Active Construction All Active Construction en-us Mon, 23 Oct 2017 07:41:04 -0400 Copyright 511nj.org 1 NJ 139 Upper westbound : emergency repairs NJ DOT - STMC: emergency repairs on NJ 139 Upper westbound between Kennedy Boulevard (Jersey City) and Palisades Av (Jersey City) , Monday October 23rd, 2017 thru Friday October 27th, 2017, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closed for repairs Fri, 20 Oct 2017 10:53:59 -0400 40.7391819067 -74.0676981458 NJ 42 both directions : pothole repair NJ DOT - TOC South: pothole repair on NJ 42 both directions from I-295 (Bellmawr) to South of Exit 7 - NJ 168 (Washington Twp) , Monday October 30th, 2017, 10:00 AM thru 03:00 PM, moving operation Wed, 18 Oct 2017 16:33:16 -0400 39.8678458114 -75.1013848352 I-76 both directions : pothole repair NJ DOT - TOC South: pothole repair on I-76 both directions from Exit 1A - NJ 42/I-295 (Bellmawr) to East of Exit 2 - I-676 (Camden) , Tuesday October 31st, 2017, 10:00 AM thru 03:00 PM, moving operation Wed, 18 Oct 2017 16:34:31 -0400 39.8739495669 -75.1022102874 I-676 both directions : pothole repair NJ DOT - TOC South: pothole repair on I-676 both directions from I-76 (Gloucester City) to Exit 5A - US 30/Federal St (Camden) , Wednesday November 1st, 2017, 10:00 AM thru 03:00 PM, moving operation Wed, 18 Oct 2017 16:35:40 -0400 39.8972220139 -75.1086951583 Bayonne Bridge both directions : Construction Port Authority NY/NJ: Construction, construction on Bayonne Bridge both directions New Jersey Side (Bayonne) to New York Side - Toll Plaza (Staten Island) 1 lane open until Mid 2019. There is a 25 mile per hour speed restriction in effect. Mon, 21 Nov 2016 06:15:15 -0500 40.649335 -74.138733 NY 26 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 26 both directions area of East Main Street; NY 206; Hickory Street; NY 79 (Triangle) alternate lanes closed for bridge replacement and intersection reconstruction. Other roadways being affected are Rt 11 and Rt 206. Flag personnel along with temporary signals used to control traffic through work zone. This work will be done from 7:00 am to 3:30 pm, 4/13/16 to 6/30/18. D262781 IR 29843 Wed, 18 Oct 2017 11:13:26 -0400 42.3293991088867 -75.9642028808594 I-81 northbound : Construction NYSDOT - Region 9: Construction, construction on I-81 northbound from westbound NY 7 (Binghamton) entrance ramp closed from 5/23/16 to 12/29/17. D262955 IR 30103 Fri, 12 May 2017 10:10:16 -0400 42.1150651426763 -75.8993053436279 US 11 both directions : Construction NYSDOT - Region 9: Construction, construction on US 11 both directions between Exit - Front Street; Ramp (Binghamton) and Exit -Upper Front Street; I-81 (Broome) right lane closed northbound from 5/23/16 to 12/29/17. There is a barrier in place at this location. D262955 IR 30103 Fri, 12 May 2017 10:01:48 -0400 42.1119995117188 -75.9102020263672 NY 17 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 17 both directions between Exit 70N - NY 201 (Union) and City of Binghamton; Town of Kirkwood Line (Binghamton) alternate lanes closed periodically for the duration of this long term construction project until 12/29/17. There may also be night work. D262955 IR 30103 Fri, 12 May 2017 10:05:16 -0400 42.1198997497559 -75.9688034057617 I-81 both directions : Construction NYSDOT - Region 9: Construction, construction on I-81 both directions between Exit 5 - US 11 (Chenango) and City of Binghamton; Town of Kirkwood Line (Binghamton) alternate lanes closed periodically for the duration of this long term construction project until 12/29/17. There may also be night work. . D262955 IR 30103 Fri, 12 May 2017 10:03:17 -0400 42.1231002807617 -75.9060974121094 I-81 northbound : Construction NYSDOT - Region 9: Construction, construction on I-81 northbound at Exit 4 - NY 7; Ramp (Binghamton) exit ramp closed at Exit 4S to NY 7 South. There is a signed detour from Exit 3 (Broad Ave) to Broad Ave to Bevier Street to NY 7 South. This is a long term closure until 12/29/17. D262955 IR 30103 Fri, 12 May 2017 10:04:22 -0400 42.1152992248535 -75.8927001953125 US 130 both directions : Construction NJ DOT - TOC South: Construction, construction on US 130 both directions between South of US 322 (Logan Twp) and South of NJ 44 (Logan Twp) 1 lane closed until further notice use caution Fri, 20 Oct 2017 12:49:33 -0400 39.7985827605 -75.3608596286 John F. Kennedy International Airport : Construction Port Authority NY/NJ: Construction, construction on John F. Kennedy International Airport (Queens) . Traffic detours in effect due to construction by Terminal 5. Allow extra travel time when picking up or dropping off passengers, or utilize AirTrain. Sun, 25 Dec 2016 05:04:45 -0500 40.6494200148145 -73.7932777404785 NY 7 westbound : Construction NYSDOT - Region 9: Construction, construction on NY 7 westbound at Exit 73 - I-81 (Binghamton) entrance ramp closed to I-81 South. This closure will be until 12/29/17. A signed detour route will be in place. D262955 IR 30103 Fri, 12 May 2017 10:06:15 -0400 42.1130981445313 -75.8981018066406 I-81 northbound : Construction NYSDOT - Region 9: Construction, construction on I-81 northbound at NY 7 (Binghamton) exit ramp closed to NY 7 South. There is a signed detour from Exit 3 (Broad Avenue) to Bevier Street to NY 7 South. This closure will be until 12/29/17. D262955 IR 30103 Fri, 12 May 2017 10:07:15 -0400 42.1152000427246 -75.897201538086 NY 7 eastbound : Construction NYSDOT - Region 9: Construction, construction on NY 7 eastbound at Exit 73 - I-81 (Binghamton) entrance ramp closed to I-81 South. This closure will be until 12/29/17. A signed detour route will be in place. D262955 IR 30103 Fri, 12 May 2017 10:08:16 -0400 42.1130981445313 -75.8981018066406 NY 7 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 7 both directions between Old State Road (Binghamton) and E. Frederick Street (Binghamton) alternate lanes closed for reconstruction of the Prospect Mountain Project. Work will be done daily between 7:00 am and 7:00 pm until 12/29/17. D262955 IR 30103 Fri, 12 May 2017 10:09:17 -0400 42.1170229392556 -75.896258354187 I-76 both directions : Construction NJ DOT - TOC South: Construction, construction on I-76 both directions between Exit 1A - NJ 42/I-295 (Bellmawr) and Exit 1C - CR 634/Market St (Gloucester City) traffic shift until 11:59 P.M. on August 29, 2019 use caution Fri, 20 Oct 2017 12:47:34 -0400 39.8739495669 -75.1022102874 NY 17C both directions : Construction NYSDOT - Region 9: Construction, construction on NY 17C both directions between William Donnelly Parkway (Barton) and Chemung Street; NY 34; START ROUTE NY 17C; Cayuta Avenue (Barton) alternate lanes closed for bridge replacement. There will be a signed detour in place. There will be a separate detour for pedestrians and bicycles. Daily work will be done between 7:00 am and 5:30 pm, 9/9/16 through 10/31/17. D263073 IR 31009 Fri, 13 Oct 2017 07:33:03 -0400 42.0102996826172 -76.5272979736328 NY 37B : Construction NYSDOT - Region 7: Construction, bridge replacement on NY 37B East Orvis Street (Massena) to North Main Street; NY 970B (Massena) all lanes closed until 11:59 P.M. on October 31, 2017 Traffic will be detoured Mon, 12 Sep 2016 00:01:03 -0400 44.9299011230469 -74.8845977783203 I-81 northbound : Construction NYSDOT - Region 9: Construction, construction on I-81 northbound at Exit 4 - NY 7; Ramp (Binghamton) exit ramp closed long term. There is a signed detour in place. It will be Exit 3 (Broad Avenue) to Bevier Street to NY 7 North. This will be in place at least until 12/29/17. D262955 IR 30103 Fri, 12 May 2017 10:11:14 -0400 42.1152992248535 -75.8927001953125 Shawangunk Lake Road both directions : Construction NYSDOT - Region 8: Construction, roadwork on Shawangunk Lake Road both directions between Bennett Lane (Shawangunk) and Bruyn Avenue (Shawangunk) alternate lanes closed until 11:59 P.M. on December 31, 2017 Traffic may use Burlingham Road south to Hamilton Road, Hamilton Road east to Orange Co. Road 48, continue east on Orange Co. Road 48 to Crawford Street, Crawford Street north to the intersection of Crawford Street and Bruyn Avenue Fri, 23 Dec 2016 07:59:58 -0500 41.598623932055 -74.3493586778641 NY 48 northbound : Construction NYSDOT - Region 3: Construction, longterm construction on NY 48 northbound north of City of Oswego; Town of Minetto Line (Oswego) until 5:00 P.M. on December 31, 2017 closed between Munn Street and Burden Drive Fri, 30 Dec 2016 08:14:43 -0500 43.4299011230469 -76.4866027832031 NY 145 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 145 both directions between Settles Mountain Road (Cobleskill) and Quarry Street (Cobleskill) alternate lanes closed controlled by temporary traffic signals from 1/25/17 through 10/31/17. PVMS boards will also be in place. D263037 IR 31868 Thu, 31 Aug 2017 07:31:52 -0400 42.6977776782661 -74.4997447729111 I-81 southbound : Construction NYSDOT - Region 9: Construction, construction on I-81 southbound between Exit - I-88 (Chenango) and Exit 5 - US 11 (Chenango) right lane and shoulder closed long term for roadwork associated with the Prospect Mountain Project. This will be a 24/7 lane closure until 12/29/17. D262955 IR 30103 Fri, 12 May 2017 10:14:11 -0400 42.1390991210938 -75.9020004272461 NY 7 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 7 both directions between Brooker Hollow Road (Worcester) and Boughton Road (Worcester) . The bridge over the Norfolk Southern railroad is closed for replacement. There is a signed detour in place. Work will be done daily between 7:00 am and 3:30 pm, 3/22/17 through 11/15/17. This is 24/7 closure. D263299 IR 32069 Thu, 23 Mar 2017 09:08:58 -0400 42.6451541621182 -74.6470677852631 I-88 both directions : Construction NYSDOT - Region 9: Construction, construction on I-88 both directions between Exit 12 - Connector from CR 48 to NY 7 at I-88 (Exit 12) (Otego) and Exit 13 - NY 205 (Oneonta) alternate lanes closed for paving and rehabilitation work. The WB traffic has been returned to the WB lanes as of 9/6/17. Traffic in both EB & WB directions will remain in a single lane as remaining contract work is completed. This work will be done between 7:00 am and 4:30 pm, 3/27/16 through 12/29/17. D262297 IR 29635 Wed, 06 Sep 2017 11:50:29 -0400 42.380298614502 -75.1875991821289 I-88 both directions : Construction NYSDOT - Region 9: Construction, construction on I-88 both directions between Exit 3 - NY 7B (Fenton) and Exit 5 - Martin Hill Road; I-88 ramps (Exit 5) to NY 7; Ramp (Colesville) alternate lanes closed during this project. The westbound traffic has now been transitioned to the eastbound passing lane. Crossovers will be provided for the on and off ramps at Exit 4 and Exit 5. There is a 14' width restriction in place. Work will be done daily between 6:00 am and 5:30 pm, 3/27/17 through 11/20/17. D263018 IR 30177 Wed, 12 Apr 2017 07:40:51 -0400 42.1642990112305 -75.8392028808594 I-81 both directions : Construction NYSDOT - Region 9: Construction, construction on I-81 both directions area of Town of Barker; Town of Chenango Line; Ramp (Chenango) alternate lanes closed for bridge work. Work will be done daily between 7:00 am and 5:30 pm, 3/29/17 through 12/15/17. D263174 IR 32107 Mon, 17 Jul 2017 07:55:18 -0400 42.2366981506348 -75.915397644043 NY 26 both directions : Construction NYSDOT - Region 7: Construction, construction on NY 26 both directions between NY 3 (Great Bend) and Fort Drum Boundary Ends (Fort Drum) until 11:59 