longterm constructionlongterm constructionNY 440 PA - Staten Island Bridges: longterm construction on NY 440 northbound ramp to/from Richmond Terrace (Staten Island) , Continuous Monday November 4th, 2013 12:00 AM thru Wednesday November 4th, 2015 11:59 PM closed and detoured
bridge constructionbridge constructionNJ 18 NJ DOT - STMC: bridge construction and longterm construction on NJ 18 northbound area of New Jersey Turnpike (East Brunswick Twp) , Continuous Wednesday October 8th, 2014 2:00 PM thru Sunday December 21st, 2014 11:59 PM 2 through lanes open to traffic
bridge rehabilitationbridge rehabilitationEaston-Phillipsburg Toll Bridge/US 22 DRJTBC: bridge rehabilitation on Easton-Phillipsburg Toll Bridge/US 22 westbound approaching New Jersey Side (Phillipsburg) , Continuous Monday March 24th, 2014 8:00 PM thru Friday December 19th, 2014 11:59 PM 1 lane of 2 lanes open
bridge rehabilitationbridge rehabilitationEaston-Phillipsburg Toll Bridge/US 22 DRJTBC: bridge rehabilitation on Easton-Phillipsburg Toll Bridge/US 22 eastbound between Pennsylvania Side (Easton) and New Jersey Side (Phillipsburg) Taper to begin after 13th Street in Easton,PA, Continuous Monday March 24th, 2014 9:30 AM thru Friday December 19th, 2014 11:59 PM 1 lane of 2 lanes open
bridge rehabilitationbridge rehabilitationPulaski Skyway NJ DOT - STMC: bridge rehabilitation and longterm construction on Pulaski Skyway northbound between US 1&9 Truck Route/Raymond Blvd (Newark) and Tonnelle Circle (Jersey City) , Continuous Saturday April 12th, 2014 6:00 AM thru Monday April 11th, 2016 11:59 PM all lanes closed and detoured
bridge rehabilitationbridge rehabilitationUS 46 NJ DOT - STMC: bridge rehabilitation on US 46 both directions between CR 503/Liberty St (South Hackensack Twp) and CR 39/Teaneck Rd (Ridgefield Park) , Continuous Monday June 2nd, 2014 9:00 AM thru Tuesday December 6th, 2016 12:00 AM traffic shift
longterm constructionlongterm constructionI-295 NJ DOT - TOC South: longterm construction on I-295 both directions Exit 25 - NJ 47/Delsea Dr (Westville) to Exit 26N - I-76/I-676 (Bellmawr) , Continuous Monday July 7th, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM traffic shift
longterm constructionlongterm constructionNJ 42 NJ DOT - TOC South: longterm construction on NJ 42 both directions Exit 14 - CR 753/Creek Rd (Bellmawr) to I-295 (Bellmawr) , Continuous Monday July 7th, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM traffic shift
longterm constructionlongterm constructionI-76 NJ DOT - TOC South: longterm construction on I-76 both directions Exit 1A - NJ 42/I-295 (Bellmawr) to Exit 1D - US 130 (Gloucester City) , Continuous Monday July 7th, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM traffic shift
longterm constructionlongterm constructionI-295 NJ DOT - TOC South: longterm construction on I-295 both directions Exit 26N - I-76/I-676 (Bellmawr) to Exit 28 - NJ 168/Black Horse Pike (Bellmawr) use caution, Continuous Monday October 6th, 2014 12:00 AM thru Wednesday December 31st, 2014 11:59 PM traffic shift
bridge workbridge workNJ 88 NJ DOT - TOC South: bridge work on NJ 88 both directions at Garden State Parkway (Lakewood Twp) , Monday November 17th, 2014 thru Friday December 5th, 2014, Monday thru Friday, 07:00 AM thru 05:00 PM, traffic shift
constructionconstructionNJ 35 NJ DOT - TOC South: construction on NJ 35 northbound South of CR 51/Holiday Rd (Toms River Twp) to North of CR 51/Holiday Rd (Toms River Twp) , Continuous Monday September 8th, 2014 6:00 AM thru Monday December 1st, 2014 6:00 AM right lane closed
utility workutility workUS 9 NJ DOT - TOC South: utility work on US 9 southbound South of CR 654/East Greenbush Rd (Bass River Twp) , Thursday November 20th, 2014 thru Thursday December 4th, 2014, Monday thru Friday, 07:00 AM thru 03:30 PM, right shoulder closed
