Active Construction All Active Construction en-us Sun, 14 Jun 2026 15:05:09 -0400 Copyright 511nj.org 1 OTHER unknown : Roadwork ConnDOT: Squantz Pond state park closed due to full capacity, in effect today until 7:01 pm. Expect lane closures. Reported Sunday, June 14 at 12:38 pm. Sun, 14 Jun 2026 12:42:31 -0400 41.515943 -73.474143 I-86 both directions : Construction NYSDOT - Region 6: Construction , mowing on I-86 both directions Steuben-Chemung County Line (Corning) All lanes of 2 lanes open until 3:30 PM Right shoulder closure Sun, 14 Jun 2026 07:00:12 -0400 42.134201 -76.965612 NY 21 northbound : Construction NYSDOT - Region 6: Construction , construction on NY 21 northbound City of Hornell; Town of Hornellsville Line (Hornell) to NY 36 at Industrial Park Road (Hornellsville) All lanes of 2 lanes open until 5:30 PM Alternating lane closures/with detours Sun, 14 Jun 2026 07:00:12 -0400 42.3364296533743 -77.6651227797918 NY 245 both directions : Construction NYSDOT - Region 6: Construction , drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) All lanes of 1 lane open until 3:30 PM 2 lane reduced to 1 with flaggers Sun, 14 Jun 2026 07:00:11 -0400 42.6546338164214 -77.3288525966306 NY 22 both directions : Construction NYSDOT TMC - Albany: Construction , culvert repairs on NY 22 both directions west of Elm St (Essex) All lanes of 1 lane open until 5:00 PM alternating lane closures Sun, 14 Jun 2026 07:00:11 -0400 44.3095772399132 -73.3547708494575 CR-67 both directions : Construction NYSDOT - Region 4: Construction , road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) All lanes of 3 lanes until 3:30 PM Alternating lane/shoulder closures with flaggers as needed Sun, 14 Jun 2026 07:00:11 -0400 43.0177219654699 -77.6674806057626 NY I86 westbound : Construction NYSDOT - Region 6: Construction , bridge rehabilitation on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 1 Right lane of 2 lanes closed until 5:30 PM 2 lanes reduced to 1 Sun, 14 Jun 2026 07:00:10 -0400 42.0003746347831 -76.5149372929721 NY 224 northbound : Construction NYSDOT - Region 6: Construction , bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) to North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) All lanes of 1 lane open until 5:30 PM 1 Lane closure Sun, 14 Jun 2026 07:00:10 -0400 42.3431782823837 -76.8272232786557 NY 371 both directions : Construction NYSDOT - Region 6: Construction , roadwork on NY 371 both directions CR-35 (Cohocton) to CR-35 (Cohocton) All lanes of 1 lane open until 5:30 PM 1 Lane, 2 Way, temp signal or STOP sign Sun, 14 Jun 2026 07:00:10 -0400 42.5309388839308 -77.4665992634875 NY 14 both directions : Construction NYSDOT - Region 6: Construction , bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) All lanes of 2 lanes open until 5:30 PM Lane Closure(Multilane HWY ) Sun, 14 Jun 2026 07:00:10 -0400 42.1544907272148 -76.8360934402304 I-390 southbound : Construction NYSDOT - Region 6: Construction , bridge work on I-390 southbound NY 415 (Avoca) to NY 415 (Avoca) 1 Left lane of 2 lanes closed until 5:30 PM 2 lanes reduced to 1 lane Sun, 14 Jun 2026 07:00:10 -0400 42.4413027681389 -77.4638724527803 i86 eastbound : Construction NYSDOT - Region 6: Construction , bridge rehabilitation on i86 eastbound (Chemung) All lanes of 2 lanes open until 5:30 PM 2 lane reduced to 1 Sun, 14 Jun 2026 07:00:09 -0400 42.0008032333726 -76.5997984845246 i86 eastbound : Construction NYSDOT - Region 6: Construction , roadwork on i86 eastbound (Elmira) All lanes of 2 lanes open until 5:30 PM 2 lanes reduced to 1 Sun, 14 Jun 2026 07:00:09 -0400 42.1075313230433 -76.7954297039629 NY 414 both directions : Construction NYSDOT - Region 6: Construction , bridge rehabilitation on NY 414 both directions I-86 (Corning) to I-86 (Corning) All lanes of 1 lane open until 5:30 PM lane shift Sun, 14 Jun 2026 07:00:09 -0400 42.1552555843246 -77.0530638239639 I-390 northbound : Construction NYSDOT - Region 6: Construction , bridge work on I-390 northbound NY 415 (Avoca) to NY 415 (Avoca) 1 Left lane of 2 lanes closed until 5:30 PM 2 Lanes Reduced to 1 Lane Sun, 14 Jun 2026 07:00:09 -0400 42.4400069768967 -77.4603444824454 WATER ST eastbound : Construction NYSDOT TMC - Albany: Construction , bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) All lanes of 2 lanes open until 3:30 PM alternating lanes Sun, 14 Jun 2026 07:00:09 -0400 42.6545061909338 -73.7457882903996 NY 417 both directions : Construction NYSDOT - Region 6: Construction , culvert repairs on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) All lanes of 1 lane open until 3:30 PM 1 Lane, 2 Way, Flagger Control Sun, 14 Jun 2026 07:00:09 -0400 42.1191524191779 -77.6069459094792 NY 305 both directions : Construction NYSDOT - Region 6: Construction , culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) All lanes of 1 lane open until 5:00 PM 2 Lane to 1 lane with temp signal NB Sun, 14 Jun 2026 07:00:09 -0400 42.1089732419927 -78.2506304069937 CR-67 both directions : Construction NYSDOT - Region 4: Construction , roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) All lanes of 3 lanes until 3:30 PM Shoulder widening. Sun, 14 Jun 2026 07:00:08 -0400 43.0179272648852 -77.6357671786218 NY 9N both directions : Construction NYSDOT TMC - Albany: Construction , repaving on NY 9N both directions NY 74; NY 22 (Ticonderoga) to Town of Crown Point; Town of Ticonderoga Line (Ticonderoga) All lanes of 1 lane open until 7:00 PM ALTERNATING LANES Sun, 14 Jun 2026 07:00:08 -0400 43.8585832526841 -73.4379982469995 Court Street both directions : Construction NYSDOT - Region 3: Construction , bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) All lanes closed until 3:30 PM ; follow detour Sun, 14 Jun 2026 07:00:08 -0400 43.0643790123933 -76.160457877142 I-481 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) All lanes of 2 lanes open until 6:00 PM ; Alternating lane closures Sun, 14 Jun 2026 06:30:09 -0400 43.1403288149624 -76.1034471422793 NY 17 westbound : Construction NYSDOT - Region 6: Construction , bridge rehabilitation on NY 17 westbound (Chemung) All lanes of 2 lanes open until 5:00 PM alternating lane closures Sun, 14 Jun 2026 06:30:08 -0400 42.014667 -76.639725 TOWN LINE RD both directions : Construction CT DOT-Newington-HWY-Oper Ctr: Construction , construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) All lanes of 1 lane open until 9:00 PM There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road Sun, 14 Jun 2026 06:00:11 -0400 41.6497127490642 -72.8818944527624 I-390 southbound : Construction NYSDOT - Region 4: Construction , roadwork on I-390 southbound from Exit 5 - Commerce Dr (North Dansville) to Steuben-Livingston County Line (Dansville) All lanes of 2 lanes until 7:00 PM Alternating Right and Left Lane closures. Sun, 14 Jun 2026 06:00:10 -0400 42.5673345304213 -77.7184951197784 New Jersey Turnpike - Eastern Spur : Roadwork NJ Turnpike Auth.: Roadwork on New Jersey Turnpike - Eastern Spur ramps to (Secaucus) to Interchange 15X - Secaucus Train Station (Secaucus) -right lane of ramp from Seacaucus Train Station to Interchange 15X closed to traffic until further notice Sun, 14 Jun 2026 05:39:17 -0400 40.75214 -74.07102 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound between West of CR 608/Baird Blvd (Camden) and East of I-676/Ben Franklin Bridge (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right lane closed Fri, 12 Jun 2026 13:25:09 -0400 39.9407043457031 -75.0997772216797 I-295 southbound : Construction NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 10 - Center Square Rd (Logan Twp) and North of Exit 7 (Oldmans Twp), Continuous Tuesday June 9, 2026 07:00 AM thru Wednesday July 1, 2026 02:00 PM, right shoulder closed Fri, 12 Jun 2026 13:25:09 -0400 39.7497406005859 -75.3771591186523 I-295 southbound : Construction NJDOT - TOC South: Roadwork on I-295 Southbound between South of Exit 10 - Center Square Rd (Logan Twp) and North of Exit 7 (Oldmans Twp), Continuous Tuesday June 9, 2026 07:00 AM thru Wednesday June 24, 2026 02:00 PM, right shoulder closed Fri, 12 Jun 2026 13:25:10 -0400 39.7488327026367 -75.3786315917969 US 30 westbound : Construction NJDOT - TOC South: Roadwork on US 30 Westbound near West of US 130/Collingswood Circle (Collingswood), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 08:00 PM, right lane closed Fri, 12 