Scheduled Construction

Sort By County
select
Search By Road
 
Checked Counties:

Incident Icon Incident Congestion Icon Congestion Construction Icon Construction Detour Icon Detour Weather Icon Weather Special Event Icon Special Event
Select Date Range:     OR   Dates From:     to    
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound Harlem River Drive (Manhattan) to New York Side/Upper Level (Manhattan) , Saturday July 23rd, 2016 thru Sunday July 24th, 2016, 11:59 PM thru 08:00 AM, 2 right lanes closed for repairs
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge westbound New York Side/Lower Level (Manhattan) to New Jersey Side/Lower Level (Fort Lee) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 08:30 AM thru 02:30 PM, right lane closed for repairs
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge westbound ramp from Henry Hudson Parkway (Manhattan) to Lower Level, Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 08:30 AM thru 02:30 PM, left lane closed for repairs
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New York Side/Lower Level (Manhattan) to Harlem River Drive (Manhattan) Lower Level, Thursday July 28th, 2016 thru Friday July 29th, 2016, 11:00 PM thru 05:00 AM, left lane closed for repairs
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New York Side/Upper Level (Manhattan) to Harlem River Drive (Manhattan) Upper Level, Thursday July 28th, 2016 thru Friday July 29th, 2016, 11:00 PM thru 05:00 AM, 2 right lanes closed for repairs
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge westbound Mid-Span/Upper Level (Manhattan) to westbound bus slip (New York) , Tuesday July 26th, 2016 thru Wednesday July 27th, 2016, 11:00 PM thru 05:00 AM, 2 right lanes closed for repairs
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New Jersey Side/Lower Level Toll Plaza (Fort Lee) to Harlem River Drive (Manhattan) Lower Level, Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday, 11:00 PM thru 05:00 AM, all lanes closed, Friday July 29th, 2016 thru Saturday July 30th, 2016, 11:59 PM thru 08:00 AM, all lanes closed
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge westbound Henry Hudson Parkway (Manhattan) to New Jersey Side/Lower Level (Fort Lee) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, all lanes closed for repairs, Friday July 29th, 2016 thru Saturday July 30th, 2016, 11:59 PM thru 08:00 AM, all lanes closed for repairs
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge westbound ramp from Henry Hudson Parkway (Manhattan) to lower level, Thursday July 28th, 2016 thru Friday July 29th, 2016, 11:00 PM thru 05:00 AM, all lanes closed and detoured
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New Jersey Side/Upper Level (Fort Lee) to New York Side/Lower Level (Manhattan) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 11:59 PM thru 05:00 AM, left lane closed for repairs, Friday July 29th, 2016 thru Saturday July 30th, 2016, 11:59 PM thru 08:00 AM, left lane closed for repairs
bridge constructionbridge constructionBayonne Bridge Port Authority NY/NJ: bridge construction on Bayonne Bridge both directions , Monday July 18th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, all lanes closed and detoured
bridge constructionbridge constructionGeorge Washington Bridge Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New Jersey Side/Lower Level Toll Plaza (Fort Lee) to New York Side/Upper Level (Manhattan) , Saturday July 23rd, 2016 thru Sunday July 24th, 2016, 11:59 PM thru 08:00 AM, all lanes closed
bridge constructionbridge constructionBayonne Bridge Port Authority NY/NJ: bridge construction on Bayonne Bridge both directions , Continuous Friday July 22nd, 2016 11:59 PM thru Monday July 25th, 2016 5:00 AM all lanes closed and detoured
bridge maintenance operationsbridge maintenance operationsI-80 NJ DOT - STMC: bridge maintenance operations and construction on I-80 westbound at West of Exit 67 - River Rd (Hackensack) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 09:00 PM thru 05:00 AM, 1 right lane closed local lanes, Tuesday July 26th, 2016 thru Wednesday July 27th, 2016, 09:00 PM thru 05:00 AM, 1 right lane express lanes
bridge maintenance operationsbridge maintenance operationsI-80 NJ DOT - STMC: bridge maintenance operations and construction on I-80 westbound at Exit 57 - NJ 19 (Paterson) , Monday July 25th, 2016 thru Saturday July 30th, 2016, Monday thru Friday, 10:00 PM thru 05:00 AM, 2 left lanes of 4 lanes closed for repairs
bridge rehabilitationbridge rehabilitationNJ 139 Lower NJ DOT - STMC: bridge rehabilitation on NJ 139 Lower westbound between New Jersey Turnpike/NJ 139 Split (Jersey City) and Tonnelle Avenue (Jersey City) , Friday July 29th, 2016 thru Saturday July 30th, 2016, 11:00 PM thru 01:00 AM, right lane closed for repairs
bridge rehabilitationbridge rehabilitationNJ 139 Lower NJ DOT - STMC: bridge rehabilitation on NJ 139 Lower both directions between Tonnelle Avenue (Jersey City) and New Jersey Turnpike/NJ 139 Split (Jersey City) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, all lanes closed and detoured
bridge rehabilitationbridge rehabilitationNJ 139 Lower NJ DOT - STMC: bridge rehabilitation on NJ 139 Lower westbound between New Jersey Turnpike/NJ 139 Split (Jersey City) and Tonnelle Avenue (Jersey City) , Monday July 25th, 2016 thru Thursday July 28th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 11:00 PM, right lane closed for repairs
bridge rehabilitationbridge rehabilitationPulaski Skyway NJ DOT - STMC: bridge rehabilitation on Pulaski Skyway southbound at Tonnelle Circle (Jersey City) , Saturday July 23rd, 2016 thru Sunday July 24th, 2016, Saturday/Sunday, 12:00 AM thru 03:00 PM, all lanes closed and detoured
bridge rehabilitationbridge rehabilitationPark Avenue TRANSCOM, Jersey City: bridge rehabilitation and longterm construction on Park Avenue northbound between 16th Street (Hoboken) and 19th Street (Weehawken Twp) Southbound 1 lane open, Continuous Tuesday July 5th, 2016 8:00 PM thru Tuesday September 13th, 2016 11:59 PM all lanes closed and detoured