line stripingline stripingNJ 72 NJ DOT - TOC South: line striping on NJ 72 both directions between West of CR 539/Whiting Rd (Barnegat Twp) and East of Ivy Rd (Stafford Twp) , Friday November 21st, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday/ Wednesday/ Friday, 07:00 AM thru 05:00 PM, right shoulder closed
paving operationspaving operationsNJ 35 NJ DOT - TOC South: paving operations on NJ 35 both directions from 24th Av (Berkeley Twp) to North of CR 14/5th Av (Seaside Park) , Continuous Wednesday October 29th, 2014 10:28 AM thru Saturday May 30th, 2015 11:59 PM traffic shift
constructionconstructionNJ 34 NJ DOT - TOC South: construction on NJ 34 northbound South of Garden State Parkway (Wall Twp) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 08:00 PM thru 05:00 AM, all lanes closed and detoured
constructionconstructionI-195 NJ DOT - TOC South: construction on I-195 eastbound West of Exit 31 - CR 547 (Howell Twp) to West of Exit 35 - NJ 34 (Wall Twp) , Tuesday December 2nd, 2014 thru Friday December 5th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, 1 lane closed
constructionconstructionUS 9 NJ DOT - TOC South: construction on US 9 both directions NJ 72 (Stafford Twp) to South of CR 606/Stafford Forge Rd (Eagleswood Twp) use caution, Friday November 21st, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday/ Friday, 08:00 PM thru 06:00 AM, traffic shift
utility workutility workNJ 66 NJ DOT - TOC South: utility work on NJ 66 eastbound Green Grove Rd (Neptune Twp) , Monday November 24th, 2014 thru Thursday November 27th, 2014, None, 09:30 AM thru 03:30 PM, right shoulder closed
utility workutility workNJ 20 NJ DOT - STMC: utility work on NJ 20 both directions 18th Av (Paterson) to 20th Av (Paterson) , Continuous Tuesday October 21st, 2014 12:00 AM thru Thursday January 15th, 2015 11:59 PM left lane closed for repairs
utility workutility workNJ 168 NJ DOT - TOC South: utility work on NJ 168 southbound between CR 635/Nicholson Rd (Haddon Twp) and South of CR 635/Nicholson Rd (Haddon Twp) , Continuous Thursday October 30th, 2014 7:00 AM thru Sunday May 31st, 2015 6:00 AM right shoulder closed
traffic shifttraffic shiftNJ 27 NJ DOT - STMC: traffic shift on NJ 27 both directions North of CR 657/North Evergreen Rd (Edison Twp) to CR 649/Wood Av (Edison Twp) , Continuous Friday November 7th, 2014 8:00 PM thru Monday December 1st, 2014 8:00 AM
utility workutility workNJ 66 NJ DOT - TOC South: utility work on NJ 66 eastbound Green Grove Rd (Neptune Twp) , Wednesday November 5th, 2014 thru Wednesday November 26th, 2014, Monday thru Friday, 09:30 AM thru 03:30 PM, right shoulder closed
bridge workbridge workNJ 35 NJ DOT - STMC: bridge work on NJ 35 both directions at Victory Bridge Mid-Span (Perth Amboy/Sayreville) , Monday November 24th, 2014 thru Friday November 28th, 2014, Monday thru Friday, 07:00 AM thru 03:30 PM, right shoulder closed for repairs
utility workutility workNJ 168 NJ DOT - TOC South: utility work on NJ 168 both directions South of CR 635/Nicholson Rd (Haddon Twp) , Tuesday December 2nd, 2014 thru Saturday December 6th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 08:00 PM thru 06:00 AM, 1 to 2 lanes closed
roadworkroadworkUS 322 NJ DOT - TOC South: roadwork on US 322 eastbound East of CR 653/Swedesboro Rd (Woolwich Twp) to West of CR 551/Kings Highway (Woolwich Twp) , Tuesday December 2nd, 2014 thru Wednesday December 3rd, 2014 Tuesday/ Wednesday, 08:30 AM thru 02:30 PM, alternate lanes closed intermittently
line stripingline stripingUS 1 NJ DOT - TOC South: line striping on US 1 both directions between Trenton-Morrisville Bridge (Trenton) and North of Henderson Rd (South Brunswick Twp) , Friday November 21st, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday/ Friday, 09:00 PM thru 06:00 AM, 1 to 2 lanes blocked
constructionconstructionUS 22 NJ DOT - STMC: construction on US 22 eastbound West of CR 529/Washington Ave (Green Brook Twp) , Saturday November 29th, 2014, None, 09:00 AM thru 03:00 PM, right shoulder closed