Jun 2026 13:25:09 -0400 39.9204940795898 -75.0875701904297 US 30 eastbound : Construction NJDOT - TOC South: Roadwork on US 30 Eastbound between East of I-676/Ben Franklin Bridge (Camden) and West of CR 608/Baird Blvd (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right shoulder closed Fri, 12 Jun 2026 13:25:09 -0400 39.9476280212402 -75.1173934936523 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place.Beginning May 27th motorists will encounter a 3-color temp signal Fri, 12 Jun 2026 07:01:19 -0400 43.2622451883243 -75.4374746118408 NY 41 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 41 both directions between Court Street (Afton) and Academy Street 1 alternate lanes of 2 lanes blocked for deck repairs on bridge(BIN 1024780) on 6/12/26 - 6/26/26 between 7am - 4pm. Expect overnight closures. This work is not weather dependent. Fri, 12 Jun 2026 06:38:04 -0400 42.2314346154949 -75.5259155621643 US 11 both directions : Construction NYSDOT - Region 3: Construction , drainage improvements on US 11 both directions between Reagan Road (Virgil) and Hoxie Gorge Road (Virgil) All lanes of 1 lane open until 6:00 PM on June 26,2026 ; Alternating one-way traffic with temporary signals Fri, 12 Jun 2026 06:00:34 -0400 42.5257749457659 -76.0926050085633 NJ 47 southbound : Construction NJDOT - TOC South: Roadwork on NJ 47 Southbound near South of CR 646/Deptford Av (Deptford Twp), Continuous Thursday June 11, 2026 10:00 PM thru Tuesday June 30, 2026 12:00 AM, right shoulder closed Thu, 11 Jun 2026 22:00:09 -0400 39.8389511108398 -75.1250839233398 NY 12 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 12 both directions between Heath Drive (Chenango) and Chenango; Broome County Line (Barker) 1 alternate lanes of 2 lanes blocked for guiderail replacement on 6/11/26 - 7/11/26 between 6:30am-5pm. This work is weather dependent. Flag personnel will be present. IR 10503091 D265703 Thu, 11 Jun 2026 10:01:15 -0400 42.2453002929688 -75.8369979858398 I-86 westbound : Roadwork NYSDOT - Region 9: Roadwork on I-86 westbound at Exit 65 (Owego) 1 right lane of 2 lanes closed 06/11/2026 - 06/25/2026 07:00 to 17:00 The contractor will close the Exit 65 On Ramp starting on 06/11/2026. The closure will remain in place for 2 weeks with overnight closure. There will be a posted detour using NY-434 WB the I-86 Exit 64 WB on ramp. This work is not weather depended. No flaggers will be on scene. IR 10501090 D#265736 Thu, 11 Jun 2026 06:34:10 -0400 42.0887667434417 -76.2292617581276 34/96 northbound : Roadwork NYSDOT - Region 9: Roadwork on 34/96 northbound at Lake Road (Spencer) 1 lane of 2 lanes blocked for ditching on 6/10/26 - 6/18/26 between 7am - 2pm. This work is not weather dependent. Flag personnel will be present. IR 10493091 Fri, 12 Jun 2026 13:58:36 -0400 42.242551439266 -76.5061472981476 I-690 westbound : Construction NYSDOT - Region 3: Construction , bridge work on I-690 westbound between Exit 17 - Teall Avenue (Syracuse) and Exit 16B - Townsend Street (Syracuse) 1 Left lane of 3 lanes closed until 3:00 PM on October 30,2026 Tue, 09 Jun 2026 13:57:06 -0400 43.054418 -76.117756 I-690 westbound : Construction NYSDOT - Region 3: Construction , installation of sign structure on I-690 westbound between Exit 18 - Midler Avenue (Syracuse) and Exit 17 - Teall Avenue (Syracuse) 1 Right lane of 3 lanes closed until 3:00 PM on July 31,2026 Tue, 09 Jun 2026 13:53:07 -0400 43.056894 -76.108624 NY 30 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 30 both directions between Bund Rd (Gilboa) and NY 990V 1 alternate lanes of 2 lanes blocked For culvert replacement on NY 30 between Bund Rd and NY 990V from 6/8/26-6/19/26 between 600am-630pm. This work is weather dependant and flag personnel will be present. D#265668 IR 10480090 Fri, 12 Jun 2026 20:40:08 -0400 42.4184282264315 -74.4771849387542 NY 208 both directions : Construction NYSDOT - Region 8: Construction, bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) shoulder closed to traffic until 12:00 A.M. on June 29, 2026 D265729/32756209 - 24/7 SHOULDER CLOSURE - Plan travel accordingly; delays may exist Mon, 08 Jun 2026 09:12:20 -0400 41.5109794091291 -74.2072657343933 NY 17C westbound : Roadwork NYSDOT - Region 9: Roadwork on NY 17C westbound between Church St (Barton) and Ayers Rd 1 westbound one lane Ditching on RT 17C on 06/08/2026 - 06/16/2026 from 07:00 - 14:00. This work is not weather dependent. Flaggers will be on scene. Fri, 12 Jun 2026 14:31:23 -0400 42.0318803762157 -76.3686612084311 NY 17 [Sullivan] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Sullivan] both directions between Exit 97 - CR 178 (Rockland) and Exit 101 - CR 71; Ramp (Liberty) 2 alternate lanes of 4 lanes blocked for pavement resurfacing between Exits 98 to 101, ref. markers 1108-1165, on NY 17 E/W from 6/8 to 11/30 between 7am & 5pm with overnight closure. This work is weather dependent, and no flag personnel are present. D: 265735 IR:10475090 Mon, 08 Jun 2026 06:34:51 -0400 41.877498626709 -74.7983016967773 NY 17 [Delaware] eastbound : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Delaware] eastbound between Exit 90 (Hancock) and Exit 92 (Delaware) 1 alternate lanes of 4 lanes closed Bridge surface work on NY-17E from 06/08/2026 - 06/11/2026 07:30-15:00. This work is weather dependent. No flaggers will be on scene. BIN# 1054912 Mon, 08 Jun 2026 06:25:40 -0400 41.9840918080503 -75.0670988473109 NY 51 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 51 both directions area of Remington Road (Ilion) all lanes closed until 6:00 P.M. on August 15, 2026 Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Elizabethtown Road and Spinnerville Gulf Road Mon, 08 Jun 2026 00:00:28 -0400 42.9856838917595 -75.0779964547546 NY 390 southbound : Construction NYSDOT - Region 4: Construction , bridge work on NY 390 southbound ramps to I-490 E. Bound (Gates) 1 Left lane of 2 lanes closed until 2:00 PM on June 18,2026 Thu, 04 Jun 2026 10:00:10 -0400 43.1572989132522 -77.6818165676595 NY 97 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 97 both directions between (Fremont) 1 alternate lanes of 2 lanes closed 05/28/2026 - 06/18/2026 06:30 -14:00 Patching between Viaduct Rd and CR 94. This work is weather dependent. Flaggers will be present. Thu, 11 Jun 2026 14:08:43 -0400 41.8176942526391 -75.0974885851016 NY 5S eastbound : Construction NYSDOT - Region 2: Construction, bridge work on NY 5S eastbound over Reese Road (Frankfort) until 4:00 P.M. on June 17, 2026 Wed, 03 Jun 2026 07:00:48 -0400 43.024952539289 -75.0714511460632 NY 17B both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17B both directions between NY 55 (Bethel) and NY 52 (Cochecton) 1 alternate lanes of 2 lanes blocked for rail repair on 6/12/26 - 6/4/26 between 6:30am - 4pm with overnight closure. This work is weather dependent. Flag personnel will be present. IR 10433091 Fri, 12 Jun 2026 15:09:57 -0400 41.673999786377 -74.8283996582031 NY 59 eastbound : Construction NYSDOT - Region 8: Construction, bridge replacement on NY 59 eastbound between (Nanuet) and Central Avenue (Nanuet) all lanes closed and detoured until 12:00 P.M. on October 02, 2026 D265445/32752409 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Wed, 03 Jun 2026 00:01:13 -0400 41.1040568627154 -74.0311403906966 NY 19 both directions : Construction NYSDOT - Region 4: Construction , bridge replacement on NY 19 both directions between Bissel Rd. (Bergen) and SACKETT RD (Bergen) All lanes closed and detoured until 3:30 PM on September 30,2026 ROAD CLOSED FOLLOW POSTED DETOUR Tue, 02 Jun 2026 07:00:09 -0400 43.0964426895276 -77.9324213223998 I-90 - NYS Thruway westbound : Construction NYSTA - Statewide Ops.: road maintenance operations ,center lane closed on I-90 - NYS Thruway westbound from After Exit 44 (I-90) - Canandaigua (Rte 332) to After Exit 44 (I-90) - Canandaigua (Rte 332) until 8:00 PM, 06/16/2026 [CARS CAD-261530051] Tue, 09 Jun 2026 06:24:58 -0400 42.996904 -77.38858 NY 36 both directions : Construction NYSDOT - Region 6: Construction , drainage improvements on NY 36 both directions CR 21 (Canisteo) to CR 21 (Canisteo) All lanes of 1 lane open until 11:59 PM On Site Detour Expect Delays Tue, 02 Jun 2026 00:00:09 -0400 42.1946897866646 -77.5504806871787 I-90 - NYS Thruway westbound : Construction NYSTA - Statewide Ops.: road maintenance operations ,right lane