bridge rehabilitationbridge rehabilitationPalisades Avenue NJ DOT - STMC: bridge rehabilitation on Palisades Avenue both directions between NJ 139 Upper Roadway East (Jersey City) and NJ 139 Upper West , Continuous Thursday June 23rd, 2016 9:00 PM thru Wednesday August 31st, 2016 11:59 PM all lanes closed and detoured
bridge replacementbridge replacementUS 202 NJ DOT - STMC: bridge replacement on US 202 both directions North of CR 512/Sunnybranch Rd (Bernardsville) , Continuous Sunday July 10th, 2016 12:00 PM thru Sunday July 24th, 2016 12:00 PM all lanes closed and detoured
bridge workbridge workNJ 50 NJ DOT - TOC South: bridge work and construction on NJ 50 southbound North of NJ 49 (Corbin City) follow detour Not currently scheduled
bridge workbridge workUS 130 NJ DOT - TOC South: bridge work on US 130 both directions NJ 133 (East Windsor Twp) , Monday July 25th, 2016, 10:00 AM thru 03:00 PM, right lane and shoulder closed
bridge workbridge workI-195 NJ DOT - TOC South: bridge work on I-195 both directions I-295 (Hamilton Twp) to East of Exit 8 - CR 539 (Upper Freehold Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:30 PM, right shoulder closed
constructionconstructionUS 202 NJ DOT - STMC: construction on US 202 northbound South of NJ 24/CR 510/Washington St (Morristown) , Continuous Monday July 25th, 2016 12:00 AM thru Saturday July 29th, 2017 11:59 PM traffic shift
constructionconstructionNJ 139 Upper NJ DOT - STMC: construction on NJ 139 Upper westbound between Hoboken Av/Coles St (Jersey City) and Kennedy Boulevard (Jersey City) , Saturday July 30th, 2016, 07:00 AM thru 03:30 PM, left lane closed for repairs
constructionconstructionNJ 139 Upper NJ DOT - STMC: construction on NJ 139 Upper both directions between Hoboken Av/Coles St (Jersey City) and Kennedy Boulevard (Jersey City) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closed for repairs
constructionconstructionNJ 139 Lower NJ DOT - STMC: construction on NJ 139 Lower both directions between Tonnelle Avenue (Jersey City) and New Jersey Turnpike/NJ 139 Split (Jersey City) , Saturday July 30th, 2016, 01:00 AM thru 07:00 AM, all lanes closed and detoured
constructionconstructionNJ 440 NJ DOT - STMC: construction on NJ 440 both directions South of CR 616/New Brunswick Ave (Woodbridge Twp) , Monday July 25th, 2016 thru Saturday July 30th, 2016, Monday thru Friday, 09:00 PM thru 05:00 AM, right lane closed for repairs
constructionconstructionUS 130 NJ DOT - STMC: construction on US 130 northbound between South of CR 522/Ridge Rd (South Brunswick Twp) and US 1/NJ 171 (North Brunswick Twp) Concrete curb restoration, Monday July 25th, 2016, 09:00 AM thru 04:00 PM, right shoulder closed
constructionconstructionGeorge Washington Bridge Port Authority NY/NJ: construction on George Washington Bridge Palisades Interstate Parkway Toll Plaza (Fort Lee) to New Jersey Side/Upper Level (Fort Lee) , Monday July 25th, 2016, 10:00 AM thru 03:00 PM, right lane closed for repairs
constructionconstructionBruce Reynolds Boulevard Port Authority NY/NJ: construction on Bruce Reynolds Boulevard westbound Hudson Terrace to Hoyt Avenue , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closed for repairs
constructionconstructionNJ 31 NJ DOT - STMC: construction on NJ 31 both directions area of Mercer CR 631/Ingleside Av (Hopewell Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 07:00 AM thru 04:00 PM, right shoulder closed
constructionconstructionI-80 NJ DOT - STMC: construction on I-80 eastbound between East of Exit 30 - Howard Blvd (Roxbury Twp) and West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, left lane closed
constructionconstructionI-80 NJ DOT - STMC: construction on I-80 westbound between West of Exit 35 - Mount Hope Av (Rockaway Twp) and West of Exit 27 - NJ 183/US 206 (Mount Olive Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, left lane closed
constructionconstructionNJ 31 NJ DOT - TOC South: construction on NJ 31 both directions South of Mercer CR 631/Ingleside Av (Hopewell Twp) , Wednesday July 20th, 2016 thru Sunday July 24th, 2016 Wednesday/ Thursday/ Friday/ Saturday, 09:00 PM thru 06:00 AM, 1 lane closed, Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 07:00 AM thru 04:00 PM, right shoulder closed
constructionconstructionI-76 NJ DOT - TOC South: construction on I-76 eastbound ramp to northbound Exit 1B - I-295 (Bellmawr) use caution, Friday July 29th, 2016 thru Saturday July 30th, 2016, 10:00 PM thru 08:00 AM, ramp closed and detoured
constructionconstructionI-295 NJ DOT - TOC South: construction on I-295 both directions ramp to westbound Exit 26S - NJ 42/I-76/I-676 (Bellmawr) use caution, Friday July 29th, 2016 thru Saturday July 30th, 2016, 10:00 PM thru 08:00 AM, 1 to 2 lanes closed
constructionconstructionI-295 NJ DOT - TOC South: construction on I-295 southbound ramp to westbound Exit 26S - NJ 42/I-76/I-676 (Bellmawr) use caution, Friday July 29th, 2016 thru Saturday July 30th, 2016, 10:00 PM thru 08:00 AM, ramp closed and detoured
constructionconstructionUS 1 NJ DOT - STMC: construction on US 1 southbound ramp to southbound NJ 18 (New Brunswick) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 10:00 PM thru 05:00 AM, ramp closed and detoured
constructionconstructionI-80 NJ DOT - STMC: construction on I-80 eastbound West of Exit 58 - Madison Ave (Paterson) to West of Exit 65 - Green St (Hackensack) Single Lane closed at 9PM, Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 06:00 AM, various lanes closed for repairs
constructionconstructionPulaski Skyway NJ DOT - STMC: construction on Pulaski Skyway southbound between US 1&9 Truck Route/I-280/NJ 7 (Jersey City) and US 1&9 Truck Route/Raymond Blvd (Newark) , Continuous Saturday July 23rd, 2016 7:00 AM thru Sunday July 24th, 2016 2:00 PM all lanes closed and detoured