P.M. on August 31, 2018 Fri, 31 Mar 2017 17:02:38 -0400 44.0322 -75.7147 NY 37 : Construction NYSDOT - Region 7: Construction, bridge replacement on NY 37 east of Village of Waddington; Town of Waddington (Waddington) 1 lane closed until 11:59 P.M. on November 30, 2017 RT. 37 Bridge over Brandy Brook is being replaced. Mon, 03 Apr 2017 00:00:11 -0400 44.8709 -75.1865 NY 38 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 38 both directions north of Jewett Hill Road (Berkshire) 1 lane closed for bridge replacement. Traffic will be controlled by daily lane closures. Work will be done between 7:00 am and 5:30 pm, 4/3/17 through 11/30/17. D263276 IR 32142 Mon, 11 Sep 2017 06:28:20 -0400 42.3089644730265 -76.1850182712078 NY 434 both directions : Construction NYSDOT - Region 9: Construction on NY 434 both directions between Vestal Avenue (Binghamton) and Vestal Parkway Ramp; Pennsylvania Avenue (Binghamton) alternate lanes closed for various construction activities. Work is scheduled to be done between 7:00 am and 3:30 pm, 3/29/17 through 11/30/17. There will be flag personnel in the work zone. D263286 IR 32157 Wed, 05 Apr 2017 08:00:18 -0400 42.0917015075684 -75.9467010498047 NY 151 eastbound : Construction NYSDOT TMC - Albany: Construction, bridge work on NY 151 eastbound west of (Watervliet) until 11:59 P.M. on November 30, 2017 Loudonville Rd Bridge between VanRensselaer Bvld and Rte 32 (Broadway) will have lane shift northbound due to Bridge Preservation. Thu, 06 Apr 2017 00:00:18 -0400 42.7234001159668 -73.7033996582031 I-88 both directions : Construction NYSDOT - Region 9: Construction, construction on I-88 both directions between START ROUTE I-88; Exit - I-81 (Fenton) and Exit 3 - NY 7B (Fenton) right lane closed for concrete pavement repair. Work will be done between 6:00 am and 4:00 pm, 4/10/17 with an expected completion date of 10/31/17. This is weather dependent. D263256 IR 32195 Fri, 20 Oct 2017 11:12:05 -0400 42.1390991210938 -75.9020004272461 I-87 Northway northbound : Construction NYSDOT TMC - Albany: Construction, construction on I-87 Northway northbound exiting at Exit 29 (North Hudson) right lane closed until 11:59 P.M. on November 30, 2017 I-87 northbound Exit at 29 with a right lane closure due to long term roadwork over the Branch River. Mon, 10 Apr 2017 08:35:31 -0400 43.9491996765137 -73.7394027709961 I-81 northbound : Construction NYSDOT - Region 9: Construction, construction on I-81 northbound between (Kirkwood) alternate lanes closed for bridgework under I-81. I-81N to be affected with a 55mph zone and yield condition. ( Between Francis ST Overpass & Colesville RD Underpass) (990G WB Off Ramp & 990G EB On Ramp will be closed Monday through Friday, 9am-12pm) Work will be done between 7:00 am to 3:30 pm, 4/14/17 through 10/31/17. D263152 IR 32145 Thu, 28 Sep 2017 14:38:19 -0400 42.095401763916 -75.8280029296875 NY 17 westbound : Construction NYSDOT - Region 9: Construction, construction on NY 17 westbound at Exit 72 (Binghamton) entrance ramp closed from Prospect Street to SR 17 WB. This will be a long term closure until at least 12/29/17. D262955 IR 30103 Fri, 12 May 2017 10:15:48 -0400 42.114014592749 -75.927414894104 NY 324 eastbound : Construction NYSDOT - Region 5: Construction, construction on NY 324 eastbound at I-290 (Amherst) 1 lane closed until 3:30 P.M. on December 29, 2017 Thu, 19 Oct 2017 13:21:39 -0400 42.9785021924528 -78.7833733856678 NY 34 both directions : Construction NYSDOT - Region 9: Construction on NY 34 both directions north of Fraley Road (Barton) alternate lanes closed for bridge replacement over Cayuta Creek and Norfolk Southern RR. Work will be done between 6:00 am and 5:00 pm, 4/19/17 through 12/29/17. There will be flag personnel in the work zone. D263302 IR 32264 Wed, 19 Apr 2017 13:48:13 -0400 42.0266387045635 -76.5241259336472 I-81 northbound : Construction NYSDOT - Region 9: Construction, construction on I-81 northbound area of City of Binghamton; Town of Kirkwood Line (Binghamton) entrance ramp closed from Corporate Drive to I-81 NB. There will be a temporary ramp for traffic to access on Stratmill Road. Work will be done between 6:00 am to 5:30 pm, 4/24/17 through 12/31/17. D263318 IR 32292 Tue, 05 Sep 2017 07:59:34 -0400 42.1087989807129 -75.8575973510742 I-81 northbound : Construction NYSDOT - Region 9: Construction, construction on I-81 northbound area of City of Binghamton; Town of Kirkwood Line (Binghamton) alternate lanes closed for bridge rehabilitation. Work will be done between 6:00 am and 5:30 pm, 4/24/17 through 12/31/17. D263318 IR 32292 Tue, 05 Sep 2017 07:57:52 -0400 42.1087989807129 -75.8575973510742 NY 17 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 17 both directions west of Exit 92 - Old State Highway; Ramp (Colchester) alternate lanes closed for bridge work. Eastbound will be done first and then westbound with traffic pattern changes. Work will be done between 7:00 am and 5:00 pm, 4/28/17 through 11/1/17. D263422 IR 32320 Thu, 29 Jun 2017 13:29:45 -0400 41.9702987670898 -75.0282974243164 US 11 both directions : Construction NYSDOT - Region 9: Construction, construction on US 11 both directions under I-81 Northbound (Chenango) alternate lanes closed for bridge work. Work will be done between 7:00 am and 5:30 pm, 5/11/17 through 12/29/17. There will be flag personnel in the work zone. This is weather dependent. D263174 IR 32425 Thu, 11 May 2017 09:05:55 -0400 42.1529998779297 -75.8974990844727 US 11 both directions : Construction NYSDOT - Region 9: Construction on US 11 both directions under Exit - Castle Creek Road; I-81 (Chenango) alternate lanes closed for bridge work. Work will be done between 7:00 am and 5:30 pm, 5/11/17 through 12/29/17. There will be flag personnel in the work zone. This is weather dependent. D263174 IR 31143 Thu, 11 May 2017 09:52:11 -0400 42.2330931550228 -75.9150981903076 NY 26 both directions : Construction NYSDOT - Region 9: Construction on NY 26 both directions at East Maine Road; CR 45 (Maine) alternate lanes closed for intersection improvements. Work will be done between 6:00 am and 5:30 pm, 5/1/17 through 12/29/17. Ames Road will be closed between 5/22/17 and 7/31/17. There will be flag personnel in the work zone. D263326 IR 32430 Fri, 12 May 2017 07:07:01 -0400 42.2132987976074 -76.038200378418 I-81 northbound : Construction NYSDOT - Region 9: Construction, construction on I-81 northbound at Gateway Rest Area (Kirkwood) . Upgrades to the Southern Tier Welcome Center will cause the rest area to be partially closed. Starting 5/22/17, the rest area will be closed to trucks ONLY. Scheduled deliveries will be permitted. On 5/30/17, the building and front parking will be closed until 6/26/17. The rear lot will remain open and have portable bathrooms and vending/tourism services. Starting 6/26/17, the inside bathroom facilities will be reopened, but front lot will remain closed. The facility will fully reopen on 11/22/17. D263025 IR 32522 Wed, 20 Sep 2017 09:01:27 -0400 42.0151433073961 -75.7676196098328 NJ 440 both directions : Construction NJ DOT - STMC: Construction, construction on NJ 440 both directions at US 9/Garden State Parkway (Woodbridge Twp) traffic shift until further notice Mon, 23 Oct 2017 05:07:40 -0400 40.5215482578 -74.308308903 I-88 both directions : Construction NYSDOT - Region 9: Construction on I-88 both directions between Exit 19 - Hollenbeck Road to Route 7 Worcester (Worcester) and Exit 22 - NY 145 (Cobleskill) alternate lanes closed for bridge rehabilitation. Work will be done between 7:00 am and 3:30 pm, 5/30/17 through 11/30/17. D263347 IR 32574 Tue, 30 May 2017 07:37:13 -0400 42.5894012451172 -74.7342987060547 NY 51 both directions : Construction NYSDOT - Region 9: Construction on NY 51 both directions between CR 12 (Morris) and Bermis Road (Morris) alternate lanes closed for culvert replacement. There will be temp signals at this location. Work will be done between 7:00 am and 5:30 pm, 5/30/17 through 11/30/17. There will be flag personnel in the work zone. This is weather dependent. D263072 IR 32576 Tue, 30 May 2017 10:18:11 -0400 42.5776471512518 -75.2009063959122 NY 51 both directions : Construction NYSDOT - Region 9: Construction on NY 51 both directions between CR 16 (New Lisbon) and Mittelsdorf Road (New Lisbon) alternate lanes closed for culvert replacement. There will be temp signals at this location. Work will be done between 7:00 am and 5:30 pm, 5/30/17 through 11/30/17. There will be flag personnel in the work zone. This is weather dependent. D263072 IR 32579 Tue, 30 May 2017 10:23:27 -0400 42.646927805252 -75.1725044846535 NY 166 both directions : Construction NYSDOT - Region 9: Construction on NY 166 both directions between CR 35 (Middlefield) and CR 52 (Middlefield) alternate lanes closed for culvert replacement. There will be temp signals at this location. Work will be done between 7:00 am and 5:30 pm, 5/30/17 through 11/30/17. There will be flag personnel in the work zone. This is weather dependent. D263072 IR 32580 Tue, 30 May 2017 10:27:59 -0400 42.6118011474609 -74.9011001586914 US 20 both directions : Construction NYSDOT - Region 9: Construction on US 20 both directions between Route 80; Ramp (Springfield) and CR 29A (Springfield) alternate lanes closed for culvert replacement. There will be temp signals at this location. Work will be done between 7:00 am and 5:30 pm, 5/30/17 through 11/30/17. There will be flag personnel in the work zone. This is weather dependent. D263072 IR 32581 Tue, 30 May 2017 10:32:22 -0400 42.8376998901367 -74.8701019287109 NY 9N both directions : Construction NYSDOT TMC - Albany: Construction, bridge work on NY 9N both directions over West Branch of Ausable River (Au Sable) alternate lanes closed until 11:59 P.M. on October 31, 2017 . Route 9N Bridge over West Branch of the Ausable River has alternating one-way traffic Tue, 30 May 2017 14:20:21 -0400 44.4411799356173 -73.6757969856262 NY 52 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 52 both directions between Tremper Road (Callicoon) and Shandelee Road (Callicoon) 1 lane closed controlled by a temporary signal. There is a width restriction of 10 feet. Work will be done between 7:00 am and 5:30 pm, 5/30/17 through 12/29/17. There will intermittent flag personnel when necessary. D263369 IR 32597 Thu, 01 Jun 2017 10:33:44 -0400 41.8055136939387 -74.886057972908 NY 52 both directions : Construction NYSDOT - Region 9: Construction on NY 52 both directions between Mill Street (Callicoon) and Center Street (Callicoon) 1 lane closed controlled by a temporary signal. There is a width restriction of 10 feet. Work will be done between 7:00 am and 5:30 pm, 5/30/17 through 12/29/17. There will be intermittent flag personnel when necessary. D263369 IR 32598 Thu, 01 Jun 2017 10:38:32 -0400 41.7806129459789 -74.9345952272415 NY 150 both directions : Construction NYSDOT TMC - Albany: Construction, bridge rehabilitation on NY 150 both directions west of Main Avenue; NY 66 (North Greenbush) all lanes closed until 11:59 P.M. on November 01, 2017 Rte 150 (West Sand Lake) bridge over the Wynantskill Creek in the Town of North Greenbush is closed due to Bridge Rehabilition. Thu, 01 Jun 2017 11:13:46 -0400 42.6935005187988 -73.6346969604492 I-295 both directions : Construction NJ DOT - TOC South: Construction, construction on I-295 both directions between Exit 26N - I-76/I-676 (Bellmawr) and Exit 28 - NJ 168/Black Horse Pike (Bellmawr) traffic shift until 