : concert TRANSCOM, Jersey City: concert on Freedom Mortgage Pavilion at (Camden) Chris Stapleton (All-American Road Show), Friday August 28th, 2026 thru Saturday August 29th, 2026, Friday/Saturday, 07:30 PM thru 10:30 PM Thu, 23 Jul 2026 09:20:02 -0400 39.9406767277634 -75.1298654079437 Freedom Mortgage Pavilion : concert TRANSCOM, Jersey City: concert on Freedom Mortgage Pavilion at (Camden) Kehlani (THE KEHLANI WORLD TOUR), Wednesday August 26th, 2026, 07:00 PM thru 10:00 PM Thu, 23 Jul 2026 09:18:55 -0400 39.9406767277634 -75.1298654079437 Freedom Mortgage Pavilion : concert TRANSCOM, Jersey City: concert on Freedom Mortgage Pavilion at (Camden) Lynyrd Skynyrd & Foreigner (Double Trouble Double Vision Tour), Thursday August 20th, 2026, 06:30 PM thru 10:30 PM Thu, 23 Jul 2026 09:18:03 -0400 39.9406767277634 -75.1298654079437 Freedom Mortgage Pavilion : concert TRANSCOM, Jersey City: concert on Freedom Mortgage Pavilion at (Camden) Avenged Sevenfold & Good Charlotte, Friday August 14th, 2026, 06:00 PM thru 09:00 PM Thu, 23 Jul 2026 09:16:58 -0400 39.9406767277634 -75.1298654079437 Freedom Mortgage Pavilion : concert TRANSCOM, Jersey City: concert on Freedom Mortgage Pavilion at (Camden) Riley Green (Cowboy As It Gets Tour), Thursday August 13th, 2026, 07:00 PM thru 10:00 PM Thu, 23 Jul 2026 09:15:29 -0400 39.9406767277634 -75.1298654079437 Freedom Mortgage Pavilion : concert TRANSCOM, Jersey City: concert on Freedom Mortgage Pavilion at (Camden) 5 Seconds of Summer (EVERYONE'S A STAR! World Tour), Saturday August 8th, 2026, 08:00 PM thru 11:00 PM Thu, 23 Jul 2026 09:15:49 -0400 39.9406767277634 -75.1298654079437 Freedom Mortgage Pavilion : concert TRANSCOM, Jersey City: concert on Freedom Mortgage Pavilion at (Camden) Muse (The Wow! Signal Tour), Wednesday July 29th, 2026, 07:00 PM thru 10:00 PM Thu, 23 Jul 2026 09:13:41 -0400 39.9406767277634 -75.1298654079437 Freedom Mortgage Pavilion : concert TRANSCOM, Jersey City: concert on Freedom Mortgage Pavilion at (Camden) WMGK Big Gig 2026: M�tley Cr�e (Return Of The Carnival Of Sin), Monday July 27th, 2026, 06:30 PM thru 09:30 PM Thu, 23 Jul 2026 09:12:21 -0400 39.9406767277634 -75.1298654079437 Port Street westbound : Construction Port Authority NY/NJ: Construction, construction on Port Street westbound Outer Port Street (Newark) to Brewster Road (Newark) 1 Left lane of 3 lanes closed Thu, 23 Jul 2026 08:24:25 -0400 40.7036788855868 -74.1478919353638 Outer Port Street eastbound : Construction Port Authority NY/NJ: Construction, construction on Outer Port Street eastbound between Port Street and Corbin Street (Newark) 1 Left lane of 3 lanes closed Thu, 23 Jul 2026 07:15:48 -0400 40.7041105046764 -74.1494159879183 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near US 30/White Horse Pike (Absecon City), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 05:00 AM, right shoulder closed Wed, 22 Jul 2026 20:33:28 -0400 39.4271278381348 -74.505973815918 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near US 30/White Horse Pike (Absecon City), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, right shoulder closed Wed, 22 Jul 2026 20:33:14 -0400 39.4271278381348 -74.505973815918 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between North of NJ 66 (Ocean Twp) and North of Shark River Drawbridge (Neptune Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Wed, 22 Jul 2026 20:33:27 -0400 40.2292785644531 -74.0390014648438 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between South of CR 528/Herbert St (Mantoloking) and North of Kittiwake Av (Toms River Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation Wed, 22 Jul 2026 20:33:21 -0400 40.0332946777344 -74.0519180297852 US 206 southbound : roadwork NJDOT - STMC: Roadwork on US 206 near North of South Bridge St (Somerville), Thursday July 30, 2026 07:00 AM thru 04:00 PM, right shoulder closed Wed, 22 Jul 2026 20:33:22 -0400 40.5615310668945 -74.6198654174805 NJ 33 westbound : roadwork NJDOT - TOC South: Roadwork on NJ 33 Westbound at East of NJ 18 (Neptune Twp) Thursday July 30, 2026 12:00 AM thru 05:00 AM, ramp Wed, 22 Jul 2026 20:33:17 -0400 40.2061576843262 -74.0510864257812 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between South of CR 528/Herbert St (Mantoloking) and North of Kittiwake Av (Toms River Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation Wed, 22 Jul 2026 20:33:18 -0400 40.0332946777344 -74.0519180297852 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between North of NJ 66 (Ocean Twp) and North of Shark River Drawbridge (Neptune Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Wed, 22 Jul 2026 20:33:19 -0400 40.2292785644531 -74.0390014648438 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between North of NJ 66 (Ocean Twp) and North of Shark River Drawbridge (Neptune Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right shoulder closed, moving operation Wed, 22 Jul 2026 20:32:48 -0400 40.2292785644531 -74.0390014648438 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between I-295 (Logan Twp) and South of US 322 (Logan Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Wed, 22 Jul 2026 20:32:57 -0400 39.8041801452637 -75.311767578125 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between South of CR 528/Herbert St (Mantoloking) and North of Kittiwake Av (Toms River Twp), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation Wed, 22 Jul 2026 20:32:55 -0400 40.0332946777344 -74.0519180297852 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between South of US 322 (Logan Twp) and I-295 (Logan Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Wed, 22 Jul 2026 20:32:54 -0400 39.8020935058594 -75.3527145385742 NJ 35 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 35 Southbound between South of CR 528/Herbert St (Mantoloking) and North of Kittiwake Av (Toms River Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation Wed, 22 Jul 2026 20:33:00 -0400 40.0332946777344 -74.0519180297852 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near US 30/White Horse Pike (Absecon City), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 05:00 AM, right shoulder closed Wed, 22 Jul 2026 20:32:58 -0400 39.4271278381348 -74.505973815918 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound between West of Atlantic City Expressway/Indiana Av (Atlantic City) and West of Casino Parking (Atlantic City), Thursday July 30, 2026 09:00 AM thru 03:00 PM, right lane closed Wed, 22 Jul 2026 20:32:51 -0400 39.3766403198242 -74.4499664306641 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between I-295 (Logan Twp) and South of US 322 (Logan Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, left lane closed Wed, 22 Jul 2026 20:33:06 -0400 39.8041801452637 -75.311767578125 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between South of US 322 (Logan Twp) and I-295 (Logan Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, left lane closed Wed, 22 Jul 2026 20:33:05 -0400 39.8020935058594 -75.3527145385742 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound between South of US 322 (Logan Twp) and I-295 (Logan Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, left lane closed Wed, 22 Jul 2026 20:33:13 -0400 39.8020935058594 -75.3527145385742 US 9 