constructionconstructionUS 1 NJ DOT - STMC: construction on US 1 both directions between North of College Farm Rd (North Brunswick Twp) and North of Ryders Ln (North Brunswick Twp) , Tuesday July 26th, 2016 thru Friday July 29th, 2016 Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, various lane closed for repairs
constructionconstructionNJ 18 NJ DOT - STMC: construction on NJ 18 both directions between North of US 1 (New Brunswick) and Paulus Blvd (New Brunswick) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, various lanes closed for repairs
constructionconstructionUS 30 NJ DOT - TOC South: construction on US 30 both directions between CR 631/Illinois Av (Absecon City) and Atlantic City Expressway/Indiana Av (Atlantic City) use caution, Tuesday July 12th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 07:00 AM thru 05:00 PM, right shoulder closed
constructionconstructionNJ 10 NJ DOT - STMC: construction on NJ 10 eastbound area of South Jefferson Rd (Hanover Twp) , Tuesday July 26th, 2016, 09:00 AM thru 02:00 PM, right lane closed for repairs
constructionconstructionUS 130 NJ DOT - STMC: construction on US 130 both directions between South of US 1/NJ 171 (North Brunswick Twp) and CR 522/Fresh Ponds Rd (South Brunswick Twp) , Monday July 25th, 2016 thru Saturday July 30th, 2016, Monday thru Friday, 09:00 PM thru 06:00 AM, right lane closed
constructionconstructionI-287 NJ DOT - STMC: construction on I-287 northbound area of Exit 10 - CR 527/Easton Ave (Franklin Twp) , Monday July 25th, 2016, 09:00 AM thru 03:00 PM, right shoulder closed
constructionconstructionNJ 18 NJ DOT - STMC: construction on NJ 18 southbound area of Exit 30 - US 9 (Old Bridge Twp) , Monday July 25th, 2016, 09:00 AM thru 03:00 PM, right shoulder closed
constructionconstructionI-287 NJ DOT - STMC: construction on I-287 southbound area of Exit 4 - Durham Rd (South Plainfield) , Wednesday July 27th, 2016, 09:00 AM thru 03:00 PM, right shoulder closed
constructionconstructionUS 130 NJ DOT - TOC South: construction on US 130 southbound South of US 322 (Logan Twp) , Monday July 25th, 2016 thru Thursday July 28th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 04:30 PM, right shoulder closed
constructionconstructionGoethals Bridge Port Authority NY/NJ: construction on Goethals Bridge westbound the ramp to Brunswick Avenue will have temporary traffic holds for girder movement., Tuesday July 26th, 2016, 12:30 AM thru 02:00 AM,
constructionconstructionGoethals Bridge Port Authority NY/NJ: construction on Goethals Bridge westbound the ramp to Brunswick Avenue will have temporary lane closures, and the Bayway Avenue ramp will be closed for girder movement., Monday July 25th, 2016, 12:30 AM thru 03:00 AM,
constructionconstructionGoethals Bridge Port Authority NY/NJ: construction on Goethals Bridge westbound , Monday July 25th, 2016 thru Wednesday July 27th, 2016 Monday/ Tuesday, 11:00 PM thru 05:00 AM, right lane closed
constructionconstructionPulaski Skyway NJ DOT - STMC: construction on Pulaski Skyway southbound US 1&9 Truck Route/I-280/NJ 7 (Jersey City) to US 1&9 Truck Route/Raymond Blvd (Newark) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, various lane closed for repairs
constructionconstructionPulaski Skyway NJ DOT - STMC: construction on Pulaski Skyway southbound between US 1&9 Truck Route/I-280/NJ 7 (Jersey City) and US 1&9 Truck Route/Raymond Blvd (Newark) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, 1 lane closed for repairs
constructionconstructionBayonne Bridge Port Authority NY/NJ: construction on Bayonne Bridge both directions , Friday July 29th, 2016 thru Sunday July 31st, 2016 Friday/ Saturday, 11:59 PM thru 08:00 AM, all lanes closed and detoured
constructionconstructionBayonne Bridge Port Authority NY/NJ: construction on Bayonne Bridge both directions , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 PM thru 05:00 AM, all lanes closed and detoured
constructionconstructionI-80 NJ DOT - STMC: construction on I-80 westbound between West of Exit 4 - NJ 94/US 46 (Knowlton Twp) and East of Exit 4 - NJ 94/US 46 (Knowlton Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 PM thru 06:00 AM, left lane closed for repairs
constructionconstructionI-287 NJ DOT - STMC: construction on I-287 both directions North of Exit 1 - US 1 (Edison Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 07:00 AM thru 03:30 PM, alternate lanes
constructionconstructionUS 30 NJ DOT - TOC South: construction on US 30 westbound East of CR 669/Warwick Rd (Magnolia) , Thursday July 7th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closed
constructionconstructionUS 40 NJ DOT - TOC South: construction on US 40 westbound CR 651/Fire Rd (Egg Harbor Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 07:00 AM thru 03:30 PM, right shoulder closed
constructionconstructionI-78 NJ DOT - STMC: construction on I-78 both directions Exit 12 - CR 635/Perryville Rd (Union Twp) , Friday July 29th, 2016, 10:00 AM thru 03:00 PM, right shoulder closed for repairs
constructionconstructionNJ 440 NJ DOT - STMC: construction on NJ 440 southbound between North of New Jersey Turnpike (Jersey City) and South of Pulaski St (Bayonne) , Friday July 29th, 2016, 10:00 AM thru 02:00 PM, left lane closed for repairs
constructionconstructionI-280 NJ DOT - STMC: construction on I-280 both directions West of Exit 13 - Orange St/1st St (Newark) to West of CR 508 (Kearny) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 PM thru 06:00 AM, various lanes closed for repairs
constructionconstructionI-280 NJ DOT - STMC: construction on I-280 eastbound ramp to southbound Exit 15 - NJ 21 (Newark) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 06:00 AM, partial ramp closed for repairs
constructionconstructionNJ 21 NJ DOT - STMC: construction on NJ 21 both directions between CR 508/Bridge St (Newark) and Clay St/Mount Pleasant Av (Newark) , Monday July 25th, 2016 thru Thursday July 28th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closed for repairs