11:59 P.M. on June 02, 2020 use caution Fri, 20 Oct 2017 12:47:13 -0400 39.8672040026 -75.102030179 NY 374 : Construction NYSDOT - Region 7: Construction, construction on NY 374 between CR 8; Plank Road (Dannemora) and Village of Dannemora (Dannemora) 1 lane may be closed until 11:59 P.M. on December 31, 2017 Tue, 06 Jun 2017 09:49:47 -0400 44.7607 -73.7687 NY 17 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 17 both directions over Exit 83 - CR 28 (Sanford) alternate lanes closed for bridge deck replacement. There will be overnight closures. Work will be done between 6:00 am to 5:30 pm, 6/8/17 through 11/30/17. D263355 IR 32673 Tue, 10 Oct 2017 13:44:17 -0400 42.0503005981445 -75.4492034912109 NY 42 both directions : Construction NYSDOT TMC - Albany: Construction, bridge rehabilitation on NY 42 both directions west of NY 23A (Lexington) alternate lanes closure until 5:30 P.M. on October 31, 2017 Route 42 over the West Kill near the intersection with Loucks Rd & Basil Rd will have alternating lanes due to bridge replacement.Temporary traffic signals will be in place after5:30pm. Fri, 09 Jun 2017 07:23:30 -0400 42.2400016784668 -74.3606033325195 NY 199 both directions : Construction NYSDOT - Region 8: Construction, roadwork on NY 199 both directions between West Market Street; NY 199 (Red Hook) all lanes closed until 11:59 P.M. on December 31, 2017 Thu, 22 Jun 2017 07:57:26 -0400 42.0001983642578 -73.9084014892578 CR 51 (Academy Hill Road) both directions : Construction NYSDOT - Region 8: Construction, roadwork on CR 51 (Academy Hill Road) both directions between Willow Glenn Road (Red Hook) and Jackson Corners Road (Red Hook) all lanes closed until 11:59 P.M. on November 22, 2017 Fri, 23 Jun 2017 10:44:03 -0400 42.0118690603947 -73.7434208393097 I-88 eastbound : Construction NYSDOT - Region 9: Construction, construction on I-88 eastbound near Exit 11 - Route 357; Franklin (Sidney) alternate lanes closed for concrete bridge deck repair. Work will be done between 7:00 am and 5:00 pm, 6/30/17 with an expected completion date of 10/24/17. D263377 IR 32836 Fri, 20 Oct 2017 08:39:15 -0400 42.3300018310547 -75.2833023071289 NY 208 both directions : Construction NYSDOT - Region 8: Construction, bridge replacement on NY 208 both directions between Street Rte 17M; NY 17M; START ROUTE NY 208 (Monroe) and North Main Street; CR 105 (Monroe) all lanes closures until 11:59 P.M. on November 30, 2017 BIN # 1040504 Wed, 05 Jul 2017 10:01:14 -0400 41.3336982727051 -74.1920013427734 Bruyn Turnpike both directions : Construction NYSDOT - Region 8: Construction, roadwork on Bruyn Turnpike both directions between Wallkill Avenue (Shawangunk) and Du Bois Road (Shawangunk) all lanes closed until 11:59 P.M. on November 30, 2017 Motorists are advised to follow the posted detour. Wed, 05 Jul 2017 10:54:00 -0400 41.6061853307133 -74.1863018274307 NY 34 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 34 both directions between Talmadge Hill Road (Waverly) and Norris Road (Waverly) alternate lanes closed controlled by temporary signals for bridge work. Work will be done between 7:00 am and 5:00 pm, 7/5/17 through 10/31/17. D263302 IR 32876 Wed, 30 Aug 2017 08:27:19 -0400 42.0319383610066 -76.5233910083771 I-88 both directions : Construction NYSDOT - Region 9: Construction, construction on I-88 both directions between Exit 8 - NY 206; Ramp (Bainbridge) and Exit 9 - NY 8; Ramp (Sidney) alternate lanes closed for milling and paving operation starting on 7/7/17 with an expected completion date of 10/31/17, 7am-6pm. This work is weather dependent without flag personnel. D263454 IR# 32889 Thu, 31 Aug 2017 11:58:08 -0400 42.2853012084961 -75.4731979370117 I-690 westbound : Construction NYSDOT - Region 3: Construction, bridge rehabilitation on I-690 westbound ramps to/from Exit 14 - Teall Avenue (Syracuse) closed until 5:00 P.M. on December 11, 2017 Sat, 08 Jul 2017 14:51:35 -0400 43.0521011352539 -76.1258010864258 NY 23 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 23 both directions between Fanny Brook Road (Roxbury) and Ferris Hill Road (Roxbury) 1 lane closed for culvert replacement. Traffic will be controlled by a temporary signal. Work will be done between 7:00 am and 5:00 pm, 7/10/17 through 10/23/17. There will be flag personnel in the work zone. D263404 IR 32904 Fri, 22 Sep 2017 15:33:44 -0400 42.3402037809667 -74.4576179981232 US 11 : Construction NYSDOT - Region 7: Construction, culvert repairs on US 11 between Town of Adams; Town of Watertown Line (Watertown) and NY 232 (Watertown) until 11:59 P.M. on October 31, 2017 Mon, 10 Jul 2017 14:34:07 -0400 43.8950004577637 -75.972297668457 I-86 : Construction NYSDOT - Region 6: Construction, roadwork on I-86 Exit 48 - NY 352; Ramp (Corning) to Exit 52A - CR 64; Ramp (Horseheads) until 11:59 P.M. on November 01, 2017 Tue, 11 Jul 2017 08:11:31 -0400 42.1245002746582 -76.9875030517578 Newark Liberty International Airport : Construction Port Authority NY/NJ: Construction, construction on Newark Liberty International Airport (Essex) until 11:59 P.M. on November 30, 2018 Eastbound Basilone Road between South Directory Road and Earhart Drive is closed through November 2018. Westbound will remain open. Thu, 13 Jul 2017 13:45:44 -0400 40.681191288788 -74.1893595457077 NY 32 both directions : Construction NYSDOT - Region 8: Construction, roadwork on NY 32 both directions between Old Firehouse Road (Tuxedo Park) and Church Street (Wallkill) all lanes closed until 11:59 P.M. on December 21, 2017 Mon, 17 Jul 2017 12:18:46 -0400 41.6205916543971 -74.0809071063995 Newark Liberty International Airport : Construction Port Authority NY/NJ: Construction, bridge replacement on Newark Liberty International Airport (Essex) all lanes closed and detoured until 11:59 P.M. on November 30, 2018 The North and South bridges along Carson Road and sections of P 3 and P 1 parking is closed. Tue, 18 Jul 2017 14:09:37 -0400 40.6916698845013 -74.1746234893799 NY 17 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 17 both directions between Exit 78 - CR 28 (Windsor) and Exit 83 - CR 28 (Sanford) alternate lanes closed for pavement resurfacing. Work will be done between 7:00 am and 5:30 pm, 7/21/17 through 10/31/17. This is weather dependent. D263485 IR 33008 Thu, 28 Sep 2017 14:00:39 -0400 42.0862998962402 -75.700798034668 NJ 139 Lower eastbound : Construction NJ DOT - STMC: Construction, construction on NJ 139 Lower eastbound between Tonnelle Avenue (Jersey City) and New Jersey Turnpike/NJ 139 Split (Jersey City) right lane closed for repairs until further notice Mon, 23 Oct 2017 05:00:08 -0400 40.7390584773 -74.0677331184 8th Street Bridge both directions : Construction TRANSCOM, Jersey City: bridge work on 8th Street Bridge both directions between Main Avenue (Wallington) and Passaic (Passaic) on or about Monday, August 7 all lanes closed for long term bridge reconstruction Wed, 02 Aug 2017 12:09:10 -0400 40.8549242110766 -74.1094779968262 I-690 eastbound : Construction NYSDOT - Region 3: Construction, bridge rehabilitation on I-690 eastbound between I-81 Southbound (Syracuse) and Exit 14 - Teall Avenue (Syracuse) 1 lane closed until 5:00 P.M. on December 31, 2017 traffic shifted to the right Thu, 10 Aug 2017 11:05:51 -0400 43.0513000488281 -76.1490020751953 I-690 westbound : Construction NYSDOT - Region 3: Construction, bridge rehabilitation on I-690 westbound between Exit 15 - Midler Avenue (Syracuse) and Lodi Street (Syracuse) 1 lane closed until 5:00 P.M. on December 31, 2017 with 2 lanes crossing over into EB lanes Thu, 10 Aug 2017 11:11:35 -0400 43.0568008422852 -76.1085968017578 NY 28 both directions : Construction NYSDOT - Region 9: Construction, construction on NY 28 both directions between Epps Road (Franklin) and Swart Hollow Road alternate lanes closed for culvert replacement starting on 8/14/17 with an expected completion date of 10/31/17 - 7am-5pm. This work is weather dependent with a temp signal being installed on 8/29. IR# 33191 Fri, 06 Oct 2017 06:56:51 -0400 42.3927835380425 -75.0349903106689 NY 220 both directions : Construction NYSDOT - Region 9: Construction on NY 220 both directions between New Street (McDonough) and START ROUTE NY 220; NY 41 (Smithville) alternate lanes closed for various pavement improvements starting on 8/14/17 with an expected completion date of 11/10/17, 6am-6pm. This work is weather dependent with flag personnel. IR# 33193 Mon, 14 Aug 2017 08:47:35 -0400 42.4607002061872 -75.7668685913086 Atlantic City Expressway westbound : Construction South Jersey Transp. Auth.: Construction, construction on Atlantic City Expressway westbound East of Exit 31 - NJ 73 (Winslow Twp) Right shoulder will remain closed until further notice. All oversized vehicles must exit before Exit 28. Mon, 23 Oct 2017 06:12:39 -0400 39.6480460478 -74.8712591959 Sprain Brook State Parkway both directions : Construction NYSDOT - Region 8: Construction, roadwork on Sprain Brook State Parkway both directions between Exit - I-287 (Greenburgh) and Exit - Grasslands Road; NY 100C (Greenburgh) various lane closures until 11:59 P.M. on November 20, 2017 Mon, 21 Aug 2017 09:00:50 -0400 41.0503005981445 -73.8106002807617 I-81 both directions : Construction NYSDOT - Region 9: Construction on I-81 both directions Exit 1 - CR 20; Kirkwood (Kirkwood) to Ostrum Road alternate lanes closed for joint repair and pavement resurfacing . This work is weather dependent with an expected completion date of 11/30/2017. Work will be performed from 7am-6pm. IR# 33243 Wed, 23 Aug 2017 08:14:45 -0400 42.0604453192349 -75.7987117767334 I-88 both directions : Construction NYSDOT - Region 9: Construction, construction on I-88 both directions between Town of Colesville; Town of Afton Line; Chenango; Broome County Line (Colesville) and Melondy Hill RD (Afton) alternate lanes closed for pavement resurfacing starting on 8/24/17 with an expected completion date of 10/31/17. This work is weather dependent without flag personnel. IR# 33254 Thu, 28 Sep 2017 14:20:32 -0400 42.1954002380371 -75.5777969360351 Payne Street both directions : Construction NYSDOT - Region 8: Construction, roadwork on Payne Street both directions between Bryant Avenue (Elmsford) and Montgomery Avenue (Elmsford) all lanes closed until 11:59 P.M. on November 20, 2017 Motorists are advised to follow the posted detour. Thu, 24 Aug 2017 12:05:46 -0400 41.062337103432 -73.8075578212738 I-86 westbound : Construction NYSDOT - Region 5: Construction, construction on I-86 westbound between Exit 27 - NY 16 (Hinsdale) and Exit 26 - NY 16 Connector (Olean) 1 lane closed until 4:30 P.M. on December 30, 2017 Thu, 12 Oct 2017 08:26:39 -0400 42.1741981506348 -78.3871002197266 NY 12 northbound : Construction NYSDOT - Region 2: Construction, bridge work on NY 12 northbound French Road (Utica) to Court Street (Utica) left lane closed until 9:00 P.M. on November 20, 2017 More specifically between French Road and Oswego Street. Motorists will encounter the closure of the passing lane with lane shifts. There will be a speed limit reduction of 45MPH through this area. Motorists that are using the ramp from Burrstone Road to travel north on Route 5/8/12 will encounter a stop sign at the end of the ramp to merge into traffic. Delays are expected. Tue, 05 Sep 2017 09:00:47 -0400 43.0863990783691 -75.280403137207 NY 12 southbound : Construction NYSDOT - Region 2: Construction, bridge work on NY 12 southbound Court Street (Utica) to French Road (Utica) left