constructionconstructionUS 9 NJ DOT - TOC South: construction on US 9 both directions NJ 72 (Stafford Twp) to South of CR 606/Stafford Forge Rd (Eagleswood Twp) , Friday November 21st, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday/ Wednesday, 07:00 AM thru 05:00 PM, right shoulder closed
millingmillingNJ 4 NJ DOT - STMC: milling and paving operations on NJ 4 eastbound between NJ 208 (Fair Lawn) and Hackensack Av (Hackensack) Double lane closures start at 11 PM to 5:30 AM., Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 09:00 PM thru 06:00 AM, left and center lanes closed for repairs
utility workutility workNJ 183 NJ DOT - STMC: utility work on NJ 183 both directions between US 206 (Roxbury Twp) and Dell Rd (Stanhope) , Wednesday November 19th, 2014 thru Tuesday December 23rd, 2014, Sunday thru Saturday, 09:00 AM thru 03:00 PM, right lane closed for repairs
utility workutility workUS 206 NJ DOT - STMC: utility work on US 206 both directions between CR 613/Drakesdale Rd (Mount Olive Twp) and CR 604/Waterloo Rd (Byram Twp) , Wednesday November 19th, 2014 thru Tuesday December 23rd, 2014, Sunday thru Saturday, 09:00 AM thru 03:00 PM, right lane closed for repairs
tree trimmingtree trimmingUS 46 NJ DOT - STMC: tree trimming on US 46 both directions area of CR 667/Mt. Olive Rd (Mount Olive Twp) , Wednesday November 19th, 2014 thru Tuesday December 23rd, 2014, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closed
constructionconstructionNJ 35 NJ DOT - TOC South: construction on NJ 35 both directions South of CR 8/9th Av (Berkeley Twp) to North of J St (Seaside Park) Not currently scheduled
bridge workbridge workNJ 55 NJ DOT - TOC South: bridge work on NJ 55 both directions South of Exit 35 - CR 674/Garden Rd (Vineland) Not currently scheduled
constructionconstructionNJ 33 NJ DOT - TOC South: construction on NJ 33 eastbound West of New Jersey Turnpike (East Windsor Twp) , Friday November 21st, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday/ Friday, 09:00 AM thru 03:00 PM, 1 to 2 lanes closed
paving operationspaving operationsUS 1 NJ DOT - TOC South: paving operations on US 1 both directions ramps to/from Franklin Corner Rd/Bakers Basin Rd (Lawrence Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 08:00 PM thru 06:00 AM, entrance ramps closed and detoured
paving operationspaving operationsUS 130 NJ DOT - STMC: paving operations on US 130 northbound between South of CR 608/Adams Ln (North Brunswick Twp) and North of CR 695/Old Georges Rd (North Brunswick Twp) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 08:00 PM thru 06:00 AM, alternate lanes closed for repairs
bridge workbridge workUS 9 NJ DOT - STMC: bridge work on US 9 southbound at NJ 440 (Woodbridge Twp) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 06:00 AM, left lane closed
constructionconstructionNJ 3 NJ DOT - STMC: construction on NJ 3 both directions between CR 509/Broad St (Clifton) and East of Garden State Parkway (Clifton) Double lanes closure start at 10PM., Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 06:00 AM, right and center lanes closed
moving operationmoving operationUS 22 NJ DOT - STMC: moving operation on US 22 westbound between CR 577/Springfield Ave (Springfield Twp) and Chestnut St (Union Twp) ramps closure, Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, None, 10:00 PM thru 06:00 AM, ramp closed intermittently
line stripingline stripingUS 1 NJ DOT - STMC: line striping on US 1 both directions between North of Forrestal Rd (Plainsboro Twp) and North of NJ 91/Jersey Ave (North Brunswick Twp) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 06:00 AM, traffic shift
constructionconstructionPalisades Interstate Parkway NJ DOT - STMC: construction on Palisades Interstate Parkway both directions between George Washington Bridge (Fort Lee) and New York State Line (Alpine) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 08:30 PM thru 05:30 AM, 1 lane closed for repairs