constructionconstructionNJ 21 NJ DOT - STMC: construction on NJ 21 both directions between CR 508/Bridge St (Newark) and Clay St/Mount Pleasant Av (Newark) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lanes closed for repairs
constructionconstructionUS 202 NJ DOT - STMC: construction on US 202 both directions between North of US 206 (Bedminster Twp) and North Maple Ave (Bernards Twp) , Monday July 18th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 07:00 AM thru 04:00 PM, traffic shift
constructionconstructionNJ 18 NJ DOT - STMC: construction on NJ 18 both directions at CR 527/Old Bridge Tpke/Edgeboro Rd (East Brunswick Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:30 AM thru 03:30 PM, 1 lane closed
constructionconstructionUS 9 NJ DOT - TOC South: construction on US 9 both directions North of I-195 (Howell Twp) to Schibanoff Ln (Freehold Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, right lane closed
constructionconstructionNJ 495 Port Authority NY/NJ: construction on NJ 495 westbound west of Pleasant Avenue (Weehawken Twp) , Sunday July 24th, 2016 thru Friday July 29th, 2016 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, 2 lanes closed for repairs
constructionconstructionLincoln Tunnel Port Authority NY/NJ: construction on Lincoln Tunnel both directions New Jersey Side - Center Tube (Weehawken Twp) to New York Side - Center Tube (Manhattan) , Tuesday July 26th, 2016 thru Thursday July 28th, 2016 Tuesday/ Wednesday, 11:00 PM thru 05:00 AM, all lanes closed
constructionconstructionUS 9 NJ DOT - STMC: construction on US 9 southbound at Schulmeister Rd (Old Bridge Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 06:00 AM thru 03:00 PM, right shoulder closed for repairs
constructionconstructionUS 46 NJ DOT - STMC: construction on US 46 both directions West of CR 517/High St (Hackettstown) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 09:00 PM thru 06:00 AM, alternate lanes closed for repairs
constructionconstructionNJ 38 NJ DOT - TOC South: construction on NJ 38 both directions US 130 (Pennsauken Twp) to Nixon Dr (Moorestown Twp) , Monday July 11th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:30 PM, right shoulder closed intermittently
constructionconstructionUS 22 NJ DOT - STMC: construction on US 22 both directions between West of CR 525/Thompson Av (Bridgewater Twp) and East of Westfield Rd (Scotch Plains Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, right shoulder closed
constructionconstructionNJ 7 NJ DOT - STMC: construction on NJ 7 both directions area of New Jersey Turnpike (Kearny) , Monday July 25th, 2016 thru Wednesday July 27th, 2016 Monday/ Tuesday, 08:00 PM thru 05:00 AM, 1 lane closed
constructionconstructionNJ 31 NJ DOT - STMC: construction on NJ 31 both directions area of US 202/NJ 12 (Flemington) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closed for repairs
constructionconstructionNJ 17 NJ DOT - STMC: construction on NJ 17 both directions Century Rd (Paramus) to Midland Av (Paramus) , Monday July 25th, 2016 thru Saturday July 30th, 2016, Monday thru Friday, 09:00 PM thru 06:00 AM, various lanes closed for repairs
constructionconstructionNJ 27 NJ DOT - STMC: construction on NJ 27 both directions in the vicinity of South of CR 522/Promeade Blvd (South Brunswick Twp) , Monday July 25th, 2016, 07:00 AM thru 03:30 PM, right shoulder closed for repairs
constructionconstructionUS 30 NJ DOT - TOC South: construction on US 30 both directions at Garden State Parkway (Galloway Twp) use caution, Monday July 18th, 2016 thru Tuesday July 26th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closed
constructionconstructionUS 1&9 NJ DOT - STMC: construction on US 1&9 northbound in the vicinity of North of Grand St (Elizabeth) , Monday July 18th, 2016 thru Sunday July 24th, 2016 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, right and center lanes closed for repairs
constructionconstructionWest Veterans Highway TRANSCOM, Jersey City: construction on West Veterans Highway from Whitesville Road (Jackson Twp) to Siena Drive (Jackson Twp) Tree Clearing & Overhead Utility Work, weekdays off peak hours through September expect lane closures and use caution through the area.
constructionconstructionMain Street TRANSCOM, Jersey City: construction on Main Street both directions between Millburn Avenue (Millburn) and Essex Street (Millburn) , Continuous Wednesday July 13th, 2016 7:00 AM thru Saturday August 13th, 2016 7:00 AM all lanes closed and detoured
constructionconstructionNJ 79 NJ DOT - TOC South: construction on NJ 79 northbound from US 9 (Freehold Twp) to North of NJ 33 Business/Park Ave (Freehold Twp) , Monday July 11th, 2016 thru Monday August 1st, 2016, 09:00 AM thru 03:30 PM, traffic shift
constructionconstructionLa Guardia Airport Port Authority NY/NJ: construction on La Guardia Airport Queens - New York (New York) The 102ND Street Bridge closed to inbound traffic. All Ped access and exiting traffic to 102ND Street is maintained. Detour is Ditmars WB to 94th Street LGA entrance., Continuous Tuesday June 28th, 2016 2:00 PM thru Sunday July 2nd, 2017 11:59 PM all lanes closed and detoured
constructionconstructionUS 130 NJ DOT - STMC: construction on US 130 both directions between South of CR 615/Station Rd (Cranbury Twp) and CR 615/Station Rd (Cranbury Twp) , Continuous Friday June 24th, 2016 12:00 AM thru Sunday July 31st, 2016 11:59 PM right shoulder closed for repairs
constructionconstructionNJ 440 NJ Turnpike Auth.: INTERCHANGE 14A IMPROVEMENT PROJECT: New Traffic Pattern to be installed on or about Wed June 15th on NJ 440 northbound from Pulaski St (Bayonne) to Harbor Drive (Bayonne). Travel lanes will be divided between Pulaski Street and Harbor Drive in Bayonne. The left lane will be maintained in its current through alignment and the right lane will be shifted East (to the right) adjacent to the Northbound off ramp alignment and merge back onto the original two-lane configuration immediately South of Harbor Drive. This traffic pattern will be in effect until late Spring 2017.