lane closed until 9:00 P.M. on November 20, 2017 More specifically between Oswego Street and French Road. Motorists will encounter the closure of the passing lane with lane shifts in place. There will be a speed limit reduction of 40MPH through this area. Delays are expected. Tue, 05 Sep 2017 09:00:49 -0400 43.1017990112305 -75.2407989501953 I-81 northbound : Construction NYSDOT - Region 3: Construction, bridge rehabilitation on I-81 northbound over Brewerton Road; US 11 (Salina) left lane closed until 5:00 P.M. on November 30, 2017 Thu, 07 Sep 2017 08:30:18 -0400 43.111198425293 -76.1461029052735 NY 10 both directions : Construction NYSDOT - Region 9: Construction on NY 10 both directions over Planter Brook (Delhi) alternate lanes closed for bridge replacement and roadway re-alignment starting on 9/7/17 with an expected completion date of 11/15/17, 6:30am-5:30pm. A temporary signal will be in place for traffic control through 10/31. This work is non-weather dependent with flag personnel. Thu, 07 Sep 2017 11:46:35 -0400 42.242720315017 -74.9648237228394 I-81 both directions : Construction NYSDOT - Region 9: Construction on I-81 both directions between Exit 7 - US 11 (Chenango) and Exit 8 - NY 26; Ramp (Barker) alternate lanes closed for bridge repairs starting on 9/11/17 with an expected completion date of 11/11/17, 7am-5:30pm. This work is weather dependent without flag personnel. Lane closures will be picked up by noon on Friday's throughout the duration of the work. IR# 33342 Mon, 11 Sep 2017 08:49:59 -0400 42.2313003540039 -75.9142990112305 NY 28 both directions : Construction NYSDOT - Region 9: Construction on NY 28 both directions between Exit 17 - I-88 (Milford) and 992G all lanes closed for bridge rehabilation through 11/15/17 Wed, 13 Sep 2017 13:51:54 -0400 42.4904697224646 -74.9726396799088 NY 324 westbound : Construction NYSDOT - Region 5: Construction, construction on NY 324 westbound at I-290 (Amherst) 1 lane closed until 3:30 P.M. on December 01, 2017 Thu, 19 Oct 2017 13:19:32 -0400 42.9786375930534 -78.7834183126688 I-890 westbound : Construction NYSDOT TMC - Albany: Construction, bridge rehabilitation on I-890 westbound at Exit 6; Michigan Avenue (Schenectady) right shoulder closed until 11:59 P.M. on December 31, 2017 . Long Term closure of I-890 WB shoulder at exit6 Mon, 25 Sep 2017 00:00:43 -0400 42.7963981628418 -73.9287033081055 Saw Mill River Parkway northbound : Construction NYSDOT - Region 8: Construction, roadwork on Saw Mill River Parkway northbound ramp to Exit 17 - CR 134 (Greenburgh) exit ramp closed until 11:59 P.M. on June 30, 2018 Mon, 25 Sep 2017 10:15:48 -0400 41.0102005004883 -73.8520965576172 NJ 72 westbound : Construction NJ DOT - TOC South: Construction, construction on NJ 72 westbound from West of Shore Av (Stafford Twp) to East of Morris Blvd (Stafford Twp) right lane closed until 11:59 P.M. on October 31, 2017 Fri, 20 Oct 2017 12:48:16 -0400 39.6600626159 -74.199169739 CR 63 (Kripplebush Road) both directions : Construction NYSDOT - Region 8: Construction, roadwork on CR 63 (Kripplebush Road) both directions north of US Hwy 209 (Marbletown) all lanes closures until 11:59 P.M. on December 30, 2017 Box Culvert Replacement Tue, 26 Sep 2017 16:41:54 -0400 41.8395136175574 -74.1898584365845 CR 53 (Stony Ford Road) both directions : Construction NYSDOT - Region 8: Construction, bridge work on CR 53 (Stony Ford Road) both directions area of Hill Road (Wallkill) all lanes closure until 11:59 P.M. on December 30, 2017 Tue, 26 Sep 2017 16:41:55 -0400 41.4572013088056 -74.3001937866211 NY 146 both directions : Construction NYSDOT TMC - Albany: Construction, construction on NY 146 both directions between E.Campbell Rd (Rotterdam) and Second Street alternate lanes blocked until 3:00 P.M. on November 02, 2017 Wed, 27 Sep 2017 07:01:20 -0400 42.7805667981746 -73.9323663711548 NY 7 both directions : Construction NYSDOT - Region 9: Construction on NY 7 both directions between Ramp To Colesville Road Interchange (Conklin) and Pennsylvania State Line alternate lanes closed for milling and paving starting on 9/28/17 with an expected completion date of 11/30/17, 7am-6pm. This work is weather dependent with flag personnel. IR# 33449 Thu, 28 Sep 2017 09:55:09 -0400 42.0559844820285 -75.8067798614502 NY 7A both directions : Construction NYSDOT - Region 9: Construction on NY 7A both directions between Broome County Line; START ROUTE NY 7A (Conklin) and Pennsylvania State Line alternate lanes closed for milling and paving starting on 9/28/17 with an expected completion date of 11/30/17, 7am-6pm. This work is weather dependent with flag personnel. IR# 33449 Thu, 28 Sep 2017 10:02:46 -0400 41.9977989196777 -75.7647018432617 NY 5 both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 5 both directions area of Herkimer-Montgomery County Line - Center of Bridge (St Johnsville) until 11:59 P.M. More specifically the bridge over East Canada Creek. Motorists will encounter one way alternating traffic with a 3-color temporary signal. Thu, 28 Sep 2017 11:42:04 -0400 43.0059 -74.7406 NY 5 both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 5 both directions area of Herkimer-Montgomery County Line - Center of Bridge (St Johnsville) until 3:00 P.M. on October 26, 2017 More specifically the bridge over East Canada Creek. Motorists will encounter one way alternating traffic with a 3-color temporary signal. Fri, 29 Sep 2017 05:05:47 -0400 43.0059 -74.7406 NY 240 both directions : Construction NYSDOT - Region 5: Construction, construction on NY 240 both directions between Benning Road (Orchard Park) and Cole Road (Orchard Park) all lanes closed until 5:00 P.M. on October 31, 2017 Detour in operation Fri, 13 Oct 2017 08:14:05 -0400 42.7334438777969 -78.7120484188199 NY 22 northbound : Construction NYSDOT - Region 8: Construction, roadwork on NY 22 northbound between E Washington Pl and Hillandale Ave (North Castle) right lane closure until 3:30 P.M. on November 03, 2017 Fri, 29 Sep 2017 09:23:35 -0400 41.0622683427099 -73.766530752182 NJ 73 southbound : Construction NJ DOT - TOC South: Construction, construction on NJ 73 southbound ramp to CR 673/Fellowship Rd (Mount Laurel Twp) ramp closed and detoured until further notice Fri, 20 Oct 2017 12:47:54 -0400 39.9297021084 -74.958220498 I-90 - Berkshire Connector eastbound : Roadwork NYSTA - Statewide Ops.: Road maintenance operations, right lane closed on I-90 - Berkshire Connector eastbound from after I-87 Exit 21A - Start of Berkshire Connector to before Exit B1 - Hudson - Rensselaer (US9 - I-90W) until further notice. [CARS CAD-172750045] Sun, 22 Oct 2017 10:00:04 -0400 42.513899 -73.786425 US 130 southbound : Construction NJ DOT - TOC South: Construction, construction on US 130 southbound from NJ 156 (Hamilton Twp) to North of NJ 156 (Hamilton Twp) traffic shift until 7:00 A.M. on October 27, 2017 Fri, 20 Oct 2017 12:48:47 -0400 40.1748346749 -74.6773265193 I-890 both directions : Construction NYSDOT TMC - Albany: Construction, road rehabilitation on I-890 both directions Exit 6; Michigan Avenue (Schenectady) right shoulder blocked until 3:00 P.M. on October 25, 2017 Mon, 02 Oct 2017 10:30:09 -0400 42.7963981628418 -73.9287033081055 NY 104 both directions : Construction NYSDOT - Region 3: Construction, culvert repairs on NY 104 both directions between NY 104A (Oswego) until 8:00 P.M. on November 30, 2017 and Sweet Road, one lane open controlled by temporary traffic signal Mon, 02 Oct 2017 11:36:05 -0400 43.4090003967285 -76.5785980224609 NY 31 both directions : Construction NYSDOT - Region 3: Construction, bridge painting on NY 31 both directions at Town of Tyre; Town of Montezuma Line (Montezuma) until 5:00 P.M. on November 12, 2017 over The Seneca River, alternating one way traffic regulated by temporary traffic signals. Tue, 03 Oct 2017 07:01:55 -0400 43.0173988342285 -76.7114028930664 NY 32 both directions : Construction NYSDOT TMC - Albany: Construction, drainage improvements on NY 32 both directions US 4 (Northumberland) to NY 50 (Northumberland) all lanes blocked until 11:59 P.M. on November 10, 2017 Thu, 05 Oct 2017 07:01:24 -0400 43.1272010803223 -73.5882034301758 936B; I-81 SB Service Road Taft-Airport : Construction NYSDOT - Region 3: Construction, bridge rehabilitation on 936B; I-81 SB Service Road Taft-Airport ramp to Brewerton Road; US 11; END ROUTE; Ramp (Salina) until 5:30 P.M. on October 31, 2017 closed Fri, 06 Oct 2017 08:47:37 -0400 43.1118011474609 -76.1463012695313 Upper Mountain Road both directions : Construction NYSDOT - Region 5: Construction, construction on Upper Mountain Road both directions between START ROUTE Upper Mountain Road; Lewiston Road; NY 104 (Lewiston) and Exit - Military Road; CR 11; NY 265; END ROUTE (Lewiston) 1 lane closed until 5:00 P.M. on October 31, 2017 Thu, 19 Oct 2017 11:58:19 -0400 43.1505012512207 -79.0380020141601 NY 240 northbound : Construction NYSDOT - Region 5: Construction, bridge rehabilitation on NY 240 northbound between Sheridan Drive; Ramp (Amherst) and END ROUTE; NY 324 (Amherst) 1 lane closed until 5:00 P.M. on December 01, 2017 Thu, 12 Oct 2017 11:49:12 -0400 42.9785003662109 -78.7838973999023 NY 97 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 97 both directions between Grassy Swamp RD (Highland) and Newman RD alternate lanes closed for asphalt paving starting on 10/10/17 with an expected completion date of 10/31/17, 7am-6pm. This work is weather dependent with flag personnel IR# 33548 Tue, 10 Oct 2017 07:04:49 -0400 41.8751851185395 -75.1471710205078 NY 17 eastbound : Roadwork NYSDOT - Region 9: Roadwork, roadwork on NY 17 eastbound at Exit 83 - CR 28 (Sanford) exit ramp closed through Monday October 23rd for ramp overpass joint repair ..IR# 33549 Fri, 20 Oct 2017 09:03:29 -0400 42.0510070929768 -75.4482650756836 I-81 southbound : Construction NYSDOT - Region 3: Construction, bridge rehabilitation on I-81 southbound between Onondaga - Oswego County Line (West Monroe) and Exit 31 - US 11; Bartell Road; Brewerton (Cicero) right lane and shoulder closure until 5:00 P.M. on October 31, 2017 over Oneida Lake Wed, 11 Oct 2017 07:02:42 -0400 43.2350006103516 -76.1295013427734 NY 80 both directions : Roadwork NYSDOT - Region 9: Roadwork, roadwork on NY 80 both directions (Burlington) 1 alternate lanes of 2 lanes blocked for polyester overlay on bridge deck. This work is weather dependent with flagger personnel controlling work site. Work to be performed between the hours of 7:00 AM through 17:00. Limits of work on SR 80 are CR 16 and Cranberry Bog Road. IR#33566 Wed, 18 Oct 2017 09:21:29 -0400 42.7235919404992 -75.1210355758667 NY 36 both directions : Construction NYSDOT - Region 4: Construction, roadwork on NY 36 both directions between NY 531 (Ogden) and Colby Street (Monroe) 2 all lanes closure until 11:59 P.M. Road closed / Local Traffic Only Thu, 12 Oct 2017 14:36:30 -0400 43.1865997314453 -77.8543014526367 I-81 southbound : Construction NYSDOT - Region 3: Construction, bridge work on I-81 southbound over Exit 14 - US 11; NY 80; NY 281; Tully (Tully) left lane closed until 5:00 P.M. on October 27, 2017 Fri, 13 Oct 2017 07:02:30 -0400 42.7962989807129 -76.1232986450195 NY 28 both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 28 both directions at Town of Newport; Village of Middleville (Middleville) until 5:00 P.M. on November 27, 2017 More specifically, there will be one way alternating traffic with a temporary traffic signal on bridge