line stripingline stripingI-78 NJ DOT - STMC: line striping and moving operation on I-78 both directions between West of Exit 11 - CR 614/Pattenburg Rd (Bethlehem Twp) and East of Exit 52 - Garden State Parkway (Hillside Twp) , Saturday November 22nd, 2014 thru Wednesday November 26th, 2014 Sunday/ Monday/ Tuesday, 09:00 PM thru 05:00 AM, 1 lane may be closed
utility workutility workNJ 440 NJ DOT - STMC: utility work on NJ 440 southbound South of US 1&9 Truck Route/Communipaw Av (Jersey City) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 08:00 PM thru 05:00 AM, right lane and shoulder closed
constructionconstructionI-80 NJ DOT - STMC: construction on I-80 eastbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 09:00 PM thru 05:00 AM, right and center lanes closed
overhead sign repairoverhead sign repairI-78 NJ DOT - STMC: overhead sign repair on I-78 both directions between Exit 57 - US 1&9/NJ 21 (Newark) and Exit 52 - Garden State Parkway (Union Twp) , Sunday November 23rd, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 05:00 AM, all lanes closed for repairs express lanes
constructionconstructionLincoln Tunnel Port Authority NY/NJ: construction on Lincoln Tunnel eastbound west of New Jersey Side - Toll Plaza (Weehawken Twp) inbound Helix closed, Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 10:00 PM thru 05:00 AM,
constructionconstructionLincoln Tunnel Port Authority NY/NJ: construction on Lincoln Tunnel westbound west of New Jersey Side - North Tube (Weehawken Twp) outbound helix crossover counter flow setup, Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 11:00 PM thru 05:00 AM,
millingmillingNJ 173 NJ DOT - STMC: milling and paving operations on NJ 173 both directions I-78 (Union Twp) to West of CR 614 (Union Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 07:00 PM thru 06:00 AM, alternate lanes closed
millingmillingI-78 NJ DOT - STMC: milling and paving operations on I-78 eastbound between Exit 57 - US 1&9/NJ 21 (Newark) and New Jersey Turnpike Toll Plaza (Newark) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 05:00 AM, right lane closed for repairs express lanes
constructionconstructionNJ 15 NJ DOT - STMC: construction on NJ 15 northbound at South of I-80 (Wharton) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 05:00 AM, left and center lanes closed for repairs
constructionconstructionNJ 139 Lower NJ DOT - STMC: construction on NJ 139 Lower westbound between Tonnelle Avenue (Jersey City) and New Jersey Turnpike/NJ 139 Split (Jersey City) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 05:00 AM, right lane closed for repairs
constructionconstructionNJ 139 Upper NJ DOT - STMC: construction on NJ 139 Upper westbound between Kennedy Boulevard (Jersey City) and Hoboken Av/Coles St (Jersey City) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 05:00 AM, left lane closed for repairs
constructionconstructionNJ 139 Upper NJ DOT - STMC: construction on NJ 139 Upper eastbound between Kennedy Boulevard (Jersey City) and Hoboken Av/Coles St (Jersey City) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 05:00 AM, right lane closed for repairs
millingmillingUS 9 NJ DOT - STMC: milling and paving operations on US 9 both directions between South of NJ 18 (Old Bridge Twp) and North of Garden State Parkway (Sayreville) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 05:00 AM, right lane closed for repairs
guard rail repairsguard rail repairsNJ 17 NJ DOT - STMC: guard rail repairs on NJ 17 southbound North of NJ 120/Paterson Plank Road (Carlstadt) to North of NJ 3 (Rutherford) , Monday December 1st, 2014, 01:00 PM thru 03:00 PM, right lane closed for repairs
bridge workbridge workGeorge Washington Bridge Port Authority NY/NJ: bridge work on George Washington Bridge westbound at New York Side/Lower Level (Manhattan) Ramp from Henry Hudson Parkway, Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 11:00 PM thru 05:00 AM, ramp closed