southbound : roadwork NJDOT - TOC South: Roadwork on US 9 Southbound near North of Groveland Av (Somers Point), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 12:00 PM, right shoulder closed Wed, 22 Jul 2026 20:33:12 -0400 39.3264236450195 -74.5987396240234 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound between West of Atlantic City Expressway/Indiana Av (Atlantic City) and West of Casino Parking (Atlantic City), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Wed, 22 Jul 2026 20:33:11 -0400 39.3766403198242 -74.4499664306641 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near East of CR 645/Graisbury Av (Audubon), Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Wed, 22 Jul 2026 20:33:03 -0400 39.8901977539062 -75.0645980834961 NJ 70 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Eastbound East of CR 541/Main St (Medford Twp) Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Wed, 22 Jul 2026 18:57:22 -0400 39.9051246643066 -74.8162384033203 NJ 70 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Eastbound East of CR 541/Main St (Medford Twp) Thursday July 30, 2026 09:00 AM thru 03:00 PM, right shoulder closed Wed, 22 Jul 2026 18:57:38 -0400 39.9051246643066 -74.8162384033203 NJ 70 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Eastbound East of CR 541/Main St (Medford Twp) Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right shoulder closed Wed, 22 Jul 2026 18:57:33 -0400 39.9051246643066 -74.8162384033203 NJ 70 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 70 Eastbound East of CR 541/Main St (Medford Twp) Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right shoulder closed Wed, 22 Jul 2026 18:57:27 -0400 39.9051246643066 -74.8162384033203 Corbin Street northbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Corbin Street northbound between Kellogg Street (Newark) and Outer Port Street (Newark), Monday July 27th, 2026 thru Wednesday July 29th, 2026, Monday/Tuesday, 06:00 PM thru 04:00 AM 1 Left lane of 2 lanes closed Wed, 22 Jul 2026 17:34:05 -0400 40.7027739777369 -74.1515703231052 North Avenue eastbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on North Avenue eastbound between Brewster Road (Elizabeth) and Ikea Drive (Elizabeth), Monday July 27th,2026 thru Wednesday July 29th,2026, Monday/Tuesday, 06:00 PM thru 04:00 AM 1 Left lane of 3 lanes closed eastbound, Sat, 25 Jul 2026 04:00:01 -0400 40.6704903699145 -74.1801738611965 US 206 southbound : roadwork NJDOT - STMC: Roadwork on US 206 near North of South Bridge St (Somerville), Tuesday July 28, 2026 07:00 AM thru 04:00 PM, right shoulder closed Fri, 24 Jul 2026 13:26:52 -0400 40.5615310668945 -74.6198654174805 US 206 southbound : roadwork NJDOT - STMC: Roadwork on US 206 near North of South Bridge St (Somerville), Wednesday July 29, 2026 07:00 AM thru 04:00 PM, right shoulder closed Wed, 22 Jul 2026 15:50:52 -0400 40.5615310668945 -74.6198654174805 NJ 27 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Northbound from North of CR 615/North Stiles St (Linden) to North of CR 619/Roselle St (Linden) Thursday July 30, 2026 09:00 AM thru 03:00 PM, right shoulder closed Wed, 22 Jul 2026 15:25:00 -0400 40.6291007995605 -74.271240234375 NJ 27 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Northbound from North of CR 615/North Stiles St (Linden) to North of CR 619/Roselle St (Linden) Monday July 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed Wed, 22 Jul 2026 15:24:43 -0400 40.6291007995605 -74.271240234375 NJ 27 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Northbound from North of CR 615/North Stiles St (Linden) to North of CR 619/Roselle St (Linden) Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right shoulder closed Wed, 22 Jul 2026 15:24:52 -0400 40.6291007995605 -74.271240234375 NJ 27 northbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Northbound from North of CR 615/North Stiles St (Linden) to North of CR 619/Roselle St (Linden) Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right shoulder closed Wed, 22 Jul 2026 15:24:48 -0400 40.6291007995605 -74.271240234375 Sports Illustrated Stadium : soccer game TRANSCOM, Jersey City: soccer game on Sports Illustrated Stadium at (Harrison) NYCFC vs. Cruz Azul (League Cup), Sunday August 9th, 2026, 07:30 PM thru 10:30 PM Wed, 22 Jul 2026 14:44:47 -0400 40.7366914609768 -74.1502866405472 Sports Illustrated Stadium : soccer game TRANSCOM, Jersey City: soccer game on Sports Illustrated Stadium at (Harrison) NYCFC vs. Club Necaxa (League Cup), Thursday August 13th, 2026, 07:30 PM thru 10:30 PM Wed, 22 Jul 2026 14:42:02 -0400 40.7366914609768 -74.1502866405472 Sports Illustrated Stadium : soccer game TRANSCOM, Jersey City: soccer game on Sports Illustrated Stadium at (Harrison) NYCFC vs. Santos Laguna (League Cup), Thursday August 6th, 2026, 07:30 PM thru 10:30 PM Wed, 22 Jul 2026 14:40:41 -0400 40.7366914609768 -74.1502866405472 Sports Illustrated Stadium : soccer game New York Red Bulls: soccer game on Sports Illustrated Stadium at (Harrison) NYNJ Red Bulls vs. Philadelphia Union, Saturday August 29th, 2026, 07:30 PM thru 10:30 PM Wed, 22 Jul 2026 14:29:21 -0400 40.7366914609768 -74.1502866405472 Sports Illustrated Stadium : soccer game New York Red Bulls: soccer game on Sports Illustrated Stadium at (Harrison) NYNJ Red Bulls vs. Chicago Fire FC, Saturday August 22nd, 2026, 07:30 PM thru 10:30 PM Wed, 22 Jul 2026 14:29:45 -0400 40.7366914609768 -74.1502866405472 Sports Illustrated Stadium : soccer game New York Red Bulls: soccer game on Sports Illustrated Stadium at (Harrison) NYNJ Red Bulls vs. Nashville SC, Wednesday August 19th, 2026, 07:30 PM thru 10:30 PM Wed, 22 Jul 2026 14:26:29 -0400 40.7366914609768 -74.1502866405472 Sports Illustrated Stadium : soccer game New York Red Bulls: soccer game on Sports Illustrated Stadium at (Harrison) NYNJ Red Bulls vs. Orlando City SC, Saturday August 1st, 2026, 07:30 PM thru 10:30 PM Wed, 22 Jul 2026 14:23:52 -0400 40.7366914609768 -74.1502866405472 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound from South of Poinier St (Newark) to North of Meeker Av (Newark) Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, 1 right lane of 4 lanes, right shoulder closed Wed, 22 Jul 2026 12:52:05 -0400 40.7165908813477 -74.1870269775391 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound from South of Poinier St (Newark) to North of Meeker Av (Newark) Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, 1 right lane of 4 lanes, right shoulder closed Wed, 22 Jul 2026 12:51:59 -0400 40.7165908813477 -74.1870269775391 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound from South of Poinier St (Newark) to North of Meeker Av (Newark) Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, 1 right lane of 4 lanes, right shoulder closed Wed, 22 Jul 2026 12:51:53 -0400 40.7165908813477 -74.1870269775391 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound from South of Poinier St (Newark) to North of Meeker Av (Newark) Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, 1 right lane of 4 lanes, right shoulder closed Wed, 22 Jul 2026 12:51:47 -0400 40.7165908813477 -74.1870269775391 NJ 27 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 27 Southbound from South of Poinier St (Newark) to North