closed on I-90 - NYS Thruway westbound from Before Exit 29A (I-90) - Little Falls (Rte 169) to Before Exit 29A (I-90) - Little Falls (Rte 169) [CARS CAD-261520326] Sun, 07 Jun 2026 11:57:24 -0400 43.006308 -74.777546 NY 17K both directions : Construction NYSDOT - Region 8: Construction, culvert repairs on NY 17K both directions between Union School Road (Crawford) and Old NY 17K (Crawford) all lanes closed and detoured until 9:00 A.M. on July 24, 2026 D265440/32744209 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Mon, 01 Jun 2026 09:00:19 -0400 41.531428094908 -74.2887033406875 NY 414 both directions : Construction NYSDOT - Region 3: Construction, drainage improvements on NY 414 both directions CR-137 (Lodi) and Stowe Rd (Lodi) All lanes of 1 lane open until 5:00 PM on June 16,2026 ; Alternating one-way traffic with temporary signals Wed, 10 Jun 2026 10:36:13 -0400 42.5584835349618 -76.8647722735708 CR-2 both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on CR-2 both directions over Fox Creek (Berne) All lanes closed until 11:59 PM on September 25,2026 Mon, 01 Jun 2026 00:00:08 -0400 42.6136884855354 -74.0896962475864 NY 79 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 79 both directions between Shafer Road (Lisle) and Michigan Hill Road (Richford) 1 alternate lanes of 2 lanes blocked to replace guiderail on 5/27/26 - 6/23/26 between 6:30am - 5pm. This work is weather dependent. Flaggers will be present. IR 10353091 Wed, 27 May 2026 08:22:23 -0400 42.3714981079102 -76.154296875 NY 38 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 38 both directions between Wade Hollow Creek Road (Newark Valley) and Dr. Knapp Road 1 alternate lanes of 2 lanes blocked for bridge painting(BIN 1024080) on 5/27/26 - 7/27/26 between 7am - 7pm. This work is weather dependent. Flaggers will be present. IR 10350091 D265640 Wed, 27 May 2026 07:06:26 -0400 42.1820847230986 -76.210944780603 I-81 southbound : Roadwork NYSDOT - Region 9: Roadwork on I-81 southbound between Exit 16 to I81S/17 W split (Binghamton) 1 alternate lanes of 4 lanes starting 5/26/2026-6/30/2026 between the hours of 1800-0600 there will be mainline milling and paving of I81 SB from Exit 16 to I81S/17W Spilt (Prospect Mountain). This work will be weather dependent. No flaggers or police will be present. Sat, 06 Jun 2026 21:04:04 -0400 42.1233323281587 -75.9066432415009 NY 12E both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 12E both directions NY 180 (Brownville) to NY 180 (Brownville) All lanes of 2 lanes closed until 11:59 PM on November 15,2026 NY Rte. 12E closed to ALL traffic at bridge crossing Perch River in Limerick. Traffic shall follow signed detour Tue, 26 May 2026 14:34:08 -0400 44.0290416425228 -76.0471677133942 NY 298 westbound : Construction NYSDOT - Region 3: Construction , drainage improvements on NY 298 westbound between Solar Street (Syracuse) and Pulaski Street (Syracuse) 1 Right lane of 2 lanes closed until 3:00 PM on July 02,2026 Tue, 26 May 2026 09:37:08 -0400 43.0641354637586 -76.1663539127023 NY 298; Bear St westbound : Construction NYSDOT - Region 3: Construction , ramp widening on NY 298; Bear St westbound ramp to I-690 (Syracuse) All lanes closed until 3:00 PM on July 02,2026 ; follow detour Tue, 26 May 2026 09:22:07 -0400 43.057398 -76.175802 I-88 eastbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 eastbound approaching Exit 23 - NY 30A; Ramp (Schoharie) 1 eastbound one lane of 2 lanes closed 05/26/2026 - 06/26/2026 06:30 - 16:00 I-88 over Smith Rd., west of Exit 23. Repair on wearing surface of bridge deck and approach slab. Overnight Closure. Work is weather dependent. No Flaggers will be on scene. IR 10331090 BIN 1070622 Tue, 26 May 2026 07:04:25 -0400 42.7056999206543 -74.3206024169922 I-88 westbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 westbound between Exit 16 - CR 47; Emmons Route 7 (Oneonta) and Exit 17 - NY 28; Gersoni Road Route 7 (Milford) for concrete joint repairs w/ paving & guiderail replacement between Ref Marker 3054 to 3009 in both driving & passing lanes from 5/26 to 11/6 between 6am & 6pm with overnight closure. This work is weather dependent and no flag personnel are present. D: 265744 IR:10329090 Tue, 26 May 2026 06:53:01 -0400 42.4580001831055 -75.0147018432617 NY 52 both directions : Construction NYSDOT - Region 8: Construction, bridge rehabilitation on NY 52 both directions between Brookside Farms Road (Newburgh) and 5th Avenue (Newburgh) right lane and shoulder closed to traffic until 12:00 A.M. on June 20, 2026 D265160/B1026780/32112309 - 24/7 RIGHT LANE CLOSURE - Plan travel accordingly; delays may exist Tue, 26 May 2026 00:00:15 -0400 41.5130253486982 -74.0492785615146 US 9W both directions : Construction NYSDOT - Region 8: Construction, longterm construction on US 9W both directions between NY 304 (Haverstraw) and Short Clove Road (Haverstraw) all lanes closed and detoured until 5:00 A.M. on June 27, 2026 202308107656/202508112934/32545509 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Sat, 23 May 2026 16:55:15 -0400 41.175199847939 -73.9438406770008 I-88 westbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 westbound over Ouleout Creek (Sidney) 1 right lane and shoulder of 4 lanes blocked for bridge repair with overnight closure over Ouleout Creek on 5/19 - 5/20/26 between 6:30am - 4pm. This work is weather dependent. No flag personnel will be present. IR 10270090 Tue, 19 May 2026 07:37:24 -0400 42.3411465108209 -75.2708467755646 RIVERVIEW RD both directions : Construction NYSDOT TMC - Albany: Construction , bridge rehabilitation on RIVERVIEW RD both directions over I-87 (Halfmoon) All lanes closed until 11:59 PM on March 31,2027 Mon, 18 May 2026 16:07:09 -0400 42.800434629655 -73.7649153438428 COONS CROSSING RD both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on COONS CROSSING RD both directions between Cary Rd/Ushers Rd (Halfmoon) and RT-67 (Stillwater) All lanes closed until 4:00 PM on September 04,2026 Follow Posted Detour Mon, 18 May 2026 09:00:13 -0400 42.9187354752918 -73.7460283032344 Fish Hatchery Road both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on Fish Hatchery Road both directions between NY 46 ( Rome) and Williams Road (Rome) all lanes closed until 5:00 P.M. on December 15, 2026 Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 46, Potter Road, Turin Road, Williams Road Mon, 18 May 2026 07:00:44 -0400 43.2613987330372 -75.4387860794468 NY 30 both directions : Construction NYSDOT - Region 2: Construction, bridge painting on NY 30 both directions between Dock Road (Long Lake) and Rice Road (Long Lake) until 5:00 P.M. on May 31, 2026 Fri, 15 May 2026 06:18:52 -0400 43.9745666528571 -74.4259922238647 I-690 westbound : Construction NYSDOT - Region 3: Construction , pothole repair on I-690 westbound between I-81 Southbound (Syracuse) and Exit 1 - I-90 (Van Buren) All lanes of 3 lanes open until 3:00 PM ; Alternating mobile lane closures Thu, 14 May 2026 11:08:07 -0400 43.0527981666013 -76.1501854284594 CENTRAL PARK AVE both directions : Construction Westchester Co. DPW: Construction , road rehabilitation on CENTRAL PARK AVE both directions between PARKWAY N (Yonkers) and NY 100 at Palmer Road (Yonkers) All lanes of 2 lanes open until 11:59 PM on April 19,2027 There will be single lane closures within the above limits Tue, 12 May 2026 16:00:13 -0400 40.905978 -73.87786 Bronx River Parkway both directions : Construction Westchester Co. DPW: Construction , road rehabilitation on Bronx River Parkway both directions City of Yonkers; City of New York Line (Yonkers) to Palmer Avenue (Yonkers) All lanes of 3 lanes open until 11:59 PM on April 19,2027 There will be single lane closures within the above limits Tue, 12 May 2026 15:53:07 -0400 40.900908 -73.860711 I-690 westbound : Construction NYSDOT - Region 3: Construction , installation of sign structure on I-690 westbound between Exit 19N-19A; NY 635;Thompson Rd. (De Witt) and NY 635; Thompson Rd. overpass (Syracuse) right shoulder of 2 lanes closed until 3:00 PM on July 01,2026 Tue, 12 May 2026 09:11:09 -0400 43.0578304772279 -76.0739346334672 NY 90 both directions : Construction NYSDOT - Region 3: Construction, culvert repairs on NY 90 both directions GULLY RD (Ledyard) and Levanna Rd (Ledyard) All lanes of 1 lane open until 6:00 PM on July 31,2026 ; Alternating one-way traffic with temporary