paving operationspaving operationsUS 130 NJ DOT - TOC South: paving operations on US 130 both directions North of NJ 168 (Camden) , Sunday November 23rd, 2014 thru Wednesday November 26th, 2014 Sunday/ Monday/ Tuesday, 09:00 PM thru 06:00 AM, 1 to 2 lanes closed
bridge workbridge workBayonne Bridge Port Authority NY/NJ: bridge work on Bayonne Bridge both directions between New York Side (Staten Island) and New Jersey Side (Bayonne) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 05:00 AM, all lanes closed
bridge workbridge workNJ 10 NJ DOT - STMC: bridge work on NJ 10 both directions In the vicinity of River Rd (East Hanover Twp) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 08:00 PM thru 06:00 AM, left lane closed
constructionconstructionUS 22 NJ DOT - STMC: construction on US 22 eastbound area of Chimney Rock Rd (Bridgewater Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 07:00 PM thru 06:00 AM, left lane closed
constructionconstructionUS 22 NJ DOT - STMC: construction on US 22 eastbound ramp from I-287 (Bridgewater Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 09:00 PM thru 06:00 AM, ramp closed and detoured
roadworkroadworkNJ 3 NJ DOT - STMC: roadwork on NJ 3 both directions between Ridge Rd (Rutherford) and Paterson Plank Road (Secaucus) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 10:30 PM thru 05:00 AM, 1 lane may be closed
roadworkroadworkNJ 3 NJ DOT - STMC: roadwork on NJ 3 eastbound ramp to eastbound NJ 495 (North Bergen Twp) , Saturday November 22nd, 2014 thru Wednesday November 26th, 2014 Sunday/ Monday/ Tuesday/ Saturday, 09:00 AM thru 04:00 PM, partial ramp closed
roadworkroadworkNJ 3 NJ DOT - STMC: roadwork on NJ 3 eastbound in the vicinity of NJ 495 (North Bergen Twp) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 08:00 PM thru 05:00 AM, 1 to 2 lanes closed
sign worksign workI-287 NJ DOT - STMC: sign work on I-287 northbound between Exit 13 - NJ 28 (Bridgewater Twp) and Exit 14 - US 22 (Bridgewater Twp) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 09:00 PM thru 05:00 AM, 2 left lanes closed for repairs
paving operationspaving operationsNJ 23 NJ DOT - STMC: paving operations on NJ 23 both directions between South of NJ 94 (Hamburg) and CR 565/Lewisburg Rd (Wantage Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 08:00 PM thru 06:00 AM, alternate lanes closed
constructionconstructionI-80 NJ DOT - STMC: construction on I-80 westbound between Exit 60 - NJ 20 (Paterson) and Exit 56 - Squirrelwood Rd (West Paterson) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 09:00 PM thru 05:00 AM, right lane and exit ramp closed
roadworkroadworkUS 1&9 Truck Route NJ DOT - STMC: roadwork on US 1&9 Truck Route northbound area of Hackensack River Drawbridge (Kearny/Jersey City) , Tuesday November 25th, 2014 thru Thursday November 27th, 2014 Tuesday/ Wednesday, 09:00 PM thru 04:00 AM, right lane closed
bridge rehabilitationbridge rehabilitationI-80 NJ DOT - STMC: bridge rehabilitation on I-80 westbound East of Exit 37 - CR 513/Hibernia Ave (Denville Twp) , Tuesday December 2nd, 2014 thru Friday December 5th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 07:00 AM thru 02:00 PM, 2 left lanes of 4 lanes closed for repairs
constructionconstructionI-78 NJ DOT - STMC: construction on I-78 eastbound West of Exit 29 - I-287/US 202/US 206 (Bedminster Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 10:00 PM thru 05:00 AM, left lane closed
bridge workbridge workGeorge Washington Bridge Port Authority NY/NJ: bridge work on George Washington Bridge westbound between New York Side/Lower Level (Manhattan) and New Jersey Side/Lower Level (Fort Lee) , Monday November 24th, 2014 thru Wednesday November 26th, 2014 Monday/ Tuesday, 11:00 PM thru 05:00 AM, all lanes closed
moving operationmoving operationNJ 90 NJ DOT - TOC South: moving operation and street sweeping on NJ 90 both directions Betsy Ross Bridge Mid-Span (Pennsauken Twp) to NJ 73 (Cinnaminson Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 09:00 PM thru 03:00 AM, 1 lane closed intermittently