of Meeker Av (Newark) Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 06:00 AM, 1 right lane of 4 lanes, right shoulder closed Wed, 22 Jul 2026 12:51:41 -0400 40.7165908813477 -74.1870269775391 NJ 48 eastbound : Construction NJ DOT - TOC South: Roadwork on NJ 48 Eastbound from West of CR 551/Pennsville-Auburn Rd (Carneys Point Twp) to East of CR 551/Pennsville-Auburn Rd (Carneys Point Twp) Wednesday July 22, 2026 07:00 AM thru Wednesday July 29, 2026 03:00 PM, right shoulder closed Wed, 22 Jul 2026 07:00:26 -0400 39.7043914794922 -75.4421997070312 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of CR 643/Mountain Ave (Bridgewater Twp), Tuesday July 28, 2026 11:00 AM thru 12:00 PM, right shoulder closed Tue, 21 Jul 2026 15:29:54 -0400 40.5811653137207 -74.6126251220703 US 22 westbound : roadwork NJDOT - STMC: Roadwork on US 22 Westbound near East of CR 643/Mountain Ave (Bridgewater Twp), left shoulder Tue, 21 Jul 2026 15:29:53 -0400 40.5811653137207 -74.6126251220703 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of NJ 33 Business (Freehold Twp) and South of Schibanoff Ln (Freehold Twp), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 05:00 AM, right lane closed Tue, 21 Jul 2026 11:57:05 -0400 40.258731842041 -74.2914352416992 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of NJ 33 Business (Freehold Twp) and South of Schibanoff Ln (Freehold Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 05:00 AM, right lane closed Tue, 21 Jul 2026 11:56:56 -0400 40.258731842041 -74.2914352416992 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of NJ 33 Business (Freehold Twp) and South of Schibanoff Ln (Freehold Twp), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, right lane closed Tue, 21 Jul 2026 11:56:53 -0400 40.258731842041 -74.2914352416992 US 9 northbound : roadwork NJDOT - TOC South: Roadwork on US 9 Northbound between North of NJ 33 Business (Freehold Twp) and South of Schibanoff Ln (Freehold Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 05:00 AM, right lane closed Tue, 21 Jul 2026 11:57:02 -0400 40.258731842041 -74.2914352416992 NJ 23 southbound : roadwork NJ DOT - STMC: Roadwork on NJ 23 Southbound South of CR 643/Mill St (Sussex) Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 05:00 AM, All lanes closed and detoured Tue, 21 Jul 2026 10:47:47 -0400 41.2094612121582 -74.6086578369141 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Monday July 27, 2026 08:00 AM thru 02:00 PM, right shoulder closed Tue, 21 Jul 2026 10:03:40 -0400 41.1034126281738 -74.5682983398438 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Friday July 31, 2026 10:00 AM thru 03:30 PM, intersection Tue, 21 Jul 2026 10:03:39 -0400 40.7204971313477 -74.0934066772461 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Wednesday July 29, 2026 09:00 AM thru 02:00 PM, right lane closed Tue, 21 Jul 2026 10:03:38 -0400 39.7488327026367 -75.3786315917969 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Wednesday July 29, 2026 10:00 AM thru 03:30 PM, intersection Tue, 21 Jul 2026 10:03:17 -0400 40.7204971313477 -74.0934066772461 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near North of NJ 38 (Pennsauken Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Tue, 21 Jul 2026 10:03:16 -0400 39.9362373352051 -75.077766418457 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near CR 613/River Av/Main St (Readington Twp), Friday July 31, 2026 10:00 AM thru 03:00 PM, right shoulder closed Tue, 21 Jul 2026 10:03:13 -0400 40.5253791809082 -74.7985992431641 US 130 northbound : roadwork NJDOT - TOC South: Roadwork on US 130 Northbound near North of NJ 38 (Pennsauken Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, right lane closed Tue, 21 Jul 2026 10:03:21 -0400 39.9362373352051 -75.077766418457 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near CR 613/River Av/Main St (Readington Twp), Tuesday July 28, 2026 10:00 AM thru 03:00 PM, right shoulder closed Tue, 21 Jul 2026 10:03:20 -0400 40.5253791809082 -74.7985992431641 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Thursday July 30, 2026 08:00 AM thru 02:00 PM, right shoulder closed Tue, 21 Jul 2026 10:03:19 -0400 41.1034126281738 -74.5682983398438 US 40 westbound : roadwork NJDOT - TOC South: Roadwork on US 40 Westbound between East of CR 620/Kings Highway (Pilesgrove Twp) and West of CR 620/Kings Highway (Pilesgrove Twp), Monday August 3, 2026 08:00 PM thru Tuesday August 4, 2026 06:00 AM, right shoulder closed Tue, 21 Jul 2026 10:03:18 -0400 39.6531066894531 -75.3518753051758 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Tuesday July 28, 2026 08:00 AM thru 02:00 PM, right shoulder closed Tue, 21 Jul 2026 10:03:28 -0400 41.1034126281738 -74.5682983398438 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Tuesday July 28, 2026 09:00 AM thru 02:00 PM, right lane closed Tue, 21 Jul 2026 10:03:23 -0400 39.7488327026367 -75.3786315917969 US 130 southbound : roadwork NJDOT - STMC: Roadwork on US 130 Southbound between Half Acre Rd (Cranbury Twp) and South of CR 615/Station Rd (Cranbury Twp), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 06:00 AM, right shoulder closed Tue, 21 Jul 2026 10:03:31 -0400 40.3158416748047 -74.5088043212891 US 130 northbound : roadwork NJDOT - STMC: Roadwork on US 130 Northbound between South of CR 615/Station Rd (Cranbury Twp) and Half Acre Rd (Cranbury Twp), Thursday July 30, 2026 09:00 PM thru Friday July 31, 2026 06:00 AM, right shoulder closed Tue, 21 Jul 2026 10:03:25 -0400 40.3016319274902 -74.512092590332 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Wednesday July 29, 2026 08:00 AM thru 02:00 PM, right shoulder closed Tue, 21 Jul 2026 10:03:11 -0400 41.1034126281738 -74.5682983398438 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near CR 613/River Av/Main St (Readington Twp), Monday July 27, 2026 10:00 AM thru 03:00 PM, right shoulder closed Tue, 21 Jul 2026 10:03:12 -0400 40.5253791809082 -74.7985992431641 NJ 29 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 29 Northbound near South of Church Rd (Hopewell Twp), Thursday July 30, 2026 09:00 AM thru 02:00 PM, right shoulder closed Tue, 21 Jul 2026 10:02:50 -0400 40.307243347168 -74.8783569335938 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound near South of Exit 10 - Center Square Rd (Logan Twp), Monday July 27, 2026 09:00 AM thru 02:00 PM, right lane closed Tue, 21 Jul 2026 10:02:57 -0400 39.7488327026367 -75.3786315917969 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Thursday July 30, 2026 10:00 AM thru 03:30 PM, intersection Tue, 21 Jul 2026 10:02:53 -0400 40.7204971313477 -74.0934066772461 NJ 23 southbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Southbound between South of CR 517/Munsonhurst Rd (Hardyston Twp) and South of Beaver Lake Rd (Hardyston Twp), Friday July 31, 2026 08:00 AM thru 02:00 PM, right shoulder closed Tue, 21 Jul 2026 10:03:02 -0400 41.1034126281738 -74.5682983398438 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near CR 613/River Av/Main St (Readington Twp), Thursday July 30, 2026 10:00 AM thru 03:00 PM, right shoulder closed Tue, 21 Jul 2026 10:03:01 -0400 40.5253791809082 -74.7985992431641 US 202 northbound : roadwork NJDOT - STMC: Roadwork on US 202 Northbound near CR 613/River Av/Main St (Readington Twp), Wednesday July 29, 2026 10:00 AM thru 03:00 PM, right shoulder closed Tue, 21 Jul 2026 10:03:08 -0400 40.5253791809082 -74.7985992431641 US 322 westbound : Construction NJDOT - TOC South: Roadwork on US 322 Westbound near East of I-295 (Logan Twp), Continuous Tuesday July 21, 2026 09:00 AM thru Thursday July 30, 2026 03:00 PM, left lane closed Tue, 21 Jul 2026 09:00:08 -0400 39.7751350402832 -75.338005065918 US 322 eastbound : Construction NJDOT - TOC South: Roadwork on US 322 Eastbound near West of I-295 (Logan Twp), Continuous Tuesday July 21, 2026 09:00 AM thru Thursday July 30, 2026 03:00 PM, left lane closed Tue, 21 Jul 2026 09:00:08 -0400 39.7807083129883 -75.3401870727539 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Tuesday July 28, 2026 10:00 AM thru 03:30 PM, intersection Mon, 20 Jul 2026 22:56:51 -0400 40.7204971313477 -74.0934066772461 US 130 southbound : Construction NJDOT - TOC South: Roadwork on US 130 Southbound near North of US 206 (Bordentown Twp), Continuous Monday July 20, 2026 08:00 PM thru Sunday September 20, 2026 05:00 AM, right lane closed Mon, 20 Jul 2026 20:00:25 -0400 40.144889831543 -74.7018814086914 NJ 48 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 48 Eastbound from West of CR 551/Pennsville-Auburn Rd (Carneys Point Twp) to East of CR 551/Pennsville-Auburn Rd (Carneys Point Twp) Wednesday July 22, 2026 07:00 AM thru Wednesday July 29, 2026 03:00 PM, right shoulder closed Mon, 20 Jul 2026 16:06:19 -0400 39.7043914794922 -75.4421997070312 NJ 440 northbound : roadwork NJDOT - STMC: Roadwork on NJ 440 Northbound at South of US 1&9 Truck Route/Communipaw Av (Jersey City) Monday July 27, 2026 10:00 AM thru 03:30 PM, intersection Mon, 20 Jul 2026 14:15:19 -0400 40.7204971313477 -74.0934066772461 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near South of CR 692/Franklin Av (Berlin), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, right shoulder closed, moving operation Mon, 20 Jul 2026 08:26:59 -0400 39.8100128173828 -74.9308166503906 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Saturday August 8, 2026 11:00 PM thru Sunday August 9, 2026 05:00 AM, right turn lane Mon, 20 Jul 2026 08:26:57 -0400 40.750171661377 -74.1677703857422 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound between North of Riverton Rd (Cinnaminson Twp) and North of Church Rd (Cinnaminson Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 03:00 AM, right shoulder closed Mon, 20 Jul 2026 08:26:53 -0400 39.9994354248047 -74.9877090454102 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound between West of CR 544/Evesham Av (Magnolia) and West of CR 678/Summerdale Rd (Somerdale), Tuesday July 28, 2026 09:00 AM thru 02:00 PM, right lane closed Mon, 20 Jul 2026 08:27:02 -0400 39.8578758239746 -75.0297012329102 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near South of CR 692/Franklin Av (Berlin), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right shoulder closed, moving operation Mon, 20 Jul 2026 08:27:00 -0400 39.8100128173828 -74.9308166503906 NJ 45 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 45 near North of CR 632/Berkeley Rd/Mantua Rd (Mantua Twp), Tuesday August 4, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 20 Jul 2026 08:27:04 -0400 39.7944869995117 -75.1723403930664 US 322 westbound : roadwork NJDOT - TOC South: Roadwork on US 322 Westbound between East of CR 555/Tuckahoe Rd (Monroe Twp) and West of CR 555/Tuckahoe Rd (Monroe Twp), Thursday August 6, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 20 Jul 2026 08:27:03 -0400 39.6879501342773 -75.0068588256836 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near South of CR 692/Franklin Av (Berlin), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 06:00 AM, right shoulder closed, moving operation Mon, 20 Jul 2026 08:26:50 -0400 39.8100128173828 -74.9308166503906 NJ 73 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Northbound between CR 708/Gibbsboro Rd (Berlin) and North of CR 692/Franklin Av (Berlin), Wednesday August 5, 2026 09:00 AM thru 03:00 PM, right shoulder closed Mon, 20 Jul 2026 08:26:49 -0400 39.8015174865723 -74.9319915771484 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Friday August 7, 2026 11:00 PM thru Saturday August 8, 2026 05:00 AM, right turn lane Mon, 20 Jul 2026 08:26:48 -0400 40.750171661377 -74.1677703857422 NJ 73 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 73 Southbound near South of CR 692/Franklin Av (Berlin), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 06:00 AM, right shoulder closed, moving operation Mon, 20 Jul 2026 08:26:52 -0400 39.8100128173828 -74.9308166503906 US 322 westbound : roadwork NJDOT - TOC South: Roadwork on US 322 Westbound near East of I-295 (Logan Twp), Continuous Tuesday July 21, 2026 09:00 AM thru Thursday July 30, 2026 03:00 PM, left lane closed Sun, 19 Jul 2026 16:24:22 -0400 39.7751350402832 -75.338005065918 US 322 eastbound : roadwork NJDOT - TOC South: Roadwork on US 322 Eastbound near West of I-295 (Logan Twp), Continuous Tuesday July 21, 2026 09:00 AM thru Thursday July 30, 2026 03:00 PM, left lane closed Sun, 19 Jul 2026 16:23:49 -0400 39.7807083129883 -75.3401870727539 US 130 southbound : roadwork NJDOT - TOC South: Roadwork on US 130 Southbound near North of US 206 (Bordentown Twp), Continuous Monday July 20, 2026 08:00 PM thru Sunday September 20, 2026 05:00 AM, right lane closed Fri, 17 Jul 2026 11:15:26 -0400 40.144889831543 -74.7018814086914 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 649/Front St (Elmer) and East of CR 553/Buck Rd (Upper Pittsgrove Twp), Monday July 27, 2026 09:00 AM thru 01:00 PM, right shoulder closed Fri, 17 Jul 2026 10:09:55 -0400 39.5950736999512 -75.1717529296875 NJ 94 northbound : roadwork NJDOT - STMC: Roadwork on NJ 94 Northbound between North of CR 521/Stillwater Rd (Frelinghuysen Twp) and North of CR 659/Spring Valley Rd (Frelinghuysen Twp), Monday July 27, 2026 09:00 AM thru 03:00 PM, alternating traffic closed, moving operation Fri, 17 Jul 2026 10:09:37 -0400 40.9752082824707 -74.9351425170898 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Wednesday July 29, 2026 11:00 PM thru Thursday July 30, 2026 05:00 AM, right turn lane Fri, 17 Jul 2026 10:09:13 -0400 40.750171661377 -74.1677703857422 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Wednesday August 5, 2026 11:00 PM thru Thursday August 6, 2026 05:00 AM, right turn lane Fri, 17 Jul 2026 10:09:14 -0400 40.750171661377 -74.1677703857422 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between West of Teaneck Rd (Teaneck Twp) and Overpeck Creek (Englewood), Tuesday August 4, 2026 11:00 PM thru Wednesday August 5, 2026 05:00 AM, right shoulder closed Fri, 17 Jul 2026 10:09:21 -0400 40.8910865783691 -74.0052261352539 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound near West of Hackensack River Bridge (East Rutherford), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 17 Jul 2026 10:08:52 -0400 40.8004150390625 -74.0689163208008 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Friday July 31, 2026 11:00 PM thru Saturday August 1, 2026 05:00 AM, right turn lane Fri, 17 Jul 2026 10:09:07 -0400 40.750171661377 -74.1677703857422 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Tuesday