signals Wed, 10 Jun 2026 10:31:12 -0400 42.7724116988184 -76.7103426997273 I-690 eastbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-690 eastbound between I-81 Northbound (Syracuse) and Exit 17 - Teall Avenue (Syracuse) 1 Left lane of 3 lanes closed until 3:00 PM on June 30,2026 Mon, 11 May 2026 09:00:08 -0400 43.05149 -76.139798 NY 5S both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 5S both directions between Currytown Road (Root) and Sprakers Hill Road (Root) until 4:00 P.M. on May 25, 2026 Motorists will encounter lane closures in both directions with temp signals in place Mon, 11 May 2026 07:00:43 -0400 42.8952077713136 -74.4707830248676 NY 5S westbound : Construction NYSDOT - Region 2: Construction, bridge work on NY 5S westbound over Reese Road (Frankfort) until 4:00 P.M. on June 05, 2026 Motorists will encounter a westbound lane closure Mon, 11 May 2026 07:00:46 -0400 43.025140840502 -75.0713068010444 NY 208 both directions : Construction NYSDOT - Region 8: Construction, drainage improvements on NY 208 both directions between Salzburg Road (Blooming Grove) and Twin Arch Road (Blooming Grove) all lanes closed and detoured until 12:00 A.M. on August 11, 2026 D265386/32732609 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Mon, 11 May 2026 00:00:24 -0400 41.4311772919587 -74.1840670786509 NY 116 both directions : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on NY 116 both directions between Hunts Lane (North Salem) and Peach Lake Road - NY 121 (North Salem) alternating traffic until 12:00 A.M. on December 31, 2026 D265445/32700709 - 24/7 LANE CLOSURE - his work is weather permitting, Plan travel accordingly; delays may exist Thu, 07 May 2026 08:40:35 -0400 41.3305667588838 -73.5493376489188 NY 17 [Tioga] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Tioga] both directions between Exit 64 - NY 96 (Owego) and Exit 66 - NY 434 (Owego) 1 alternate lanes of 4 lanes blocked , to set out construction signs, pothole patching and clearing roadway for project startup, on 5/7/26 - 7/31/26 between 7am - 5pm. Work is between Marshland Road and the Owego rest stop.This work is not weather dependent. No flag personnel will be present. IR 10194090 Thu, 21 May 2026 14:29:10 -0400 42.0937004089355 -76.2662963867188 NY 28N both directions : Construction NYSDOT TMC - Albany: Construction , culvert repairs on NY 28N both directions between OWENS RD (Chester) and COBBLE CREEK RD (Chester) All lanes of 1 lane open until 11:59 PM on June 30,2026 alternating lane closures Wed, 06 May 2026 00:00:08 -0400 43.7280929928247 -73.9680348553066 Korean Veterans Memorial Parkway southbound : Construction NYSDOT - Region 11: Construction on Korean Veterans Memorial Parkway southbound between Richmond Avenue (Staten Island) and Arden Avenue (Staten Island) 1 Right lane of 2 lanes closed until further notice Long Term - Construction Thu, 04 Jun 2026 06:27:28 -0400 40.5561761020781 -74.1755364818118 NY 17 [Broome] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Broome] both directions area of Exit 83 - CR 28 (Sanford) 2 alternate lanes of 4 lanes blocked , for Bridge Painting(BIN 1013300) on 5/526 - 6/15/26 between 7am - 7pm. Two lanes reduced to one lane on EB and WB lanes on exit 83 ramp under NY 17 EB/WB. This work is weather dependent. No flag personnel will be present. IR 10181090 Tue, 05 May 2026 07:05:58 -0400 42.0503005981445 -75.4492034912109 County Route 69 Airport Rd. both directions : Roadwork NYSDOT - Region 9: Roadwork on County Route 69 Airport Rd. both directions at Exit 71 - CR 69 (Union) 2 right lanes of 6 lanes blocked for bridge painting on SR-17E/W from CR-69 Airport Rd. on BIN# 1063229 with overnight lane closures that will be removed on Friday's, no lane closures on weekends.Work will occur between 5/4 & 6/15 during 7am to 7pm. This work is weather dependent, and no flag personnel are present. IR:10168090 D265640 Mon, 04 May 2026 07:21:37 -0400 42.119701385498 -75.9503021240234 WILER RD both directions : Construction NYSDOT - Region 4: Construction , bridge replacement on WILER RD both directions between CR-203; Brick Schoolhouse Rd (Hamlin) and CR-207; Hamlin Center Rd. (Hamlin) All lanes closed and detoured until 5:00 PM on November 01,2026 Road closed, follow posted detour. Thu, 30 Apr 2026 09:00:20 -0400 43.3127737164957 -77.891045545342 NY 21 both directions : Construction NYSDOT - Region 4: Construction , culvert repairs on NY 21 both directions between Bristol Spring Rd; CR 12 (Naples) and NY 64 (South Bristol) All lanes closed and detoured until 5:00 PM on June 25,2026 Road closed , local traffic only, Follow posted detour Mon, 27 Apr 2026 06:00:03 -0400 42.6309303492858 -77.3918185245488 Commodore Barry Bridge both directions : New traffic Pattern DRPA: New traffic Pattern on Commodore Barry Bridge both directions between New Jersey Side (Logan Twp) and Pennsylvania Side (Chester) All lanes open westbound; 1 Right lane of 3 lanes closed eastbound W/B SPEED 35 MPH; E/B SPEED 45 MPH Mon, 08 Jun 2026 08:02:48 -0400 39.8203851780585 -75.363147884063 US 11 both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on US 11 both directions Delancy Avenue (Moira) to Delancy Avenue (Moira) All lanes of 1 lane diverted until 11:59 PM on November 30,2026 The bridge on Rte. 11 over Little Salmon River is reduced to one lane alternating traffic under control of a temporary signal Fri, 24 Apr 2026 14:35:03 -0400 44.8307384652527 -74.5097295546029 NY 30 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 30 both directions over Hatchery Brook (Lake Pleasant) until 5:30 P.M. on May 01, 2026 Fri, 24 Apr 2026 07:30:40 -0400 43.5269349476878 -74.3866872937893 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Dopp Hill Road (Western) and Main Street (Western) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Fri, 24 Apr 2026 07:00:26 -0400 43.3006618047943 -75.3877980208782 NY 49 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) until 5:00 P.M. Fri, 24 Apr 2026 07:00:27 -0400 43.2231900929207 -75.5936199477147 ALMOND ST both directions : Construction NYSDOT - Region 3: Construction , longterm construction on ALMOND ST both directions between E TAYLOR ST (Syracuse) and VAN BUREN ST (Syracuse) All lanes of 3 lanes open until 5:00 PM on October 15,2026 ; Alternating one-way traffic with flaggers Thu, 23 Apr 2026 18:51:01 -0400 43.0393993117124 -76.1422048967569 VAN BUREN ST both directions : Construction NYSDOT - Region 3: Construction , utility work on VAN BUREN ST both directions between ALMOND ST (Syracuse) and HENRY ST (Syracuse) All lanes closed until 5:00 PM on October 15,2026 ; follow detour Thu, 23 Apr 2026 18:47:01 -0400 43.0384656070661 -76.142081355163 NY 46 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 46 both directions between Dopp Hill Road (Western) and Main Street (Western) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Mon, 20 Apr 2026 11:48:19 -0400 43.3006618047943 -75.3877980208782 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Exit 6 S-N- US 11; Ramp (Chenango) and Exit 7 - US 11 (Chenango) 2 alternate lanes of 4 lanes blocked for pavement repairs & resurfacing in the lanes of I-81NB & SB with alternate lane closures between Exits 16(old Exit 6) to 21(old Exit 7) and overnight lane closures from 4/20/26 to 9/30/26 between 7am & 7pm. This work is weather dependent & no flag personnel are present. IR:10068090 D265682 Wed, 27 May 2026 07:36:31 -0400 42.1501998901367 -75.8964996337891 NY 434 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 434 both directions between Main St. (Vestal) and Front St. (Vestal) 2 alternate lanes of 4 lanes blocked for bridge replacement of BIN# 1063329 over Choconut Creek on SR-434WB. WB traffic will be shifted to 1 eastbound lane, and EB traffic will be reduced to 1 lane between Main ST & Front St. Detour for Town Hall Rd. will be Front St. his work will occur between 4/20/26 to 10/31/26 from 7am to 4pm. This work is not weather dependent, and no flag personnel will be present. IR:10066090 D265629 Mon, 20 Apr 2026 07:11:42 -0400 42.0840671613892 -76.0636093469569 US 20 westbound : Construction NYSDOT - Region 3: Construction , roadwork on US 20 westbound between Pine Ridge Rd (Sennett) and Walker Rd (Sennett) 1 Right lane of 2 lanes closed until 4:00 PM on July 21,2026 Mon, 20 Apr 2026 07:00:22 -0400 42.9384410977108 -76.5068053515196 