constructionconstructionUS 22 NJ DOT - STMC: construction on US 22 westbound between Glenside Av (Scotch Plains Twp) and Fairway Dr (Union Twp) , Monday December 1st, 2014 thru Tuesday December 2nd, 2014, 09:00 PM thru 06:00 AM, left lane closed for repairs
roadworkroadworkUS 30 NJ DOT - TOC South: roadwork on US 30 eastbound West of Atlantic City Expressway/Indiana Av (Atlantic City) , Tuesday December 2nd, 2014, 10:00 AM thru 06:00 PM, 2 lanes closed
bridge workbridge workNJ 18 NJ DOT - TOC South: bridge work on NJ 18 southbound NJ 27 (New Brunswick) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 08:00 PM thru 04:30 AM, left lane closed
bridge workbridge workUS 9 NJ DOT - TOC South: bridge work on US 9 northbound Entrance To Power Plant (Lacey Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 05:00 PM thru 01:00 AM, right shoulder closed
millingmillingUS 1 NJ DOT - STMC: milling and paving operations on US 1 southbound between US 9 (Woodbridge Twp) and CR 531/Main St (Edison Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 11:00 PM thru 06:00 AM, right lane and shoulder closed for repairs
guard rail repairsguard rail repairsNJ 3 NJ DOT - STMC: guard rail repairs on NJ 3 eastbound ramp to NJ 495 (North Bergen Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 10:00 PM thru 05:00 AM, ramp closed and detoured
constructionconstructionNJ 73 NJ DOT - TOC South: construction on NJ 73 both directions South of NJ 38 (Maple Shade Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 09:00 PM thru 06:00 AM, 1 to 2 lanes closed
constructionconstructionUS 130 NJ DOT - STMC: construction on US 130 northbound South of CR 695/Old Georges Rd (North Brunswick Twp) , Tuesday December 2nd, 2014, 06:30 AM thru 03:00 PM, right shoulder closed
constructionconstructionNJ 20 NJ DOT - STMC: construction on NJ 20 northbound between In the vicinity of To CR 652 (Paterson) and Fairlawn Av Bridge (Paterson) , Tuesday December 2nd, 2014, 08:00 AM thru 04:00 PM, right shoulder closed
bridge workbridge workI-287 NJ DOT - STMC: bridge work on I-287 southbound South of Exit 39 - NJ 10 (Hanover Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 09:00 PM thru 06:00 AM, right and center lanes closed
roadworkroadworkI-80 NJ DOT - STMC: roadwork on I-80 eastbound between West of Exit 62 - Garden State Parkway (Elmwood Park) and Exit 62 - Garden State Parkway (Saddle Brook Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 08:00 PM thru 05:00 AM, 1 lane closed for repairs local lanes
overhead sign repairoverhead sign repairNJ 42 NJ DOT - TOC South: overhead sign repair on NJ 42 northbound between Exit 13 - NJ 55 (Deptford Twp) and Exit 14 - CR 753/Creek Rd (Bellmawr) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 08:00 PM thru 06:00 AM, left and center lanes blocked
paving operationspaving operationsI-295 NJ DOT - TOC South: paving operations on I-295 southbound between South of Exit 26S - NJ 42/I-76/I-676 (Bellmawr) and South of Exit 26N - I-76/I-676 (Bellmawr) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 09:00 PM thru 05:00 AM, 1 lane may be blocked
constructionconstructionUS 130 NJ DOT - STMC: construction on US 130 southbound between South of CR 608/Adams Ln (North Brunswick Twp) and North of CR 694/Church Rd (North Brunswick Twp) , Tuesday December 2nd, 2014 thru Saturday December 6th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 08:00 PM thru 06:00 AM, 1 lane closed
drainage improvementsdrainage improvementsNJ 33 NJ DOT - TOC South: drainage improvements on NJ 33 eastbound East of Klockner Rd (Hamilton Twp) , Tuesday December 2nd, 2014 thru Tuesday December 30th, 2014, Monday thru Friday, 09:00 AM thru 03:00 PM, right shoulder closed
bridge workbridge workI-295 NJ DOT - TOC South: bridge work on I-295 southbound South of Exit 20 - CR 643/Jessup Rd (West Deptford Twp) , Monday December 1st, 2014, 10:00 AM thru 02:00 PM, right shoulder closed