constructionconstructionI-295 NJ DOT - TOC South: construction on I-295 both directions between Exit 26N - I-76/I-676 (Bellmawr) and Exit 28 - NJ 168/Black Horse Pike (Bellmawr) use caution, Continuous Tuesday March 29th, 2016 12:00 AM thru Wednesday March 29th, 2017 11:59 PM traffic shift
constructionconstructionNJ 48 NJ DOT - TOC South: construction on NJ 48 both directions between East of CR 551/Pennsville-Auburn Rd (Carneys Point Twp) and West of US 40 (Carneys Point Twp) use caution, Continuous Monday March 14th, 2016 12:00 AM thru Friday March 31st, 2017 11:59 PM all lanes closed and detoured
constructionconstructionI-295 NJ DOT - TOC South: construction on I-295 both directions South of Exit 25 - NJ 47/Delsea Dr (Westville) to South of Exit 26N - I-76/I-676 (Bellmawr) , Continuous Monday August 31st, 2015 3:00 PM thru Friday June 30th, 2017 11:59 PM traffic shift
construction cancelledconstruction cancelledNJ 3 NJ DOT - STMC: construction cancelled on NJ 3 eastbound at Paterson Plank Road (Secaucus) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, left lane closed
construction cancelledconstruction cancelledGeorge Washington Bridge Port Authority NY/NJ: construction cancelled on George Washington Bridge eastbound New Jersey Side/Lower Level Toll Plaza (Fort Lee) to New York Side/Lower Level (Manhattan) Lower Level, Friday July 22nd, 2016 thru Friday July 29th, 2016 Monday/ Thursday, 09:00 PM thru 05:00 AM, all lanes closed
construction cancelledconstruction cancelledGeorge Washington Bridge Port Authority NY/NJ: construction cancelled on George Washington Bridge westbound New York Side/Lower Level (Manhattan) to New Jersey Side/Lower Level (Fort Lee) , Monday July 18th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 08:30 AM thru 02:30 PM, right lane closed for repairs
crane operationscrane operationsGoethals Bridge Port Authority NY/NJ: crane operations on Goethals Bridge westbound west of New York Side - Toll Plaza (Staten Island) causing a temporary traffic hold., Thursday July 28th, 2016, 04:30 AM thru 05:00 AM,
crane operationscrane operationsGoethals Bridge Port Authority NY/NJ: crane operations on Goethals Bridge eastbound approaching New York Side - Toll Plaza (Staten Island) causing traffic slowdowns., Thursday July 28th, 2016, 04:30 AM thru 05:00 AM,
curb workcurb workUS 9 NJ DOT - TOC South: curb work on US 9 both directions North of Central Ave (Northfield) to North of CR 615 (Northfield) , Monday July 18th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 07:00 AM thru 04:00 PM, traffic shift
curb workcurb workUS 9 NJ DOT - TOC South: curb work on US 9 northbound North of CR 571/Indian Head Rd (Toms River Twp) , Monday July 25th, 2016, 08:00 AM thru 04:00 PM, right lane closed
EZ-Pass toll lane repairsEZ-Pass toll lane repairsNew Hope-Lambertville Toll Bridge/US 202 DRJTBC: EZ-Pass toll lane repairs on New Hope-Lambertville Toll Bridge/US 202 southbound approaching Pennsylvania Side - Toll Plaza (New Hope) Testing of new E-ZPass system will require closure of one toll collection lane for an extended period., Continuous Monday June 20th, 2016 8:00 AM thru Friday July 29th, 2016 4:00 PM 3 toll lanes of 4 lanes open
line stripingline stripingUS 9 NJ DOT - STMC: line striping on US 9 both directions between South of CR 690/Texas Rd (Old Bridge Twp) and NJ 440 (Woodbridge Twp) , Saturday July 23rd, 2016 thru Sunday July 24th, 2016, 09:00 PM thru 09:00 AM, traffic shift
line stripingline stripingUS 130 NJ DOT - STMC: line striping on US 130 both directions between South of Church Rd (Cinnaminson Twp) and North of NJ 133 (East Windsor Twp) , Saturday July 23rd, 2016 thru Sunday July 24th, 2016, 09:00 PM thru 09:00 AM, traffic shift
line stripingline stripingUS 206 NJ DOT - STMC: line striping on US 206 both directions between North of US 130/US 206 (Bordentown Twp) and North of CR 626/Somerset St (Raritan Boro) , Saturday July 23rd, 2016 thru Sunday July 24th, 2016, 09:00 PM thru 09:00 AM, traffic shift
line stripingline stripingNJ 15 NJ DOT - STMC: line striping on NJ 15 northbound between CR 634/N. Main St (Wharton) and NJ 181 (Sparta Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, 1 lane closed
line stripingline stripingI-195 NJ DOT - TOC South: line striping on I-195 westbound West of Exit 16 - CR 537/Great Adventure (Millstone Twp) to East of Exit 21 - CR 527 (Jackson Twp) , Monday July 25th, 2016 thru Thursday July 28th, 2016 Monday/ Tuesday/ Wednesday, 09:00 PM thru 06:00 AM, moving operation
line stripingline stripingNJ 67 NJ DOT - STMC: line striping and moving operation on NJ 67 both directions between South of CR 56/Main St (Fort Lee) and US 46 (Fort Lee) , Monday July 25th, 2016, 09:00 AM thru 03:00 PM, alternate lanes closed
line stripingline stripingNJ 70 NJ DOT - TOC South: line striping on NJ 70 both directions West of CR 530/Lakehurst Rd (Pemberton Twp) to NJ 34/NJ 35 (Wall Twp) , Monday July 25th, 2016 thru Sunday July 31st, 2016 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 PM thru 05:00 AM, moving operation
line stripingline stripingUS 30 NJ DOT - TOC South: line striping on US 30 both directions West of NJ 73 (Berlin) to West of Atlantic City Expressway/Indiana Av (Atlantic City) , Monday July 25th, 2016 thru Sunday July 31st, 2016 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 PM thru 05:00 AM, moving operation
line stripingline stripingUS 206 NJ DOT - TOC South: line striping on US 206 both directions North of Dunns Mill Rd (Bordentown Twp) to North of CR 626/Somerset St (Raritan Boro) , Friday July 15th, 2016 thru Sunday July 24th, 2016 Friday/ Saturday, 09:00 PM thru 05:00 AM, traffic shift, Monday July 25th, 2016 thru Sunday July 31st, 2016 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 05:00 AM, moving operation
line stripingline stripingUS 130 NJ DOT - TOC South: line striping on US 130 both directions between South of Church Rd (Cinnaminson Twp) and North of NJ 133 (East Windsor Twp) , Monday July 25th, 2016 thru Sunday July 31st, 2016 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 AM thru 05:00 AM, moving operation
line stripingline stripingUS 40 NJ DOT - TOC South: line striping on US 40 both directions New Jersey Turnpike/I-295 (Carneys Point Twp) to West of CR 671/Aura-Willow Grove (Upper Pittsgrove Twp) , Tuesday July 5th, 2016 thru Sunday July 31st, 2016, Monday thru Friday, 09:00 PM thru 05:00 AM, moving operation