July 28, 2026 11:00 PM thru Wednesday July 29, 2026 05:00 AM, right turn lane Fri, 17 Jul 2026 10:09:01 -0400 40.750171661377 -74.1677703857422 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of Vaux Hall Rd (Union Twp), Wednesday July 29, 2026 10:00 PM thru Thursday July 30, 2026 05:00 AM, right lane closed, moving operation Fri, 17 Jul 2026 10:08:32 -0400 40.6975326538086 -74.2500610351562 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of Vaux Hall Rd (Union Twp), Thursday July 30, 2026 10:00 PM thru Friday July 31, 2026 05:00 AM, right lane closed, moving operation Fri, 17 Jul 2026 10:08:03 -0400 40.6975326538086 -74.2500610351562 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of Vaux Hall Rd (Union Twp), Monday July 27, 2026 10:00 PM thru Tuesday July 28, 2026 05:00 AM, right lane closed, moving operation Fri, 17 Jul 2026 10:08:04 -0400 40.6975326538086 -74.2500610351562 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Thursday August 6, 2026 11:00 PM thru Friday August 7, 2026 05:00 AM, right turn lane Fri, 17 Jul 2026 10:07:56 -0400 40.750171661377 -74.1677703857422 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between West of Teaneck Rd (Teaneck Twp) and Overpeck Creek (Englewood), Wednesday August 5, 2026 11:00 PM thru Thursday August 6, 2026 05:00 AM, right shoulder closed Fri, 17 Jul 2026 10:07:31 -0400 40.8910865783691 -74.0052261352539 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Thursday July 30, 2026 11:00 PM thru Friday July 31, 2026 05:00 AM, right turn lane Fri, 17 Jul 2026 10:07:26 -0400 40.750171661377 -74.1677703857422 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound near West of Hackensack River Bridge (East Rutherford), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 17 Jul 2026 10:07:24 -0400 40.8004150390625 -74.0689163208008 NJ 94 northbound : roadwork NJDOT - STMC: Roadwork on NJ 94 Northbound between North of CR 521/Stillwater Rd (Frelinghuysen Twp) and North of CR 659/Spring Valley Rd (Frelinghuysen Twp), Wednesday July 29, 2026 09:00 AM thru 03:00 PM, alternating traffic closed, moving operation Fri, 17 Jul 2026 10:07:19 -0400 40.9752082824707 -74.9351425170898 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of Vaux Hall Rd (Union Twp), Tuesday July 28, 2026 10:00 PM thru Wednesday July 29, 2026 05:00 AM, right lane closed, moving operation Fri, 17 Jul 2026 10:07:09 -0400 40.6975326538086 -74.2500610351562 US 22 eastbound : roadwork NJDOT - STMC: Roadwork on US 22 Eastbound near East of Vaux Hall Rd (Union Twp), Friday July 31, 2026 10:00 PM thru Saturday August 1, 2026 05:00 AM, right lane closed, moving operation Fri, 17 Jul 2026 10:06:43 -0400 40.6975326538086 -74.2500610351562 US 1&9 Truck Route southbound : roadwork NJDOT - STMC: Roadwork on US 1&9 Truck Route Southbound near North of Raymond Blvd (Newark), Wednesday August 5, 2026 09:00 AM thru 02:00 PM, right shoulder closed Fri, 17 Jul 2026 10:06:40 -0400 40.7329521179199 -74.127799987793 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound near West of Hackensack River Bridge (East Rutherford), Thursday July 30, 2026 09:00 AM thru 03:00 PM, left lane closed Fri, 17 Jul 2026 10:05:56 -0400 40.8004150390625 -74.0689163208008 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Saturday August 1, 2026 11:00 PM thru Sunday August 2, 2026 05:00 AM, right turn lane Fri, 17 Jul 2026 10:05:57 -0400 40.750171661377 -74.1677703857422 NJ 3 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 3 Eastbound near West of Hackensack River Bridge (East Rutherford), Monday July 27, 2026 09:00 AM thru 03:00 PM, right lane closed Fri, 17 Jul 2026 10:05:55 -0400 40.8004150390625 -74.0689163208008 NJ 94 northbound : roadwork NJDOT - STMC: Roadwork on NJ 94 Northbound between North of CR 521/Stillwater Rd (Frelinghuysen Twp) and North of CR 659/Spring Valley Rd (Frelinghuysen Twp), Tuesday July 28, 2026 09:00 AM thru 03:00 PM, alternating traffic closed, moving operation Fri, 17 Jul 2026 10:06:20 -0400 40.9752082824707 -74.9351425170898 NJ 21 northbound : roadwork NJDOT - STMC: Roadwork on NJ 21 Northbound at Clay St/Mount Pleasant Av (Newark) Tuesday August 4, 2026 11:00 PM thru Wednesday August 5, 2026 05:00 AM, right turn lane Fri, 17 Jul 2026 10:06:37 -0400 40.750171661377 -74.1677703857422 Commodore Barry Bridge eastbound : Construction DRPA: Construction on Commodore Barry Bridge eastbound New Jersey Side (Logan Twp) to New Jersey Side - Toll Plaza (Logan Twp) 1 Right lane of 2 lanes closed SPEED 25MPH Sun, 26 Jul 2026 06:50:27 -0400 39.8244120140622 -75.3675721235221 Betsy Ross Bridge westbound : Construction DRPA: Construction on Betsy Ross Bridge westbound Ramp to 95N (Philadelphia) 1 Left lane of 6 lanes closed Sun, 26 Jul 2026 06:27:33 -0400 39.9954744704656 -75.0799776725623 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 649/Front St (Elmer) and East of CR 553/Buck Rd (Upper Pittsgrove Twp), Friday July 31, 2026 09:00 AM thru 01:00 PM, right shoulder closed Tue, 14 Jul 2026 13:09:43 -0400 39.5950736999512 -75.1717529296875 NJ 4 eastbound : roadwork NJDOT - STMC: Roadwork on NJ 4 Eastbound between West of Teaneck Rd (Teaneck Twp) and Overpeck Creek (Englewood), Monday August 3, 2026 11:00 PM thru Tuesday August 4, 2026 05:00 AM, right shoulder closed Tue, 14 Jul 2026 13:09:17 -0400 40.8910865783691 -74.0052261352539 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 649/Front St (Elmer) and East of CR 553/Buck Rd (Upper Pittsgrove Twp), Tuesday July 28, 2026 09:00 AM thru 01:00 PM, right shoulder closed Tue, 14 Jul 2026 13:08:58 -0400 39.5950736999512 -75.1717529296875 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 649/Front St (Elmer) and East of CR 553/Buck Rd (Upper Pittsgrove Twp), Wednesday July 29, 2026 09:00 AM thru 01:00 PM, right shoulder closed Tue, 14 Jul 2026 13:08:59 -0400 39.5950736999512 -75.1717529296875 US 40 eastbound : roadwork NJDOT - TOC South: Roadwork on US 40 Eastbound between CR 649/Front St (Elmer) and East of CR 553/Buck Rd (Upper Pittsgrove Twp), Thursday July 30, 2026 09:00 AM thru 01:00 PM, right shoulder closed Tue, 14 Jul 2026 13:09:05 -0400 39.5950736999512 -75.1717529296875 NJ 166 northbound : roadwork NJ DOT - TOC South: Roadwork on NJ 166 Northbound At CR 623/Old Freehold Rd (Toms River Twp) Tuesday July 28, 2026 09:00 PM thru Wednesday July 29, 2026 03:00 AM, 1 right lane of 2 lanes closed Mon, 13 Jul 2026 19:45:42 -0400 39.9669609069824 -74.202507019043 NJ 166 northbound : roadwork NJ DOT - TOC South: Roadwork on NJ 166 Northbound At CR 623/Old Freehold Rd (Toms River Twp) Monday July 27, 2026 09:00 PM thru Tuesday July 28, 2026 03:00 AM, 1 right lane of 2 lanes closed Mon, 13 Jul 2026 19:45:37 -0400 39.9669609069824 -74.202507019043 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound between West of CR 608/Baird Blvd (Camden) and East of I-676/Ben Franklin Bridge (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right lane closed Thu, 23 Jul 2026 12:35:48 -0400 39.9407043457031 -75.0997772216797 US 30 westbound : roadwork NJDOT - TOC South: Roadwork on US 30 Westbound near West of US 130/Collingswood Circle (Collingswood), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 08:00 PM, right lane closed Thu, 23 Jul 2026 12:35:49 -0400 