utility workutility workUS 206 NJ DOT - TOC South: utility work on US 206 southbound South of I-195 (Bordentown Twp) , Tuesday December 2nd, 2014 thru Thursday December 4th, 2014 Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closed
utility workutility workI-287 NJ DOT - STMC: utility work on I-287 southbound North of Exit 45 - Vreeland Ave (Boonton) , Thursday December 4th, 2014, 09:00 AM thru 03:30 PM, right shoulder closed
roadworkroadworkNJ 42 NJ DOT - TOC South: roadwork on NJ 42 southbound South of Exit 8 - CR 534/Clementon Blackwood Rd (Gloucester Twp) , Monday December 1st, 2014, 10:00 AM thru 02:00 PM, right shoulder closed
utility workutility workNJ 18 NJ DOT - STMC: utility work on NJ 18 northbound between South of US 1 (East Brunswick Twp) and Paulus Blvd (New Brunswick) , Tuesday December 2nd, 2014 thru Friday December 5th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, left lane closed
utility workutility workNJ 18 NJ DOT - STMC: utility work on NJ 18 southbound between Paulus Blvd (New Brunswick) and South of US 1 (East Brunswick Twp) , Tuesday December 2nd, 2014 thru Friday December 5th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 02:00 PM, left lane closed
constructionconstructionUS 1&9 NJ DOT - STMC: construction on US 1&9 both directions area of NJ 35 (Woodbridge Twp) , Wednesday December 3rd, 2014 thru Thursday December 4th, 2014 Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right shoulder closed
constructionconstructionI-287 NJ DOT - STMC: construction on I-287 southbound area of Exit 4 - Durham Rd (South Plainfield) , Wednesday December 3rd, 2014 thru Thursday December 4th, 2014 Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right shoulder closed
constructionconstructionNJ 440 NJ DOT - STMC: construction on NJ 440 both directions between South of Kennedy Boulevard (Jersey City) and W 63rd St (Bayonne) , Wednesday December 3rd, 2014 thru Thursday December 4th, 2014 Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right shoulder closed
constructionconstructionNJ 4 NJ DOT - STMC: construction on NJ 4 both directions between Mackay Ave (Paramus) and In the vicinity of NJ 17 (Paramus) , Monday December 1st, 2014 thru Saturday December 6th, 2014, Monday thru Friday, 09:00 PM thru 06:00 AM, right lane closed
constructionconstructionNJ 4 NJ DOT - STMC: construction on NJ 4 both directions between Mackay Ave (Paramus) and In the vicinity of NJ 17 (Paramus) , Tuesday December 2nd, 2014 thru Friday December 5th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 07:00 AM thru 03:30 PM, right shoulder closed
constructionconstructionNJ 4 NJ DOT - STMC: construction on NJ 4 both directions between Mackay Ave (Paramus) and In the vicinity of NJ 17 (Paramus) , Tuesday December 2nd, 2014 thru Friday December 5th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, right lane closed
constructionconstructionNJ 3 NJ DOT - STMC: construction on NJ 3 both directions between CR 509/Broad St (Clifton) and East of Garden State Parkway (Clifton) , Tuesday December 2nd, 2014 thru Friday December 5th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 07:00 AM thru 03:30 PM, right shoulder closed
constructionconstructionNJ 3 NJ DOT - STMC: construction on NJ 3 both directions between CR 509/Broad St (Clifton) and East of Garden State Parkway (Clifton) , Tuesday December 2nd, 2014 thru Friday December 5th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, right lane closed
constructionconstructionNJ 3 NJ DOT - STMC: construction on NJ 3 both directions between CR 509/Broad St (Clifton) and East of Garden State Parkway (Clifton) Double lane closures atart at 10 PM., Monday December 1st, 2014 thru Saturday December 6th, 2014, Monday thru Friday, 09:00 PM thru 06:00 AM, right and center lanes closed
safety improvementssafety improvementsUS 130 NJ DOT - TOC South: safety improvements on US 130 both directions Taylors Ln/New Albany Rd (Cinnaminson Twp) , Wednesday November 26th, 2014 thru Monday December 1st, 2014 Monday/ Wednesday, 07:00 AM thru 02:00 PM, right shoulder closed