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions area of Exit 14 - Main Street (Oneonta) 1 right lane and shoulder of 4 lanes blocked for culvert rehabilitation at Ref. Marker 2024 around Exit 14 on I-88E/W with a long-term shoulder closure using concrete barriers. Between 4/16/26 to 12/1/26 during 7am to 6pm. This work is weather dependent, and no flaggers will be present. IR: 10041090 D265389 Thu, 16 Apr 2026 07:00:24 -0400 42.4444007873535 -75.0671005249023 I-87 Northway northbound : Construction NYSDOT TMC - Albany: Construction , bridge replacement on I-87 Northway northbound Off-ramp Exit 32 -Garvey Mill Road (Lewis) All lanes closed until 4:00 PM on November 13,2026 Exit 32 off-ramp closed as well as a left lane closure on the ramp bridge over Spruce Mill Brook. Traffic re-routing through the rest area on to right lane of the bridge over Spruce Mill Brook. Mon, 13 Apr 2026 08:02:07 -0400 44.2818110139232 -73.5304837982673 NY 34 southbound : Roadwork NYSDOT - Region 9: Roadwork on NY 34 southbound between Hulbert Hollow Rd. (Spencer) and Michigan Hollow Rd. (Spencer) 1 southbound one lane of 2 lanes blocked for bridge replacement on SR-34 between Hulbert Hollow Rd. & Michigan Hollow Rd. from 5/18/26 to 10/12/26 during 7am to 5pm. This work is weather dependent, and no flag personnel will be present. Temporary signal in place for traffic control. IR:10012090 D265517 Mon, 18 May 2026 07:22:44 -0400 42.2570719026262 -76.5074547182689 I-490 eastbound : Construction NYSDOT - Region 4: Construction , bridge replacement on I-490 eastbound from Pittsford Palmyra Road; NY 31 (Perinton) to Bushnells Basin (Perinton) All lanes of 2 lanes until 5:00 PM The I490 EB between Exit 26 to Exit 27. Both the EB lanes will be shifted to the right and/but staying in the EB travel direction beginning Monday March 30th. Lanes Shifts scheduled to be in place for the 2026 construction season. Mon, 13 Apr 2026 07:00:10 -0400 43.0793255286162 -77.4858025416461 NY 253 eastbound : Construction NYSDOT - Region 4: Construction , structure repairs on NY 253 eastbound at I-390 (Henrietta) 1 Right lane of 3 lanes closed until 4:00 PM on August 31,2026 Mon, 13 Apr 2026 07:00:10 -0400 43.0588347894494 -77.6415996853271 I-490 westbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on I-490 westbound at Bushnells Basin on ramp (Perinton) All lanes closed until 5:00 PM Exit 27 - I490 WB on ramp will be closed to all traffic beginning Monday March 30th. Detour will be posted Closure scheduled to be in place for the 2026 construction season. Mon, 13 Apr 2026 07:00:10 -0400 43.0576998898582 -77.47116 NY 28 both directions : Construction NYSDOT - Region 2: Construction, bridge replacement on NY 28 both directions between Exit - Mohawk Street; I-90; Steele Street (Herkimer) and Marginal Road (Herkimer) until 6:00 P.M. on November 30, 2026 Motorists may encounter flagging operations under the I-90 bridge Mon, 13 Apr 2026 06:01:19 -0400 43.0176476218537 -74.9935529126271 NY 3 both directions : Construction NYSDOT - Region 7: Construction , drainage improvements on NY 3 both directions (Piercefield) All lanes of 1 lane open until 11:59 PM No active work at this time. All lanes and shoulders open to traffic Mon, 13 Apr 2026 00:00:07 -0400 44.24 -74.5938098640825 NY 126 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 126 both directions (Wilna) All lanes of 3 lanes open to traffic until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 13 Apr 2026 00:00:07 -0400 43.9778987922716 -75.6096251086944 BRIDGE ST eastbound : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes of 2 lanes open until 11:59 PM All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays Mon, 13 Apr 2026 00:00:07 -0400 43.9743621931654 -75.6148611815249 NY 3 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) to Route 3 - Arsenal Street at North Meadow Street (Watertown) All lanes open to traffic until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 13 Apr 2026 00:00:06 -0400 43.97639096423 -75.9206566174228 NY 26 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) All lanes of 1 lane open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 13 Apr 2026 00:00:06 -0400 43.7882979619324 -75.493499612246 NY 12F both directions : Construction NYSDOT - Region 7: Construction , bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) to NY 971H; Paddy Hill Road (Hounsfield) All lanes of 2 lanes open until 11:59 PM Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements Mon, 13 Apr 2026 00:00:08 -0400 43.9994230767768 -75.9830930786789 I-590 southbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on I-590 southbound Elmwood Avenue; CR 87 (Brighton) to EXIT 2A to NY 31; Monroe Ave (Brighton) 1 Right lane of 3 lanes diverted until 12:00 PM on November 30,2026 RIGHT LANE IS EXIT ONLY AT EXIT 2A Sat, 11 Apr 2026 05:00:21 -0400 43.126751 -77.553513 NY 31 westbound : Construction NYSDOT - Region 4: Construction , bridge replacement on NY 31 ramp westbound Entrance ramp I-590 SB (Brighton) All lanes closed and detoured until 12:00 PM on November 30,2026 RAMP CLOSED Sat, 11 Apr 2026 05:00:21 -0400 43.117 -77.553968 I-590 southbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on I-590 ramp southbound Exit ramp Exit 2B to NY 31; Monroe Ave. (Brighton) All lanes closed and detoured until 12:00 PM on November 30,2026 RAMP CLOSED Sat, 11 Apr 2026 05:00:21 -0400 43.114341 -77.552248 NY 230 both directions : Construction NYSDOT - Region 6: Construction , culvert repairs on NY 230 both directions Town of Tyrone; Town of Barrington Line (Tyrone) to Town of Tyrone; Town of Barrington Line (Tyrone) All lanes of 1 lane open until 11:59 PM 2 lanes reduced to 1 with signals Fri, 10 Apr 2026 18:33:06 -0400 42.4940850354644 -77.0567725962961 I-87 Northway both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on I-87 Northway both directions E. Schroon River Rd just north of Exit 23 (Bolton) 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound until 11:59 PM on September 30,2026 11' lane width restriction Fri, 10 Apr 2026 14:41:05 -0400 43.4997297094236 -73.7468358468454 I-590 both directions : Construction NYSDOT - Region 4: Construction , bridge replacement on I-590 both directions between Edgewood Ave (Brighton) and Elmwood Avenue; CR 87 (Brighton) 1 Left lane of 3 lanes closed until 5:00 PM on September 30,2026 Fri, 10 Apr 2026 11:34:07 -0400 43.1084545195575 -77.5609362742396 Earhart Drive both directions : Construction Port Authority NY/NJ: Construction on Earhart Drive both directions Basilone Road (Elizabeth) to South Bridge Road All lanes closed until June 30th, 2028 Mon, 04 May 2026 20:12:29 -0400 40.6854533201585 -74.1888271599343 US 11 both directions : Construction NYSDOT - Region 3: Construction , bridge replacement on US 11 both directions between Bennett St (Cicero) and River Rd (Hastings) All lanes of 1 lane open until 3:30 PM on December 31,2026 ; Alternating one-way traffic with temporary signals Thu, 09 Apr 2026 13:21:06 -0400 43.2394080545219 -76.1406134324658 NY 28 both directions : Construction NYSDOT - Region 2: Construction, tree trimming on NY 28 both directions between ONeil Flowage (Indian Lake) and Durant Road (Indian Lake) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Thu, 09 Apr 2026 07:01:11 -0400 43.8203436936601 -74.346154646509 NY 54A northbound : Construction NYSDOT - Region 6: Construction , safety improvements on NY 54A northbound Town of Pulteney; Town of Urbana Line (Pulteney) to Town of Pulteney; Town of Urbana Line (Pulteney) All lanes closed until 11:59 PM on May 29,2026 2 lanes reduced to 1 Wed, 08 Apr 2026 13:55:06 -0400 42.4753782378973 -77.1720962528018 I-481 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) All lanes closed until 6:00 PM on September 11,2026 ; follow detour Wed, 08 Apr 2026 09:00:14 -0400 43.0768629491718 -76.0559744237577 South Ave southbound : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on South Ave southbound ramp to I-490 Eastbound (Rochester) All lanes closed and detoured until 11:59 PM on December 31,2026 RAMP CLOSED Wed, 08 Apr 2026 08:39:08 -0400 43.1524435297133 -77.6073289140658 NY 3 both directions : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 3 both directions NY 178 (Henderson) to NY 178 (Henderson) All lanes and both shoulder of 1 lane closed westbound; All lanes of 1 lane