over Maltanner Creek, between Rte 29 (Fairfield St) and Park Ave in the Town of Middleville. Mon, 16 Oct 2017 06:20:26 -0400 43.1301015171016 -74.9742221832275 NY 425 northbound : Construction NYSDOT - Region 5: Construction, bridge work on NY 425 northbound in the vicinity of I-290;Youngmann Expressway; Ramp (Tonawanda) 1 lane closed until 3:30 P.M. on November 30, 2017 Thu, 19 Oct 2017 13:07:31 -0400 42.9999008178711 -78.8527984619141 I-90 - Berkshire Connector westbound : Roadwork NYSTA - Statewide Ops.: Road maintenance operations, left lane closed on I-90 - Berkshire Connector westbound from after Exit B1 - Hudson - Rensselaer (US9 - I-90W) to before I-87 Exit 21A - Start of Berkshire Connector until further notice. [CARS CAD-172900089] Sun, 22 Oct 2017 10:00:27 -0400 42.504714 -73.757734 NY 30 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 30 both directions from East Branch (Delaware) to Shinhopple alternate lanes closed for HMA shim overlay starting on 10/17/17 with an expected completion date of 10/31/17, 7am-6pm. This work is weather dependent with flag personnel. IR# 33595 Tue, 17 Oct 2017 08:58:22 -0400 42.0204267854969 -75.1111221313477 NY 17 eastbound : Roadwork NYSDOT - Region 9: Roadwork on NY 17 eastbound east of Exit 94 - Stewart Brook Road; NY 206 (Rockland) right lane closed for bridge deck repairs starting on 10/18/17 with an expected completion date of 10/27/17, 8am-2pm. This work is weather dependent without flag personnel. IR# 33597 Tue, 17 Oct 2017 09:37:45 -0400 41.9327011108398 -74.9173965454102 I-290 eastbound : Construction NYSDOT - Region 5: Construction, bridge work on I-290 eastbound at Exit 2 - NY 425 Colvin Boulevard (Tonawanda) right lane closed until 7:00 P.M. on October 30, 2017 Tue, 17 Oct 2017 19:01:06 -0400 42.9976005554199 -78.8572998046875 I-81 southbound : Construction NYSDOT - Region 3: Construction, milling on I-81 southbound area of Town of Preble; Town of Homer Line (Homer) until 5:00 P.M. on October 25, 2017 Little York Crossing. Daily/Overnight Left Lane Closure Wed, 18 Oct 2017 07:02:36 -0400 42.7038993835449 -76.1504974365234 I-81 northbound : Construction NYSDOT - Region 3: Construction, roadwork on I-81 northbound between Preble Rest Area (Preble) and Exit 13 - NY 281; Preble (Preble) left lane closed until 5:00 P.M. on October 25, 2017 Wed, 18 Oct 2017 07:02:37 -0400 42.7254 -76.1443 NY 10 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 10 both directions (Delhi) 1 alternate lanes of 2 lanes blocked between Gallant Avenue and Van Dyke Avenue in Delhi/Stamford for guide rail replacement. This work will be accomplished between 10/19 - 10/27. Hours of operation between 7:00 AM and 17:00. This work is weather dependent with flagger personnel present. IR# 33614 Thu, 19 Oct 2017 10:14:51 -0400 42.3456040916308 -74.710807800293 US 206 both directions : Construction NJ DOT - TOC South: Construction, construction on US 206 both directions CR 569/Carter Rd (Lawrence Twp) to South of CR 604/Elm Rd (Princeton Twp) all lanes closed and detoured until further notice Fri, 20 Oct 2017 13:06:00 -0400 40.3100102207 -74.7120918777 US 1&9/Tonnelle Avenue southbound : Construction NJ DOT - STMC: Construction, construction on US 1&9/Tonnelle Avenue southbound ramp to southbound US 1&9 Truck Route/Pulaski Skyway (Jersey City) ramp closed and detoured until 3:00 P.M. Mon, 23 Oct 2017 04:35:12 -0400 40.7403277884 -74.064518649 Henry Hudson Bridge northbound : Construction MTA Bridges & Tunnels: Construction, construction on Henry Hudson Bridge northbound between Manhattan Side (Manhattan) and Bronx Side (New York) 1 lane closed until further notice Mon, 23 Oct 2017 06:14:38 -0400 40.87648 -73.92414 I-90 - NYS Thruway westbound : Roadwork NYSTA - Statewide Ops.: Road maintenance operations, right lane closed on I-90 - NYS Thruway westbound from after Exit 57A (I-90) - Eden - Angola to before Exit 58 (I-90) - Silver Creek (Rte 438) until 2:00 PM, 10/26/2017. [CARS CAD-172950508] Sun, 22 Oct 2017 23:01:13 -0400 42.592642 -79.049941 NJ 3 westbound : Construction NJ DOT - STMC: Construction, construction on NJ 3 westbound ramp from NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur (East Rutherford) right shoulder closed for repairs until 11:59 P.M. on October 28, 2017 Mon, 23 Oct 2017 00:00:00 -0400 40.8048634319 -74.0738098041 NY 36 both directions : Construction NYSDOT - Region 4: Construction, roadwork on NY 36 both directions between NY 531 (Ogden) and Colby Street (Monroe) all lanes subject to closure until 11:59 P.M. local traffic only Mon, 23 Oct 2017 00:00:30 -0400 43.1865997314453 -77.8543014526367 NY 531 eastbound : Construction NYSDOT - Region 4: Construction, roadwork on NY 531 eastbound ramps to Brockport Spencerport Road; NY 31; START ROUTE NY 531 (Ogden) 1 all lanes subject to closed until 11:59 P.M. ramp closed Mon, 23 Oct 2017 00:00:31 -0400 43.1884002685547 -77.8628997802734 Trolley Blvd. both directions : Construction NYSDOT - Region 4: Construction, bridge replacement on Trolley Blvd. both directions between Lee Road (Gates) and Long Pond Road all lanes closed until 11:59 P.M. Mon, 23 Oct 2017 00:00:32 -0400 43.1733544546525 -77.692244052887 I-490 westbound : Construction NYSDOT - Region 4: Construction, construction on I-490 westbound at Exit 9A - I-490 (Gates) right lane closed until 11:59 P.M. Mon, 23 Oct 2017 00:00:35 -0400 43.157299041748 -77.6894989013672 US 4 both directions : Construction NYSDOT TMC - Albany: Construction, bridge rehabilitation on US 4 both directions at Rensselaer-Saratoga County Line; Waterford Bridge (Waterford) alternate lanes closed until 3:00 P.M. has alternating one-way traffic with flaggers on weekdays and full weekend closures on 10/14-10/15, 10/21-10/22, 10/28-10/29 & 11/4-11/5 Mon, 23 Oct 2017 00:00:37 -0400 42.7887001037598 -73.6738967895508 I-78 both directions : Construction NJ DOT - STMC: Construction, construction on I-78 both directions ramp to/from Exit 58 - US 1&9/E. Port St (Newark) 1 lane closed for repairs until 2:00 P.M. Ramp 5/6 Mon, 23 Oct 2017 05:00:29 -0400 40.7107912463 -74.166906745 I-78 eastbound : Construction NJ DOT - STMC: Construction, construction on I-78 local lanes eastbound between I-78 Toll Bridge (Phillipsburg) and East of Exit 3 - NJ 173/US 22 (Greenwich Twp) 1 lane closed for repairs until 8:00 P.M. Mon, 23 Oct 2017 05:00:29 -0400 40.671992833 -75.1777933737 Throgs Neck Bridge southbound : New traffic Pattern MTA Bridges & Tunnels: New traffic Pattern on Throgs Neck Bridge southbound Queens Bound (New York) use caution departing the toll plaza. Mon, 23 Oct 2017 04:20:32 -0400 40.8129 -73.794 RFK Triborough Bridge northbound : Long term road construction MTA Bridges & Tunnels: Long term road construction, longterm construction on RFK Triborough Bridge northbound ramp to Manhattan Span (Manhattan) 1 lane of 3 lanes closed until 5:00 A.M. on January 31, 2018 Mon, 23 Oct 2017 04:26:54 -0400 40.80013 -73.927599 Marine Parkway Bridge northbound : Long term road construction MTA Bridges & Tunnels: Long term road construction, longterm construction on Marine Parkway Bridge northbound between Rockaway Side (New York) and Brooklyn Side (New York) right lane closed until further notice Mon, 23 Oct 2017 04:27:52 -0400 40.56857 -73.88197 I-87 - NYS Thruway northbound : Roadwork NYSTA - Statewide Ops.: Road maintenance operations, right lane closed on I-87 - NYS Thruway northbound from Tappan Zee Bridge Toll Barrier to before Exit 10 (I-87) - South Nyack (US 9W) until 3:00 PM, 10/23/2017. [CARS CAD-172960045] Mon, 23 Oct 2017 05:54:53 -0400 41.065784 -73.865039 NY 41A both directions : Construction NYSDOT - Region 3: Construction, repaving on NY 41A both directions between NY 359 (Skaneateles) until 6:00 P.M. and Hartnett Rd- single lane alternating traffic with flaggers Mon, 23 Oct 2017 06:00:44 -0400 42.8656005859375 -76.4032974243164 NY 313 both directions : Construction NYSDOT TMC - Albany: Construction, roadwork on NY 313 both directions between Anaquassacook (Jackson) and Vermont Line alternate lanes closures until 6:00 P.M. Mon, 23 Oct 2017 06:00:49 -0400 43.0716466074274 -73.3186340332031 Saw Mill River Parkway northbound : Construction NYSDOT - Region 8: Construction, roadwork on Saw Mill River Parkway northbound between Exit 33 - Roaring Brook Road (New Castle) and Exit 34 - South Croton Avenue (Mount Kisco) left lane closure until 3:00 P.M. Mon, 23 Oct 2017 06:00:50 -0400 41.1801986694336 -73.758903503418 I-684 northbound : Construction NYSDOT - Region 8: Construction, roadwork on I-684 northbound between Exit 6A - NY 22 to NY 138 - Goldens Bridge (Northbound Exit Ramp) (Lewisboro) and Exit 10 - US 6 - US 202 - NY 22 - Brewster (Southeast) various lane closures until 3:30 P.M. Mon, 23 Oct 2017 06:00:53 -0400 41.2797012329102 -73.681396484375 NY 13 both directions : Construction NYSDOT - Region 3: Construction, line striping on NY 13 both directions between Five Mile Drive; NY 13A (Ithaca) and East Shore Drive; NY 34; Eastshore Drive (Ithaca) mobile lane closure until 5:00 P.M. including parts of NY-79 in the city of Ithaca Mon, 23 Oct 2017 06:00:56 -0400 42.4145011901855 -76.5314025878906 Garden State Parkway northbound : Roadwork NJ Turnpike Auth.: Roadwork on Garden State Parkway northbound South of Great Egg Toll Plaza (Egg Harbor Twp) to North of Exit 29 - US 9 (Somers Point) left lane closed to traffic until 4:00 P.M. Mon, 23 Oct 2017 06:18:52 -0400 39.2971751544 -74.6206940424 NJ 47 both directions : Construction NJ DOT - TOC South: Construction, roadwork on NJ 47 both directions CR 552/West Sherman Av (Vineland) to NJ 56/Landis Av (Vineland) right shoulder closed until 4:00 P.M. Mon, 23 Oct 2017 06:30:39 -0400 39.4482934961 -75.0421839596 NY 12 both directions : Construction NYSDOT - Region 2: Construction, roadwork on NY 12 both directions Buell Avenue; NY 315 (Sangerfield) to Red Hill Road; CR 13; Chuckery Corners (Kirkland) until 5:30 P.M. More specifically between Bacon Street and Burmaster Road. Motorists will encounter one way alternating traffic with flaggers in place due to culvert pipe cleaning. Mon, 23 Oct 2017 06:30:23 -0400 42.9309997558594 -75.3798980712891 NY 825 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 825 both directions Ellsworth Road; Geiger Road (Rome) to Black River Boulevard North; East Chestnut Street; NY 825; NY 46 (Rome) until 5:30 P.M. more specifically Ellsworth Road to the Mohawk River.One way alternating traffic between Hanger Road and the bridge over the Mohawk River with flaggers in place. Market Street will be closed between Route 825 and March Street until November 2017. Mon, 23 Oct 2017 06:30:25 -0400 43.2173 -75.4177 NY 365A both directions : Construction NYSDOT - Region 2: Construction, construction on NY 365A both directions NY 365; END ROUTE; NY 365A (Vernon) to Genesee Street; NY 5; START ROUTE NY 365A (Oneida) until 5:00 P.M. Motorists will encounter one way alternating traffic with flaggers in place. Miscellaneous construction operations including Recreational Trail and sidewalk work. Minor delays are expected. Mon, 23 Oct 2017 06:30:26 -0400 43.0904998779297 -75.6298980712891 NY 297 both directions : Construction NYSDOT - Region 3: Construction, roadwork on NY 297 both directions between Milton Avenue (Geddes) and State Fair Boulevard; END ROUTE; Ramp (Geddes) until 5:00 P.M. alternate lane closure with flaggers Mon, 23 Oct 2017 06:30:27 -0400 43.062198638916 -76.2166976928711 NY 334 both