traffic signal repairstraffic signal repairsNJ 122 NJ DOT - STMC: traffic signal repairs on NJ 122 both directions between In the vicinity of CR 642/Carpenterville Rd (Phillipsburg) and US 22 (Pohatcong Twp) , Tuesday December 2nd, 2014, 09:00 AM thru 03:00 PM, 1 lane may be closed
sign worksign workI-287 NJ DOT - STMC: sign work on I-287 northbound South of Exit 13 - NJ 28 (Bridgewater Twp) to South of Exit 14 - US 22 (Bridgewater Twp) 9 pm for single lane closure, 10 pm for double lane closure, Monday December 1st, 2014 thru Tuesday December 2nd, 2014, 09:00 PM thru 05:00 AM, left and center lanes closed
roadworkroadworkI-287 NJ DOT - STMC: roadwork on I-287 southbound between North of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) , Monday December 1st, 2014 thru Friday December 5th, 2014, Monday thru Friday, 12:00 AM thru 11:59 PM, right shoulder closed
sign worksign workI-287 NJ DOT - STMC: sign work on I-287 northbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) , Monday December 1st, 2014 thru Friday December 5th, 2014, Monday thru Friday, 12:00 AM thru 11:59 PM, right shoulder closed
drainage improvementsdrainage improvementsNJ 57 NJ DOT - STMC: drainage improvements on NJ 57 eastbound at CR 519/Uniontown Rd (Lopatcong Twp) alternating trafiic, Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 08:05 PM thru 05:00 AM,
curb workcurb workNJ 124 NJ DOT - STMC: curb work on NJ 124 both directions area of Madison St/Elm St (Morristown) , Tuesday December 2nd, 2014 thru Friday December 5th, 2014 Tuesday/ Wednesday/ Thursday/ Friday, 08:00 AM thru 04:00 PM, right shoulder closed
moving operationmoving operationI-78 NJ DOT - STMC: moving operation and sign work on I-78 both directions between Exit 17 - NJ 31 South (Clinton Twp) and East of Exit 18 - US 22 (Clinton Twp) , Tuesday November 25th, 2014 thru Wednesday November 26th, 2014, 10:00 PM thru 04:30 AM, 1 to 2 lanes closed
moving operationmoving operationI-80 NJ DOT - STMC: moving operation and sign work on I-80 both directions between Exit 56 - Squirrelwood Rd (West Paterson) and Exit 67 - River Rd (Ridgefield Park) , Saturday December 6th, 2014 thru Sunday December 7th, 2014, 09:30 PM thru 05:00 AM, 1 to 2 lanes closed
moving operationmoving operationI-287 NJ DOT - STMC: moving operation and sign work on I-287 both directions between North of Exit 53 - Hamburg Turnpike (Pompton Lakes) and North of Exit 55 - CR 511/Ringwood Ave (Wanaque) , Monday December 1st, 2014 thru Tuesday December 2nd, 2014, 09:30 PM thru 05:00 AM, 1 lane closed
moving operationmoving operationUS 202 NJ DOT - STMC: moving operation and sign work on US 202 both directions between CR 670/Alps Rd (Wayne Twp) and CR 683/Newark Pompton Tpke (Wayne Twp) , Wednesday December 3rd, 2014 thru Thursday December 4th, 2014, 09:30 PM thru 05:00 AM, 1 lane closed
moving operationmoving operationNJ 23 NJ DOT - STMC: moving operation and sign work on NJ 23 both directions between US 46 (Wayne Twp) and North of I-80 (Wayne Twp) , Wednesday December 3rd, 2014 thru Thursday December 4th, 2014, 09:30 PM thru 05:00 AM, 1 lane closed
moving operationmoving operationNJ 208 NJ DOT - STMC: moving operation and sign work on NJ 208 both directions between Utter Av (Hawthorne) and Grandview Av (Wyckoff) , Friday December 5th, 2014 thru Saturday December 6th, 2014, 09:30 PM thru 05:00 AM, 1 lane closed
drainage improvementsdrainage improvementsAtlantic City Expressway South Jersey Transp. Auth.: drainage improvements on Atlantic City Expressway westbound between West of Frank S. Farley Service Plaza (Hamilton Twp) , Wednesday November 26th, 2014, 08:30 AM thru 05:00 PM, left lane closed
This page auto-refreshes every 2 minutes.
*Disclaimer: Traffic information is subject to change at any time.
+ - portions based on historical data.
Travel Times are displayed in HH:MM format.
This page auto-refreshes every 2 minutes.
[ICX1-WEB22X]