closed eastbound until 11:59 PM on November 15,2026 NYS Rte. 3 closed in both directions at the bridge over Stoney Creek. Traffic is directed to follow the signed detour Tue, 07 Apr 2026 12:09:06 -0400 43.8410857915649 -76.1991277724751 NY 310 both directions : Construction NYSDOT - Region 7: Construction , culvert repairs on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) All lanes of 1 lane open until 11:59 PM Rte. 310 over tributary to Nettle Creek is now open to alternating one-way traffic. Traffic is being controlled by a temporary signal. Additional work at the site will be completed once the weather is more favorable. Mon, 06 Apr 2026 15:37:07 -0400 44.6590178874974 -75.1495181801412 NY 12F both directions : Construction NYSDOT - Region 7: Construction , bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) to NY 971H; Paddy Hill Road (Hounsfield) All lanes of 2 lanes open until 11:59 PM Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements Mon, 06 Apr 2026 15:24:07 -0400 43.9994230767768 -75.9830930786789 NY 168 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 168 both directions between END ROUTE; NY 80; Hamlet of Stark (Stark) and CR 206; Lighthall Road all lanes closed until 6:00 P.M. on June 27, 2026 Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 80 and Lighthall Road. Mon, 06 Apr 2026 07:00:26 -0400 42.9264591263652 -74.7934481566887 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions between Town of Worcester; Town of Richmondville Line (Richmondville) and Exit 20 - NY 7; NY 10; Richmondville (Richmondville) 2 alternate lanes of 4 lanes blocked For pavement resurfacing, joint repairs & guiderail installation on I-88 E/W between Otsego County line & Exit 20. From 4/6/26 to 11/2/26 between 6am &6pm. this work is not weather dependent and no flag personnel are present. IR: 9963090 D265446 Mon, 06 Apr 2026 06:24:08 -0400 42.6492004394531 -74.6349029541016 NY 3 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) to Route 3 - Arsenal Street at North Meadow Street (Watertown) All lanes open to traffic until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 06 Apr 2026 00:00:06 -0400 43.97639096423 -75.9206566174228 NY 26 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) All lanes of 1 lane open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 06 Apr 2026 00:00:06 -0400 43.7882979619324 -75.493499612246 I-490 westbound : Construction NYSDOT - Region 4: Construction , longterm construction on I-490 westbound between Exit 27 - NY 96 (Perinton) and Exit 26 - NY 31 (Pittsford) All lanes shift until 5:00 PM on December 18,2026 Sat, 04 Apr 2026 07:01:07 -0400 43.0570952593101 -77.4711561917241 NY 21 both directions : Construction NYSDOT - Region 6: Construction , installation of fiber optics on NY 21 both directions Cohocton Street; NY 371 (Cohocton) to PARKS RD (Cohocton) All lanes of 1 lane open until 3:00 PM Shoulder closure 2 lane to 1 lane with flagger Thu, 02 Apr 2026 14:26:09 -0400 42.5656179918977 -77.4851325701242 WATER ST southbound : Construction NYSDOT TMC - Albany: Construction , bridge rehabilitation on WATER ST southbound between COLONIE ST (Albany) and ORANGE ST (Albany) 1 Left lane of 2 lanes closed until 11:59 PM on December 31,2026 left lane closure with temporary concrete barrier Tue, 31 Mar 2026 00:00:07 -0400 42.6560526568251 -73.7441176875787 NY 310 both directions : Construction NYSDOT - Region 7: Construction , culvert repairs on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) All lanes of 1 lane open until 11:59 PM Rte. 310 over tributary to Nettle Creek is now open to alternating one-way traffic. Traffic is being controlled by a temporary signal. Additional work at the site will be completed once the weather is more favorable. Mon, 30 Mar 2026 08:36:08 -0400 44.6590178874974 -75.1495181801412 NY 12F both directions : Construction NYSDOT - Region 7: Construction , bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) to NY 971H; Paddy Hill Road (Hounsfield) All lanes of 2 lanes open until 11:59 PM Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements Mon, 30 Mar 2026 08:11:09 -0400 43.9994230767768 -75.9830930786789 NY 46 both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 46 both directions over I-90 (Oneida) until 6:00 P.M. Motorists will encounter lane closures in both directions Mon, 30 Mar 2026 06:01:16 -0400 43.1102981567383 -75.6647033691406 NY 5 both directions : Construction NYSDOT - Region 3: Construction , roadwork on NY 5 both directions between Almond Street (Syracuse) and University Ave (Syracuse) 1 Left lane of 2 lanes closed until 3:30 PM on July 01,2026 Fri, 27 Mar 2026 13:44:06 -0400 43.0507859952873 -76.141945806778 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Exit 2E - Connector from US 11 to I-81 (Exit 2) & NY 17 (Exit 75) (Kirkwood) and Exit 3 - Broad Avenue West (Binghamton) 1 alternate lanes of 4 lanes blocked for Bridge Painting, BINS 1013111 (I-81 SB), 1013112 (I-81 NB) over Loughlin Road between New exits 9 and 10, RM 81 91011096. Left or Right Lane Closure on Southbound I-81 Bridge. Left Lane Closure on Northbound I-81 Bridge. Closure to be removed on Fridays. A single lane closure managed by a temp. signal will be in place on Loughlin Rd. under the bridges during the project. From 3/26/26 - 6/9/26 between 7am and 7pm. This work is weather dependent. Open Reach Started. IR 9913090 D235640 Tue, 26 May 2026 14:51:25 -0400 42.0956001281738 -75.8136978149414 NY 17 [Delaware] westbound : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Delaware] westbound between Exit 90 - CR 17; NY 30 (Hancock) and Exit 89 - Old State Highway; Ramp (Hancock) 1 right lane of 2 lanes blocked for bridge painting on BIN 1013431 on SR-17WB between Exits 90 & 89 with overnight lane closure from 3/23/26 to 6/20/26 between 7am &7pm. This work is weather dependent and no flag personnel are present. IR: 9902090 D265640 Mon, 23 Mar 2026 07:01:34 -0400 41.9929008483887 -75.1376037597656 NY 69 both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 69 both directions between NY 291 (Whitestown) and NY 922A; Clinton Street; CR 30 (Whitestown) until 6:00 P.M. on November 21, 2026 Motorists will encounter lane closures in both directions for work on the I-90 bridge Mon, 23 Mar 2026 06:00:43 -0400 43.1389007568359 -75.3051986694336 US 9W both directions : Construction NYSDOT - Region 8: Construction, drainage improvements on US 9W both directions between NY 218 (Highlands) and Mountain Road (Cornwall) right lane closed to traffic until 12:00 A.M. on September 04, 2026 D265262/32427409 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist Mon, 16 Mar 2026 09:44:16 -0400 41.3771406249868 -73.9836180210114 I-481 southbound : Construction NYSDOT - Region 3: Construction , bridge work on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 88 (Old Exit 4) - I-690 (De Witt) All lanes of 2 lanes open until 6:00 PM on September 11,2026 ; Lane Shift Mon, 16 Mar 2026 09:00:10 -0400 43.0830976069085 -76.0537121137582 I-481 southbound : Construction NYSDOT - Region 3: Construction , bridge work on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 88 (Old Exit 4) - I-690 (De Witt) All lanes of 2 lanes open until 6:00 PM on September 11,2026 ; Lane Shift Mon, 16 Mar 2026 08:59:07 -0400 43.0830976069085 -76.0537121137582 Sprain Brook State Pkwy southbound : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on Sprain Brook State Pkwy southbound ramp from W/B I-287 (Greenburgh) until further notice D265281/32709309 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Tue, 17 Mar 2026 08:43:45 -0400 41.0566264173802 -73.8090318177941 NY 5S both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 5S both directions between CR 122; Auriesville Road (Glen) and CR 27; Main Street; Hamlet of Fort Hunter (Montgomery) until 6:00 P.M. on November 21, 2026 Mon, 16 Mar 2026 06:00:52 -0400 42.9299 -74.315 NY 284 both directions : Construction NYSDOT - Region 8: Construction, culvert repairs on NY 284 both directions between Langlitz Road (Minisink) and Farms Road (Minisink) all lanes closed and detoured until 12:00 A.M. on June 20, 2026 D265386/32597309 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Mon, 16 Mar 2026 00:00:30 -0400 41.3285156373355 -74.5527167373649 Palisades Interstate Parkway southbound : Construction NYSDOT - Region 8: Construction, bridge