All Incidents

Sort By County
select
Search By Road
 
Checked Counties:

Incident Icon Incident Congestion Icon Congestion Construction Icon Construction Detour Icon Detour Weather Icon Weather Special Event Icon Special Event
Gas main breakGas main breakUS 206 As of 2:29am, there's Emergency construction and a Gas main break on US 206 southbound at Eggert Crossing Rd in Lawrence Twp. All lanes closed for repairs 2 way traffic on northbound roadway.
Vehicle off the roadwayVehicle off the roadwayNew Jersey Turnpike - Pennsylvania Ext. As of 1:58am, there's a Vehicle off the roadway on the New Jersey Turnpike - Pennsylvania Ext. westbound at East of Toll Plaza in Florence Twp. All lanes open to traffic.
Operational ActivityOperational ActivityGeorge Washington Bridge As of 10:15pm, there's Operational Activity on the George Washington Bridge eastbound at Palisades Interstate Parkway Toll Plaza in Fort Lee. Manned toll lanes closed from 11:00 P.M. until 6:00 A.M.
Operational ActivityOperational ActivityGeorge Washington Bridge As of 10:14pm, there's Operational Activity on the George Washington Bridge eastbound at New Jersey Side/Lower Level Toll Plaza in Fort Lee. Manned toll lanes closed from 11:00 P.M. until 6:00 A.M.
Operational ActivityOperational ActivityLincoln Tunnel As of 10:13pm, there's Operational Activity at the Lincoln Tunnel in both directions between New York Side - Center Tube in Manhattan and New Jersey Side - Center Tube in Weehawken Twp. All lanes closed from 11:00 P.M. until 5:00 A.M.
Road CollapseRoad CollapseCounty Route 519 As of 11:16pm, there's a Road Collapse on County Route 519 in both directions at CR 651 in Kingwood Twp. All lanes closed and detoured until further notice.
ConstructionConstructionUS 46 As of 5:17pm, there's Construction on US 46 in both directions between CR 503/Liberty St in South Hackensack Twp and CR 39/Teaneck Rd in Ridgefield Park. Traffic shift until 7:00 A.M. on November 30, 2015.
ConstructionConstructionNJ 139 Lower As of 5:17pm, there's Construction on NJ 139 Lower westbound between New Jersey Turnpike/NJ 139 Split and Tonnelle Avenue in Jersey City. Various lane closed for repairs until 11:59 P.M. on March 29, 2016, DAILY AM and PM LANE CLOSURES.
ConstructionConstructionUS 1&9 Truck Route As of 5:17pm, there's Construction on US 1&9 Truck Route northbound ramps to New Jersey Turnpike in Newark. Ramp closed for repairs until April 12, 2015.
ConstructionConstructionNJ 27 As of 5:16pm, there's Construction on NJ 27 in both directions from North of CR 657/North Evergreen Rd to CR 649/Wood Av in Edison Twp until 8:00 A.M. on December 01, 2014.
ConstructionConstructionNJ 18 As of 5:16pm, there's Construction on NJ 18 northbound area of New Jersey Turnpike in East Brunswick Twp. 2 through lanes open to traffic until 11:59 P.M. on December 21, 2014.
ConstructionConstructionNJ 20 As of 5:16pm, there's Construction on NJ 20 in both directions between 20th Av and 18th Av in Paterson. Left lane closed for repairs until January 15th, 2015.
ConstructionConstructionPulaski Skyway As of 5:16pm, there's Construction on Pulaski Skyway northbound between US 1&9 Truck Route/Raymond Blvd in Newark and Tonnelle Circle in Jersey City. All lanes closed and detoured until April 11, 2016.
ConstructionConstructionPulaski Skyway As of 5:16pm, there's Construction on Pulaski Skyway in both directions ramp to/from Broadway in Jersey City. Ramp closed and detoured until further notice.
ConstructionConstructionUS 30 As of 2:04pm, there's Construction on US 30 in both directions between Airport Circle/US 130/NJ 38 in Pennsauken Twp and US 130/Collingswood Circle in Collingswood. Traffic shift until 11:59 P.M. on June 30th. 2015.
ConstructionConstructionI-295 As of 12:31pm, there's Construction on I-295 in both directions from Exit 25 - NJ 47/Delsea Dr in Westville to Exit 28 - NJ 168/Black Horse Pike in Bellmawr. Traffic shift until 11:59 P.M. on December 31, 2014, use caution.
ConstructionConstructionNJ 35 As of 12:31pm, there's Construction on NJ 35 southbound in the vicinity of CR 629/Bay Blvd in Seaside Heights. Right shoulder closed until 6:00 A.M. on December 1, 2014.
ConstructionConstructionNJ 35 As of 12:31pm, there's Construction on NJ 35 northbound in the vicinity of CR 51/Holiday Rd in Toms River Twp. Right lane closed until 6:00 A.M. on December 1, 2014.
ConstructionConstructionNJ 42 As of 12:30pm, there's Construction on NJ 42 in both directions from Exit 14 - CR 753/Creek Rd to I-295 in Bellmawr. Traffic shift until 11:59 P.M. on December 31, 2014.
ConstructionConstructionI-76 As of 12:30pm, there's Construction on I-76 in both directions from Exit 1A - NJ 42/I-295 in Bellmawr to Exit 1D - US 130 in Gloucester City. Traffic shift until 11:59 P.M. on December 31, 2014, use caution.
Long term road constructionLong term road constructionBayonne Bridge As of 11:17pm, there's Long term road construction on the Bayonne Bridge in both directions between New Jersey Side in Bayonne and New York Side in Staten Island 1 lane open until November 4, 2015., There is a 25 mile per hour speed restriction in effect.
ConstructionConstructionBen Franklin Bridge As of 11:17pm, there's Construction on the Ben Franklin Bridge eastbound from Pennsylvania Side in Philadelphia to New Jersey Side in Camden 3 lanes open PM Rush Hour and all other times 2 lanes open each way. Speed limited posted at 35 miles per hour due to ongoing construction projects., Motorists are advised to consider using Walt Whitman or Betsy Ross Bridges during peak traffic periods including evening rush hours, peak shore travel times and Camden Waterfront events.
Long term road constructionLong term road constructionNY 440 As of 11:15pm, there's Long term road construction on NY 440 northbound ramp to/from Richmond Terrace in Staten Island. closed and detoured until 11:59 P.M. on November 04, 2015.
Long term road constructionLong term road constructionNY 440 As of 11:15pm, there's Long term road construction on NY 440 in both directions between Bayonne Bridge and Forest Avenue in Staten Island. 1 lane open until November 4, 2015.
ConstructionConstructionEaston-Phillipsburg Toll Bridge/US 22 As of 6:48pm, there's Construction on the Easton-Phillipsburg Toll Bridge/US 22 eastbound between Pennsylvania Side in Easton and New Jersey Side in Phillipsburg. 1 lane open until 11:59 P.M. on December 19, 2014, Taper line begins after 13th Street in Easton, Pennsylvania.
ConstructionConstructionEaston-Phillipsburg Toll Bridge/US 22 As of 6:47pm, there's Construction on the Easton-Phillipsburg Toll Bridge/US 22 westbound approaching New Jersey Side in Phillipsburg. 1 lane open until 11:59 P.M. on December 19, 2014.
This page auto-refreshes every 2 minutes.
*Disclaimer: Traffic information is subject to change at any time.
+ - portions based on historical data.
Travel Times are displayed in HH:MM format.
This page auto-refreshes every 2 minutes.
[ICX1-WEB51C]