directions : Construction NYSDOT - Region 2: Construction, roadwork on NY 334 both directions Village of Fonda; Town of Mohawk Line (Mohawk) to END ROUTE; NY 67 (Johnstown) until 6:00 P.M. MOre specifically between County Route 30 (Old Trail Road) and Route 67. Motorists will encounter one way alternating traffic with flaggers in place due to culvert pipe cleaning. Mon, 23 Oct 2017 06:30:28 -0400 42.9556 -74.3833 NY 30A both directions : Construction NYSDOT - Region 2: Construction, roadwork on NY 30A both directions NY 920P; Riverside Drive (Fultonville) to Steele Avenue Extension; Saratoga Boulevard (Johnstown) until 5:30 P.M. More specifically between Putnam Ave and Steele Ave Extension. Motorists will encounter one way alternating traffic with flaggers in place due to culvert pipe cleaning. Mon, 23 Oct 2017 06:30:30 -0400 42.9495 -74.3691 NY 77 both directions : Construction NYSDOT - Region 5: Construction, repaving on NY 77 both directions between Town of Royalton; Town of Alabama Line (Royalton) and Rochester Road; NY 31; END ROUTE (Lockport) alternate lanes closed until 5:30 P.M. Look out for flaggers Mon, 23 Oct 2017 06:30:31 -0400 43.1259994506836 -78.4654006958008 NY 29 both directions : Construction NYSDOT - Region 2: Construction, roadwork on NY 29 both directions NY 30 Junction Vail Mills (Mayfield) to Saratoga; Fulton County Line (Broadalbin) until 5:00 P.M. Motorists will encounter one way alternating traffic with flaggers in place due to culvert pipe cleaning. Mon, 23 Oct 2017 06:30:32 -0400 43.0474014282227 -74.2169036865234 NY 5 both directions : Construction NYSDOT - Region 2: Construction, roadwork on NY 5 both directions CR 37 Dyke Road (Schuyler) to West German Street (Herkimer) until 5:30 P.M. More specifically between Elmwood Road and West German Street. Motorists will encounter one way alternating traffic with flaggers in place due to culver pipe cleaning. Mon, 23 Oct 2017 06:30:33 -0400 43.099 -75.1525 NY 29 both directions : Construction NYSDOT - Region 2: Construction, roadwork on NY 29 both directions East State Street; NY 67 (Johnstown) to NY 331; Oppenheim (Oppenheim) until 6:00 P.M. More specifically between East State Street and Stowell Road. Motorists will encounter one way alternating traffic with flaggers in place due to culvert pipe cleaning. Mon, 23 Oct 2017 06:30:34 -0400 43.0065994262695 -74.3683013916016 NY 10 both directions : Construction NYSDOT - Region 2: Construction, guard rail repairs on NY 10 both directions NY 29 (Ephratah) to NY 29A (Caroga) until 5:30 P.M. Motorists will encounter one way alternating traffic with flaggers in place. Mon, 23 Oct 2017 06:30:36 -0400 43.0424995422363 -74.5259017944336 Rip Van Winkle Bridge both directions : Construction NYS Bridge Authority: Construction on Rip Van Winkle Bridge both directions Greene County side (Hudson/Catskill) to Columbia County side (Hudson/Catskill) Use caution. Mon, 23 Oct 2017 06:54:38 -0400 42.225193 -73.853439 Washington Street both directions : Construction TRANSCOM, Jersey City: Construction, road rehabilitation on Washington Street both directions between Observer Highway (Hoboken) and 15th Street (Hoboken) from 7:00 A.M. until 7:00 P.M. expect lane closures (except holidays) Mon, 23 Oct 2017 06:56:19 -0400 40.7356977635112 -74.0314364433289 Rip Van Winkle Bridge both directions : Construction NYS Bridge Authority: Construction, fence repairs on Rip Van Winkle Bridge both directions (Columbia/Greene) until 11:59 P.M. Sidewalk -M-F 7am-5pm Pedestrians will be required to turnaround once they reach the construction site Mon, 23 Oct 2017 06:59:30 -0400 42.221823 -73.844017 US 40 both directions : Construction NJ DOT - TOC South: Construction, construction on US 40 both directions at Garden State Parkway (Egg Harbor Twp) 1 lane closed until 3:30 P.M. use caution Mon, 23 Oct 2017 07:00:45 -0400 39.4003124411 -74.5601848597 NY 5 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 5 both directions NY 46 (Oneida) to Village of Vernon (Vernon) until 5:30 P.M. More specifically between Seneca Ave (Oneida) and Sconondoa St (Vernon).Motorists will encounter one way alternating traffic with flaggers in place due to miscellaneous construction operations including guiderail installations, shoulder backup, signs and striping. Minor to significant delays are expected Mon, 23 Oct 2017 07:00:24 -0400 43.0788 -75.6458 NJ 152 both directions : Construction NJ DOT - TOC South: Construction, roadwork on NJ 152 both directions from CR 635/Bay Ave (Somers Point) to Seaview Dr (Egg Harbor Twp) right shoulder closed until 4:30 P.M. Mon, 23 Oct 2017 07:00:46 -0400 39.3180408109 -74.5880315122 Marine Parkway Bridge both directions : Construction MTA Bridges & Tunnels: Construction, bridge work on Marine Parkway Bridge both directions Rockaway/Brooklyn Bound (New York) until 3:00 P.M. pedestrian walkway closed. Shuttle van service will be provided by TBTA. Mon, 23 Oct 2017 07:00:32 -0400 40.5759 -73.8865 Taylor Road both directions : Construction NYSDOT - Region 5: Construction, bridge work on Taylor Road both directions at Rte 219 (Orchard Park) 1 lane may be closed until 7:00 P.M. Taylor Rd has alternating 1 way traffic regulated by temporary signals. Look out for flaggers Mon, 23 Oct 2017 07:00:25 -0400 42.7727286746002 -78.7676475942135 I-80 westbound : Construction NJ DOT - STMC: Construction, construction on I-80 westbound between Exit 25 - US 206 (Mount Olive Twp) and West of Exit 19 - CR 517 (Allamuchy Twp) right lane closed until 3:00 P.M. Mon, 23 Oct 2017 07:00:46 -0400 40.905675951009 -74.7247338294983 NY 298 eastbound : Construction NYSDOT - Region 3: Construction, traffic signal repairs on NY 298 eastbound near Town of Salina; Town of De Witt Line (Salina) right lane closures until 4:00 P.M. at the Arterial Road intersection. Mon, 23 Oct 2017 07:00:26 -0400 43.0821990966797 -76.1159973144531 I-295 southbound : Construction NJ DOT - TOC South: Construction, fence repairs on I-295 southbound North of Exit 4 - NJ 48 (Oldmans Twp) to North of Exit 7 (Oldmans Twp) right shoulder closed until 3:30 P.M. Mon, 23 Oct 2017 07:00:46 -0400 39.7205122512 -75.4262859352 NY 31 both directions : Construction NYSDOT - Region 3: Construction, traffic signal repairs on NY 31 both directions at Salina Street; NY 370 (Lysander) until 4:00 P.M. intermittent lane & shoulder closures Mon, 23 Oct 2017 07:00:27 -0400 43.1590995788574 -76.3267974853515 NJ 7 southbound : Construction NJ DOT - STMC: Construction, construction on NJ 7 southbound South of CR 507/Schuyler Av (North Arlington) right shoulder closed for repairs until 3:00 P.M. Mon, 23 Oct 2017 07:00:47 -0400 40.7728552767 -74.1283715243 NY 173 westbound : Construction NYSDOT - Region 3: Construction, traffic signal repairs on NY 173 westbound at West Genesee Street; CR 98 (Camillus) alternate lanes closed until 4:00 P.M. Mon, 23 Oct 2017 07:00:31 -0400 43.0470008850098 -76.2387008666992 NJ 55 southbound : Construction NJ DOT - TOC South: Construction, guard rail repairs on NJ 55 southbound from Exit 24 - NJ 49 (Millville) to Exit 21 - Schooner Landing Rd (Maurice River Twp) left lane closed until 3:00 P.M. Mon, 23 Oct 2017 07:00:48 -0400 39.3907535238 -75.010325877 NY 5 both directions : Construction NYSDOT - Region 3: Construction, traffic signal repairs on NY 5 both directions east of Syracuse City Line; Route 635; Town of Dewitt (Syracuse) until 4:00 P.M. intermittent lane and shoulder closures at Midler Avenue and Seeley Road Mon, 23 Oct 2017 07:00:33 -0400 43.0552 -76.0883 NJ 42 both directions : Construction NJ DOT - TOC South: Construction, utility work on NJ 42 both directions from US 322/CR 536 Spur (Monroe Twp) to North of CR 655/Fries Mill Rd (Washington Twp) right shoulder closed until 3:30 P.M. Mon, 23 Oct 2017 07:00:48 -0400 39.6893323347 -74.9929788573 NY 31 both directions : Construction NYSDOT - Region 3: Construction, traffic signal repairs on NY 31 both directions between I-81 (Cicero) and Thompson Road; CR 14 (Cicero) alternate lanes closed until 4:00 P.M. at the entrance to Cicero North Syracuse High School Mon, 23 Oct 2017 07:00:35 -0400 43.1755981445313 -76.1159973144531 NJ 37 westbound : Construction NJ DOT - TOC South: Construction, drainage improvements on NJ 37 westbound East of Coolidge Av (Toms River Twp) to East of CR 4/Washington St (Toms River Twp) right shoulder closed until 3:00 P.M. Mon, 23 Oct 2017 07:00:48 -0400 39.9506540375 -74.1364511468 NY 96 northbound : Construction NYSDOT - Region 3: Construction, traffic signal repairs on NY 96 northbound north of Town of Ulysses; Town of Ithaca Line (Ulysses) westbound one lane closure until 4:00 P.M. at Perry City Road Mon, 23 Oct 2017 07:00:36 -0400 42.4799995422363 -76.5607986450195 NJ 3 eastbound : Construction NJ DOT - STMC: Construction, drainage improvements on NJ 3 eastbound West of CR 509/Broad St (Clifton) right shoulder closed until 3:00 P.M. Mon, 23 Oct 2017 07:00:48 -0400 40.8607418569 -74.1805761915 NY 290 both directions : Construction NYSDOT - Region 3: Construction, traffic signal repairs on NY 290 both directions west of Upton Street (De Witt) alternate lanes closure until 4:00 P.M. at North Center St. Mon, 23 Oct 2017 07:00:40 -0400 43.0633010864258 -76.0687026977539 NY 45 both directions : Construction NYSDOT - Region 8: Construction, roadwork on NY 45 both directions between Pinebrook Road (Ramapo) and Amber Ridge Road (Ramapo) alternate lanes closure until 4:00 P.M. Mon, 23 Oct 2017 07:00:43 -0400 41.0755996704102 -74.0640029907227 NY 5 both directions : Construction NYSDOT - Region 3: Construction, reconstruction on NY 5 both directions west of Village of Elbridge; Town of Elbridge (Elbridge) until 6:00 P.M. lane shifts with flaggers at Hamilton Road Mon, 23 Oct 2017 07:00:44 -0400 43.0355 -76.442 NY 8 both directions : Construction NYSDOT TMC - Albany: Construction, construction on NY 8 both directions between Hamilton County Line (Indian Lake) and Route 9 (Thurman) alternate lanes closures until 5:00 P.M. Mon, 23 Oct 2017 07:00:45 -0400 43.6323479070391 -73.8583374023438 NY 417 both directions : Construction NYSDOT - Region 5: Construction, construction on NY 417 both directions between I-86; Southern Tier Expressway (Allegany) and North 7th Street (Olean) alternate lanes closed until 4:30 P.M. Look out for flaggers Mon, 23 Oct 2017 07:00:46 -0400 42.1015014648438 -78.5224990844727 NY 5 eastbound : Construction NYSDOT - Region 2: Construction, bridge work on NY 5 eastbound near West German Street (Herkimer) until 5:00 P.M. More specifically there will be an Eastbound shoulder closure at Route 51 Ramp. Mon, 23 Oct 2017 07:00:47 -0400 43.0222039225468 -75.0293469429016 I-86 eastbound : Construction NYSDOT - Region 5: Construction, construction on I-86 eastbound between Exit 6 - NY 76; Ramp (Sherman) and Exit 8 - NY 394 West Lake Road (North Harmony) 1 lane closed until 5:30 P.M. Mon, 23 Oct 2017 07:00:48 -0400 42.149600982666 -79.5987014770508 US 62 both directions : Construction NYSDOT - Region 5: Construction, construction on US 62 both directions between Witmer Road (Wheatfield) and Williams Road (Wheatfield) 1 lane closed until 5:00 P.M. Mon, 23 Oct 2017 07:00:50 -0400 43.0910987854004 -78.9012985229492 US 20 both directions : Construction NYSDOT - Region 5: Construction, construction on US 20 both directions between Bowen Road (Lancaster) and Broadway; NY 130; NY 78 (Lancaster) 1 lane closed until 4:00 P.M. Mon, 23 Oct 2017 07:00:52 -0400 42.8950004577637 -78.6429977416992 NY 443 westbound : Construction NYSDOT TMC - Albany: Construction, construction on NY 443 westbound between Hudson Ave (Bethlehem) and Groesbeck alternate lanes closures until 5:00 P.M. Mon, 23 Oct 2017 07:00:53 -0400 42.6261282159828 -73.8221061229706 NY 443 westbound : Construction NYSDOT TMC - Albany: Construction, construction on NY 443 westbound between Kenwood Avenue; NY 140 (Bethlehem) and Elsmere Avenue; NY 335 (Bethlehem) 1 lane may be closed until 5:00 P.M. Mon, 23 Oct 2017 07:00:54 -0400 42.622200012207 -73.8329010009766 US 9W both directions : Construction NYSDOT TMC - Albany: Construction, construction on US 9W both directions at Thruway Bridge (Coxsackie) until 5:00 P.M. Rte 9W will have a lane shift due to Culvert roadwork. Mon, 23 Oct 2017 07:00:56 -0400 42.3834012028185 -73.8330602645874 NY 266 southbound : Construction NYSDOT - Region 5: Construction, utility work on NY 266 southbound in the vicinity of Exit - I-190 (Tonawanda) 1 lane closed until 5:00 P.M. Waterline installation Mon, 23 Oct 2017 07:00:58 -0400 42.9653015136719 -78.9217987060547 Saw Mill River Parkway northbound : Construction NYSDOT - Region 8: Construction, roadwork on Saw Mill River Parkway northbound at Exit 32 - Hunts Lane (New Castle) right shoulder closure until 4:00 P.M. Mon, 23 Oct 2017 07:01:02 -0400 41.1591987609863 -73.7744979858398 NY 404 both directions : Construction NYSDOT - Region 4: Construction, construction on NY 404 both directions area of Five Mile Line Road; CR 18 (Webster) alternate lanes closed until 4:00 P.M. to Hard Rd Mon, 23 Oct 2017 07:01:03 -0400 43.2051010131836 -77.4747009277344 NY 31 both directions : Construction NYSDOT - Region 4: Construction, bridge replacement on NY 31 both directions area of NY 390 (Gates) until 11:59 P.M. Long-term construction for Bridge replacement on Lyell Ave. East Bound and West Bound continuous lane restrictions will exist at various times. Detours posted as needed. Mon, 23 Oct 2017 07:01:07 -0400 43.1646995544434 -77.6828994750977 NY 9D both directions : Construction NYSDOT - Region 8: Construction, roadwork on NY 9D both directions between Stonykill Road (Wappinger) and Old State Road (Wappinger) alternate lanes closure until 5:00 P.M. Mon, 23 Oct 2017 07:01:08 -0400 41.5590134081675 -73.941764831543 NY 22 both directions : Construction NYSDOT - Region 8: Construction, roadwork on NY 22 both directions between North Chippawalla Road (Dover) and Cricket Hill Road (Dover) alternate lanes closure until 5:00 P.M. Mon, 23 Oct 2017 07:01:09 -0400 41.6700587965699 -73.5762119293213 NY 444 both directions : Construction NYSDOT - Region 4: Construction, construction on NY 444 both directions at Main Street (East Bloomfield) various lane closures until 12:00 P.M. Mon, 23 Oct 2017 07:01:10 -0400 42.9021987915039 -77.4198989868164 I-990 both directions : Construction NYSDOT - Region 5: Construction, construction on I-990 both directions between START ROUTE I-990; from I-290 Youngmann Expressway (Amherst) and North French Road (Amherst) all lanes open until 5:00 P.M. Mon, 23 Oct 2017 07:01:12 -0400 43.0007019042969 -78.8125991821289 Walden Avenue both directions : Construction NYSDOT - Region 5: Construction, construction on Walden Avenue both directions between Harlem Road; NY 240 (Cheektowaga) and Exit - I-90; Thruway (Cheektowaga) 1 lane closed until 3:00 P.M. Mon, 23 Oct 2017 07:01:14 -0400 42.9071998596191 -78.7843017578125 Sprain Brook State Parkway northbound : Construction NYSDOT - Region 8: Construction, roadwork on Sprain Brook State Parkway northbound between Exit - Grasslands Road; NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) various lane closures until 3:00 P.M. Mon, 23 Oct 2017 07:01:15 -0400 41.0700988769531 -73.8034973144531 Taconic State Parkway northbound : Construction NYSDOT - Region 8: Construction, roadwork on Taconic State Parkway northbound between Exit 2 - Sprain Brook State Parkway (Mount Pleasant) and Exit 20 - US 6 (Yorktown) various lane closures until 3:00 P.M. Mon, 23 Oct 2017 07:01:16 -0400 41.1026000976563 -73.7963027954102 NY 78 southbound : Construction NYSDOT - Region 5: Construction, construction on NY 78 southbound between Broadway; NY 130 (Cheektowaga) and Walden Avenue (Lancaster) 1 lane closed until 3:00 P.M. Mon, 23 Oct 2017 07:01:17 -0400 42.9019012451172 -78.6968994140625 NY 5 both directions : Construction NYSDOT - Region 2: Construction, traffic signal repairs on NY 5 both directions at CR 28; Tribles Hill Stoners Trail (Fonda) until 3:30 P.M. More specifically, intermittent shoulder closures may be present. Mon, 23 Oct 2017 07:01:18 -0400 42.9569 -74.2854 Buffalo Street northbound : Construction NYSDOT - Region 5: Construction, intersection improvements on Buffalo Street northbound between START ROUTE Buffalo Street; North 12th Street (Olean) and Exit - NY 17; I-86; Southern Tier Expressway (Olean) right shoulder closed until 3:30 P.M. Mon, 23 Oct 2017 07:01:22 -0400 42.0850982666016 -78.4448013305664 Niagara Scenic Parkway northbound : Construction NYSDOT - Region 5: Construction, construction on Niagara Scenic Parkway northbound between John Daly Blvd (Niagara Falls) and Old Falls St (Niagara Falls) all lanes closed until 3:30 P.M. on October 27, 2017 Riverway closed from 10/23 to 10/27, from Old Falls St to John B Daly Blvd. Follow posted detour. Mon, 23 Oct 2017 07:01:23 -0400 43.0808313730995 -79.0507936477661 NY 104 both directions : Construction NYSDOT - Region 4: Construction, construction on NY 104 both directions at Manitou Road; NY 261 (Parma) all lanes until 5:30 P.M. Mon, 23 Oct 2017 07:01:24 -0400 43.217399597168 -77.7527008056641 Taconic State Parkway northbound : Construction NYSDOT - Region 8: Construction, roadwork on Taconic State Parkway northbound between Westchester County/Putnam County Line (Yorktown) and Exit - NY 55 (La Grange) various lane closures until 4:00 P.M. Mon, 23 Oct 2017 07:01:25 -0400 41.6682014465332 -73.7889022827149 US 219 both directions : Construction NYSDOT - Region 5: Construction, construction on US 219 both directions between Exit - US 20A; Ramp (Orchard Park) and Southwestern Boulevard; US 20 (Orchard Park) 1 lane closed until 7:00 P.M. Mon, 23 Oct 2017 07:01:27 -0400 42.759 -78.7635 US 219 northbound : Construction NYSDOT - Region 5: Construction, bridge rehabilitation on US 219 northbound between Ridge Road (West Seneca) and I-90; END ROUTE US 219 (West Seneca) 1 lane closed until 7:00 P.M. Workzone is at Rte 219 over Smoke Creek Mon, 23 Oct 2017 07:01:29 -0400 42.8283 -78.7906 I-81 northbound : Construction NYSDOT - Region 3: Construction, bridge work on I-81 northbound over Exit 14 - US 11; NY 80; NY 281; Tully (Tully) alternate lanes closed until 5:00 P.M. Mon, 23 Oct 2017 07:01:30 -0400 42.7962989807129 -76.1232986450195 NY 32 both directions : Construction NYSDOT - Region 8: Construction, roadwork on NY 32 both directions between Quaker Avenue; CR 107 (Cornwall) and Blooming Grove Turnpike; Temple Hill Road; NY 300; NY 94 (New Windsor) alternate lanes closures until 5:00 P.M. Mon, 23 Oct 2017 07:01:31 -0400 41.4305000305176 -74.053596496582 NY 168 both directions : Construction NYSDOT - Region 2: Construction, bridge work on NY 168 both directions END ROUTE; NY 80; Hamlet of Start (Stark) to CR 178; Cramer Corners (Stark) until 5:00 P.M. More the bridge over Otsquago Creek between Route 80 and Hoke Road. There will be occasional lane closures with flaggers in place. Mon, 23 Oct 2017 07:01:32 -0400 42.9183514346112 -74.7794938087463 NY 233 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 233 both directions START ROUTE NY 233; NY 12B; Franklin Springs (Kirkland) to NY 412; College Street (Kirkland) until 5:00 P.M. Motorists may encounter one way alternating traffic with flaggers due to work on roadway, driveways and the surrounding areas. Mon, 23 Oct 2017 07:01:34 -0400 43.0422335604595 -75.3995990753174 I-990 both directions : Construction NYSDOT - Region 5: Construction, construction on I-990 both directions between START ROUTE I-990; from I-290 Youngmann Expressway (Amherst) and North French Road (Amherst) all lanes open until 5:00 P.M. Mon, 23 Oct 2017 07:01:37 -0400 43.0007019042969 -78.8125991821289 I-81 both directions : Construction NYSDOT - Region 3: Construction, installation of sign structure on I-81 both directions between Exit 14 - US 11; NY 80; NY 281; Tully (Tully) and Exit 16 - US 11; Nedrow; Onondaga Nation (Onondaga) until 5:30 P.M. variuos right lane closures Mon, 23 Oct 2017 07:01:39 -0400 42.7962989807129 -76.1232986450195 I-81 both directions : Construction NYSDOT - Region 3: Construction, installation of sign structure on I-81 both directions between Exit 14 - US 11; NY 80; NY 281; Tully (Tully) and Exit 16 - US 11; Nedrow; Onondaga Nation (Onondaga) until 5:30 P.M. various right and left shoulder closures Mon, 23 Oct 2017 07:01:40 -0400 42.7962989807129 -76.1232986450195 NY 140 northbound : Construction NYSDOT TMC - Albany: Construction, construction on NY 140 northbound at Adam Street (Bethlehem) right shoulder closed until 5:00 P.M. right shoulder closed. There will also be alternating one way traffic on Adam Street between Kenwood ave and Hudson Ave Mon, 23 Oct 2017 07:01:40 -0400 42.6227920578328 -73.8352918624878 NY 16 both directions : Construction NYSDOT - Region 5: Construction, construction on NY 16 both directions between Town of Wales; Town of Holland Line (Holland) and Town of Wales; Town of Aurora Line (Wales) 1 lane may be closed until 5:30 P.M. Look out for flaggers Mon, 23 Oct 2017 07:01:41 -0400 42.692699432373 -78.5710983276367 NY 313 eastbound : Construction NYSDOT TMC - Albany: Construction, roadwork on NY 313 eastbound between Plains Rd (Cambridge) and Spring St (Cambridge) alternate lanes closed until 5:30 P.M. Traffic control and signs will move along with the waterline installation; oversize loads can easily pass controlled area Mon, 23 Oct 2017 07:01:43 -0400 43.0378297968626 -73.35768699646 NY 96 northbound : Construction NYSDOT - Region 4: Construction, bridge work on NY 96 northbound over Exit - I-490 (Victor) alternate lanes closed until 3:00 P.M. Mon, 23 Oct 2017 07:01:45 -0400 43.016300201416 -77.4427032470703 I-90 - NYS Thruway westbound : Roadwork NYSTA - Statewide Ops.: Road maintenance operations, right lane closed on I-90 - NYS Thruway westbound from after Exit 31 (I-90) - Utica (Rte 8 - Rte 12) to before Exit 32 (I-90) - Westmoreland (Rte 233) until 8:00 PM, 10/24/2017. [CARS CAD-172960053] Mon, 23 Oct 2017 07:01:16 -0400 43.133624 -75.264044 NY 347 both directions : Construction NYSDOT - Region 10: Construction, construction on NY 347 both directions between Terry Road; CR 16 (Smithtown) and Gibbs Pond Road (Smithtown) 1 lane may be closed until 3:00 P.M. Mon, 23 Oct 2017 07:08:07 -0400 40.8476982116699 -73.1696014404297 Newburgh Beacon Bridge eastbound : Construction NYS Bridge Authority: Construction on Newburgh Beacon Bridge eastbound Orange County Side (Newburgh) to Dutchess County Side (Beacon) work on right, use caution. until 4:30 P.M. Mon, 23 Oct 2017 07:13:44 -0400 41.52082 -74.00649 I-90 - NYS Thruway westbound : Roadwork NYSTA - Statewide Ops.: Road maintenance operations, left lane closed on I-90 - NYS Thruway westbound from Exit 35 (I-90) - Syracuse (Rte 298) to before Exit 36 (I-90) - Syracuse (I-81) until 3:00 PM, 10/23/2017. [CARS CAD-172960054] Mon, 23 Oct 2017 07:12:07 -0400 43.092759 -76.090879 I-195 eastbound : Construction