rehabilitation on Palisades Interstate Parkway southbound ramp to Exit 9W - I-87 - I-287 (Clarkstown) ramp closed and detoured until 12:00 A.M. on November 16, 2026 D265160/32254709 - EXIT RAMP CLOSED TO TRAFFIC - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Thu, 12 Mar 2026 12:29:42 -0400 41.1040791130742 -73.995487617742 I-81 northbound : Roadwork NYSDOT - Region 9: Roadwork on I-81 northbound between Exit 8 - NY 26; Ramp (Barker) and Exit 7 - US 11 (Chenango) 1 northbound one lane of 4 lanes closed blocked intermittently through duration of culvert rehabilitation on I-81NB between Exits 19 & 21 (old 7 & 8) from 3/11/26 through 10/1/26 during the hours of 7:00 AM to 6:00 PM. This work is weather dependent with no flagger personnel present. Police presence requested. IR9853090 D265389 Mon, 01 Jun 2026 14:59:59 -0400 42.3191986083984 -75.9664993286133 NY 9A northbound : Construction NYSDOT - Region 11: Construction on NY 9A northbound ramp to W 125th Street (New York) All lanes closed until further notice Long Term - Construction Fri, 20 Mar 2026 15:15:27 -0400 40.8184470717359 -73.9610529282641 Korean Veterans Memorial Parkway westbound : Construction NYSDOT - Region 11: Construction on Korean Veterans Memorial Parkway westbound NY 440 (Staten Island) 2 lanes of 3 lanes closed until further notice Long Term - Construction Sun, 12 Apr 2026 10:55:25 -0400 40.5262261288054 -74.2253870983623 I-86 both directions : Construction NITTEC: Construction , bridge work on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Strunk Road (Ellicott) 1 Right lane of 2 lanes closed until 11:59 PM Tue, 10 Mar 2026 07:05:07 -0400 42.157516 -79.475119 I-86 both directions : Construction NITTEC: Construction , bridge work on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Strunk Road (Ellicott) 1 Right lane of 2 lanes closed until 11:59 PM Fri, 06 Mar 2026 12:56:08 -0500 42.157516 -79.475119 NY 310 both directions : Construction NYSDOT - Region 7: Construction , culvert repairs on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) All lanes of 1 lane open until 11:59 PM Rte. 310 over tributary to Nettle Creek is now open to alternating one-way traffic. Traffic is being controlled by a temporary signal. Additional work at the site will be completed once the weather is more favorable. Fri, 20 Feb 2026 08:37:08 -0500 44.6590178874974 -75.1495181801412 NY 126 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 126 both directions (Wilna) All lanes of 3 lanes open to traffic until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 16 Feb 2026 00:00:08 -0500 43.9778987922716 -75.6096251086944 NY 26 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) All lanes of 1 lane open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 16 Feb 2026 00:00:08 -0500 43.7882979619324 -75.493499612246 NY 3 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) to Route 3 - Arsenal Street at North Meadow Street (Watertown) All lanes open to traffic until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 16 Feb 2026 00:00:07 -0500 43.97639096423 -75.9206566174228 BRIDGE ST eastbound : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes of 1 lane open until 11:59 PM All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays Mon, 16 Feb 2026 00:00:07 -0500 43.9743621931654 -75.6148611815249 NY 3 both directions : Construction NYSDOT - Region 7: Construction , drainage improvements on NY 3 both directions (Piercefield) All lanes of 1 lane open until 11:59 PM No active work at this time. All lanes and shoulders open to traffic Mon, 16 Feb 2026 00:00:07 -0500 44.24 -74.5938098640825 NY 17 [Tioga] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Tioga] both directions between Exit 66 - NY 434 (Owego) and Exit 63 - CR 54; Stunton Hill Road (Nichols) 1 right lane of 2 lanes blocked for pothole repair to occur today (2/4) during the hours of 8:000 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Started Open Reach. IR# 9700090 Wed, 04 Feb 2026 09:09:16 -0500 42.0626983642578 -76.143798828125 NY 221 both directions : Construction NYSDOT - Region 3: Construction , bridge replacement on NY 221 both directions between Jennings Creek Rd (Lapeer) and Cooper Hill Rd (Lapeer) All lanes closed until 4:00 PM on September 21,2026 ; follow detour Mon, 02 Feb 2026 07:02:08 -0500 42.4255071124658 -76.0834941522333 NY 31 : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on NY 31 ramp to I-490 Eastbound (Rochester) All lanes closed and detoured until 11:59 PM RAMP CLOSED Wed, 21 Jan 2026 11:21:04 -0500 43.1511861395552 -77.6072980233321 NY 27A eastbound : Roadwork NYSDOT - Region 10: Roadwork on NY 27A eastbound at Ocean Avenue (Islip) 1 Center lane of 3 lanes closed until further notice Tue, 13 Jan 2026 16:25:45 -0500 40.7279778365612 -73.2247004818139 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp to Center Avenue (Fort Lee) All lanes closed will be closed through July. Cars/Buses use Exit 73 for Local Streets. Trucks follow posted detours Sun, 18 Jan 2026 05:35:06 -0500 40.8552310825741 -73.9694127322947 Bruce Reynolds Boulevard westbound : Construction Port Authority NY/NJ: Construction on Bruce Reynolds Boulevard westbound Lemoine Avenue (Fort Lee) to Center Avenue All lanes closed will be closed through September 2026 Sun, 18 Jan 2026 05:35:45 -0500 40.8541588400011 -73.9683181500042 George Washington Bridge eastbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) 1 Left lane of 2 lanes closed motorists will not be able to make the left turn onto Center Avenue through July 2026. Sun, 18 Jan 2026 05:35:56 -0500 40.8550757297774 -73.9711807961208 NY 3 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) to Route 3 - Arsenal Street at North Meadow Street (Watertown) All lanes of 2 lanes open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 05 Jan 2026 00:01:04 -0500 43.97639096423 -75.9206566174228 NY 26 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) All lanes of 2 lanes open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 05 Jan 2026 00:00:07 -0500 43.7882979619324 -75.493499612246 NY 126 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 126 both directions (Wilna) All lanes of 3 lanes open until 11:59 PM Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Mon, 05 Jan 2026 00:00:07 -0500 43.9778987922716 -75.6096251086944 NY 12F both directions : Construction NYSDOT - Region 7: Construction , bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) to NY 971H; Paddy Hill Road (Hounsfield) All lanes of 2 lanes open until 11:59 PM Motorists may experience minor disruptions near the Bridge St. intersection due to equipment and/or material movements Mon, 05 Jan 2026 00:00:04 -0500 43.9994230767768 -75.9830930786789 NY 28 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 28 both directions area of South Inlet Raquette Lake (Raquette Lake) until 6:00 P.M. on September 30, 2026 Motorists will encounter laneclosures in both directions with the use of temporary signals Fri, 02 Jan 2026 07:47:21 -0500 43.8071129362516 -74.609983699413 NY 34 both directions : Construction NYSDOT - Region 3: Construction , bridge replacement on NY 34 both directions between Trombley Rd (Brutus) and Emerson Rd (Cato) All lanes closed until 6:00 AM on November 01,2026 ; follow detour Thu, 01 Jan 2026 07:00:05 -0500 43.0647604598753 -76.5591280459337 NY 3 both directions : Construction NYSDOT - Region 7: Construction , drainage improvements on NY 3 both directions (Piercefield) All lanes of 1 lane open until 11:59 PM No active work at this time. All lanes and shoulders open to traffic Mon, 29 Dec 2025 08:59:03 -0500 44.24 -74.5938098640825 NY 30 both directions : Construction NYSDOT - Region 2: Construction, guard rail repairs on NY 30 both directions between Hamilton County; Franklin County Line (Tupper Lake) and NY 28N; Long Lake (Long Lake) until 4:00 P.M. Motorists will encounter lane closures in both dierctions with flaggers in place Fri, 19 Dec 2025 07:00:47 -0500 44.0996017456055 -74.5289993286133 NY 347 westbound : Roadwork NYSDOT - Region 10: Roadwork on NY 347 westbound Nicolls Road; CR 97 (Brookhaven) to Hallock Road (Lake Grove) 1 Right lane of 3 lanes closed until further notice Thu, 26 Mar 2026 15:19:14 -0400 40.8831055 -73.1068105 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Whitney Point Rest Area (Lisle) and Cortland - Broome