39.9204940795898 -75.0875701904297 US 30 eastbound : roadwork NJDOT - TOC South: Roadwork on US 30 Eastbound between East of I-676/Ben Franklin Bridge (Camden) and West of CR 608/Baird Blvd (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right shoulder closed Thu, 23 Jul 2026 12:35:49 -0400 39.9476280212402 -75.1173934936523 I-295 southbound : roadwork NJDOT - TOC South: Roadwork on I-295 Southbound at north of Exit 69 - US 206 (Lawrence Twp) Continuous Friday June 5, 2026 03:00 AM thru Monday August 31, 2026 03:00 PM, ramp Thu, 23 Jul 2026 12:35:49 -0400 40.2858772277832 -74.7353897094727 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound near East of I-287 (Parsippany-Troy Hills Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:21 -0400 40.8641662597656 -74.4003524780273 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between Little Ferry Circle (Little Ferry) and East of Central Ave (South Hackensack Twp), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:22 -0400 40.852123260498 -74.0318756103516 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Thursday July 30, 2026 08:00 PM thru Friday July 31, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:03:20 -0400 41.0953254699707 -74.5298080444336 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound near West of CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:23 -0400 40.8636894226074 -74.394645690918 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between East of Central Ave (South Hackensack Twp) and Little Ferry Circle (Little Ferry), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:10 -0400 40.8566703796387 -74.050048828125 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:03:16 -0400 41.0953254699707 -74.5298080444336 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Friday July 31, 2026 08:00 PM thru Saturday August 1, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:03:14 -0400 41.0953254699707 -74.5298080444336 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Saturday August 1, 2026 08:00 PM thru Sunday August 2, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:03:07 -0400 41.0953254699707 -74.5298080444336 US 46 westbound : roadwork NJDOT - STMC: Roadwork on US 46 Westbound between Little Ferry Circle (Little Ferry) and East of Central Ave (South Hackensack Twp), Tuesday July 28, 2026 08:00 PM thru Wednesday July 29, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:01 -0400 40.852123260498 -74.0318756103516 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Monday July 27, 2026 08:00 PM thru Tuesday July 28, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:02:50 -0400 41.0953254699707 -74.5298080444336 US 46 eastbound : roadwork NJDOT - STMC: Roadwork on US 46 Eastbound between East of Central Ave (South Hackensack Twp) and Little Ferry Circle (Little Ferry), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 06:00 AM, right lane closed Mon, 13 Jul 2026 08:03:06 -0400 40.8566703796387 -74.050048828125 NJ 23 northbound : roadwork NJDOT - STMC: Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of NJ 94 (Hamburg), Wednesday July 29, 2026 08:00 PM thru Thursday July 30, 2026 05:00 AM, right shoulder closed, moving operation Mon, 13 Jul 2026 08:03:15 -0400 41.0953254699707 -74.5298080444336 George Washington Bridge eastbound : Construction Port Authority NY/NJ: Construction, construction on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) 1 Left lane of 2 lanes closed motorists will not be able to make the left turn onto Center Avenue through July 2026. Mon, 13 Jul 2026 07:12:13 -0400 40.8554885303696 -73.9716333729092 Outerbridge Crossing westbound : bridge construction Port Authority NY/NJ: bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy) Not currently Scheduled Sat, 18 Jul 2026 08:00:01 -0400 40.525217087805 -74.2400616914618 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall at (East Rutherford) AS IT IS, Saturday August 8th, 2026, 07:00 PM thru 10:00 PM Mon, 29 Jun 2026 09:28:13 -0400 40.8103304020617 -74.0684148072978 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall (East Rutherford) French Montana, Saturday August 15th, 2026, 09:00 PM thru 11:59 PM Mon, 29 Jun 2026 09:25:54 -0400 40.8103304020617 -74.0684148072978 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall at (East Rutherford) MAGIC!, Saturday October 24th, 2026, 07:00 PM thru 10:00 PM Mon, 29 Jun 2026 09:24:15 -0400 40.8103304020617 -74.0684148072978 George Washington Bridge eastbound : bridge construction Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York) Not currently Scheduled Sun, 21 Jun 2026 08:00:01 -0400 40.8532203381601 -73.9610771597614 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall at (East Rutherford) Scotty McCreery, Sunday October 18th, 2026, 07:00 PM thru 10:00 PM Fri, 12 Jun 2026 07:26:21 -0400 40.8103304020617 -74.0684148072978 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Logic & G-Eazy: The Endless Summer Tour Part II, Saturday October 3rd, 2026, 07:00 PM thru 10:00 PM Wed, 10 Jun 2026 14:17:05 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Dan + Shay: The Young Tour, Thursday September 24th, 2026, 07:00 PM thru 10:00 PM Tue, 09 Jun 2026 17:48:04 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Roxette 40th Anniversary Tour 2026, Friday September 18th, 2026, 06:30 PM thru 09:00 PM Tue, 09 Jun 2026 17:46:21 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) O.A.R Three Decades Tour, Thursday September 24th, 2026, 06:30 PM thru 09:00 PM Tue, 09 Jun 2026 17:43:40 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) TLC & Salt-N-Pepa with En Vogue - IT'S ICONIC, Saturday September 12th, 2026, 07:30 PM thru 10:30 PM Tue, 09 Jun 2026 17:41:29 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Wu-Tang Forever: The Final Chamber, Friday September 11th, 2026, 07:30 PM thru 10:30 PM Tue, 09 Jun 2026 17:37:30 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Breaking Benjamin, Sunday September 6th, 2026, 06:00 PM thru 09:00 PM Tue, 09 Jun 2026 17:35:49 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Pitbull - I'm Back with special guest Lil Jon, Thursday September 3rd, 2026, 08:00 PM thru 11:00 PM Tue, 09 Jun 2026 17:27:28 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Empire of the Sun - Ask That God: Afterlife North American Tour, Wednesday September 2nd, 2026, 07:30 PM thru 10:00 PM Tue, 09 Jun 2026 17:25:49 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Jerry Garcia Symphonic Celebration, Saturday August 29th, 2026, 08:00 PM thru 11:59 PM Wed, 10 Jun 2026 14:19:35 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Rob Zombie & Marilyn Manson with The Hu & Orgy, Wednesday August 26th, 2026, 06:30 PM thru 09:30 PM Tue, 09 Jun 2026 17:22:23 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Howard Jones: Things Can Only Get Better Tour, Friday August 21st, 2026, 06:30 PM thru 09:00 PM Tue, 09 Jun 2026 17:20:35 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Ninja Kidz Live: Infinite Possibilities, Sunday August 23rd, 2026, 06:00 PM thru 08:00 PM Tue, 09 Jun 2026 17:20:16 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Kesha: The Freedom Tour, Wednesday August 19th, 2026, 07:00 PM thru 09:30 PM Tue, 09 Jun 2026 17:16:58 