longterm constructionlongterm constructionBayonne Bridge Port Authority NY/NJ: longterm construction on Bayonne Bridge both directions New Jersey Side (Bayonne) to New York Side - Toll Plaza (Staten Island) There is a 25 mile per hour speed restriction in effect., Continuous Wednesday November 4th, 2015 12:00 AM thru Friday November 4th, 2016 11:59 PM 1 lane open
millingmillingNJ 166 NJ DOT - TOC South: milling and paving operations on NJ 166 northbound at NJ 37 (Toms River Twp) , Tuesday July 26th, 2016 thru Wednesday July 27th, 2016, 10:00 PM thru 06:00 AM, ramp closed and detoured
moving operationmoving operationUS 206 NJ DOT - STMC: moving operation on US 206 both directions North of CR 618/Fredon Springdale Rd (Andover Twp) to South of CR 519/Newton Av (Frankford Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, right shoulder closed intermittently
moving operationmoving operationNJ 71 NJ DOT - TOC South: moving operation on NJ 71 both directions North of NJ 33/Corlies Av (Neptune Twp) to South of Roseld Av (Allenhurst) , Monday July 25th, 2016 thru Friday August 26th, 2016, Monday thru Friday, 09:00 AM thru 03:30 PM, 1 lane may be closed
moving operationmoving operationNJ 208 NJ DOT - STMC: moving operation and road maintenance operations on NJ 208 both directions between South of Lincoln Av (Glen Rock) and US 202 (Oakland) Also Various ramps closed intermittently., Tuesday July 19th, 2016 thru Sunday July 24th, 2016 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 PM thru 05:00 AM, 1 lane closed
paving operationspaving operationsUS 1&9 NJ DOT - STMC: paving operations on US 1&9 southbound South of CR 624/North Ave (Elizabeth) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 08:00 PM thru 06:00 AM, 2 left and center lanes of 3 lanes closed for repairs
paving operationspaving operationsNJ 15 NJ DOT - STMC: paving operations on NJ 15 southbound area of Parker Rd (Rockaway Twp) , Thursday July 28th, 2016 thru Friday July 29th, 2016, 08:00 PM thru 05:00 AM, left lane closed
paving operationspaving operationsNJ 15 NJ DOT - STMC: paving operations on NJ 15 northbound area of CR 634/N. Main St (Wharton) , Thursday July 28th, 2016 thru Friday July 29th, 2016, 09:00 PM thru 05:00 AM, left lane closed
reconstructionreconstructionLa Guardia Airport Port Authority NY/NJ: reconstruction on La Guardia Airport Long Term Parking P3 (New York) is closed permanently. Use lots P 2, P 4 and P 5. Free shuttle service is available to terminals and parking lots. Allow extra time., Continuous Tuesday June 7th, 2016 12:00 AM thru Wednesday June 7th, 2017 11:59 PM
road maintenance operationsroad maintenance operationsUS 130 NJ DOT - STMC: road maintenance operations on US 130 both directions between South of CR 608/Adams Ln (North Brunswick Twp) and US 1/NJ 171 (North Brunswick Twp) , Wednesday July 20th, 2016 thru Sunday July 24th, 2016 Wednesday/ Thursday/ Friday, 09:00 PM thru 06:00 AM, 1 to 2 lanes closed for repairs
road wideningroad wideningCounty Route 539 Green Street TRANSCOM, Jersey City: road widening and safety improvements on County Route 539 Green Street both directions at US 9 (Tuckerton) expect lane closures during off-peak hours, Monday July 25th, thru Friday August 26th, weekdays
roadworkroadworkI-295 NJ DOT - TOC South: roadwork on I-295 northbound at South of Exit 61 - Arena Dr (Hamilton Twp) , Tuesday July 26th, 2016 thru Thursday July 28th, 2016 Tuesday/ Wednesday, 10:00 PM thru 06:00 AM, right lane closed
roadworkroadworkUS 322 NJ DOT - TOC South: roadwork on US 322 both directions West of NJ 54 (Folsom) to East of NJ 73 (Hamilton Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 07:00 AM thru 03:30 PM, 1 lane closed
roadworkroadworkNJ 35 NJ DOT - TOC South: roadwork on NJ 35 northbound 8th Av (Belmar) to North of Shark River Drawbridge (Neptune Twp) , Monday July 25th, 2016 thru Thursday July 28th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, right lane closed
roadworkroadworkNJ 35 NJ DOT - TOC South: roadwork on NJ 35 southbound North of Shark River Drawbridge (Neptune Twp) to South of Shark River Drawbridge (Belmar) , Wednesday July 27th, 2016 thru Thursday July 28th, 2016 Wednesday/ Thursday, 09:00 AM thru 04:00 PM, right lane closed
roadworkroadworkUS 130 NJ DOT - TOC South: roadwork on US 130 northbound Church Rd (Robbinsville) , Sunday July 24th, 2016 thru Friday July 29th, 2016 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 07:00 PM thru 05:00 AM, right and left lanes closed
roadworkroadworkUS 9 NJ DOT - TOC South: roadwork on US 9 both directions South of CR 628/Prospect St (Lakewood Twp) to CR 604/Green St (Woodbridge Twp) , Monday July 25th, 2016 thru Sunday July 31st, 2016 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 09:00 PM thru 05:00 AM, traffic shift
roadworkroadworkUS 130 NJ DOT - TOC South: roadwork on US 130 both directions area of NJ 133 (East Windsor Twp) , Wednesday July 27th, 2016, 10:00 AM thru 03:00 PM, 1 lane closed
roadworkroadworkNJ 109 NJ DOT - TOC South: roadwork on NJ 109 both directions from Bank St/Lyle Ln (Cape May) to Garden State Parkway (Lower Twp) , Continuous Monday July 11th, 2016 7:00 AM thru Sunday July 24th, 2016 6:00 AM right shoulder closed
roadworkroadworkUS 130 NJ DOT - TOC South: roadwork on US 130 both directions South of US 322 (Logan Twp) to South of NJ 44 (Logan Twp) use caution, Continuous Tuesday July 5th, 2016 7:00 PM thru Thursday August 4th, 2016 12:00 AM 1 lane closed
roadworkroadworkNJ 70 NJ DOT - TOC South: roadwork on NJ 70 both directions from NJ 38 (Pennsauken Twp) to Cropwell Rd (Evesham Twp) , Tuesday July 5th, 2016 thru Sunday July 31st, 2016, Monday thru Friday, 12:00 PM thru 03:30 PM, right shoulder closed
roadworkroadworkNJ 36 NJ DOT - TOC South: roadwork on NJ 36 southbound South of Branchport Av (Long Branch) to North of NJ 35 (Eatontown) , Monday August 8th, 2016 thru Tuesday August 9th, 2016, 09:00 PM thru 03:00 PM, left lane closed intermittently
safety improvementssafety improvementsHolland Tunnel Port Authority NY/NJ: safety improvements on Holland Tunnel eastbound between New Jersey Side - South Tube (Jersey City) and New York Side - South Tube (Manhattan) Between 6:00 A.M. and 8:00 A.M.: The Left Lane is scheduled to be closed for safety inspection., Sunday June 5th, 2016 thru Sunday December 31st, 2017, 06:00 AM thru 08:00 AM,