County Line (Lisle) 1 right lane and shoulder of 2 lanes blocked intermittently through duration of culvert rehabilitation from 12/10/25 through 10/1/26 during the hours of 7:00 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. The I-81 NB section will be completed prior to SB. Started Open Reach. IR# 9467090 D265389 Mon, 01 Jun 2026 14:45:28 -0400 42.4091987609863 -76.0146026611328 I-684 both directions : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) right shoulder closure until 11:59 A.M. on November 26, 2026 D265186/B1077550/32651809 - This work is weather permitting. Plan travel accordingly; delays may exist Mon, 08 Dec 2025 00:00:34 -0500 41.3032078231156 -73.6745859893158 NY 3 both directions : Construction NYSDOT - Region 7: Construction on NY 3 both directions (Piercefield) All lanes open 2 way traffic No active work at this time. All lanes and shoulders open to traffic Mon, 29 Dec 2025 08:19:08 -0500 44.24 -74.5938098640825 CR-636 northbound : Construction NJ DOT - TOC North: Construction on CR-636 northbound between JACKSON AVE (Woodland Park) and CR-636 (Woodland Park) All lanes closed until 11:59 PM on July 01,2026 Mon, 24 Nov 2025 10:58:52 -0500 40.9025862339041 -74.1922361851741 BEVINS RD both directions : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on BEVINS RD both directions FRENCH CREEK RD (Clayton) to FRENCH CREEK RD (Clayton) All lanes closed until 5:00 PM Bevins Road Bridge over French Creek is closed to all traffic. Wed, 19 Nov 2025 16:50:04 -0500 44.188614536652 -76.1348379877102 I-87 Northway northbound : Construction NYSDOT - Region 7: Construction , reconstruction on I-87 Northway northbound END ROUTE I-87; US-Canadian Line (Champlain) to END ROUTE I-87; US-Canadian Line (Champlain) 5 lanes of 8 lanes closed until 11:59 PM on February 28,2027 8 car lanes NB reduced to 3 (max) lanes Mon, 06 Oct 2025 14:11:05 -0400 45.0087514673341 -73.452063085427 US 9W both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on US 9W both directions between Hickory Circle and Pictuay Rd (Bethlehem) All lanes of 2 lanes open until 5:00 PM on July 03,2026 one lane open in both directions, NB lane shift in place Wed, 06 Aug 2025 09:46:05 -0400 42.5340517856205 -73.8058262254228 Corbin Street both directions : Construction Port Authority NY/NJ: Construction on Corbin Street both directions Kellogg Street (Newark) to Outer Port Street 1 Right lane of 3 lanes closed July 13th, 2026 Tue, 26 May 2026 08:35:33 -0400 40.7029624496184 -74.1514398425719 I-81 northbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 northbound at Exit 29N - NY 481; North Syracuse; Oswego (Cicero) right shoulder of 3 lanes closed until 6:00 PM ; Alternating shoulder closures Mon, 28 Jul 2025 07:00:05 -0400 43.1420079390913 -76.1119110803027 NY 8 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 8 both directions between Griffen Road ( Wells) and Teachout Road (Wells) until 6:00 P.M. Fri, 27 Jun 2025 06:00:40 -0400 43.4603615850682 -74.2278188257434 NY 23 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 23 both directions between NY 8 South New Berlin (New Berlin) and CR 18 (Morris) 1 alternate lanes of 2 lanes blocked for bridge replacement SR-23 over the Unadilla River starting 6/17/25 to 8/31/26 from 6am to 5pm. A one-lane on-site detour will be activated for SR-23 East & West bound traffic for both directions between SR-8 & CR-18. Traffic will be controlled utilizing Temporary Traffic Signals. This work is weather dependent, and no flag personnel are present. IR:7969090 D:265265 Wed, 07 Jan 2026 12:27:44 -0500 42.529598236084 -75.3850021362305 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp from West 179th Street (New York) All lanes open until June 30th, 2026 Trucks wider than 10 ft or longer than 110 ft are prohibited. Sat, 30 May 2026 21:56:26 -0400 40.8493802929073 -73.9396241842173 US 11 both directions : Roadwork NYSDOT - Region 9: Roadwork on US 11 both directions between Main Street (Whitney Point) and Keibel Road (Whitney Point) 1 alternate lanes of 2 lanes blocked at various times for bridge reconstruction, curbing, drainage work to occur from 4/21 through 7/31/2026. Two lane, two way traffic will be maintained between Main Street and Keibel Road 24 hours/day. This work is weather dependent with flaggger personnel present. Started Open Reach. IR# 7461090 D264920 Tue, 05 Aug 2025 07:27:41 -0400 42.3359817350312 -75.9737122414941 I-87 Northway northbound : Construction NYSDOT TMC - Albany: Construction , roadwork on I-87 Northway northbound at END ROUTE I-87; US-Canadian Line (Champlain) All lanes of 2 lanes open until 11:59 PM Starting on 4/21/25, border crossing will be restricted to trailers over 16'4" in height, 8'5" in width and over 53' in length. Mon, 21 Apr 2025 00:00:07 -0400 45.008807 -73.452067 I-86 eastbound : Construction NITTEC: Construction , culvert repairs on I-86 eastbound Exit 26 - NY 16 Connector (Olean) to Exit 27 - NY 16 (Hinsdale) 1 Left lane of 2 lanes closed until 11:59 PM on May 30,2025 Tue, 15 Apr 2025 15:23:04 -0400 42.100083 -78.431821 GARDEN RD both directions : Construction NYSDOT - Region 7: Construction, bridge work on GARDEN RD both directions RT-26 (Philadelphia) to Sophia Street (Philadelphia)2 All lanes of 2 lanes closed westbound All lanes of 2 lanes closed eastbound until 11:59 PM Garden Rd over Indian River Bridge #P021Closed to Traffic until further notice Fri, 02 Jan 2026 16:29:05 -0500 44.1589685052784 -75.7085867284068 Bridge Street Interstate bridge # 7 westbound : Roadwork NYSDOT - Region 9: Roadwork on Bridge Street Interstate bridge # 7 westbound (Callicoon) 1 westbound one lane of 2 lanes blocked for bridge rehabilitation to occur from 3/24/25 through 11/30/26 during the hours of 6:00 AM to 5:30 PM. This work is weather dependent with no flagger personnel present. Traffic will be controlled by temporary signal. Started Open Reach. IR# 6256091 D265033 Mon, 01 Dec 2025 16:45:55 -0500 41.7650010366706 -75.0609952667757 NY 17 [Tioga] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Tioga] both directions between Exit 65 - NY 434; Ramp (Owego) and Town of Owego; Town of Vestal Line (Owego) 1 alternate lanes of 2 lanes blocked for preparations for upcoming construction to occur from 03/20 through 11/01 during the hours of 7:00AM and 5:00PM. New striping will be placed on NY 17 EB allowing traffic to only use the right lane. Starting 3/22 a temporary concrete barrier will be placed in EB following the new striping patterns. On 4/01 head to head traffic will be in place with a single lane for WB and EB all on the EB side of the highway and the contractor will CLOSE Exit 66 WB off ramp to traffic. A signed detour will be in place taking WB traffic to Exit 65 and getting them onto NY 17 EB and back to Exit 66. The ramp to get on NY 17 WB from Exit 66 will remain open. There will be no flag personnel present and this work is weather dependent. Started Open Reach. IR#4948091 D265091 Tue, 25 Jun 2024 13:19:54 -0400 42.0886001586914 -76.2288970947265 Inner Port Street both directions : Construction Port Authority NY/NJ: Construction on Inner Port Street both directions between Corbin Street (Newark) and Port Street (Newark) All lanes closed December 31st, 2026 Mon, 30 Mar 2026 07:21:56 -0400 40.7040488538158 -74.1505620476053 I-86 eastbound : Construction NITTEC: Construction , bridge work on I-86 eastbound Exit ramp to Exit 9 closed. Use Exit 10. (Ellery) All lanes closed until 11:59 PM on December 31,2026 Wed, 03 Apr 2024 10:13:04 -0400 42.152016 -79.382971 US 11 both directions : Construction NYSDOT - Region 7: Construction , construction on US 11 both directions in the vicinity of HALLAHAN RD (Lawrence) All lanes of 1 lane open until 11:59 PM on December 31,2027 Narrow Bridge Sun, 15 Dec 2024 21:00:05 -0500 44.7720819404316 -74.713616527616 NY 240 both directions : Construction NITTEC: Construction, construction on NY 240 both directions Westbrook Drive (Cheektowaga) to Maryvale Drive (Cheektowaga) 1 Left lane of 2 lanes closed Tue, 12 Nov 2024 18:46:02 -0500 42.9336719270712 -78.7841518738921 Port Street eastbound : Construction Port Authority NY/NJ: Construction on Port Street eastbound ramp to Corbin Street (Newark) All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until July 13th 2026 Tue, 26 May 2026 08:34:30 -0400 40.7047103800473 -74.1514923040378