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Beatstock With Deborah Cox, Treach & More, Saturday August 15th, 2026, 05:30 PM thru 09:00 PM Tue, 09 Jun 2026 17:13:18 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Five Finger Death Punch, Wednesday August 5th, 2026, 06:45 PM thru 09:00 PM Tue, 09 Jun 2026 17:14:53 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) Margaritaville Presents Jimmy Buffett's Coral Reefer Band, Tuesday August 4th, 2026 thru Tuesday August 4th, 2026, 12:00 AM thru 11:59 PM Tue, 09 Jun 2026 17:06:19 -0400 40.3929811131815 -74.177076101696 PNC Arts Center : concert PNC Art Center: concert on PNC Arts Center (Holmdel Twp) The Return Of The Carnival Of Sins: M�tley Cr�e, Friday July 31st, 2026, 06:30 PM thru 11:59 PM Wed, 10 Jun 2026 14:30:23 -0400 40.3929811131815 -74.177076101696 NJ 24 westbound : roadwork NJDOT - STMC: Roadwork on NJ 24 Westbound near West of Exit 7 - NJ 124/JFK Parkway (Chatham), Continuous Monday June 22, 2026 07:00 AM thru Monday November 30, 2026 04:00 PM, right shoulder closed Mon, 08 Jun 2026 08:20:51 -0400 40.753776550293 -74.379768371582 Broadway both directions : emergency repairs Port Authority NY/NJ: emergency repairs on Broadway both directions between 178th Street (New York) and 179th Street (New York) Under the Port Authority GWB Bus Terminal. Not currently Scheduled Fri, 05 Jun 2026 05:00:01 -0400 40.8489390784605 -73.9370795597705 Van Wyck Expressway southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Van Wyck Expressway southbound ramp from Federal Circle (New York) Not currently Scheduled Sat, 06 Jun 2026 04:00:01 -0400 40.6569554668775 -73.8078060230612 NJ 7 northbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Northbound near CR 672/Mill St (Belleville Twp), Continuous Monday May 18, 2026 12:00 AM thru Friday August 28, 2026 12:00 PM, right shoulder closed Fri, 22 May 2026 09:55:32 -0400 40.7827377319336 -74.1540374755859 NJ 7 southbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Southbound near North of NJ 21 (Belleville Twp), Continuous Friday May 22, 2026 12:00 AM thru Friday August 28, 2026 12:00 PM, right shoulder closed Fri, 22 May 2026 09:55:34 -0400 40.7841758728027 -74.153694152832 NJ 7 southbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Southbound near North of NJ 21 (Belleville Twp), Continuous Monday May 18, 2026 12:00 AM thru Friday August 28, 2026 12:00 PM, right lane closed Fri, 15 May 2026 13:56:53 -0400 40.7841758728027 -74.153694152832 NJ 7 northbound : roadwork NJDOT - STMC: Roadwork on NJ 7 Northbound near CR 672/Mill St (Belleville Twp), Continuous Monday May 18, 2026 12:00 AM thru Friday August 28, 2026 11:00 PM, right lane closed Fri, 15 May 2026 13:56:46 -0400 40.7827377319336 -74.1540374755859 I-78 eastbound : roadwork NJDOT - STMC: Roadwork on I-78 Eastbound near East of Exit 44 - CR 527/Glenside Ave (Berkeley Heights Twp), Continuous Monday May 18, 2026 11:00 PM thru Tuesday July 28, 2026 11:00 PM, right shoulder closed Fri, 15 May 2026 00:59:42 -0400 40.684009552002 -74.3889694213867 Trump National Golf Course : golf tournament TRANSCOM, Jersey City: golf tournament on Trump National Golf Course at (Bedminster Twp) LIV Golf New York , Thursday August 6th, 2026 thru Sunday August 9th, 2026, Sunday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM Mon, 11 May 2026 10:47:06 -0400 40.6535101692702 -74.6971463449697 American Dream Mall : concert Meadowlands Complex: concert on American Dream Mall at (East Rutherford) ARRIVAL From Sweden: The Music of ABBA, Thursday August 20th, 2026, 07:00 PM thru 10:00 PM Mon, 11 May 2026 09:49:45 -0400 40.8103304020617 -74.0684148072978 US 202 southbound : roadwork NJDOT - STMC: Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Continuous Friday May 15, 2026 07:00 AM thru Saturday February 27, 2027 07:00 PM, Sun, 03 May 2026 07:45:52 -0400 40.5741958618164 -74.6357498168945 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Karol G Viajando Por El Mundo Tropitour , Thursday September 17th, 2026, 07:00 PM thru 11:00 PM Thu, 23 Apr 2026 10:38:36 -0400 40.8134600702536 -74.0742874145508 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Chris Brown & Usher , Friday August 7th, 2026 thru Saturday August 8th, 2026, Friday/Saturday, 07:00 PM thru 11:00 PM Thu, 23 Apr 2026 10:36:33 -0400 40.8134600702536 -74.0742874145508 9th Avenue southbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st,2026 thru Thursday August 27th,2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed , Tue, 14 Jul 2026 05:00:28 -0400 40.7549062841009 -73.9952685512616 Dyer Avenue (Lincoln Tunnel Expressway) both directions : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st,2026 thru Thursday August 27th,2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed westbound, eastbound Tue, 14 Jul 2026 05:00:20 -0400 40.7518868422388 -73.9995678946567 Earhart Drive both directions : Construction Port Authority NY/NJ: Construction on Earhart Drive both directions Basilone Road (Elizabeth) to South Bridge Road All lanes closed until June 30th, 2028 Mon, 04 May 2026 20:12:29 -0400 40.6854533201585 -74.1888271599343 Sports Illustrated Stadium : soccer game New York Red Bulls: soccer game on Sports Illustrated Stadium at (Harrison) Leeds United vs. Sunderland AFC, Thursday July 30th, 2026, 07:30 PM thru 10:30 PM Thu, 09 Apr 2026 07:39:22 -0400 40.7366914609768 -74.1502866405472 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 38 - US 46 (Denville Twp), Continuous Friday April 10, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Sun, 05 Apr 2026 04:13:49 -0400 40.9053802490234 -74.4967422485352 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Continuous Thursday April 9, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed local lane Fri, 03 Apr 2026 07:14:08 -0400 40.8605499267578 -74.3977203369141 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near East of Exit 47A - I-280 (Fairfield Twp), Continuous Wednesday April 8, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Fri, 03 Apr 2026 07:14:03 -0400 40.8682289123535 -74.3308258056641 I-80 westbound : roadwork NJDOT - STMC: Roadwork on I-80 Westbound near West of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Tuesday April 7, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Thu, 02 Apr 2026 08:49:28 -0400 40.8945350646973 -74.263801574707 I-80 eastbound : roadwork NJDOT - STMC: Roadwork on I-80 Eastbound near East of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Monday April 6, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed Thu, 02 Apr 2026 08:49:41 -0400 40.8987617492676 -74.2436065673828 MetLife Stadium : concert TRANSCOM, Jersey City: concert on MetLife Stadium at (East Rutherford) AC/DC AC/DC "Power Up Tour 2026" , Friday September 25th, 2026, 07:00 PM thru 11:00 PM Thu, 02 Apr 2026 08:27:14 -0400 40.8134600702536 -74.0742874145508 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Guns N' Roses Guns N' Roses World Tour , Wednesday August 12th, 2026, 06:25 PM thru 11:00 PM Thu, 02 Apr 2026 08:24:03 -0400 40.8134600702536 -74.0742874145508 North Beach : concert TRANSCOM, Jersey City: concert on North Beach at (Asbury Park) Sea. Hear. Now, Saturday September 19th, 2026 thru Sunday September 20th, 2026, Saturday/ Sunday, 11:00 AM thru 