NJ DOT - TOC South: Construction, roadwork on I-195 eastbound approaching Exit 22 - CR 638 (Jackson Twp) right shoulder closed until 3:30 P.M. Mon, 23 Oct 2017 07:30:54 -0400 40.1568476327 -74.311885188 NY 17 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 both directions at Exit 83 - CR 28 (Sanford) alternate lanes closure .. There will be POTHOLE REPAIR at this location.. From 10/23/17.. Until 10/27/17... Weather dependent/ OPEN REACH... .. IR# 33638 Mon, 23 Oct 2017 07:29:13 -0400 42.0503005981445 -75.4492034912109 NY 10 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 10 both directions between Loonenburgh Turnpike (Sharon) and Honeybe Lane alternate lanes closed for paving on 10/23/17, 7:30am-6pm. This work is weather dependent with flag personnel. IR# 33639 Mon, 23 Oct 2017 07:29:40 -0400 42.7529115443649 -74.604377746582 NY 78 both directions : Construction NYSDOT - Region 5: Construction, construction on NY 78 both directions in the vicinity of CR 299 North French Road (Clarence) right shoulder closed until 4:00 P.M. Workzone is between Lapp Rd and Smith Rd. Look out for flaggers Mon, 23 Oct 2017 07:30:40 -0400 43.0334014892578 -78.6968994140625 NY 404 eastbound : Construction NYSDOT - Region 4: Construction, construction on NY 404 eastbound between START ROUTE NY 404; Empire Boulevard (Irondequoit) and NY 590 (Irondequoit) left lane closed until 3:00 P.M. Mon, 23 Oct 2017 07:30:41 -0400 43.1767997741699 -77.5436019897461 NY 5 both directions : Construction NYSDOT - Region 5: Construction, drainage improvements on NY 5 both directions between Ohio Street (Buffalo) and City of Buffalo (Lackawanna) 1 lane may be closed until 4:00 P.M. Mon, 23 Oct 2017 07:30:44 -0400 42.8386 -78.8563 Pulaski Skyway both directions : Construction NJ DOT - STMC: Construction, construction on Pulaski Skyway both directions ramp to/from Broadway (Jersey City) ramp closed and detoured until further notice Mon, 23 Oct 2017 05:08:33 -0400 40.7357 -74.0849 NJ 42 both directions : Construction NJ DOT - TOC South: Construction, construction on NJ 42 both directions between Exit 12 - CR 544/Clements Bridge Rd (Deptford Twp) and I-295 (Bellmawr) traffic shift until 11:59 P.M. on July 31, 2019 Fri, 20 Oct 2017 12:49:52 -0400 39.8355918426 -75.091350314 The Beacon Theatre : show Madison Square Garden: show at The Beacon Theatre (Manhattan) Jerry Seinfeld, Thursday November 2nd, 2017, 07:00 PM thru 09:00 PM, Thursday November 2nd, 2017, 09:30 PM thru 11:30 PM, Friday December 8th, 2017, 07:00 PM thru 09:00 PM, Friday December 8th, 2017, 09:30 PM thru 11:30 PM Wed, 08 Mar 2017 12:16:42 -0500 40.7804495284105 -73.9813837409019 Beach Street : festival TRANSCOM, Jersey City: festival on Beach Street area of Gill Avenue (Rockaway Twp), Saturday November 11th, 2017, 11:00 AM thru 05:00 PM Sat, 14 Oct 2017 19:00:14 -0400 40.9029092113275 -74.5029205083847 The Beacon Theatre : show Madison Square Garden: show at The Beacon Theatre (New York) Kevin James, Saturday October 28th, 2017 thru Sunday October 29th, 2017, Saturday/Sunday, 07:00 PM thru 10:00 PM Wed, 03 May 2017 09:52:12 -0400 40.7804495284105 -73.9813837409019 Madison Square Garden : show Madison Square Garden: show at Madison Square Garden the Theater (Manhattan) Chris Rock: Total Blackout Tour 2017, Wednesday December 6th, 2017 thru Thursday December 7th, 2017 Wednesday/ Thursday, 08:00 PM thru 11:00 PM Wed, 03 May 2017 09:59:00 -0400 40.749996 -73.988892 Madison Square Garden : show Madison Square Garden: show at Madison Square Garden the Arena (Manhattan) 142nd Annual Westminster Kennel Club Dog Show, Monday February 12th, 2018, 08:00 PM thru 11:00 PM, Tuesday February 13th, 2018, 07:30 PM thru 10:30 PM Wed, 03 May 2017 10:01:24 -0400 40.750127 -73.989876 Barclays Center : show Barclays Center: show at Barclays Center (Brooklyn) Chris Rock Total Blackout Tour, Saturday December 9th, 2017, 08:00 PM thru 11:00 PM Wed, 03 May 2017 11:12:40 -0400 40.6833580495388 -73.9765931134918 NJ Performing Arts Center : show NJ PAC: show at NJ Performing Arts Center at Prudential Hall (Newark) Travis Wall's Shaping Sound, Sunday January 28th, 2018, 06:00 PM thru 09:00 PM Wed, 10 May 2017 08:49:10 -0400 40.7403476969931 -74.1675853729248 The Beacon Theatre : show Madison Square Garden: show at The Beacon Theatre (Manhattan) Michael McIntyre Big World Tour, Thursday February 1st, 2018, 08:00 PM thru 11:00 PM Tue, 30 May 2017 11:00:44 -0400 40.7804495284105 -73.9813837409019 The Beacon Theatre : show Madison Square Garden: show at The Beacon Theatre (Manhattan) Joe Rogan, Friday November 3rd, 2017, 08:30 PM thru 11:00 PM Tue, 30 May 2017 11:03:21 -0400 40.7804495284105 -73.9813837409019 Madison Square Garden : show Madison Square Garden: show at Madison Square Garden the Theater (Manhattan) Ricky Gervais: Humanity, Wednesday October 25th, 2017, 08:00 PM thru 10:30 PM Tue, 30 May 2017 11:11:27 -0400 40.749996 -73.988892 NJ Performing Arts Center : show NJ PAC: show at NJ Performing Arts Center at Prudential Hall (Newark) Tango Buenos Aires: The Spirit pf Argentina, Thursday October 26th, 2017, 07:30 PM thru 10:30 PM Tue, 18 Jul 2017 10:13:18 -0400 40.7403476969931 -74.1675853729248 NJ Performing Arts Center : show NJ PAC: show at NJ Performing Arts Center at Prudential Hall (Newark) the stand-up of Gary Owen, Deon Cole and Smokey Suarez, Friday November 17th, 2017, 08:00 PM thru 10:00 PM Tue, 18 Jul 2017 11:14:14 -0400 40.7403476969931 -74.1675853729248 NJ Performing Arts Center : show NJ PAC: show at NJ Performing Arts Center at The Chase Room (Newark) The Scarf Diaries, Saturday November 18th, 2017, 03:00 PM thru 05:00 PM, Saturday November 18th, 2017, 07:00 PM thru 09:00 PM Tue, 18 Jul 2017 11:20:00 -0400 40.7400550534214 -74.166898727417 NJ Performing Arts Center : opera NJ PAC: opera at NJ Performing Arts Center at Victoria Theater (Newark) Trilogy: An Opera Company: Kenyatta, Sunday November 19th, 2017, 07:00 PM thru 09:00 PM Tue, 18 Jul 2017 11:23:49 -0400 40.7400875694374 -74.1673707962036 NJ Performing Arts Center : show NJ PAC: show at NJ Performing Arts Center at Victoria Theater (Newark) An Evening with Savion Glover, Thursday December 7th, 2017, 07:00 PM thru 09:00 PM Tue, 18 Jul 2017 11:30:00 -0400 40.7400875694374 -74.1673707962036 NJ Performing Arts Center : show NJ PAC: show at NJ Performing Arts Center at Prudential Hall (Newark) The Hip Hop Nutcrackers featuring Kurtis Blow, Friday December 15th, 2017, 07:00 PM thru 09:00 PM Tue, 18 Jul 2017 11:34:00 -0400 40.7403476969931 -74.1675853729248 NJ Performing Arts Center : show NJ PAC: show at NJ Performing Arts Center at Victoria Theater (Newark) Forces of nature Dance Company, Saturday December 16th, 2017, 02:00 PM thru 04:00 PM Tue, 18 Jul 2017 11:36:07 -0400 40.7400875694374 -74.1673707962036 NJ Performing Arts Center : show NJ PAC: show at NJ Performing Arts Center around Prudential Hall (Newark) The Nutcracker, Saturday December 16th, 2017, 03:00 PM thru 05:00 PM Tue, 18 Jul 2017 11:37:26 -0400 40.7403476969931 -74.1675853729248 NJ Performing Arts Center : show NJ PAC: show at NJ Performing Arts Center at Prudential Hall (Newark) Michael Carbonaro, Saturday December 30th, 2017, 07:00 PM thru 09:00 PM Tue, 18 Jul 2017 11:42:39 -0400 40.7403476969931 -74.1675853729248 Madison Square Garden : wrestling Madison Square Garden: wrestling at Madison Square Garden the Arena (Manhattan) WWE Live Holiday Tour, Tuesday December 26th, 2017, 07:30 PM thru 10:30 PM Tue, 25 Jul 2017 11:12:20 -0400 40.750127 -73.989876 Randalls Island Park : race event NYC DOT: race event at Randalls Island Park (Manhattan) Run the River 5K, Saturday October 28th, 2017, 08:30 AM thru 01:00 PM Wed, 30 Aug 2017 10:23:33 -0400 40.7952443459985 -73.9260256290436 Palisades Interstate Parkway both directions : festival NYSDOT - Region 8: festival on Palisades Interstate Parkway both directions at Exit 17 - Anthony Wayne Recreation Area Ramp (Woodbury) Bear Mountain Oktoberfest; Delays possible, Saturday September 23rd, 2017 thru Sunday October 29th, 2017, Saturday/Sunday, 12:30 PM thru 05:30 PM Fri, 15 Sep 2017 11:49:20 -0400 41.2971992492676 -74.029800415039 Prudential Center - ROCK : show Prudential Center: show at Prudential Center - ROCK (Newark), Friday February 16th, 2018, 07:00 PM thru 10:00 PM Thu, 21 Sep 2017 09:46:29 -0400 40.7335901472838 -74.1711848974228 NJ Performing Arts Center : show NJ PAC: show at NJ Performing Arts Center Prudential Hall (Newark) Alton Brown Live: Eat Your Science, Friday November 3rd, 2017, 07:00 PM thru 10:00 PM Thu, 21 Sep 2017 10:29:33 -0400 40.7403476969931 -74.1675853729248 Madison Square Garden : show Madison Square Garden: show at Madison Square Garden the Theater (Manhattan) New York Comedy Festival presents Bill Maher, Saturday November 11th, 2017, 08:00 PM thru 10:30 PM Thu, 21 Sep 2017 11:34:18 -0400 40.749996 -73.988892 The Beacon Theatre : show Madison Square Garden: show at The Beacon Theatre (New York) New York Comedy Festival presents Nick Offerman, Saturday November 11th, 2017, 07:30 PM thru 10:00 PM Thu, 21 Sep 2017 11:35:20 -0400 40.7804495284105 -73.9813837409019 The Beacon Theatre : show Madison Square Garden: show at The Beacon Theatre (New York) New York Comedy Festival presents Ron White, Friday November 10th, 2017, 08:00 PM thru 10:30 PM Thu, 21 Sep 2017 11:36:27 -0400 40.7804495284105 -73.9813837409019 Madison Square Garden : show Madison Square Garden: show at Madison Square Garden the Arena (Manhattan) New York Comedy Festival presents TruTV Impractical Jokers, Thursday November 9th, 2017, 08:00 PM thru 10:30 PM Thu, 21 Sep 2017 11:38:16 -0400 40.750127 -73.989876 The Beacon Theatre : show Madison Square Garden: show at The Beacon Theatre (New York) New York Comedy Festival presents Lovett or Leave It, Thursday November 9th, 2017, 08:00 PM thru 10:30 PM, Saturday November 11th, 2017 thru Sunday November 12th, 2017, 10:15 PM thru 12:30 AM Thu, 21 Sep 2017 11:40:30 -0400 40.7804495284105 -73.9813837409019 Madison Square Garden : show Madison Square Garden: show at Madison Square Garden the Theater (Manhattan) Stand Up for Heroes, Tuesday November 7th, 2017, 08:00 PM thru 11:00 PM Thu, 21 Sep 2017 11:52:12 -0400 40.749996 -73.988892 Radio City Music Hall : show Madison Square Garden: show at Radio City Music Hall (New York) The Christmas Spectacular Starring the Radio City Rockets, Thursday November 9th, 2017 thru Monday January 1st, 2018, serveral shows daily between 10:00 AM and 11:00 PM Thu, 21 Sep 2017 12:42:26 -0400 40.7599027332108 -73.9803932910537 Lexington Avenue : festival NYC DOT: festival on Lexington Avenue between 42nd Street (Manhattan)and 57th Street (Manhattan) Lexington Avenue Fall Festival, Saturday October 28th, 2017, 10:00 AM thru 06:00 PM, all lanes closed Mon, 16 Oct 2017 09:55:26 -0400 40.7514595790465 -73.9760622382164 6th Avenue : festival NYC DOT: festival on 6th Avenue between Flatbush Avenue (Brooklyn)and St. Marks Avenue (Brooklyn) and St. Marks Avenue between Flatbush Avenue (Kings) and 6th Avenue (Kings) DOT Weekend Walks - North Flatbush Fall Fest, Saturday October 28th, 2017, 12:00 PM thru 05:00 PM, all lanes closed Mon, 16 Oct 2017 09:58:44 -0400 40.6802673157106 -73.9747003465891 1st Street and Sinatra Drive : race event TRANSCOM, Jersey City: race event on 1st Street and Sinatra Drive at Pier A (Hoboken) HoBOOken 5K, Saturday October 28th, 2017, 08:00 AM thru 11:59 PM Thu, 19 Oct 2017 10:57:35 -0400 40.7367911774477 -74.027493596077