safety improvementssafety improvementsHolland Tunnel Port Authority NY/NJ: safety improvements on Holland Tunnel westbound between New York Side - North Tube (Manhattan) and New Jersey Side - North Tube (Jersey City) Between 6:00 A.M. and 8:00 A.M.: The Left Lane is scheduled to be closed for safety inspection, Sunday April 17th, 2016 thru Monday April 17th, 2017, 05:00 AM thru 08:00 AM,
scheduled roadworkscheduled roadworkNew Jersey Turnpike - Eastern Spur NJ Turnpike Auth.: scheduled roadwork on New Jersey Turnpike - Eastern Spur northbound from North of Interchange 17E - NJ 3/Lincoln Tunnel (Secaucus) to South of Northern Mixing Bowl (North Bergen Twp) , Monday July 25th, 2016, 08:00 PM thru 11:59 PM, left lane closed
scheduled roadworkscheduled roadworkNew Jersey Turnpike - Hudson County Extension NJ Turnpike Auth.: scheduled roadwork on New Jersey Turnpike - Hudson County Extension westbound from East of Interchange 14C - Toll Plaza (Jersey City) to Interchange 14C - Toll Plaza (Jersey City) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 09:00 PM thru 05:00 AM, right lane closed
scheduled roadworkscheduled roadworkNew Jersey Turnpike - Hudson County Extension NJ Turnpike Auth.: scheduled roadwork on New Jersey Turnpike - Hudson County Extension eastbound from Interchange 14 - I-78 (Newark) to West of Interchange 14C - Toll Plaza (Jersey City) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 09:00 PM thru 03:00 AM, left lane closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway northbound from South of Exit 127 - US 9/I-287/NJ 440 (Woodbridge Twp) to South of Exit 130B-A - US 1 (Woodbridge Twp) , Friday July 29th, 2016 thru Saturday July 30th, 2016, 09:00 PM thru 06:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from South of Exit 143A (Irvington Twp) to North of Exit 136 - Stiles St (Cranford Twp) , Friday July 29th, 2016 thru Saturday July 30th, 2016, 09:00 PM thru 08:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from South of Exit 117 - NJ 36 (Hazlet Twp) to North of Exit 114 - Red Hill Rd (Holmdel Twp) , Wednesday July 27th, 2016 thru Friday July 29th, 2016 Wednesday/ Thursday, 09:00 PM thru 06:00 AM, 2 lanes closed outer roadway
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from North of Exit 130B-A - US 1 (Woodbridge Twp) to North of Exit 129 - New Jersey Turnpike (Woodbridge Twp) , Wednesday July 27th, 2016 thru Thursday July 28th, 2016, 09:00 PM thru 05:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from North of Asbury Toll Plaza (Tinton Falls) to South of Garden State Parkway - Monmouth Service Area (Wall Twp) , Tuesday July 26th, 2016 thru Friday July 29th, 2016 Tuesday/ Wednesday/ Thursday, 07:00 PM thru 06:00 AM, 2 lanes closed, Friday July 29th, 2016 thru Saturday July 30th, 2016, 07:00 PM thru 08:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from South of Garden State Parkway - Cheesequake Service Area (Sayreville) to North of Exit 120 - Laurence Harbor (Old Bridge Twp) , Tuesday July 26th, 2016 thru Thursday July 28th, 2016 Tuesday/ Wednesday, 09:00 PM thru 06:00 AM, 2 lanes closed outer roadway
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from North of Exit 130B-A - US 1 (Woodbridge Twp) to North of Exit 129 - New Jersey Turnpike (Woodbridge Twp) , Tuesday July 26th, 2016 thru Wednesday July 27th, 2016, 09:00 PM thru 05:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from South of Exit 143A (Irvington Twp) to South of Exit 138 - CR 509 (Kenilworth) , Tuesday July 26th, 2016 thru Wednesday July 27th, 2016, 10:00 PM thru 04:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway northbound from North of Exit 144 - CR 510 (Irvington Twp) to South of Exit 149 - CR 506 (Bloomfield) , Tuesday July 26th, 2016 thru Friday July 29th, 2016 Tuesday/ Wednesday/ Thursday, 08:00 PM thru 06:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from North of Exit 82A - NJ 37 West (Toms River Twp) to South of Exit 80 - CR 530 (South Toms River) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from South of Exit 105 - NJ 36 (Tinton Falls) to South of Garden State Parkway - Monmouth Service Area (Wall Twp) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 10:00 PM thru 06:00 AM, 2 lanes closed outer roadway
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway northbound from North of Exit 114 - Red Hill Rd (Holmdel Twp) to South of Exit 116 - PNC Arts Center (Holmdel Twp) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 09:00 PM thru 05:00 AM, 2 lanes closed outer roadway
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway northbound from North of Exit 117 - NJ 36 (Aberdeen Twp) to South of Exit 120 - Laurence Harbor (Old Bridge Twp) , Monday July 25th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Thursday, 09:00 PM thru 06:00 AM, 2 lanes closed outer roadway
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from South of Garden State Parkway - Cheesequake Service Area (Sayreville) to North of Exit 120 - Laurence Harbor (Old Bridge Twp) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 09:00 PM thru 06:00 AM, 2 lanes closed outer roadway
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway northbound from Union Toll Plaza (Hillside Twp) to South of Exit 143A (Irvington Twp) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 08:00 PM thru 06:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from North of Exit 144 - CR 510 (Newark) to South of Exit 143A (Irvington Twp) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 10:00 PM thru 10:00 PM, 2 lanes closed, Thursday July 28th, 2016 thru Friday July 29th, 2016, 11:00 PM thru 06:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway southbound from South of Exit 154 - US 46 (Clifton) to North of Exit 153A - NJ 3 (Clifton) , Monday July 25th, 2016 thru Tuesday July 26th, 2016, 08:00 PM thru 06:00 AM, 2 lanes closed
scheduled roadworkscheduled roadworkGarden State Parkway NJ Turnpike Auth.: scheduled roadwork on Garden State Parkway both directions ramp to/from Exit 163 - NJ 17 (Paramus) , Monday July 18th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 11:00 PM thru 05:00 AM, all lanes closed
scheduled roadworkscheduled roadworkNew Jersey Turnpike - Hudson County Extension NJ Turnpike Auth.: scheduled roadwork on New Jersey Turnpike - Hudson County Extension both directions ramps from Interchange 14A - NJ 440/Bayonne Bridge (Bayonne) two center toll lanes closed with traffic shift around the clock for ten weeks, Continuous Friday May 20th, 2016 9:00 PM thru Friday July 29th, 2016 5:00 AM