11:00 PM Thu, 26 Mar 2026 14:21:17 -0400 40.2239673811411 -73.9979217444968 George Washington Bridge eastbound : Truck restrictions Port Authority NY/NJ: Truck restrictions on George Washington Bridge Lower Level eastbound (Fort Lee) All lanes open . All commercial vehicles exiting at Exit 73 from US Route 46, Route 4, and the I-95 Local Lanes, please stay to the left and use Exit 73 to exit from the I-95 Express Lanes. Tue, 30 Jun 2026 13:44:34 -0400 40.8567846997699 -73.9734259635123 George Washington Bridge southbound : construction Port Authority NY/NJ: construction on George Washington Bridge Upper Level southbound ramp from Palisades Interstate Parkway (Fort Lee) to Palisades Interstate Parkway (Fort Lee) Not currently Scheduled Sun, 22 Mar 2026 08:00:01 -0400 40.8545430432684 -73.9629827826926 Sports Illustrated Stadium : lacrosse TRANSCOM, Jersey City: lacrosse on Sports Illustrated Stadium at (Harrison) PLL Championship, Sunday September 20th, 2026 thru Sunday September 20th, 2026, 12:30 PM thru 06:00 PM Thu, 05 Feb 2026 16:28:47 -0500 40.7366914609768 -74.1502866405472 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Bruno Mars "The Romantic Tour", Friday August 21st, 2026 thru Wednesday August 26th, 2026, Tuesday/Wednesday/Friday/Saturday, 07:00 PM thru 11:00 PM Fri, 16 Jan 2026 11:59:59 -0500 40.8134600702536 -74.0742874145508 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) BTS WORLD TOUR , Saturday August 1st, 2026 thru Sunday August 2nd, 2026, Saturday/ Sunday, 08:00 PM thru 11:00 PM Fri, 16 Jan 2026 11:57:36 -0500 40.8134600702536 -74.0742874145508 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp to Center Avenue (Fort Lee) All lanes closed will be closed through July. Cars/Buses use Exit 73 for Local Streets. Trucks follow posted detours Sun, 18 Jan 2026 05:35:06 -0500 40.8552310825741 -73.9694127322947 Bruce Reynolds Boulevard westbound : Construction Port Authority NY/NJ: Construction on Bruce Reynolds Boulevard westbound Lemoine Avenue (Fort Lee) to Center Avenue All lanes closed will be closed through September 2026 Sun, 18 Jan 2026 05:35:45 -0500 40.8541588400011 -73.9683181500042 George Washington Bridge eastbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed Tue, 13 Jan 2026 05:45:44 -0500 40.8550757297774 -73.9711807961208 Bruce Reynolds Blvd westbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on Bruce Reynolds Blvd westbound between Lemoine Avenue (Fort Lee) and Center Avenue (Fort Lee) will be closed through September., Continuous Monday January 12th, 2026 10:00 PM thru Wednesday September 30th, 2026 11:59 PM All lanes closed Tue, 13 Jan 2026 05:43:29 -0500 40.8536749463068 -73.9685448747159 George Washington Bridge westbound : scheduled roadwork Port Authority NY/NJ: scheduled roadwork on George Washington Bridge Upper Level westbound ramp to Center Avenue (Fort Lee) will be closed through July. Cars/Buses use Exit 73 for Local Streets. Trucks follow posted detours, Continuous Monday January 12th, 2026 10:00 PM thru Friday July 31st, 2026 11:59 PM All lanes closed Tue, 13 Jan 2026 05:42:46 -0500 40.8552310825741 -73.9694127322947 NJ 495 : operational activity Port Authority NY/NJ: operational activity and special event on NJ 495 XBL East of New Jersey Turnpike (North Bergen Twp) to West of Boulevard East (Weehawken Twp), Friday January 2nd, 2026 thru Friday January 1st, 2027, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes open Mon, 20 Jul 2026 05:55:16 -0400 40.7801663207199 -74.052560637231 MetLife Stadium : concert Meadowlands Complex: concert on MetLife Stadium at (East Rutherford) Ed Sheeran "The Loop Tour" , Friday September 4th, 2026 thru Saturday September 5th, 2026, Friday/Saturday, 05:30 PM thru 11:00 PM Fri, 31 Oct 2025 13:30:08 -0400 40.8134600702536 -74.0742874145508 Sports Illustrated Stadium : concert New York Red Bulls: concert on Sports Illustrated Stadium at (Harrison) IRON MAIDEN RUN FOR YOUR LIVES WORLD TOUR with Megadeath & Anthrax, Saturday September 5th, 2026 thru Sunday September 6th, 2026, Saturday/ Sunday, 06:00 PM thru 11:00 PM Fri, 02 Jan 2026 15:58:33 -0500 40.7366914609768 -74.1502866405472 Corbin Street both directions : Construction Port Authority NY/NJ: Construction on Corbin Street both directions Kellogg Street (Newark) to Outer Port Street 1 Right lane of 3 lanes closed until further notice Tue, 14 Jul 2026 10:04:17 -0400 40.7029624496184 -74.1514398425719 NJ 71 southbound : roadwork NJ DOT - TOC South: Roadwork on NJ 71 Southbound At South of Shark River Bridge (Belmar) Thursday June 12, 2025 09:30 PM thru Friday June 13, 2025 05:00 AM, 2 left lanes of 3 lanes closed Fri, 13 Jun 2025 05:00:03 -0400 40.1846885681152 -74.0237121582031 NJ 18 northbound : roadwork NJDOT - TOC South: Roadwork on NJ 18 Northbound between South of Exit 19 - NJ 34 (Colts Neck Twp) and South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp), Thursday June 12, 2025 07:00 AM thru 03:00 PM, right shoulder closed Thu, 12 Jun 2025 15:00:12 -0400 40.2814140319824 -74.1344451904297 NJ 18 southbound : roadwork NJDOT - TOC South: Roadwork on NJ 18 Southbound between South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp) and South of Exit 19 - NJ 34 (Colts Neck Twp), left shoulder Thu, 12 Jun 2025 15:00:12 -0400 40.3417434692383 -74.2804183959961 US 9 northbound : roadwork NJ DOT - TOC South: Roadwork on US 9 Northbound between North of CR 571/Indian Head Rd (Toms River Twp) and CR 620/Church Rd (Toms River Twp) Monday June 9, 2025 09:00 PM thru Saturday June 14, 2025 05:00 AM, All lanes closed and detoured Sat, 14 Jun 2025 05:00:01 -0400 39.9955101013184 -74.2116622924805 NJ 38 eastbound : roadwork NJ DOT - TOC South: Roadwork on NJ 38 Eastbound At Cherry Hill Mall (Cherry Hill Twp) Friday June 6, 2025 09:00 AM thru 03:00 PM, 1 left lane of 3 lanes closed Fri, 06 Jun 2025 15:00:18 -0400 39.9390411376953 -75.0226669311523 NJ 70 westbound : construction NJ DOT - TOC South: Construction on NJ 70 Westbound between East of CR 674/Greentree Rd (Cherry Hill Twp) and East of New Jersey Turnpike (Cherry Hill Twp) Wednesday June 4, 2025 07:00 AM thru 03:30 PM, 1 right lane of 4 lanes closed Wed, 04 Jun 2025 15:30:01 -0400 39.9045906066895 -74.9711456298828 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp from West 179th Street (New York) All lanes open until further notice. Trucks wider than 10 ft or longer than 110 ft are prohibited. Tue, 16 Jun 2026 11:09:17 -0400 40.8493802929073 -73.9396241842173 Meadowlands Racetrack : racing Meadowlands Complex: racing on Meadowlands Racetrack at (East Rutherford), Friday July 10th,2026 thru Friday July 31st,2026, Friday/Saturday, 06:35 PM thru 11:00 PM Thu, 09 Jul 2026 23:00:10 -0400 40.8202318285764 -74.0717875957489 Inner Port Street both directions : Construction Port Authority NY/NJ: Construction on Inner Port Street both directions between Corbin Street (Newark) and Port Street (Newark) All lanes closed December 31st, 2026 Mon, 30 Mar 2026 07:21:56 -0400 40.7040488538158 -74.1505620476053 NJ 47 both directions : bridge replacement NJ DOT - TOC South: bridge replacement on NJ 47 both directions CR 551/Broadway Av (Westville) to US 130 (Westville) Not currently Scheduled Wed, 31 Dec 2025 23:59:00 -0500 39.8703414582983 -75.1255272596073