street sweepingstreet sweepingUS 9 NJ DOT - TOC South: street sweeping on US 9 both directions between South of CR 657/Stone Harbor Blvd (Middle Twp) and North of Garden State Parkway (Upper Twp) use caution Not currently scheduled
substructure repairssubstructure repairsNJ 28 NJ DOT - STMC: emergency repairs and substructure repairs and utility work on NJ 28 both directions area of West of NJ 439 (Elizabeth) Emergency Repair of Sanitary Main, Monday July 25th, 2016 thru Tuesday July 26th, 2016, 08:00 PM thru 05:00 AM, all lanes closed and detoured
survey worksurvey workI-78 NJ DOT - STMC: survey work on I-78 westbound area of Exit 57 - US 1&9/NJ 21 (Newark) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, right shoulder closed local lanes
toll plaza repairstoll plaza repairsOuterbridge Crossing Port Authority NY/NJ: toll plaza repairs on Outerbridge Crossing eastbound at New York Side - Toll Plaza (Staten Island) closing the high speed EZ Pass lanes., Monday July 25th, 2016 thru Tuesday July 26th, 2016, 11:59 PM thru 02:00 AM,
traffic signal repairstraffic signal repairsUS 130 NJ DOT - STMC: traffic signal repairs on US 130 both directions between North of CR 615/Station Rd (Cranbury Twp) and CR 615/Station Rd (Cranbury Twp) , Continuous Monday July 18th, 2016 10:00 AM thru Monday July 25th, 2016 2:00 PM right lane closed for repairs
tree trimmingtree trimmingI-295 NJ DOT - TOC South: tree trimming on I-295 southbound Exit 52 - Columbus Rd (Mansfield Twp) , Monday July 25th, 2016 thru Thursday July 28th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 AM thru 03:00 PM, right shoulder closed
tree trimmingtree trimmingUS 206 NJ DOT - STMC: tree trimming on US 206 southbound area of NJ 24/CR 513/West Main St (Chester Twp) , Monday July 25th, 2016, 09:00 AM thru 03:00 PM, right lane closed for repairs
tree trimmingtree trimmingUS 206 NJ DOT - STMC: tree trimming on US 206 northbound NJ 24/CR 513/West Main St (Chester Twp) to South of CR 625/Bartley Chester Rd (Chester Twp) , Monday August 1st, 2016, 09:00 AM thru 03:00 PM, traffic shift
tree trimmingtree trimmingUS 206 NJ DOT - STMC: tree trimming on US 206 northbound NJ 24/CR 513/West Main St (Chester Twp) to South of CR 625/Bartley Chester Rd (Chester Twp) , Wednesday July 27th, 2016 thru Friday July 29th, 2016 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, traffic shift
tunnel repairstunnel repairsLincoln Tunnel Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel eastbound New Jersey Side - South Tube (Weehawken Twp) to New York Side - South Tube (Manhattan) , Thursday July 28th, 2016 thru Friday July 29th, 2016, 11:00 PM thru 05:00 AM, all lanes closed
tunnel repairstunnel repairsLincoln Tunnel Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel westbound New York Side - North Tube (Manhattan) to New Jersey Side - North Tube (Weehawken Twp) , Sunday July 24th, 2016 thru Tuesday July 26th, 2016 Sunday/ Monday, 11:00 PM thru 05:00 AM, all lanes closed
tunnel repairstunnel repairsHolland Tunnel Port Authority NY/NJ: tunnel repairs on Holland Tunnel eastbound New Jersey Side - South Tube (Jersey City) to New York Side - South Tube (Manhattan) , Sunday July 24th, 2016 thru Friday July 29th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, 1 lane closed for repairs
tunnel repairstunnel repairsHolland Tunnel Port Authority NY/NJ: tunnel repairs on Holland Tunnel westbound New York Side - North Tube (Manhattan) to New Jersey Side - North Tube (Jersey City) , Monday July 25th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 12:00 AM thru 05:30 AM, 1 lane closed for repairs
utility workutility workNJ 77 NJ DOT - TOC South: utility work on NJ 77 both directions South of CR 538/Elk Rd (Elk Twp) to CR 538/Elk Rd (Elk Twp) , Thursday July 21st, 2016 thru Monday July 25th, 2016 Monday/ Thursday/ Friday, 07:00 AM thru 04:00 PM, right shoulder closed
utility workutility workNJ 440 NJ DOT - STMC: utility work on NJ 440 southbound area of CR 602/Danforth Av (Jersey City) , Monday July 25th, 2016 thru Thursday July 28th, 2016 Monday/ Tuesday/ Wednesday, 09:00 PM thru 05:00 AM, right lane closed
utility workutility workUS 9 NJ DOT - TOC South: utility work on US 9 southbound South of CR 14/Hillard Blvd (Stafford Twp) , Tuesday July 26th, 2016 thru Tuesday August 2nd, 2016, Sunday thru Saturday, 09:00 AM thru 03:00 PM, right shoulder closed
utility workutility workNJ 17 NJ DOT - STMC: utility work on NJ 17 both directions North of Island Rd (Mahwah Twp) , Sunday July 24th, 2016, 08:00 AM thru 02:00 PM, right lane closed
utility workutility workUS 1 NJ DOT - TOC South: utility work on US 1 both directions South of South Broad St (Trenton) to North of Perry St (Trenton) , Continuous Thursday July 21st, 2016 2:38 PM thru Friday July 29th, 2016 11:59 PM right shoulder closed
utility workutility workNJ 31 NJ DOT - TOC South: utility work on NJ 31 both directions South of CR 636/Ewingville Rd/Upper Ferry Rd (Ewing Twp) , Wednesday July 20th, 2016 thru Friday July 29th, 2016, Monday thru Friday, 09:00 AM thru 03:00 PM, center lane closed
utility workutility workUS 1&9 NJ DOT - STMC: utility work on US 1&9 southbound in the vicinity of Shaler Blvd (Ridgefield) , Monday July 25th, 2016 thru Thursday July 28th, 2016 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closed for repairs
utility workutility workNJ 29 NJ DOT - STMC: utility work on NJ 29 both directions North of NJ 179/Bridge St/South Main St (Lambertville) , Tuesday July 26th, 2016, 09:00 AM thru 03:30 PM, alternate lanes closed
utility workutility workNJ 82 NJ DOT - STMC: utility work on NJ 82 westbound NJ 124/Maple Ave (Springfield Twp) , Thursday July 28th, 2016 thru Friday July 29th, 2016, 09:00 PM thru 05:00 AM, 2 right lanes of 4 lanes closed for repairs
water main workwater main workI-295 NJ DOT - TOC South: water main work on I-295 northbound North of Exit 62 - Olden Ave (Hamilton Twp) , Tuesday July 26th, 2016, 08:30 AM thru 04:00 PM, right shoulder closed
This page auto-refreshes every 2 minutes.
*Disclaimer: Traffic information is subject to change at any time.
+ - portions based on historical data.
Travel Times are displayed in HH:MM format.
This page auto-refreshes every 2 minutes.
[ICX1-WEB21X]